TRANSIT HUB
Site Analysis
Naina Deshmukh
Class of 2010
Acharya’s NRV School of Architecture
CONTENTS
Sl.
No.
Title Page no.
1 Morphology 1
2 Zoning 5
3 Location 7
4 The Proposed site 8
5 Site features 9
6 Accessibility 10
7 Surrounding 12
8 Administration 13
9 Vehicular traffic 14
10 Traffic density 16
11 Noise analysis 16
12 Climate 17
13 Summary of climatic data 17
14 Wind data 18
15 Sun path 19
16 Analysis of climatic data 19
17
Topography, Vegetation and
drainage
20
18 Summary 21
19 References 22
The name "Bangalore" represents an anglicised version of the Kannada
language name, "Bengaḷūru“. The earliest reference to the name "Bengaluru" was
found in a 9th century Western Ganga Dynasty stone inscription on a "vīra gallu" (a
rock edict extolling the virtues of a warrior). In this inscription found in Begur,
"Bengaluru" is referred to as a place in which a battle was fought in 890 CE. It states
that the place was part of the Ganga Kingdom until 1004 and was known as
"Bengaval-uru", the "City of Guards“ in Halegannada (Old Kannada).
1791
 This map was prepared on 22nd March, 1791 by Lord
Cornwallis.
 Comprised of today’s Avenue Road, Chickpet and
surrounding areas.
 The town was enclosed by thick hedges or bushes, and
a strong fort adjoining it at the south part.
 The Peta was the actual city within walls.
 It is now called the old city area.
 Tipu Sultan was then the ruler.
 Lord Cornwallis attacked and successfully captured
Bangalore and its fort.
 The British made Srirangapatna their military base,
after the whole of Mysore came under their control.
 Since Bangalore had a better climate, they moved the
military base to Bangalore in 1809.
1876
 The City’s governance changed hands between its
founding in 1537 and 1831, when the British took
over the city’s administration.
 In 1809, the Cantonment was established by the
British which resulted in building administration and
residential areas for British Military.
 1881, saw roads named after military conventions
- Infantry road, Brigade road and Artillery road.
 In 1893, the plague broke out, and a ‘Plague Camp’
was created in the south of Richmond Town.
 Around 1900s, the present day Malleshwaram and
Basavangudi also formed.
MORPHOLOGY
1889
 In 1889 a Committee was constituted for the development of City ‘extensions’ to meet
the demands of a growing population. During the first quarter of the 20thcentury a
number of newly planned development 'extensions' were developed with regular roads,
open spaces and provisions for civic amenities (e.g. Fraser Town, Richmond Town,
Sankarapuram and Viveswarapuram).
1924
• The Dharmambudi tank is now Majestic Bus
stand, the Sampangi Tank is now Kanteerva
Stadium and Challaghatta lake is now the
Golf Course.
• Domlur and Kormangala were not a part of
the city, but were tiny villages.
1945
 However, there was no comprehensive
approach for guiding the growth of the City
in an integrated manner. As a result irregular
developments occurred in between these
extension areas. To deal with this situation, the City Improvement Trust was constituted
in 1945 under special statute (Bangalore City Improvement Trust Board Act, 1945).
1949
 In 1949 the two cities were merged and the establishment of a number of key industries
stimulated growth that resulted in an unprecedented 5.10 lakhs to 9.91 lakhs population
increase during the 1941-51 inter-censal period. In an attempt to cope with this rapid
growth, a Committee was set up by the Government of Karnataka in 1952 to draw up a
Development Plan, including broad land use proposals. But, in the main, the proposals
were not implemented as there was no legal backing to enforce the Plan.
To address this Government constituted the Bangalore Metropolitan Planning Board
to prepare a Master Plan for the metropolitan region with the assistance of the State Town
Planning Department. The result was the Outline Development Plan (ODP) for the Bangalore
Metropolitan Region. This Plan was adopted by the Planning Authority constituted under the
Karnataka Town and Country Planning Act , 1961 and was finally approved by the
Government in 1972.
This Plan represented the first step towards a Development Plan for Bangalore. It
was prepared for a period of 15 years (1961-76) and covered an area of 500 sq. kilometre s. of
which 220 sq. kilometres, was proposed for 'compact development' and designated as the
Conurbation Area. The remaining 280 sq. kilometres outside the Conurbation Area, was
earmarked as a green belt. The ODP remained in force until 1984. Well beyond its plan
period. By this time it outlived its utility and the City had grown beyond the Conurbation Area
and encroached the green belt. The delay in preparing a Comprehensive Development Plan to
timely supersede the OOP resulted n large scale unauthorised development.
MORPHOLOGY
BDA
 To counter multiplicity of authority Government constituted the Bangalore Development
Authority (BDA), in 1976 under the statute of The Bangalore Development Authority Act,
1976 to amalgamate the duties of the Bangalore City Planning Authority and the City
Improvement Trust Board and thereby combining the functions relating to plan
preparation, enforcement and implementation under one agency.
 Thus, the BDA became not only the Planning Authority for the Bangalore Metropolitan
Area but also a development agency.
 An early task of the BDA was to prepare the Comprehensive Development Plan (CDP),
to supplant the outdated GOP. But, it took nearly eight years to prepare this Plan and
have it approved by the State Government.
