Integration of Primavera P6 EPPM
with Oracle E-Business Suite
Prepared by:
Nikola Škorić
Planning and Scheduling Engineer
Krško Nuclear Power Plant
Session ID#: 15444
Presenter info
■ Nikola Škorić
■ Master of Computer Science (University of Zagreb, 2007)
■ Licensed reactor operator (2010)
■ Planning and Scheduling engineer (2012)
Company info
■ Krško Nuclear Power Plant
■ Joint venture of Slovenia and Croatia
■ Westinghouse built pressurized water reactor
■ First criticality reached: 1981
■ Net power output: 696 MW
Presentation overview
■ Specifics of nuclear industry
■ Outage planning
■ Motivation for this project
■ Architecture of the solution
■ Problems encountered in implementation
■ End results
■ Current status and future plans
Outage planning in nuclear
industry
Nuclear industry
■ Large power unit: 17 GWh per day
■ Outage lasts 30-40 days
▪ Large number of activities
▪ Large number of workers
▪ Small operating space (especially reactor building)
Nuclear industry
■ Nuclear fuel produces
decay heat after
shutdown
■ Nuclear safety first
■ A part of safety equipment
has to remain operable
▪ Power sources
▪ Water sources
▪ Valve lineups
Outage planning in nuclear
■ "System windows" – a timeframe in which particular system is
maintained in certain state
▪ Visual inspection of snubbers on train A
— Can be done anytime
▪ Instrumentation venting for SW01
— Has 20 predecessors
■ Work orders are placed into system windows
Outage planning in nuclear
■ "Tagout" – a safety procedure which ensures equipment or
energy source is isolated
■ Hazards:
▪ Hot water
▪ Water under pressure
▪ Electricity
▪ Mechanical forces
■ Tagouts are "placed on" SWs, WOs or operations
▪ Tags have to be hanged before SW/WO/OP starts
Outage planning in NEK
Outage planning in NEK
■ 35 days
■ 850 system windows
■ 1,000 tagouts
■ 5,000 work orders
■ 15,000 operations
■ ∑: 23,000 activities
■ 2 Primavera specialists
Outage planning in NEK
■ Pre 2011
▪ WOs written in in-house built Work Order System
▪ Everything scheduled in Primavera
■ 2011 – transition to Oracle eBS
■ Post 2011
▪ WOs written and scheduled in eAM (eBS module)
▪ SWs scheduled in Primavera
Outage planning in NEK
1. Oracle Primavera P6 Professional (P6)
▪ Only desktop app, web app unusably slow
2. Oracle E-Business Suite (eBS)
▪ Enterprise Asset Management (eAM)
3. Ventyx Shift Operations Management System (eSOMS)
▪ Clearance Module
4. Shift Supervisor Screen (SSS)
▪ In-house built
Outage planning in NEK
Source Approving Start/stop Status Scheduling
Backbone activity P6 N/A SSS SSS P6
System window P6 N/A P6 SSS P6
Tagout eSOMS eSOMS eSOMS eSOMS custom
Work order eAM SSS eAM SSS eAM*
Operation eAM N/A eAM eAM eAM
Resource eAM N/A eAM N/A N/A
* taking into account SWs in P6
Problems with outage planning
in NEK
Problems
1. Shift supervisor does not have a single overview of the plant
status
▪ Shift supervisor uses 3 different tools
2. Critical path is obfuscated
▪ Only SWs are in Primavera
▪ WOs and operations are in eAM
▪ Tagouts are in eSOMS
3. Detailed planning not possible
▪ No way for linking WOs, operations and tagouts
4. Tagouts planned by custom built tool
5. WOs planned by suboptimal tool
▪ eAM planning capabilities leave a lot to be desired
Problems
6. WO predecessors scattered across tools
▪ Are all predecessors finished?
7. Planning of operations almost nonexistent
8. Planning of some activities impossible
9. No resource planning
■ Out of sync with industry standards
Problems
■ INPO 06-008 »Guidelines for the Conduct of Outages at
Nuclear Power Plants«
▪ Level I: backbone schedule
▪ Level II: activities into schedule to develop system windows,
resource estimates and logic ties for major activities
▪ Level III: resource leveling, logic ties refined
▪ Level IV: cross-discipline horizontal and vertical reviews
Proposed solution
Solution
Source Approving Start/stop Status Scheduling
Backbone activity P6 N/A P6 P6 P6
System window P6 N/A P6 P6 P6
Tagout eSOMS eSOMS eSOMS P6 P6
Work order eAM SSS eAM P6 P6
Operation eAM N/A eAM P6 P6
Resource eAM N/A eAM P6 P6
Existing eAM / P6 integration
■ eAM supports export to P6 format
▪ offline
— must be run manually, cannot be automated easily
▪ not customizable
— no control over what gets exported and in what format
▪ does not work for large projects
— OK for 500 activities
— NEK refueling outage has over 20,000 activities
Solution
eAM This project P6Outside world
eAM P6WOs
Schedule
P6eAM
planned
dates
eAM P6actual
dates
WO
authors
workers
Solution
■ New WOs eAM→P6
▪ WOs fall on data date
▪ Makes sense only just
before scheduling
■ Planned dates P6→eAM
▪ Change only on
scheduling
▪ Makes sense only just
after scheduling
eAM This project P6
eAM P6WOs
Schedule
P6eAM planned
dates
Solution
■ As frequent as possible
■ We chose 15 minutes
eAM This project P6
eAM P6actual
dates
Implementation of the solution
The team
■ Nikola Škorić
▪ NEK, project lead
■ Luka Novosel
▪ Primakon Zagreb
■ Andrej Zalar
▪ OSIR Ljubljana
■ Dušan Urbič
▪ OSIR Ljubljana
■ Simon Jurečič
▪ OSIR Ljubljana
Primavera eAM
Implementation
■ eAM: Oracle RDBMS
■ P6: Oracle RDBMS
■ Preparing output from eAM: PL/SQL
■ Reading from eAM and writing to P6: Java
■ Reading from P6 and writing to eAM: PL/SQL
Implementation
This project
PL/SQL Java
PL/SQL
PL/SQL Java
eAM P6WOs
Schedule
P6eAM planned
dates
eAM P6
actual
dates
Implementation
■ Java
▪ 7,000 lines of code
▪ 36 classes
▪ 700 commits to git repository
■ PL/SQL
▪ 13,000 lines of code
▪ 3 packages
▪ 100 commits to svn repository
Part 1: transfer of work orders
from eAM to P6
Transfer of work orders
eAM This project P6
eAM P6WOs
Schedule
Data sources
■ Dates
▪ Master: P6
▪ Slave: eAM
■ All other data
▪ Master: eAM
▪ Slave: P6
■ „Limitation“: data in P6 cannot be modified
Data sources
Operation
Waiting
WO Planner
Waiting
Work Week
Manager
Waiting
Shift Supervisor
Waiting
WO Coordinator
Approved for work
Work finished
WO coordinator
Work finished
Shift Supervisor
Draft
Completed
Working
Finished
Data sources
Imported to Primavera
Operation
Waiting
WO Planner
Waiting
Work Week
Manager
Waiting
Shift Supervisor
Waiting
WO Coordinator
Approved for work
Work finished
WO coordinator
Work finished
Shift Supervisor
Draft
Completed
Working
Finished
Data representation
Activity ID Activity Name Activity type Activity code
NNNNN Description from eAM Level of Effort D
NNNNN-Z Start of WO NNNNN Start Milestone ZD
NNNNN-OOO Description from eAM Task Dependent O
NNNNN-K End of WO NNNNN Finish Milestone KD
Activity ID Activity Name Activity type Activity code
OASWNN000Z Start of system window NN Start Milestone Z
OASWNN000K End of system window NN Finish Milestone K
Data representation – work order
Data representation – system window
Data transferred – work orders
EAM P6
P6 project ID P6 project ID
System window Link from SW activity to WO activity + AC + UDF
Work order ID Part of activity ID + UDF
Asset Part of activity name + UDF
Description Part of activity name + UDF
Calendar 24/7
Start Constraint on start milestone
Duration Planned duration
WO type AC
ORAM codes ACs
Plant system AC
Safety train AC
Location UDF
Department AC
WO Planner UDF
Work Coordinator UDF
HTTP link to eAM WO Notebook
Data transferred – operations
EAM P6
P6 project ID P6 project ID
System window AC + UDF
Work order ID Link from WO activity to WO activity + AC
Operation ID Part of activity ID + UDF
Description Activity name
Long description UDF
Calendar Calendar
Duration Planned duration
Links Links
Resources/Instances Roles/Resources
Department AC
Tagging required AC
Reference WO UDF
Data transferred – roles / resources
EAM P6
Operation Assignment to operation
Resource ID Role ID
Instance ID Resource ID
Resource sequence number UDF
Duration Original duration
Required Budgeted units
Assigned units Budgeted units / time
Lag Lag
Data not transferred
■ Planned start
▪ Work orders
— Set as „start on or after“ constraint on WO start milestone
▪ Operations
— Calculated by P6 from predecessor relationships
▪ Roles/resources
— Calculated by P6 from parent activity + lag
■ Planned finish
▪ Calculated by P6 from planned start and planned duration
Cancelled/deleted WOs
■ If WO loses status – removed from P6
