7. Project Manager (Perm-way works). July 2007 – November 2009
Implementation of the following activities:
Earth Movement: 550.000 m3.
Double track using Iberian gauge with a total length of 27.500m.
Track ballast spread (167.000 m3), placement of sleepers “MR” and
“PR”, placement of track, securing, heavy tamper, welding and rail
de-stress.
Installing a total of 28 crossovers and railroad switches.
14. Construction Manager. December 2005 – June 2007
Typology of the tunnels (Cut & Cover, total length of 3.600 m):
Concrete pile walls (diameters from 800 to 1500, depth up to 22m). In
total 120.000 ml were performed.
Upper slab on supporting heads and lower reinforced slab.
Shotcreting of pile walls.
Typology of the bridges:
Pk 0+500, Single steel box girder bridge of 96m length, central span
48m.
Pergola pk 6+100, two openings of 14 and 12 beams of 21m length
each beam.
4 curved post-tensioned slabs of 1,20m at the edge y 27 m of length.
Footbridge between Pozuelo and the University of Somosaguas.
21. Site Manager. June 2004 – November 2005
Work’s description:
Drainage system of 370 m length with a stretch of 135 m jackable and
diameter of 2500mm.
Three connecting chambers.
Roundabout renovation.
Overflow and sand trap chambers
28. Construction Manager. May 2002 – May 2004
Typology of the bridges:
Foundations: footings over drive piles or on land.
Circular pillars of 1,5m diameter with height up to 15 m.
Superstructure formed by pre-fabricated beams and solid slab
Two of the bridges are extensions of the existing ones at the San Pedro
Sula highway – Puerto Cortés