 The CDP had a planning time horizon of 15 years (1986-2001) and a target population
of 7.0 million. The designated planning area was extended from 500 sq. Kilometres to
1,279 sq. kilometres.
BMRDA
 In an attempt to deal with these new but burgeoning urban problems, the Government in
1985 constituted the Bangalore Metropolitan Region Development Authority (BMRDA)
by an Act of Legislature.
BBMP
 BBMP was formed in 2007, by amalgamating the erstwhile Bangalore Mahanagara
Palike (BMP), surrounding eight smaller urban local bodies and 110 villages.
 BBMP now spans over an area of 800 sq km.
2013
 In 2013, it is not surprising to see significant changes in the configuration of the city.
The changes have been driven by the social and economic forces at work in Bangalore.
 The growth of Bangalore as a city for employment has brought large scale migration
and with it changes in land use patterns.
 An obvious change in the city’s land use is the elimination of nearly all water bodies.
Dharmambudi tank is the present day’s Kempegowda (Majestic) bus stand where as
Sampangi tank is the Kanteerava stadium.
 Numerous lakes have been drained or left to die for use as residential or industrial
areas. Agricultural land has been converted into apartment and shopping complexes.
MORPHOLOGY
Area of Bangalore
Source of water
High ground:
 The waters coming off the two sides of Bangalore ridge
flow initially through a series of tanks.
 They eventually reach the Bay of Bengal.
 In the late 1800s, this divide was overcome at a
place called High Ground.
MORPHOLOGY
YEAR AREA (SQ. KM.)
1949 69
1963-64 112
1969 134
1979 161
1995 226
2006 696
2013 741
Bangalore city has developed spatially in a concentric manner:
 The first zone
 comprises the erstwhile city corporation area of 226 sq. km.
 The second zone
 includes the areas of the former 8 neighboring municipal councils and 111 villages,
which together form the peri-urban areas and are now incorporated into the Greater
Bangalore City Corporation.
 The third zone
 includes other villages extending up to the Bangalore Metropolitan Area limits as
proposed by BDA.
ZONING
There are five major zones that are observed in the present land usage
pattern:
Zone 1
The core area consists of traditional business areas, administrative centre and the
central Business district.
Zone 2
The peri-central area, has old residential areas planned around the core area.
Zone 3
The Recent extensions of the city (past 3–5 years) flanking both sides of the outer ring
road.
Zone 4
The new layouts, in the periphery of the city, with small vacant lands & agricultural
lands.
Zone 5
The Green belt and agricultural area, in the city’s outskirts including small villages.
ZONING
 13.66° N, 77.56° E
 On Bangalore – Tumkur highway
 Bangalore, Karnataka – 560 058
LOCATION
 Area of site 1 = 42367 sq. m
 Area of site 2 = 32906 sq. m
 Total area = 71,414.4 sq. m or 17.51 acres
 Space standards for various buildings/uses:
 Parking requirements for various uses:
THE PROPOSED SITE
Min. road width in m Min. size of plot in sq. m
Game centers, multiplex 18 2000
Office buildings ( C3 and above) 12 300
One car parking of 2.5m x 5.5m each for
every
Retail Business ( shops, Shopping
complexes, Malls, etc)
50 sq. m of floor area
Office buildings (Govt/Semi-Govt.&
Pvt)
50 sq. m of floor area
 Floor – Area Ratio:
Areas which fall within 150m radius from the metro terminals shall be eligible
for a maximum FAR of 4 for all permissible uses, irrespective of the FAR applicable
for the respective uses in the respective tables.
SITE FEATURES
 NH 4 passes through the site.
 Can be accessed by
 BMTC buses
 KSRTC buses
 Bangalore metro
 Private buses, cabs, auto rickshaws
 Private vehicles
 No dedicated lanes for bicycles, buses.
NH 4
 Main roads
 four lanes
 Service roads
 on either sides of the highway
 two lanes
 Express way
 elevated
 double lane
 from Goreguntepalya to Nelamangala
 Bangalore metro station
 on the western side of the highway at Jalahalli cross
Jalahalli cross
 Junction disperses traffic towards
 Tumkur, Peenya, Jalahalli, Yeshwantpur
 Traffic density
 heavy
 Pedestrian facilities
 no skywalks, subways
 zebra crossing at the junction
 Delay in traffic flow
 heavy traffic density and haphazard movement of pedestrians
 Major users
 BMTC buses, inter state buses, heavy transport vehicles
ACCESSIBILITY
 From various transport terminals in the city: (map 1)
ACCESSIBILITY
Destination Distance in km
Travel Time in
minutes
A Jalahalli cross - -
B Bangalore city railway station 11.2 28
C Kempegowda bus station 11.3 30
D MG road 14.8 40
E Shivajinagar bus depot 13.2 35
F Cantonment railway station 11.9 30
G Bangalore international airport 34.8 50
Peenya
 established in late 1970s
 industrial area
 houses small, medium, and large scale industries.
 known for engineering, electrical goods
 Wipro Technologies, Kirloskar Group, ABB, Bharat Fritz Werner have their factories at
Peenya.
Yeshwantpur
 industrial-cum-residential area
 TTMC, BMTC depot 8, 26
 APMC yard, biggest wholesale market of agricultural produce in the region
 Columbia Asia hospital
 Metro cash and carry, Orion mall, Taj Vivanta
Jalahalli
 green belt of coconut grove and eucalyptus plantations
 surrounded by large government organizations which started just after independence
 BEL institutes, Cluny Convent School, Kendriya Vidyalaya, Jalahalli Public School,
Mother Teresa Public School, St. Claret School & College, Air Force Technical College,
Sree Ayyappa Education Centre
 Rockline Mall