■ If WO is deleted from eAM – problem
■ If WO is changes project – problem
Part 2: transfer of planned dates
from P6 to eAM
Solution
eAM This project P6Outside world
eAM P6WOs
Schedule
P6eAM
planned
dates
eAM P6actual
dates
WO
authors
workers
Transfer of work orders
eAM This project P6
Schedule
P6eAM planned
dates
Data transferred
■ for each work order
▪ planned start (from P6) → start (in eAM)
▪ planned finish (from P6) → finish (in eAM)
■ for each operation
▪ planned start (from P6) → start (in eAM)
▪ planned finish (from P6) → finish (in eAM)
Part 3: transfer of actual dates
from eAM to P6
Solution
eAM This project P6Outside world
eAM P6WOs
Schedule
P6eAM
planned
dates
eAM P6actual
dates
WO
authors
workers
Transfer of actual dates
eAM This project P6
eAM P6
actual
dates
Data sources
■ Master: eAM
■ Slave: P6
Data transferred – work orders and
operations
P6 EAM status of WO Moment
NNNNN actual start
NNNNN-Z actual start
Approved for work WO Coordinator starts WO
NNNNN actual finish
NNNNN-K actual finish
Work finished WO COOR WO Coordinator ends WO
P6 EAM status of WO Moment
NNNNN-OOO actual start Working First Line Supervisor starts OP
NNNNN-OOO actual finish Finished First Line Supervisor ends OP
Data transferred – work orders
Operation
Waiting
WO Planner
Waiting
Work Week
Manager
Waiting
Shift Supervisor
Waiting
WO Coordinator
Approved for work
Work finished
WO coordinator
Work finished
Shift Supervisor
Draft
Completed
Working
Finished
Data transferred – operations
Operation
Waiting
WO Planner
Waiting
Work Week
Manager
Waiting
Shift Supervisor
Waiting
WO Coordinator
Approved for work
Work finished
WO coordinator
Work finished
Shift Supervisor
Draft
Completed
Working
Finished
Data transferred – resources
■ None for now
■ Resource actuals are:
▪ A complicated issue
▪ Of questionable demand
Testing
Testing
■ Development workflow:
1. Implement solution
2. Run the program
3. Check if data was transferred correctly
■ Checking:
▪ Manual
▪ Automated
Testing
■ SQL view to P6 database
■ SQL view to eAM database
■ Comparison of:
1. WOs
2. operations
3. roles/resources
■ Very robust testing tool
Implementation issues
Implementation issues
■ Deleted and moved work orders
■ Activity type for work order
■ Linking of tagouts to work orders
■ Calendars
■ Time resolution difference
■ 0 time interpretation difference
■ Resource durations and units
■ Performance problems
■ Reference operations actuals
Issues: Deleted and moved work orders
Imported to Primavera
Operation
Waiting
WO Planner
Waiting
Work Week
Manager
Waiting
Shift Supervisor
Waiting
WO Coordinator
Approved for work
Work finished
WO coordinator
Work finished
Shift Supervisor
Draft
Completed
Working
Finished
Issues: Deleted and moved work orders
■ First choice: work order has to be reset to „draft“ status
▪ Program detects WOs in wrong status for that project and
removes them from P6
■ In practice: WO planners are fast
▪ They change WO‘s project (to next outage)
▪ Or they delete WO from eAM
■ Consequence: program does not find WO with wrong status
▪ WO stays in P6
■ Solution: manually remove WO from P6
▪ Administrative solution, albeit effective one
■ Future solution: fully compare eAM and P6
▪ Problem: not a trivial algorithm
Issues: Activity type for work order
■ First choice: task dependent
▪ Relationship loops
▪ Does not adapt to changes in operation duration
■ Second choice: dedicated script
▪ Unpractical, has to be run every time operation duration
changes
▪ Duplicating Primavera features
■ Solution: level of effort
▪ Requires milestones to avoid loops
▪ Cannot be linked to
— Relationships define duration of LoE activity
— Serious drawback
Issues: Linking of tagouts to work orders
■ For each tagout eSOMS:
1. Takes a list of activity IDs
2. Creates hang/remove activities
3. Creates relationships
Issues: Linking of tagouts to work orders
■ First choice: task dependent WOs
▪ Unacceptable
■ WOs have to be level of effort
▪ Relationships should point to milestones
▪ eSOMS doesn't know how to do that
■ Solution: no tagouts on WOs
▪ Tagouts placed only on SWs and operations
■ Future solution: implement our own eSOMS integration
▪ Our implementation will link to milestones
Issues: Calendars
■ eAM has only 24/7 calendar
▪ Planning unrealistic
■ First choice: only 24/7 in P6
▪ Easy solution
▪ Planning unrealistic, defeats the purpose
■ Solution: implementing calendars in eAM
▪ Allows for detailed planning
▪ Considerable effort
Issues: Time resolution difference
■ eAM has support for fraction of a second
■ P6 has support for minutes
■ NEK plans in hours
■ First choice: transfer data as is
▪ P6 migrates to planning seconds
■ Second choice: round eAM times to hours during transfer to
P6
▪ different data in eAM in P6
▪ testing impossible
■ Solution: redesign eAM to accept only hours
Issues: 0 time interpretation difference
Issues: 0 time interpretation difference
■ If:
▪ Last operation in work order has duration 0, and
▪ Operation before that ends on last second of the work day
■ Then
▪ P6 schedules it for start of the next work day (i.e. 7 AM)
▪ eAM schedules it for end of previous work day (i.e. 3 PM)
■ Consequence
▪ 16 hour discrepancy between P6 and eAM
■ Solution: none
▪ We adjusted all of our programs to ignore that issue
Issues: Resource durations and units
■ Primavera: duration * units / time = units
▪ Strictly enforced
■ eAM: whatever
▪ In practice, every planner has his own interpretation
■ First choice: Write eAM data to P6 and hope for the best
▪ Didn‘t work
■ Solution: ignore the problem
▪ We do not analyze/optimize resources (yet)
▪ Most practical solution given time constraints
■ Future solution: teach eAM the P6 way
▪ The right thing to do
▪ A major change to eAM
Issues: Performance problems
■ First choice: iterate through all WOs changed since last run
▪ We relied on eAM‘s internal „last change“ timestamp
▪ WO “changed” every time planned start/finish was changed
— That is: on every reschedule
■ Every run lasted for 2.5 hours
■ Solution: use testing engine to find differences
▪ heavily optimized to take as little time as possible
Issues: Reference operations actuals
■ Reference operation – placeholder operation for another work
order
▪ Administratively belongs to parent WO
▪ In practice belongs to some other SW
■ First choice: do not import them to P6
▪ What if RO has several predecessors/successors
■ Second choice: make it a milestone (duration: 0h)
▪ Gives the wrong impression (nothing lasts 0h)
■ Third choice: start when predecessors end, end when
successor starts
▪ What if the only successor is RO? Deadlock!
Issues: Reference operations actuals
Has ordinary
predecessor
Has reference
predecessor
Condition for start Date of start
Yes Yes All ordinary
predecessors finished
End of last ordinary
predecessor
Yes No All ordinary
predecessors finished
End of last ordinary
predecessor
No Yes All reference
predecessors finished
End of last reference
predecessor
No No Work order started Start of work order
■ Solution for actual start of reference operation
Changes to eAM
■ eAM had limited support for operation linking
▪ Implemented operation linking
■ eAM had only one calendar: 24/7
▪ Implemented multiple calendars
■ eAM had support for planning up to a second
▪ Restricted dates to hours
■ eAM Gantt charts had minimal resolution of 1 day
▪ Implemented Gantt charts with 1 minute resolution
End results
End result
End result
End result
End result
Current status and future plans
Current status
■ Integration operational for
▪ refueling outage
▪ forced outage
▪ online operation
■ Currently we are
▪ Refactoring code
▪ Documenting code
▪ Writing unit tests
▪ Packaging code to run as eAM module
Future plans
■ Custom P6/eSOMS integration tool
▪ linking tagouts to WOs
▪ resources calculation
▪ conflict check and optimization
■ Better support for roles/resources
▪ better eAM resource support
▪ resource actuals
■ Opening the project for others to use?
Thank you
■ Thank you for your attention!
■ Email: nikola.skoric@nek.si
■ LinkedIn: linkedin.com/in/nskoric
Please complete the session
evaluation
We appreciate your feedback and insight
You may complete the session evaluation either
on paper or online via the mobile app