 major industrial areas like Bharat Electronics Limited (BEL), Hindustan Machine
Tools(HMT), CMTI and other PSUs
T Dasarahalli
 former City Municipal Council
 now it is officially merged to BBMP
SURROUNDING
BBMP
 ward no. 16
 population – 29,467
Electricity regulated through
 Bangalore Electricity Supply Company (BESCOM)
Water supply and sanitation facilities
 Bangalore Water Supply and Sewerage Board (BWSSB)
Waste management
 solid waste sent to composting units such as the Karnataka Composting Development
Corporation
 remaining solid waste dumped in open spaces outside the city
ADMINISTRATION
VEHICULAR TRAFFIC
 Weekday 8.30 am
 Weekday 12.30 pm
VEHICULAR TRAFFIC
 Weekday 5.30 pm
 Traffice movement is slow in the lane from Nelamangala towards Yeshwantpur.
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Year
Recordhigh
°C(°F)
32.1
(89.8)
34.5
(94.1)
37.0
(98.6)
38.9
(102)
37.8
(100)
36.4
(97.5)
28.1
(82.6)
27.4
(81.3)
28.2
(82.8)
28.0
(82.4)
27.0
(80.6)
26.2
(79.2)
38.9
(102)
Average
high°C(°F)
27.6
(81.7)
30.2
(86.4)
32.9
(91.2)
34.1
(93.4)
33.3
(91.9)
29.4
(84.9)
28.1
(82.6)
27.5
(81.5)
28.3
(82.9)
28.0
(82.4)
27.0
(80.6)
26.2
(79.2)
29.38
(84.89)
Dailymean
°C(°F)
21.3
(70.3)
23.6
(74.5)
26.1
(79)
28.0
(82.4)
27.4
(81.3)
24.6
(76.3)
23.9
(75)
23.5
(74.3)
23.9
(75)
23.7
(74.7)
22.2
(72)
21.1
(70)
24.11
(75.4)
Average
low°C(°F)
15.3
(59.5)
17.2
(63)
19.6
(67.3)
21.8
(71.2)
21.5
(70.7)
20.0
(68)
19.8
(67.6)
19.6
(67.3)
19.7
(67.5)
19.4
(66.9)
17.7
(63.9)
16.0
(60.8)
18.97
(66.14)
Recordlow
°C(°F)
10.6
(51.1)
11.4
(52.5)
13.9
(57)
16.8
(62.2)
17.2
(63)
17.4
(63.3)
17.0
(62.6)
17.5
(63.5)
16.8
(62.2)
13.0
(55.4)
11.3
(52.3)
10.6
(51.1)
10.6
(51.1)
Rainfallmm
(inches)
1.8
(0.07)
7.9
(0.31)
7.0
(0.27)
40.0
(1.57)
110.2
(4.33)
89.1
(3.50)
108.9
(4.28)
142.5
(5.61)
241.0
(9.48)
154.5
(6.08)
54.1
(2.13)
17.5
(0.68)
974.5
(38.36)
Avg.rainy
days
0.2 0.5 0.8 3.0 6.9 6.0 7.4 10.0 10.3 7.9 3.9 1.6 58.5
%
humidity
60 52 45 51 60 72 76 79 76 73 70 68 65.2
Meanmonthly
sunshinehours
263.5 248.6 272.8 258.0 241.8 138.0 111.6 114.7 144.0 173.6 189.0 211.8 2,367.4
 Due to its elevation, Bangalore enjoys a pleasant climate throughout the year, with
temperatures ranging between 33°C and 16°C, with an average of 24°C.
 The summer heat is moderated by occasional thunderstorms and squalls.
 Bangalore receives adequate rainfall of about 860mm from the Northeast Monsoon as
well as the Southwest Monsoon.
 The wettest months are August, September and October.
 Summary of climatic data:
CLIMATE
• The picture shows wind roses for Bangalore for the respective months of a year.
WIND DATA
N – total no. of observations
C – no. of calms as percentage
of the total
• The picture shows the sun path at the proposed site.
• The sun paths are different due to factors such as:
 Location – local latitude
 Rising and setting position – based on the time of the year
 Duration of the day and night
Analysis
 90% of wind direction is from the northwest direction
 Fenestration:
 Should be minimal on the southeastern side to block the harsh sun.
 Should be sufficiently placed on the northwestern side to allow the winds
inside the building and on the northern side to benefit from the glare free
natural lighting.
 Water bodies, if any, should be placed in the direction of the wind, which
adds humidity to the dry atmosphere.
SUN PATH
Topography:
 An average elevation of 920m above mean sea level.
 The topography of the site is flat with negligible contours.
 Seismic activity
 Classified as a part of the seismic zone II (a stable zone)
Drainage:
 Dasarahalli tank is located to the west of the site.
 There are no other major water bodies in and around the site.
 Drainage pattern
 The drainage of water is towards the south west direction of the site
Vegetation:
 Primarily in the form of large deciduous canopy and minority coconut trees.
TOPOGRAPHY, VEGETATION AND DRAINAGE
 Greater Bangalore (77°37’19.54’’ E and 12°59’09.76’’ N) is the principal administrative,
cultural, commercial, industrial, and knowledge capital of the state of Karnataka with
an area of 741 sq. km.
 Morphology:
 Bangalore has grown spatially more than ten times since 1949 (69 square
kilometers) and is a part of both the Bangalore urban and rural districts.
 Now, Bangalore is the fifth largest metropolis in India currently with a population
of about 7 million.
 Climate:
 The mean annual total rainfall is about 880 mm with about 60 rainy days a year
over the last ten years.
 The summer temperature ranges from 18° C – 38° C, while the winter
temperature ranges from 12° C – 25° C.
 Bangalore is located at an altitude of 920 metres above mean sea level.
 Thus, Bangalore enjoys a salubrious climate all round the year.
 Topography and Drainage:
 There are four delineating watersheds, viz. Hebbal, Koramangala, Challaghatta
and Vrishabhavathi watersheds
 The undulating terrain in the region has facilitated creation of a large number of
tanks providing for the traditional uses of irrigation, drinking, fishing and washing.
 This led to Bangalore having hundreds of such water bodies through the
centuries.
 Even in early second half of 20th century, in 1961, the number of lakes and tanks
in the city stood at 262 (and spatial extent of Bangalore was 112 sq km).
However, number of lakes and tanks in 1985 was 81 (and spatial extent of
Bangalore was 161 sq km).
SUMMARY
 India Meteorological Department
 Centre for Policy Research, India
 Centre for Ecological Sciences, IISc, Bangalore
 Census of India
 Google maps
 eksparsh.wordpress.com
REFERENCES

Weitere ähnliche Inhalte

Was ist angesagt?

CHENNAI MOFUSSIL BUS TERMINUS_a case study
CHENNAI MOFUSSIL BUS TERMINUS_a case studyCHENNAI MOFUSSIL BUS TERMINUS_a case study
CHENNAI MOFUSSIL BUS TERMINUS_a case studyMridul Bhandari
 
Bus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showBus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showkiranightly
 
1.4 town planning ancient india vedic buddha period
1.4 town planning ancient india vedic buddha period1.4 town planning ancient india vedic buddha period
1.4 town planning ancient india vedic buddha periodSachin PatiL
 
Gandhinagar town planning and master plan study
Gandhinagar town planning and master plan studyGandhinagar town planning and master plan study
Gandhinagar town planning and master plan studyAnoushka Tyagi
 
BUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDYBUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDYSumit Ranjan
 
Planning concept of Chandigarh city.
Planning concept of Chandigarh city.Planning concept of Chandigarh city.
Planning concept of Chandigarh city.Noshad Ahmed Wahocho
 
What's different between urban planning, urban design, architecture, AADI
What's different between urban planning, urban design, architecture, AADIWhat's different between urban planning, urban design, architecture, AADI
What's different between urban planning, urban design, architecture, AADIaalliance
 
Planning of chandigarh by le corbusier
Planning of chandigarh by le corbusierPlanning of chandigarh by le corbusier
Planning of chandigarh by le corbusierctlachu
 
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Gargee Ghosh
 
Bus Terminal-Bachelor thesis project 2006
Bus Terminal-Bachelor thesis project 2006 Bus Terminal-Bachelor thesis project 2006
Bus Terminal-Bachelor thesis project 2006 Hassan Raza
 
Riverfront development Case study Hoshangabad Thesis
Riverfront development  Case study Hoshangabad Thesis Riverfront development  Case study Hoshangabad Thesis
Riverfront development Case study Hoshangabad Thesis Praveen Mukati
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentShruthi Kshirasagar
 
Belapur Incremental housing - A case study
Belapur Incremental housing - A case studyBelapur Incremental housing - A case study
Belapur Incremental housing - A case studyRithika Ravishankar
 
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)Sumaiya Islam
 

Was ist angesagt? (20)

CHENNAI MOFUSSIL BUS TERMINUS_a case study
CHENNAI MOFUSSIL BUS TERMINUS_a case studyCHENNAI MOFUSSIL BUS TERMINUS_a case study
CHENNAI MOFUSSIL BUS TERMINUS_a case study
 
Bus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showBus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt show
 
1.4 town planning ancient india vedic buddha period
1.4 town planning ancient india vedic buddha period1.4 town planning ancient india vedic buddha period
1.4 town planning ancient india vedic buddha period
 
Gandhinagar town planning and master plan study
Gandhinagar town planning and master plan studyGandhinagar town planning and master plan study
Gandhinagar town planning and master plan study
 
BUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDYBUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDY
 
Planning concept of Chandigarh city.
Planning concept of Chandigarh city.Planning concept of Chandigarh city.
Planning concept of Chandigarh city.
 
What's different between urban planning, urban design, architecture, AADI
What's different between urban planning, urban design, architecture, AADIWhat's different between urban planning, urban design, architecture, AADI
What's different between urban planning, urban design, architecture, AADI
 
Planning of chandigarh by le corbusier
Planning of chandigarh by le corbusierPlanning of chandigarh by le corbusier
Planning of chandigarh by le corbusier
 
City center kolkata
City center kolkataCity center kolkata
City center kolkata
 
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
 
Gandhinagar- Town Planning
Gandhinagar- Town PlanningGandhinagar- Town Planning
Gandhinagar- Town Planning
 
Bus Terminal-Bachelor thesis project 2006
Bus Terminal-Bachelor thesis project 2006 Bus Terminal-Bachelor thesis project 2006
Bus Terminal-Bachelor thesis project 2006
 
Riverfront development Case study Hoshangabad Thesis
Riverfront development  Case study Hoshangabad Thesis Riverfront development  Case study Hoshangabad Thesis
Riverfront development Case study Hoshangabad Thesis
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented Development
 
Belapur Incremental housing - A case study
Belapur Incremental housing - A case studyBelapur Incremental housing - A case study
Belapur Incremental housing - A case study
 