Weitere ähnliche Inhalte

Was ist angesagt?

Oracle ERP Cloud Period Close White Paper
Oracle ERP Cloud Period Close White PaperOracle ERP Cloud Period Close White Paper
Oracle ERP Cloud Period Close White PaperGhouseBatlapadu
 
Rapid implementation Spreadsheets in Oracle ERP Cloud
Rapid implementation Spreadsheets in Oracle ERP CloudRapid implementation Spreadsheets in Oracle ERP Cloud
Rapid implementation Spreadsheets in Oracle ERP CloudPrithis Das, PMP, OCS ☁️
 
5 enterprise structures
5   enterprise structures5   enterprise structures
5 enterprise structuresmohamed refaei
 
Enabling independent teams by creating decoupled data flows
Enabling independent teams by creating decoupled data flowsEnabling independent teams by creating decoupled data flows
Enabling independent teams by creating decoupled data flowsconfluent
 
How to auto create trip in oracle order management
How to auto create trip in oracle order managementHow to auto create trip in oracle order management
How to auto create trip in oracle order managementshravan kumar chelika
 
Understanding Multi-Org Structure in Oracle Apps
Understanding Multi-Org Structure in Oracle AppsUnderstanding Multi-Org Structure in Oracle Apps
Understanding Multi-Org Structure in Oracle AppsBaker Khader Abdallah, PMP
 
Oracle Project Financial Management Cloud in 9 Weeks
Oracle Project Financial Management Cloud in 9 WeeksOracle Project Financial Management Cloud in 9 Weeks
Oracle Project Financial Management Cloud in 9 WeeksPerficient, Inc.
 
How to Create Expense Report in Oracle Fusion (002).pdf
How to Create Expense Report in Oracle Fusion (002).pdfHow to Create Expense Report in Oracle Fusion (002).pdf
How to Create Expense Report in Oracle Fusion (002).pdfSakunthala N V
 
Encumbrance accounting in oracle ebs r12
Encumbrance accounting in oracle ebs r12Encumbrance accounting in oracle ebs r12
Encumbrance accounting in oracle ebs r12Sam Elrashedy
 
Oracle PPM Cloud Deployment, Made Easy
Oracle PPM Cloud Deployment, Made EasyOracle PPM Cloud Deployment, Made Easy
Oracle PPM Cloud Deployment, Made EasyMatthew Bezuidenhout
 
OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713]
OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713]OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713]
OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713]vasuballa
 
Oracle Fusion Applications Accounts Payables
Oracle Fusion Applications Accounts PayablesOracle Fusion Applications Accounts Payables
Oracle Fusion Applications Accounts PayablesBerry Clemens
 
oracle ebs free web service integration tools
oracle ebs free web service integration toolsoracle ebs free web service integration tools
oracle ebs free web service integration toolsSmartDog Services
 
Oracle R12 – Multiple Organization Setup Steps
Oracle R12 – Multiple Organization Setup StepsOracle R12 – Multiple Organization Setup Steps
Oracle R12 – Multiple Organization Setup StepsBoopathy CS
 

Was ist angesagt? (20)

Oracle ERP Cloud Period Close White Paper
Oracle ERP Cloud Period Close White PaperOracle ERP Cloud Period Close White Paper
Oracle ERP Cloud Period Close White Paper
 
Oracle R12 Legal Entity
Oracle R12 Legal EntityOracle R12 Legal Entity
Oracle R12 Legal Entity
 
Rapid implementation Spreadsheets in Oracle ERP Cloud
Rapid implementation Spreadsheets in Oracle ERP CloudRapid implementation Spreadsheets in Oracle ERP Cloud
Rapid implementation Spreadsheets in Oracle ERP Cloud
 
5 enterprise structures
5   enterprise structures5   enterprise structures
5 enterprise structures
 
Enabling independent teams by creating decoupled data flows
Enabling independent teams by creating decoupled data flowsEnabling independent teams by creating decoupled data flows
Enabling independent teams by creating decoupled data flows
 
How to auto create trip in oracle order management
How to auto create trip in oracle order managementHow to auto create trip in oracle order management
How to auto create trip in oracle order management
 
How to create PO with ASN
How to create PO with ASNHow to create PO with ASN
How to create PO with ASN
 
Oracle Fusion Financial Report Centre Reporting Beginner course
Oracle Fusion Financial Report Centre Reporting Beginner courseOracle Fusion Financial Report Centre Reporting Beginner course
Oracle Fusion Financial Report Centre Reporting Beginner course
 
Understanding Multi-Org Structure in Oracle Apps
Understanding Multi-Org Structure in Oracle AppsUnderstanding Multi-Org Structure in Oracle Apps
Understanding Multi-Org Structure in Oracle Apps
 
Oracle Project Financial Management Cloud in 9 Weeks
Oracle Project Financial Management Cloud in 9 WeeksOracle Project Financial Management Cloud in 9 Weeks
Oracle Project Financial Management Cloud in 9 Weeks
 
How to Create Expense Report in Oracle Fusion (002).pdf
How to Create Expense Report in Oracle Fusion (002).pdfHow to Create Expense Report in Oracle Fusion (002).pdf
How to Create Expense Report in Oracle Fusion (002).pdf
 
Encumbrance accounting in oracle ebs r12
Encumbrance accounting in oracle ebs r12Encumbrance accounting in oracle ebs r12
Encumbrance accounting in oracle ebs r12
 
Oracle PPM Cloud Deployment, Made Easy
Oracle PPM Cloud Deployment, Made EasyOracle PPM Cloud Deployment, Made Easy
Oracle PPM Cloud Deployment, Made Easy
 
OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713]
OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713]OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713]
OOW16 - Testing Oracle E-Business Suite Best Practices [CON6713]
 
Oracle Fusion Applications Accounts Payables
Oracle Fusion Applications Accounts PayablesOracle Fusion Applications Accounts Payables
Oracle Fusion Applications Accounts Payables
 
oracle ebs free web service integration tools
oracle ebs free web service integration toolsoracle ebs free web service integration tools
oracle ebs free web service integration tools
 
Oracle receivables
Oracle receivablesOracle receivables
Oracle receivables
 
R12 Fixed Assets General Questions
R12 Fixed Assets General QuestionsR12 Fixed Assets General Questions
R12 Fixed Assets General Questions
 
E-Business Tax Purchasing Whitepaper
E-Business Tax Purchasing WhitepaperE-Business Tax Purchasing Whitepaper
E-Business Tax Purchasing Whitepaper
 
Oracle R12 – Multiple Organization Setup Steps
Oracle R12 – Multiple Organization Setup StepsOracle R12 – Multiple Organization Setup Steps
Oracle R12 – Multiple Organization Setup Steps
 

Andere mochten auch

Integrating primavera p6 with oracle erp which technology path is right for...
Integrating primavera p6 with oracle erp   which technology path is right for...Integrating primavera p6 with oracle erp   which technology path is right for...
Integrating primavera p6 with oracle erp which technology path is right for...p6academy
 
Primavera AIA Integration with PIPs
Primavera AIA Integration with PIPsPrimavera AIA Integration with PIPs
Primavera AIA Integration with PIPsMark Kromer
 
Successfully Manage Cost and Schedule with Primavera Unifier and Primavera P6
Successfully Manage Cost and Schedule with Primavera Unifier and Primavera P6Successfully Manage Cost and Schedule with Primavera Unifier and Primavera P6
Successfully Manage Cost and Schedule with Primavera Unifier and Primavera P6p6academy
 
P6 analytics producing meaningful results in P6 analytics - Oracle Primavera...
P6 analytics producing meaningful results in P6 analytics  - Oracle Primavera...P6 analytics producing meaningful results in P6 analytics  - Oracle Primavera...
P6 analytics producing meaningful results in P6 analytics - Oracle Primavera...p6academy
 
WCRUG 2013 - Procurity Keep Their JDE "On the Go" with Clean Data and Improve...
WCRUG 2013 - Procurity Keep Their JDE "On the Go" with Clean Data and Improve...WCRUG 2013 - Procurity Keep Their JDE "On the Go" with Clean Data and Improve...
WCRUG 2013 - Procurity Keep Their JDE "On the Go" with Clean Data and Improve...TeamCain
 
IoT & JD Edwards (Oracle jde summit paris 10-12-2015 session fonctionnelle)
IoT & JD Edwards (Oracle jde summit paris   10-12-2015   session fonctionnelle) IoT & JD Edwards (Oracle jde summit paris   10-12-2015   session fonctionnelle)
IoT & JD Edwards (Oracle jde summit paris 10-12-2015 session fonctionnelle) Yohann GARCIA
 
A JDE Hat Trick – 3 Ways to Extend your JDE and Get Great Efficiencies
A JDE Hat Trick – 3 Ways to Extend your JDE and Get Great EfficienciesA JDE Hat Trick – 3 Ways to Extend your JDE and Get Great Efficiencies
A JDE Hat Trick – 3 Ways to Extend your JDE and Get Great EfficienciesTeamCain
 
Bi publisher for jde
Bi publisher for jdeBi publisher for jde
Bi publisher for jdenihitha19
 
Webinar: The Secret Sauce to a Widely Successful JD Edwards World to JD Edwar...
Webinar: The Secret Sauce to a Widely Successful JD Edwards World to JD Edwar...Webinar: The Secret Sauce to a Widely Successful JD Edwards World to JD Edwar...
Webinar: The Secret Sauce to a Widely Successful JD Edwards World to JD Edwar...KPIT
 
Jde world to e1 v9 upgrade v2
Jde world to e1 v9 upgrade   v2Jde world to e1 v9 upgrade   v2
Jde world to e1 v9 upgrade v2InSync Conference
 
Oracle primavera p6 and ebs projects where do they meet ppt
Oracle primavera p6 and ebs projects   where do they meet pptOracle primavera p6 and ebs projects   where do they meet ppt
Oracle primavera p6 and ebs projects where do they meet pptp6academy
 
Primavera integration possibilities Technical overview - Oracle Primavera Col...
Primavera integration possibilities Technical overview - Oracle Primavera Col...Primavera integration possibilities Technical overview - Oracle Primavera Col...
Primavera integration possibilities Technical overview - Oracle Primavera Col...p6academy
 
Webinar Presentation: Validation of “next-gen" in-Vehicle Displays.
Webinar Presentation: Validation of “next-gen" in-Vehicle Displays.Webinar Presentation: Validation of “next-gen" in-Vehicle Displays.
Webinar Presentation: Validation of “next-gen" in-Vehicle Displays.KPIT
 
Primavera integration possibilities technical overview ppt
Primavera integration possibilities   technical overview pptPrimavera integration possibilities   technical overview ppt
Primavera integration possibilities technical overview pptp6academy
 
Primavera manual tutorial book
Primavera manual tutorial bookPrimavera manual tutorial book
Primavera manual tutorial bookThomas Britto
 
Developer & Fusion Middleware 1 _ Advait Waghmare _ Integrate your 3PL with J...
Developer & Fusion Middleware 1 _ Advait Waghmare _ Integrate your 3PL with J...Developer & Fusion Middleware 1 _ Advait Waghmare _ Integrate your 3PL with J...
Developer & Fusion Middleware 1 _ Advait Waghmare _ Integrate your 3PL with J...InSync2011
 
IVI Software Update - Challenges and Strategies - Webinar Presentation
IVI Software Update - Challenges and Strategies - Webinar PresentationIVI Software Update - Challenges and Strategies - Webinar Presentation
IVI Software Update - Challenges and Strategies - Webinar PresentationKPIT
 
JDE & Peoplesoft 1 | John Schiff | JD Edwards Go9.pdf
JDE & Peoplesoft 1 | John Schiff | JD Edwards Go9.pdfJDE & Peoplesoft 1 | John Schiff | JD Edwards Go9.pdf
JDE & Peoplesoft 1 | John Schiff | JD Edwards Go9.pdfInSync2011
 
KPIT Supplier Portal for JDEdwards Enterprise One
KPIT Supplier Portal for JDEdwards Enterprise One KPIT Supplier Portal for JDEdwards Enterprise One
KPIT Supplier Portal for JDEdwards Enterprise One KPIT
 

Andere mochten auch (20)

Integrating primavera p6 with oracle erp which technology path is right for...
Integrating primavera p6 with oracle erp   which technology path is right for...Integrating primavera p6 with oracle erp   which technology path is right for...
Integrating primavera p6 with oracle erp which technology path is right for...
 
Primavera AIA Integration with PIPs
Primavera AIA Integration with PIPsPrimavera AIA Integration with PIPs
Primavera AIA Integration with PIPs
 
Successfully Manage Cost and Schedule with Primavera Unifier and Primavera P6
Successfully Manage Cost and Schedule with Primavera Unifier and Primavera P6Successfully Manage Cost and Schedule with Primavera Unifier and Primavera P6
Successfully Manage Cost and Schedule with Primavera Unifier and Primavera P6
 
P6 analytics producing meaningful results in P6 analytics - Oracle Primavera...
P6 analytics producing meaningful results in P6 analytics  - Oracle Primavera...P6 analytics producing meaningful results in P6 analytics  - Oracle Primavera...
P6 analytics producing meaningful results in P6 analytics - Oracle Primavera...
 
WCRUG 2013 - Procurity Keep Their JDE "On the Go" with Clean Data and Improve...
WCRUG 2013 - Procurity Keep Their JDE "On the Go" with Clean Data and Improve...WCRUG 2013 - Procurity Keep Their JDE "On the Go" with Clean Data and Improve...
WCRUG 2013 - Procurity Keep Their JDE "On the Go" with Clean Data and Improve...
 
IoT & JD Edwards (Oracle jde summit paris 10-12-2015 session fonctionnelle)
IoT & JD Edwards (Oracle jde summit paris   10-12-2015   session fonctionnelle) IoT & JD Edwards (Oracle jde summit paris   10-12-2015   session fonctionnelle)
IoT & JD Edwards (Oracle jde summit paris 10-12-2015 session fonctionnelle)
 
JDE Projects Month End Course - Work Orders
JDE Projects Month End Course - Work OrdersJDE Projects Month End Course - Work Orders
JDE Projects Month End Course - Work Orders
 
A JDE Hat Trick – 3 Ways to Extend your JDE and Get Great Efficiencies
A JDE Hat Trick – 3 Ways to Extend your JDE and Get Great EfficienciesA JDE Hat Trick – 3 Ways to Extend your JDE and Get Great Efficiencies
A JDE Hat Trick – 3 Ways to Extend your JDE and Get Great Efficiencies
 
Bi publisher for jde
Bi publisher for jdeBi publisher for jde
Bi publisher for jde
 
Webinar: The Secret Sauce to a Widely Successful JD Edwards World to JD Edwar...
Webinar: The Secret Sauce to a Widely Successful JD Edwards World to JD Edwar...Webinar: The Secret Sauce to a Widely Successful JD Edwards World to JD Edwar...
Webinar: The Secret Sauce to a Widely Successful JD Edwards World to JD Edwar...
 