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
 
urban design
urban design urban design
urban design
 
tara group housing
tara group housingtara group housing
tara group housing
 
Detailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master PlanDetailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master Plan
 
Isbt kashmere gate 2
Isbt kashmere gate 2Isbt kashmere gate 2
Isbt kashmere gate 2
 

Ähnlich wie Site analysis - Transit hub

BANGALORE - URBAN INFRASTRUCTURE.pptx
BANGALORE - URBAN INFRASTRUCTURE.pptxBANGALORE - URBAN INFRASTRUCTURE.pptx
BANGALORE - URBAN INFRASTRUCTURE.pptxRushaliDangi1
 
C 1 highway development in india
C 1 highway development in indiaC 1 highway development in india
C 1 highway development in indiaSachin PatiL
 
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTUVATSAL PATEL
 
kolkata and Rajarhat City Planning: A Brief Description
kolkata and Rajarhat City Planning: A Brief Descriptionkolkata and Rajarhat City Planning: A Brief Description
kolkata and Rajarhat City Planning: A Brief DescriptionMihir Adhikary
 
Kolkata Metropolitan Development Plan
Kolkata Metropolitan Development PlanKolkata Metropolitan Development Plan
Kolkata Metropolitan Development PlanDivya Kothari
 
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)MIRAL SONI
 
[Urban management policy training] ulaanbaatar city presentation
[Urban management policy training] ulaanbaatar city presentation[Urban management policy training] ulaanbaatar city presentation
[Urban management policy training] ulaanbaatar city presentationshrdcinfo
 
Highway Engineering Introduction: Lecture 1
Highway Engineering  Introduction: Lecture 1Highway Engineering  Introduction: Lecture 1
Highway Engineering Introduction: Lecture 1Raghubir Singh
 
Highway Development and Planning Transportation Engineering
Highway Development and Planning Transportation EngineeringHighway Development and Planning Transportation Engineering
Highway Development and Planning Transportation Engineeringssuserdcb186
 
Highway development in India
Highway development in IndiaHighway development in India
Highway development in IndiaRAMPRASAD KUMAWAT
 
Outer ring road network in valley
Outer ring road network in valleyOuter ring road network in valley
Outer ring road network in valleyNarayan Rijal
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineeringAavani Thampi
 
Development control regulations kochi report
Development control regulations kochi reportDevelopment control regulations kochi report
Development control regulations kochi reportGeeva Chandana
 
Xinxin Wang_Portfolio
Xinxin Wang_PortfolioXinxin Wang_Portfolio
Xinxin Wang_PortfolioXinxin Wang
 
Revisiting Indira Nagar- a contemporary urban agglomeration in Lucknow
Revisiting Indira Nagar- a contemporary urban agglomeration in LucknowRevisiting Indira Nagar- a contemporary urban agglomeration in Lucknow
Revisiting Indira Nagar- a contemporary urban agglomeration in LucknowSubodhShankar3
 
MUMBAI METROPOLITIAN REGION
MUMBAI METROPOLITIAN REGIONMUMBAI METROPOLITIAN REGION
MUMBAI METROPOLITIAN REGIONIntekhab Alam
 

Ähnlich wie Site analysis - Transit hub (20)

BANGALORE - URBAN INFRASTRUCTURE.pptx
BANGALORE - URBAN INFRASTRUCTURE.pptxBANGALORE - URBAN INFRASTRUCTURE.pptx
BANGALORE - URBAN INFRASTRUCTURE.pptx
 
Banglore
BangloreBanglore
Banglore
 
C 1 highway development in india
C 1 highway development in indiaC 1 highway development in india
C 1 highway development in india
 
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
 
kolkata and Rajarhat City Planning: A Brief Description
kolkata and Rajarhat City Planning: A Brief Descriptionkolkata and Rajarhat City Planning: A Brief Description
kolkata and Rajarhat City Planning: A Brief Description
 
Kolkata Metropolitan Development Plan
Kolkata Metropolitan Development PlanKolkata Metropolitan Development Plan
Kolkata Metropolitan Development Plan
 
Bangalore
BangaloreBangalore
Bangalore
 
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)
 
Development Plan- Planning interventions by (VNIT) Visvesvaraya National Inst...
Development Plan- Planning interventions by (VNIT) Visvesvaraya National Inst...Development Plan- Planning interventions by (VNIT) Visvesvaraya National Inst...
Development Plan- Planning interventions by (VNIT) Visvesvaraya National Inst...
 
[Urban management policy training] ulaanbaatar city presentation
[Urban management policy training] ulaanbaatar city presentation[Urban management policy training] ulaanbaatar city presentation
[Urban management policy training] ulaanbaatar city presentation
 
Highway Engineering Introduction: Lecture 1
Highway Engineering  Introduction: Lecture 1Highway Engineering  Introduction: Lecture 1
Highway Engineering Introduction: Lecture 1
 
Highway Development and Planning Transportation Engineering
Highway Development and Planning Transportation EngineeringHighway Development and Planning Transportation Engineering
Highway Development and Planning Transportation Engineering
 
Highway development in India
Highway development in IndiaHighway development in India
Highway development in India
 
Town planing Rohtak
Town planing Rohtak Town planing Rohtak
Town planing Rohtak
 
Outer ring road network in valley
Outer ring road network in valleyOuter ring road network in valley
Outer ring road network in valley
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineering
 
Development control regulations kochi report
Development control regulations kochi reportDevelopment control regulations kochi report
Development control regulations kochi report
 
Xinxin Wang_Portfolio
Xinxin Wang_PortfolioXinxin Wang_Portfolio
Xinxin Wang_Portfolio
 
Revisiting Indira Nagar- a contemporary urban agglomeration in Lucknow
Revisiting Indira Nagar- a contemporary urban agglomeration in LucknowRevisiting Indira Nagar- a contemporary urban agglomeration in Lucknow
Revisiting Indira Nagar- a contemporary urban agglomeration in Lucknow
 
MUMBAI METROPOLITIAN REGION
MUMBAI METROPOLITIAN REGIONMUMBAI METROPOLITIAN REGION
MUMBAI METROPOLITIAN REGION
 

Kürzlich hochgeladen

PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造kbdhl05e
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryWilliamVickery6
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degreeyuu sss
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一z xss
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfAayushChavan5
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`dajasot375
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxmapanig881
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricksabhishekparmar618
 
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full NightCall Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一diploma 1
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdfvaibhavkanaujia
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 

Kürzlich hochgeladen (20)

PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William Vickery
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdf
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptx
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricks
 
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full NightCall Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdf
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 

Site analysis - Transit hub

  • 1. TRANSIT HUB Site Analysis Naina Deshmukh Class of 2010 Acharya’s NRV School of Architecture
  • 2. CONTENTS Sl. No. Title Page no. 1 Morphology 1 2 Zoning 5 3 Location 7 4 The Proposed site 8 5 Site features 9 6 Accessibility 10 7 Surrounding 12 8 Administration 13 9 Vehicular traffic 14 10 Traffic density 16 11 Noise analysis 16 12 Climate 17 13 Summary of climatic data 17 14 Wind data 18 15 Sun path 19 16 Analysis of climatic data 19 17 Topography, Vegetation and drainage 20 18 Summary 21 19 References 22
  • 3. The name "Bangalore" represents an anglicised version of the Kannada language name, "Bengaḷūru“. The earliest reference to the name "Bengaluru" was found in a 9th century Western Ganga Dynasty stone inscription on a "vīra gallu" (a rock edict extolling the virtues of a warrior). In this inscription found in Begur, "Bengaluru" is referred to as a place in which a battle was fought in 890 CE. It states that the place was part of the Ganga Kingdom until 1004 and was known as "Bengaval-uru", the "City of Guards“ in Halegannada (Old Kannada). 1791  This map was prepared on 22nd March, 1791 by Lord Cornwallis.  Comprised of today’s Avenue Road, Chickpet and surrounding areas.  The town was enclosed by thick hedges or bushes, and a strong fort adjoining it at the south part.  The Peta was the actual city within walls.  It is now called the old city area.  Tipu Sultan was then the ruler.  Lord Cornwallis attacked and successfully captured Bangalore and its fort.  The British made Srirangapatna their military base, after the whole of Mysore came under their control.  Since Bangalore had a better climate, they moved the military base to Bangalore in 1809. 1876  The City’s governance changed hands between its founding in 1537 and 1831, when the British took over the city’s administration.  In 1809, the Cantonment was established by the British which resulted in building administration and residential areas for British Military.  1881, saw roads named after military conventions - Infantry road, Brigade road and Artillery road.  In 1893, the plague broke out, and a ‘Plague Camp’ was created in the south of Richmond Town.  Around 1900s, the present day Malleshwaram and Basavangudi also formed. MORPHOLOGY
  • 4. 1889  In 1889 a Committee was constituted for the development of City ‘extensions’ to meet the demands of a growing population. During the first quarter of the 20thcentury a number of newly planned development 'extensions' were developed with regular roads, open spaces and provisions for civic amenities (e.g. Fraser Town, Richmond Town, Sankarapuram and Viveswarapuram). 1924 • The Dharmambudi tank is now Majestic Bus stand, the Sampangi Tank is now Kanteerva Stadium and Challaghatta lake is now the Golf Course. • Domlur and Kormangala were not a part of the city, but were tiny villages. 1945  However, there was no comprehensive approach for guiding the growth of the City in an integrated manner. As a result irregular developments occurred in between these extension areas. To deal with this situation, the City Improvement Trust was constituted in 1945 under special statute (Bangalore City Improvement Trust Board Act, 1945). 