Jde world to e1 v9 upgrade v2
Jde world to e1 v9 upgrade   v2Jde world to e1 v9 upgrade   v2
Jde world to e1 v9 upgrade v2
 
Oracle primavera p6 and ebs projects where do they meet ppt
Oracle primavera p6 and ebs projects   where do they meet pptOracle primavera p6 and ebs projects   where do they meet ppt
Oracle primavera p6 and ebs projects where do they meet ppt
 
Primavera integration possibilities Technical overview - Oracle Primavera Col...
Primavera integration possibilities Technical overview - Oracle Primavera Col...Primavera integration possibilities Technical overview - Oracle Primavera Col...
Primavera integration possibilities Technical overview - Oracle Primavera Col...
 
Webinar Presentation: Validation of “next-gen" in-Vehicle Displays.
Webinar Presentation: Validation of “next-gen" in-Vehicle Displays.Webinar Presentation: Validation of “next-gen" in-Vehicle Displays.
Webinar Presentation: Validation of “next-gen" in-Vehicle Displays.
 
Primavera integration possibilities technical overview ppt
Primavera integration possibilities   technical overview pptPrimavera integration possibilities   technical overview ppt
Primavera integration possibilities technical overview ppt
 
Primavera manual tutorial book
Primavera manual tutorial bookPrimavera manual tutorial book
Primavera manual tutorial book
 
Developer & Fusion Middleware 1 _ Advait Waghmare _ Integrate your 3PL with J...
Developer & Fusion Middleware 1 _ Advait Waghmare _ Integrate your 3PL with J...Developer & Fusion Middleware 1 _ Advait Waghmare _ Integrate your 3PL with J...
Developer & Fusion Middleware 1 _ Advait Waghmare _ Integrate your 3PL with J...
 
IVI Software Update - Challenges and Strategies - Webinar Presentation
IVI Software Update - Challenges and Strategies - Webinar PresentationIVI Software Update - Challenges and Strategies - Webinar Presentation
IVI Software Update - Challenges and Strategies - Webinar Presentation
 
JDE & Peoplesoft 1 | John Schiff | JD Edwards Go9.pdf
JDE & Peoplesoft 1 | John Schiff | JD Edwards Go9.pdfJDE & Peoplesoft 1 | John Schiff | JD Edwards Go9.pdf
JDE & Peoplesoft 1 | John Schiff | JD Edwards Go9.pdf
 
KPIT Supplier Portal for JDEdwards Enterprise One
KPIT Supplier Portal for JDEdwards Enterprise One KPIT Supplier Portal for JDEdwards Enterprise One
KPIT Supplier Portal for JDEdwards Enterprise One
 

Ähnlich wie Integration of primavera p6 eppm with oracle e business suite - Oracle Primavera P6 Collaborate 14

Project archive what to do with those projects that have completed or place...
Project archive   what to do with those projects that have completed or place...Project archive   what to do with those projects that have completed or place...
Project archive what to do with those projects that have completed or place...p6academy
 
Oracle Primavera P6 r8.2 and CM14 on Exa platform using oracle Fusion Middlew...
Oracle Primavera P6 r8.2 and CM14 on Exa platform using oracle Fusion Middlew...Oracle Primavera P6 r8.2 and CM14 on Exa platform using oracle Fusion Middlew...
Oracle Primavera P6 r8.2 and CM14 on Exa platform using oracle Fusion Middlew...p6academy
 
P6 as cost management system - Oracle Primavera P6 Collaborate 14
P6 as cost management system - Oracle Primavera P6 Collaborate 14P6 as cost management system - Oracle Primavera P6 Collaborate 14
P6 as cost management system - Oracle Primavera P6 Collaborate 14p6academy
 
Managing What If Scenarios for Unconventional Oil & Gas
Managing What If Scenarios for Unconventional Oil & GasManaging What If Scenarios for Unconventional Oil & Gas
Managing What If Scenarios for Unconventional Oil & Gasp6academy
 
Maintaining the full primavera suite at a large construction company
Maintaining the full primavera suite at a large construction companyMaintaining the full primavera suite at a large construction company
Maintaining the full primavera suite at a large construction companyp6academy
 
Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Co...
Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Co...Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Co...
Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Co...p6academy
 
Oracle SPM 12c. IOUG #C15LV
Oracle SPM 12c. IOUG #C15LVOracle SPM 12c. IOUG #C15LV
Oracle SPM 12c. IOUG #C15LVAlfredo Krieg
 
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14p6academy
 
Dashboard / Digest / Compliance reporting of key performance, quality and oth...
Dashboard / Digest / Compliance reporting of key performance, quality and oth...Dashboard / Digest / Compliance reporting of key performance, quality and oth...
Dashboard / Digest / Compliance reporting of key performance, quality and oth...p6academy
 
C15LV: Ins and Outs of Concurrent Processing Configuration in Oracle e-Busine...
C15LV: Ins and Outs of Concurrent Processing Configuration in Oracle e-Busine...C15LV: Ins and Outs of Concurrent Processing Configuration in Oracle e-Busine...
C15LV: Ins and Outs of Concurrent Processing Configuration in Oracle e-Busine...Maris Elsins
 
Rego University: Integrating MSP with CA PPM (CA Clarity PPM)
Rego University: Integrating MSP with CA PPM (CA Clarity PPM)Rego University: Integrating MSP with CA PPM (CA Clarity PPM)
Rego University: Integrating MSP with CA PPM (CA Clarity PPM)Rego Consulting
 
SEC591_Business Impact Analysis_PROJ
SEC591_Business Impact Analysis_PROJSEC591_Business Impact Analysis_PROJ
SEC591_Business Impact Analysis_PROJJames Dawkins
 
Primavera P6 Tips and Tricks
Primavera P6 Tips and TricksPrimavera P6 Tips and Tricks
Primavera P6 Tips and Tricksp6academy
 
LVOUG meetup #4 - Case Study 10g to 11g
LVOUG meetup #4 - Case Study 10g to 11gLVOUG meetup #4 - Case Study 10g to 11g
LVOUG meetup #4 - Case Study 10g to 11gMaris Elsins
 
The Primavera suite how the tools work together - Oracle Primavera Collabor...
The Primavera suite   how the tools work together - Oracle Primavera Collabor...The Primavera suite   how the tools work together - Oracle Primavera Collabor...
The Primavera suite how the tools work together - Oracle Primavera Collabor...p6academy
 
Data flow between p6 and cm ppt
Data flow between p6 and cm pptData flow between p6 and cm ppt
Data flow between p6 and cm pptp6academy
 
Using primavera analytics across multiple remote site locations - Oracle Prim...
Using primavera analytics across multiple remote site locations - Oracle Prim...Using primavera analytics across multiple remote site locations - Oracle Prim...
Using primavera analytics across multiple remote site locations - Oracle Prim...p6academy
 
Using primavera analytics across multiple remote site locations - Oracle Prim...
Using primavera analytics across multiple remote site locations - Oracle Prim...Using primavera analytics across multiple remote site locations - Oracle Prim...
Using primavera analytics across multiple remote site locations - Oracle Prim...p6academy
 
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...p6academy
 
Collaborate 15 Session ID 100810 Tue Apr 14 15 FMI Upgrade Strat and JDE Roll...
Collaborate 15 Session ID 100810 Tue Apr 14 15 FMI Upgrade Strat and JDE Roll...Collaborate 15 Session ID 100810 Tue Apr 14 15 FMI Upgrade Strat and JDE Roll...
Collaborate 15 Session ID 100810 Tue Apr 14 15 FMI Upgrade Strat and JDE Roll...Melissa Penfield
 

Ähnlich wie Integration of primavera p6 eppm with oracle e business suite - Oracle Primavera P6 Collaborate 14 (20)

Project archive what to do with those projects that have completed or place...
Project archive   what to do with those projects that have completed or place...Project archive   what to do with those projects that have completed or place...
Project archive what to do with those projects that have completed or place...
 
Oracle Primavera P6 r8.2 and CM14 on Exa platform using oracle Fusion Middlew...
Oracle Primavera P6 r8.2 and CM14 on Exa platform using oracle Fusion Middlew...Oracle Primavera P6 r8.2 and CM14 on Exa platform using oracle Fusion Middlew...
Oracle Primavera P6 r8.2 and CM14 on Exa platform using oracle Fusion Middlew...
 
P6 as cost management system - Oracle Primavera P6 Collaborate 14
P6 as cost management system - Oracle Primavera P6 Collaborate 14P6 as cost management system - Oracle Primavera P6 Collaborate 14
P6 as cost management system - Oracle Primavera P6 Collaborate 14
 
Managing What If Scenarios for Unconventional Oil & Gas
Managing What If Scenarios for Unconventional Oil & GasManaging What If Scenarios for Unconventional Oil & Gas
Managing What If Scenarios for Unconventional Oil & Gas
 
Maintaining the full primavera suite at a large construction company
Maintaining the full primavera suite at a large construction companyMaintaining the full primavera suite at a large construction company
Maintaining the full primavera suite at a large construction company
 
Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Co...
Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Co...Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Co...
Implementation review eppm p6 8.2 at a major utility - Oracle Primavera P6 Co...
 
Oracle SPM 12c. IOUG #C15LV
Oracle SPM 12c. IOUG #C15LVOracle SPM 12c. IOUG #C15LV
Oracle SPM 12c. IOUG #C15LV
 
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
 
Dashboard / Digest / Compliance reporting of key performance, quality and oth...
Dashboard / Digest / Compliance reporting of key performance, quality and oth...Dashboard / Digest / Compliance reporting of key performance, quality and oth...
Dashboard / Digest / Compliance reporting of key performance, quality and oth...
 
C15LV: Ins and Outs of Concurrent Processing Configuration in Oracle e-Busine...
C15LV: Ins and Outs of Concurrent Processing Configuration in Oracle e-Busine...C15LV: Ins and Outs of Concurrent Processing Configuration in Oracle e-Busine...
C15LV: Ins and Outs of Concurrent Processing Configuration in Oracle e-Busine...
 
Rego University: Integrating MSP with CA PPM (CA Clarity PPM)
Rego University: Integrating MSP with CA PPM (CA Clarity PPM)Rego University: Integrating MSP with CA PPM (CA Clarity PPM)
Rego University: Integrating MSP with CA PPM (CA Clarity PPM)
 
SEC591_Business Impact Analysis_PROJ
SEC591_Business Impact Analysis_PROJSEC591_Business Impact Analysis_PROJ
SEC591_Business Impact Analysis_PROJ
 
Primavera P6 Tips and Tricks
Primavera P6 Tips and TricksPrimavera P6 Tips and Tricks
Primavera P6 Tips and Tricks
 
LVOUG meetup #4 - Case Study 10g to 11g
LVOUG meetup #4 - Case Study 10g to 11gLVOUG meetup #4 - Case Study 10g to 11g
LVOUG meetup #4 - Case Study 10g to 11g
 
The Primavera suite how the tools work together - Oracle Primavera Collabor...
The Primavera suite   how the tools work together - Oracle Primavera Collabor...The Primavera suite   how the tools work together - Oracle Primavera Collabor...
The Primavera suite how the tools work together - Oracle Primavera Collabor...
 
Data flow between p6 and cm ppt
Data flow between p6 and cm pptData flow between p6 and cm ppt
Data flow between p6 and cm ppt
 
Using primavera analytics across multiple remote site locations - Oracle Prim...
Using primavera analytics across multiple remote site locations - Oracle Prim...Using primavera analytics across multiple remote site locations - Oracle Prim...
Using primavera analytics across multiple remote site locations - Oracle Prim...
 
Using primavera analytics across multiple remote site locations - Oracle Prim...
Using primavera analytics across multiple remote site locations - Oracle Prim...Using primavera analytics across multiple remote site locations - Oracle Prim...
Using primavera analytics across multiple remote site locations - Oracle Prim...
 
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
 
Collaborate 15 Session ID 100810 Tue Apr 14 15 FMI Upgrade Strat and JDE Roll...
Collaborate 15 Session ID 100810 Tue Apr 14 15 FMI Upgrade Strat and JDE Roll...Collaborate 15 Session ID 100810 Tue Apr 14 15 FMI Upgrade Strat and JDE Roll...
Collaborate 15 Session ID 100810 Tue Apr 14 15 FMI Upgrade Strat and JDE Roll...
 

Mehr von p6academy

Oracle OpenWorld 2015
Oracle OpenWorld 2015Oracle OpenWorld 2015
Oracle OpenWorld 2015p6academy
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordablyp6academy
 
What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1p6academy
 
Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2p6academy
 
Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2p6academy
 
What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1p6academy
 
What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1p6academy
 
What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1p6academy
 
What's New in Unifier 16.1
What's New in Unifier 16.1What's New in Unifier 16.1
What's New in Unifier 16.1p6academy
 
20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktopp6academy
 
Oracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 AnnouncedOracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 Announcedp6academy
 
Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1p6academy
 
P6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations OverviewP6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations Overviewp6academy
 
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM  (Web) Release 8 and laterAdministering Users, Access and Views in P6 EPPM  (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and laterp6academy
 
P6 Release 8 Installation Orientation
P6 Release 8 Installation OrientationP6 Release 8 Installation Orientation
P6 Release 8 Installation Orientationp6academy
 
Oracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value PropositionOracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value Propositionp6academy
 
Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition p6academy
 
Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)p6academy
 
Oracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study GuideOracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study Guidep6academy
 
Oracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study GuideOracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study Guidep6academy
 

Mehr von p6academy (20)

Oracle OpenWorld 2015
Oracle OpenWorld 2015Oracle OpenWorld 2015
Oracle OpenWorld 2015
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordably
 
What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1
 
Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2
 
Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2
 
What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1
 
What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1
 
What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1
 
What's New in Unifier 16.1
What's New in Unifier 16.1What's New in Unifier 16.1
What's New in Unifier 16.1
 
20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop
 
Oracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 AnnouncedOracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 Announced
 
Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1
 
P6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations OverviewP6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations Overview
 
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM  (Web) Release 8 and laterAdministering Users, Access and Views in P6 EPPM  (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
 
P6 Release 8 Installation Orientation
P6 Release 8 Installation OrientationP6 Release 8 Installation Orientation
P6 Release 8 Installation Orientation
 
Oracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value PropositionOracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value Proposition
 
Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition
 
Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)
 
Oracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study GuideOracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study Guide
 
Oracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study GuideOracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study Guide
 

Kürzlich hochgeladen

BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLWhitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceDamini Dixit
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...lizamodels9
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876dlhescort
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 

Kürzlich hochgeladen (20)

BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLWhitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 

Integration of primavera p6 eppm with oracle e business suite - Oracle Primavera P6 Collaborate 14