1949  In 1949 the two cities were merged and the establishment of a number of key industries stimulated growth that resulted in an unprecedented 5.10 lakhs to 9.91 lakhs population increase during the 1941-51 inter-censal period. In an attempt to cope with this rapid growth, a Committee was set up by the Government of Karnataka in 1952 to draw up a Development Plan, including broad land use proposals. But, in the main, the proposals were not implemented as there was no legal backing to enforce the Plan. To address this Government constituted the Bangalore Metropolitan Planning Board to prepare a Master Plan for the metropolitan region with the assistance of the State Town Planning Department. The result was the Outline Development Plan (ODP) for the Bangalore Metropolitan Region. This Plan was adopted by the Planning Authority constituted under the Karnataka Town and Country Planning Act , 1961 and was finally approved by the Government in 1972. This Plan represented the first step towards a Development Plan for Bangalore. It was prepared for a period of 15 years (1961-76) and covered an area of 500 sq. kilometre s. of which 220 sq. kilometres, was proposed for 'compact development' and designated as the Conurbation Area. The remaining 280 sq. kilometres outside the Conurbation Area, was earmarked as a green belt. The ODP remained in force until 1984. Well beyond its plan period. By this time it outlived its utility and the City had grown beyond the Conurbation Area and encroached the green belt. The delay in preparing a Comprehensive Development Plan to timely supersede the OOP resulted n large scale unauthorised development. MORPHOLOGY
  • 5. BDA  To counter multiplicity of authority Government constituted the Bangalore Development Authority (BDA), in 1976 under the statute of The Bangalore Development Authority Act, 1976 to amalgamate the duties of the Bangalore City Planning Authority and the City Improvement Trust Board and thereby combining the functions relating to plan preparation, enforcement and implementation under one agency.  Thus, the BDA became not only the Planning Authority for the Bangalore Metropolitan Area but also a development agency.  An early task of the BDA was to prepare the Comprehensive Development Plan (CDP), to supplant the outdated GOP. But, it took nearly eight years to prepare this Plan and have it approved by the State Government.  The CDP had a planning time horizon of 15 years (1986-2001) and a target population of 7.0 million. The designated planning area was extended from 500 sq. Kilometres to 1,279 sq. kilometres. BMRDA  In an attempt to deal with these new but burgeoning urban problems, the Government in 1985 constituted the Bangalore Metropolitan Region Development Authority (BMRDA) by an Act of Legislature. BBMP  BBMP was formed in 2007, by amalgamating the erstwhile Bangalore Mahanagara Palike (BMP), surrounding eight smaller urban local bodies and 110 villages.  BBMP now spans over an area of 800 sq km. 2013  In 2013, it is not surprising to see significant changes in the configuration of the city. The changes have been driven by the social and economic forces at work in Bangalore.  The growth of Bangalore as a city for employment has brought large scale migration and with it changes in land use patterns.  An obvious change in the city’s land use is the elimination of nearly all water bodies. Dharmambudi tank is the present day’s Kempegowda (Majestic) bus stand where as Sampangi tank is the Kanteerava stadium.  Numerous lakes have been drained or left to die for use as residential or industrial areas. Agricultural land has been converted into apartment and shopping complexes. MORPHOLOGY
  • 6. Area of Bangalore Source of water High ground:  The waters coming off the two sides of Bangalore ridge flow initially through a series of tanks.  They eventually reach the Bay of Bengal.  In the late 1800s, this divide was overcome at a place called High Ground. MORPHOLOGY YEAR AREA (SQ. KM.) 1949 69 1963-64 112 1969 134 1979 161 1995 226 2006 696 2013 741
  • 7. Bangalore city has developed spatially in a concentric manner:  The first zone  comprises the erstwhile city corporation area of 226 sq. km.  The second zone  includes the areas of the former 8 neighboring municipal councils and 111 villages, which together form the peri-urban areas and are now incorporated into the Greater Bangalore City Corporation.  The third zone  includes other villages extending up to the Bangalore Metropolitan Area limits as proposed by BDA. ZONING
  • 8. There are five major zones that are observed in the present land usage pattern: Zone 1 The core area consists of traditional business areas, administrative centre and the central Business district. Zone 2 The peri-central area, has old residential areas planned around the core area. Zone 3 The Recent extensions of the city (past 3–5 years) flanking both sides of the outer ring road. Zone 4 The new layouts, in the periphery of the city, with small vacant lands & agricultural lands. Zone 5 The Green belt and agricultural area, in the city’s outskirts including small villages. ZONING
  • 9.  13.66° N, 77.56° E  On Bangalore – Tumkur highway  Bangalore, Karnataka – 560 058 LOCATION
  • 10.  Area of site 1 = 42367 sq. m  Area of site 2 = 32906 sq. m  Total area = 71,414.4 sq. m or 17.51 acres  Space standards for various buildings/uses:  Parking requirements for various uses: THE PROPOSED SITE Min. road width in m Min. size of plot in sq. m Game centers, multiplex 18 2000 Office buildings ( C3 and above) 12 300 One car parking of 2.5m x 5.5m each for every Retail Business ( shops, Shopping complexes, Malls, etc) 50 sq. m of floor area Office buildings (Govt/Semi-Govt.& Pvt) 50 sq. m of floor area
  • 11.  Floor – Area Ratio: Areas which fall within 150m radius from the metro terminals shall be eligible for a maximum FAR of 4 for all permissible uses, irrespective of the FAR applicable for the respective uses in the respective tables. SITE FEATURES