  • 1. REMINDER Check in on the COLLABORATE mobile app Integration of Primavera P6 EPPM with Oracle E-Business Suite Prepared by: Nikola Škorić Planning and Scheduling Engineer Krško Nuclear Power Plant Session ID#: 15444
  • 2. Presenter info ■ Nikola Škorić ■ Master of Computer Science (University of Zagreb, 2007) ■ Licensed reactor operator (2010) ■ Planning and Scheduling engineer (2012)
  • 3. Company info ■ Krško Nuclear Power Plant ■ Joint venture of Slovenia and Croatia ■ Westinghouse built pressurized water reactor ■ First criticality reached: 1981 ■ Net power output: 696 MW
  • 4. Presentation overview ■ Specifics of nuclear industry ■ Outage planning ■ Motivation for this project ■ Architecture of the solution ■ Problems encountered in implementation ■ End results ■ Current status and future plans
  • 5. Outage planning in nuclear industry
  • 6. Nuclear industry ■ Large power unit: 17 GWh per day ■ Outage lasts 30-40 days ▪ Large number of activities ▪ Large number of workers ▪ Small operating space (especially reactor building)
  • 7. Nuclear industry ■ Nuclear fuel produces decay heat after shutdown ■ Nuclear safety first ■ A part of safety equipment has to remain operable ▪ Power sources ▪ Water sources ▪ Valve lineups
  • 8. Outage planning in nuclear ■ "System windows" – a timeframe in which particular system is maintained in certain state ▪ Visual inspection of snubbers on train A — Can be done anytime ▪ Instrumentation venting for SW01 — Has 20 predecessors ■ Work orders are placed into system windows
  • 9. Outage planning in nuclear ■ "Tagout" – a safety procedure which ensures equipment or energy source is isolated ■ Hazards: ▪ Hot water ▪ Water under pressure ▪ Electricity ▪ Mechanical forces ■ Tagouts are "placed on" SWs, WOs or operations ▪ Tags have to be hanged before SW/WO/OP starts
  • 11. Outage planning in NEK ■ 35 days ■ 850 system windows ■ 1,000 tagouts ■ 5,000 work orders ■ 15,000 operations ■ ∑: 23,000 activities ■ 2 Primavera specialists
  • 12. Outage planning in NEK ■ Pre 2011 ▪ WOs written in in-house built Work Order System ▪ Everything scheduled in Primavera ■ 2011 – transition to Oracle eBS ■ Post 2011 ▪ WOs written and scheduled in eAM (eBS module) ▪ SWs scheduled in Primavera
  • 13. Outage planning in NEK 1. Oracle Primavera P6 Professional (P6) ▪ Only desktop app, web app unusably slow 2. Oracle E-Business Suite (eBS) ▪ Enterprise Asset Management (eAM) 3. Ventyx Shift Operations Management System (eSOMS) ▪ Clearance Module 4. Shift Supervisor Screen (SSS) ▪ In-house built
  • 14. Outage planning in NEK Source Approving Start/stop Status Scheduling Backbone activity P6 N/A SSS SSS P6 System window P6 N/A P6 SSS P6 Tagout eSOMS eSOMS eSOMS eSOMS custom Work order eAM SSS eAM SSS eAM* Operation eAM N/A eAM eAM eAM Resource eAM N/A eAM N/A N/A * taking into account SWs in P6
  • 15. Problems with outage planning in NEK
  • 16. Problems 1. Shift supervisor does not have a single overview of the plant status ▪ Shift supervisor uses 3 different tools 2. Critical path is obfuscated ▪ Only SWs are in Primavera ▪ WOs and operations are in eAM ▪ Tagouts are in eSOMS 3. Detailed planning not possible ▪ No way for linking WOs, operations and tagouts 4. Tagouts planned by custom built tool 5. WOs planned by suboptimal tool ▪ eAM planning capabilities leave a lot to be desired
  • 17. Problems 6. WO predecessors scattered across tools ▪ Are all predecessors finished? 7. Planning of operations almost nonexistent 8. Planning of some activities impossible 9. No resource planning ■ Out of sync with industry standards
  • 18. Problems ■ INPO 06-008 »Guidelines for the Conduct of Outages at Nuclear Power Plants« ▪ Level I: backbone schedule ▪ Level II: activities into schedule to develop system windows, resource estimates and logic ties for major activities ▪ Level III: resource leveling, logic ties refined ▪ Level IV: cross-discipline horizontal and vertical reviews
  • 20. Solution Source Approving Start/stop Status Scheduling Backbone activity P6 N/A P6 P6 P6 System window P6 N/A P6 P6 P6 Tagout eSOMS eSOMS eSOMS P6 P6 Work order eAM SSS eAM P6 P6 Operation eAM N/A eAM P6 P6 Resource eAM N/A eAM P6 P6
  • 21. Existing eAM / P6 integration ■ eAM supports export to P6 format ▪ offline — must be run manually, cannot be automated easily ▪ not customizable — no control over what gets exported and in what format ▪ does not work for large projects — OK for 500 activities — NEK refueling outage has over 20,000 activities
  • 22. Solution eAM This project P6Outside world eAM P6WOs Schedule P6eAM planned dates eAM P6actual dates WO authors workers
  • 23. Solution ■ New WOs eAM→P6 ▪ WOs fall on data date ▪ Makes sense only just before scheduling ■ Planned dates P6→eAM ▪ Change only on scheduling ▪ Makes sense only just after scheduling eAM This project P6 eAM P6WOs Schedule P6eAM planned dates
  • 24. Solution ■ As frequent as possible ■ We chose 15 minutes eAM This project P6 eAM P6actual dates
  • 26. The team ■ Nikola Škorić ▪ NEK, project lead ■ Luka Novosel ▪ Primakon Zagreb ■ Andrej Zalar ▪ OSIR Ljubljana ■ Dušan Urbič ▪ OSIR Ljubljana ■ Simon Jurečič ▪ OSIR Ljubljana Primavera eAM
  • 27. Implementation ■ eAM: Oracle RDBMS ■ P6: Oracle RDBMS ■ Preparing output from eAM: PL/SQL ■ Reading from eAM and writing to P6: Java ■ Reading from P6 and writing to eAM: PL/SQL
  • 28. Implementation This project PL/SQL Java PL/SQL PL/SQL Java eAM P6WOs Schedule P6eAM planned dates eAM P6 actual dates
  • 29. Implementation ■ Java ▪ 7,000 lines of code ▪ 36 classes ▪ 700 commits to git repository ■ PL/SQL ▪ 13,000 lines of code ▪ 3 packages ▪ 100 commits to svn repository
  • 30. Part 1: transfer of work orders from eAM to P6
  • 31. Transfer of work orders eAM This project P6 eAM P6WOs Schedule
  • 32. Data sources ■ Dates ▪ Master: P6 ▪ Slave: eAM ■ All other data ▪ Master: eAM ▪ Slave: P6 ■ „Limitation“: data in P6 cannot be modified
  • 33. Data sources Operation Waiting WO Planner Waiting Work Week Manager Waiting Shift Supervisor Waiting WO Coordinator Approved for work Work finished WO coordinator Work finished Shift Supervisor Draft Completed Working Finished
  • 34. Data sources Imported to Primavera Operation Waiting WO Planner Waiting Work Week Manager Waiting Shift Supervisor Waiting WO Coordinator Approved for work Work finished WO coordinator Work finished Shift Supervisor Draft Completed Working Finished
  • 35. Data representation Activity ID Activity Name Activity type Activity code NNNNN Description from eAM Level of Effort D NNNNN-Z Start of WO NNNNN Start Milestone ZD NNNNN-OOO Description from eAM Task Dependent O NNNNN-K End of WO NNNNN Finish Milestone KD Activity ID Activity Name Activity type Activity code OASWNN000Z Start of system window NN Start Milestone Z OASWNN000K End of system window NN Finish Milestone K
  • 37. Data representation – system window
  • 38. Data transferred – work orders EAM P6 P6 project ID P6 project ID System window Link from SW activity to WO activity + AC + UDF Work order ID Part of activity ID + UDF Asset Part of activity name + UDF Description Part of activity name + UDF Calendar 24/7 Start Constraint on start milestone Duration Planned duration WO type AC ORAM codes ACs Plant system AC Safety train AC Location UDF Department AC WO Planner UDF Work Coordinator UDF HTTP link to eAM WO Notebook
  • 39. Data transferred – operations EAM P6 P6 project ID P6 project ID System window AC + UDF Work order ID Link from WO activity to WO activity + AC Operation ID Part of activity ID + UDF Description Activity name Long description UDF Calendar Calendar Duration Planned duration Links Links Resources/Instances Roles/Resources Department AC Tagging required AC Reference WO UDF
  • 40. Data transferred – roles / resources EAM P6 Operation Assignment to operation Resource ID Role ID Instance ID Resource ID Resource sequence number UDF Duration Original duration Required Budgeted units Assigned units Budgeted units / time Lag Lag
  • 41. Data not transferred ■ Planned start ▪ Work orders — Set as „start on or after“ constraint on WO start milestone ▪ Operations — Calculated by P6 from predecessor relationships ▪ Roles/resources — Calculated by P6 from parent activity + lag ■ Planned finish ▪ Calculated by P6 from planned start and planned duration
  • 42. Cancelled/deleted WOs ■ If WO loses status – removed from P6 ■ If WO is deleted from eAM – problem ■ If WO is changes project – problem
  • 43. Part 2: transfer of planned dates from P6 to eAM
  • 44. Solution eAM This project P6Outside world eAM P6WOs Schedule P6eAM planned dates eAM P6actual dates WO authors workers
  • 45. Transfer of work orders eAM This project P6 Schedule P6eAM planned dates
  • 46. Data transferred ■ for each work order ▪ planned start (from P6) → start (in eAM) ▪ planned finish (from P6) → finish (in eAM) ■ for each operation ▪ planned start (from P6) → start (in eAM) ▪ planned finish (from P6) → finish (in eAM)
  • 47. Part 3: transfer of actual dates from eAM to P6
  • 48. Solution eAM This project P6Outside world eAM P6WOs Schedule P6eAM planned dates eAM P6actual dates WO authors workers
  • 49. Transfer of actual dates eAM This project P6 eAM P6 actual dates
  • 50. Data sources ■ Master: eAM ■ Slave: P6
  • 51. Data transferred – work orders and operations P6 EAM status of WO Moment NNNNN actual start NNNNN-Z actual start Approved for work WO Coordinator starts WO NNNNN actual finish NNNNN-K actual finish Work finished WO COOR WO Coordinator ends WO P6 EAM status of WO Moment NNNNN-OOO actual start Working First Line Supervisor starts OP NNNNN-OOO actual finish Finished First Line Supervisor ends OP
  • 52. Data transferred – work orders Operation Waiting WO Planner Waiting Work Week Manager Waiting Shift Supervisor Waiting WO Coordinator Approved for work Work finished WO coordinator Work finished Shift Supervisor Draft Completed Working Finished
  • 53. Data transferred – operations Operation Waiting WO Planner Waiting Work Week Manager Waiting Shift Supervisor Waiting WO Coordinator Approved for work Work finished WO coordinator Work finished Shift Supervisor Draft Completed Working Finished
  • 54. Data transferred – resources ■ None for now ■ Resource actuals are: ▪ A complicated issue ▪ Of questionable demand
  • 56. Testing ■ Development workflow: 1. Implement solution 2. Run the program 3. Check if data was transferred correctly ■ Checking: ▪ Manual ▪ Automated
  • 57. Testing ■ SQL view to P6 database ■ SQL view to eAM database ■ Comparison of: 1. WOs 2. operations 3. roles/resources ■ Very robust testing tool
  • 59. Implementation issues ■ Deleted and moved work orders ■ Activity type for work order ■ Linking of tagouts to work orders ■ Calendars ■ Time resolution difference ■ 0 time interpretation difference ■ Resource durations and units ■ Performance problems ■ Reference operations actuals
  • 60. Issues: Deleted and moved work orders Imported to Primavera Operation Waiting WO Planner Waiting Work Week Manager Waiting Shift Supervisor Waiting WO Coordinator Approved for work Work finished WO coordinator Work finished Shift Supervisor Draft Completed Working Finished
  • 61. Issues: Deleted and moved work orders ■ First choice: work order has to be reset to „draft“ status ▪ Program detects WOs in wrong status for that project and removes them from P6 ■ In practice: WO planners are fast ▪ They change WO‘s project (to next outage) ▪ Or they delete WO from eAM ■ Consequence: program does not find WO with wrong status ▪ WO stays in P6 ■ Solution: manually remove WO from P6 ▪ Administrative solution, albeit effective one ■ Future solution: fully compare eAM and P6 ▪ Problem: not a trivial algorithm
  • 62. Issues: Activity type for work order ■ First choice: task dependent ▪ Relationship loops ▪ Does not adapt to changes in operation duration ■ Second choice: dedicated script ▪ Unpractical, has to be run every time operation duration changes ▪ Duplicating Primavera features ■ Solution: level of effort ▪ Requires milestones to avoid loops ▪ Cannot be linked to — Relationships define duration of LoE activity — Serious drawback
  • 63. Issues: Linking of tagouts to work orders ■ For each tagout eSOMS: 1. Takes a list of activity IDs 2. Creates hang/remove activities 3. Creates relationships
  • 64. Issues: Linking of tagouts to work orders ■ First choice: task dependent WOs ▪ Unacceptable ■ WOs have to be level of effort ▪ Relationships should point to milestones ▪ eSOMS doesn't know how to do that ■ Solution: no tagouts on WOs ▪ Tagouts placed only on SWs and operations ■ Future solution: implement our own eSOMS integration ▪ Our implementation will link to milestones
  • 65. Issues: Calendars ■ eAM has only 24/7 calendar ▪ Planning unrealistic ■ First choice: only 24/7 in P6 ▪ Easy solution ▪ Planning unrealistic, defeats the purpose ■ Solution: implementing calendars in eAM ▪ Allows for detailed planning ▪ Considerable effort
  • 66. Issues: Time resolution difference ■ eAM has support for fraction of a second ■ P6 has support for minutes ■ NEK plans in hours ■ First choice: transfer data as is ▪ P6 migrates to planning seconds ■ Second choice: round eAM times to hours during transfer to P6 ▪ different data in eAM in P6 ▪ testing impossible ■ Solution: redesign eAM to accept only hours
  • 67. Issues: 0 time interpretation difference
  • 68. Issues: 0 time interpretation difference ■ If: ▪ Last operation in work order has duration 0, and ▪ Operation before that ends on last second of the work day ■ Then ▪ P6 schedules it for start of the next work day (i.e. 7 AM) ▪ eAM schedules it for end of previous work day (i.e. 3 PM) ■ Consequence ▪ 16 hour discrepancy between P6 and eAM ■ Solution: none ▪ We adjusted all of our programs to ignore that issue
  • 69. Issues: Resource durations and units ■ Primavera: duration * units / time = units ▪ Strictly enforced ■ eAM: whatever ▪ In practice, every planner has his own interpretation ■ First choice: Write eAM data to P6 and hope for the best ▪ Didn‘t work ■ Solution: ignore the problem ▪ We do not analyze/optimize resources (yet) ▪ Most practical solution given time constraints ■ Future solution: teach eAM the P6 way ▪ The right thing to do ▪ A major change to eAM
  • 70. Issues: Performance problems ■ First choice: iterate through all WOs changed since last run ▪ We relied on eAM‘s internal „last change“ timestamp ▪ WO “changed” every time planned start/finish was changed — That is: on every reschedule ■ Every run lasted for 2.5 hours ■ Solution: use testing engine to find differences ▪ heavily optimized to take as little time as possible
  • 71. Issues: Reference operations actuals ■ Reference operation – placeholder operation for another work order ▪ Administratively belongs to parent WO ▪ In practice belongs to some other SW ■ First choice: do not import them to P6 ▪ What if RO has several predecessors/successors ■ Second choice: make it a milestone (duration: 0h) ▪ Gives the wrong impression (nothing lasts 0h) ■ Third choice: start when predecessors end, end when successor starts ▪ What if the only successor is RO? Deadlock!
  • 72. Issues: Reference operations actuals Has ordinary predecessor Has reference predecessor Condition for start Date of start Yes Yes All ordinary predecessors finished End of last ordinary predecessor Yes No All ordinary predecessors finished End of last ordinary predecessor No Yes All reference predecessors finished End of last reference predecessor No No Work order started Start of work order ■ Solution for actual start of reference operation
  • 73. Changes to eAM ■ eAM had limited support for operation linking ▪ Implemented operation linking ■ eAM had only one calendar: 24/7 ▪ Implemented multiple calendars ■ eAM had support for planning up to a second ▪ Restricted dates to hours ■ eAM Gantt charts had minimal resolution of 1 day ▪ Implemented Gantt charts with 1 minute resolution
  • 79. Current status and future plans
  • 80. Current status ■ Integration operational for ▪ refueling outage ▪ forced outage ▪ online operation ■ Currently we are ▪ Refactoring code ▪ Documenting code ▪ Writing unit tests ▪ Packaging code to run as eAM module
  • 81. Future plans ■ Custom P6/eSOMS integration tool ▪ linking tagouts to WOs ▪ resources calculation ▪ conflict check and optimization ■ Better support for roles/resources ▪ better eAM resource support ▪ resource actuals ■ Opening the project for others to use?
  • 82. Thank you ■ Thank you for your attention! ■ Email: nikola.skoric@nek.si ■ LinkedIn: linkedin.com/in/nskoric
  • 83. Please complete the session evaluation We appreciate your feedback and insight You may complete the session evaluation either on paper or online via the mobile app