  • 12.  NH 4 passes through the site.  Can be accessed by  BMTC buses  KSRTC buses  Bangalore metro  Private buses, cabs, auto rickshaws  Private vehicles  No dedicated lanes for bicycles, buses. NH 4  Main roads  four lanes  Service roads  on either sides of the highway  two lanes  Express way  elevated  double lane  from Goreguntepalya to Nelamangala  Bangalore metro station  on the western side of the highway at Jalahalli cross Jalahalli cross  Junction disperses traffic towards  Tumkur, Peenya, Jalahalli, Yeshwantpur  Traffic density  heavy  Pedestrian facilities  no skywalks, subways  zebra crossing at the junction  Delay in traffic flow  heavy traffic density and haphazard movement of pedestrians  Major users  BMTC buses, inter state buses, heavy transport vehicles ACCESSIBILITY
  • 13.  From various transport terminals in the city: (map 1) ACCESSIBILITY Destination Distance in km Travel Time in minutes A Jalahalli cross - - B Bangalore city railway station 11.2 28 C Kempegowda bus station 11.3 30 D MG road 14.8 40 E Shivajinagar bus depot 13.2 35 F Cantonment railway station 11.9 30 G Bangalore international airport 34.8 50
  • 14. Peenya  established in late 1970s  industrial area  houses small, medium, and large scale industries.  known for engineering, electrical goods  Wipro Technologies, Kirloskar Group, ABB, Bharat Fritz Werner have their factories at Peenya. Yeshwantpur  industrial-cum-residential area  TTMC, BMTC depot 8, 26  APMC yard, biggest wholesale market of agricultural produce in the region  Columbia Asia hospital  Metro cash and carry, Orion mall, Taj Vivanta Jalahalli  green belt of coconut grove and eucalyptus plantations  surrounded by large government organizations which started just after independence  BEL institutes, Cluny Convent School, Kendriya Vidyalaya, Jalahalli Public School, Mother Teresa Public School, St. Claret School & College, Air Force Technical College, Sree Ayyappa Education Centre  Rockline Mall  major industrial areas like Bharat Electronics Limited (BEL), Hindustan Machine Tools(HMT), CMTI and other PSUs T Dasarahalli  former City Municipal Council  now it is officially merged to BBMP SURROUNDING
  • 15. BBMP  ward no. 16  population – 29,467 Electricity regulated through  Bangalore Electricity Supply Company (BESCOM) Water supply and sanitation facilities  Bangalore Water Supply and Sewerage Board (BWSSB) Waste management  solid waste sent to composting units such as the Karnataka Composting Development Corporation  remaining solid waste dumped in open spaces outside the city ADMINISTRATION
  • 16. VEHICULAR TRAFFIC  Weekday 8.30 am  Weekday 12.30 pm
  • 17. VEHICULAR TRAFFIC  Weekday 5.30 pm  Traffice movement is slow in the lane from Nelamangala towards Yeshwantpur.
  • 18. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Year Recordhigh °C(°F) 32.1 (89.8) 34.5 (94.1) 37.0 (98.6) 38.9 (102) 37.8 (100) 36.4 (97.5) 28.1 (82.6) 27.4 (81.3) 28.2 (82.8) 28.0 (82.4) 27.0 (80.6) 26.2 (79.2) 38.9 (102) Average high°C(°F) 27.6 (81.7) 30.2 (86.4) 32.9 (91.2) 34.1 (93.4) 33.3 (91.9) 29.4 (84.9) 28.1 (82.6) 27.5 (81.5) 28.3 (82.9) 28.0 (82.4) 27.0 (80.6) 26.2 (79.2) 29.38 (84.89) Dailymean °C(°F) 21.3 (70.3) 23.6 (74.5) 26.1 (79) 28.0 (82.4) 27.4 (81.3) 24.6 (76.3) 23.9 (75) 23.5 (74.3) 23.9 (75) 23.7 (74.7) 22.2 (72) 21.1 (70) 24.11 (75.4) Average low°C(°F) 15.3 (59.5) 17.2 (63) 19.6 (67.3) 21.8 (71.2) 21.5 (70.7) 20.0 (68) 19.8 (67.6) 19.6 (67.3) 19.7 (67.5) 19.4 (66.9) 17.7 (63.9) 16.0 (60.8) 18.97 (66.14) Recordlow °C(°F) 10.6 (51.1) 11.4 (52.5) 13.9 (57) 16.8 (62.2) 17.2 (63) 17.4 (63.3) 17.0 (62.6) 17.5 (63.5) 16.8 (62.2) 13.0 (55.4) 11.3 (52.3) 10.6 (51.1) 10.6 (51.1) Rainfallmm (inches) 1.8 (0.07) 7.9 (0.31) 7.0 (0.27) 40.0 (1.57) 110.2 (4.33) 89.1 (3.50) 108.9 (4.28) 142.5 (5.61) 241.0 (9.48) 154.5 (6.08) 54.1 (2.13) 17.5 (0.68) 974.5 (38.36) Avg.rainy days 0.2 0.5 0.8 3.0 6.9 6.0 7.4 10.0 10.3 7.9 3.9 1.6 58.5 % humidity 60 52 45 51 60 72 76 79 76 73 70 68 65.2 Meanmonthly sunshinehours 263.5 248.6 272.8 258.0 241.8 138.0 111.6 114.7 144.0 173.6 189.0 211.8 2,367.4  Due to its elevation, Bangalore enjoys a pleasant climate throughout the year, with temperatures ranging between 33°C and 16°C, with an average of 24°C.  The summer heat is moderated by occasional thunderstorms and squalls.  Bangalore receives adequate rainfall of about 860mm from the Northeast Monsoon as well as the Southwest Monsoon.  The wettest months are August, September and October.  Summary of climatic data: CLIMATE
  • 19. • The picture shows wind roses for Bangalore for the respective months of a year. WIND DATA N – total no. of observations C – no. of calms as percentage of the total
  • 20. • The picture shows the sun path at the proposed site. • The sun paths are different due to factors such as:  Location – local latitude  Rising and setting position – based on the time of the year  Duration of the day and night Analysis  90% of wind direction is from the northwest direction  Fenestration:  Should be minimal on the southeastern side to block the harsh sun.  Should be sufficiently placed on the northwestern side to allow the winds inside the building and on the northern side to benefit from the glare free natural lighting.  Water bodies, if any, should be placed in the direction of the wind, which adds humidity to the dry atmosphere. SUN PATH
  • 21. Topography:  An average elevation of 920m above mean sea level.  The topography of the site is flat with negligible contours.  Seismic activity  Classified as a part of the seismic zone II (a stable zone) Drainage:  Dasarahalli tank is located to the west of the site.  There are no other major water bodies in and around the site.  Drainage pattern  The drainage of water is towards the south west direction of the site Vegetation:  Primarily in the form of large deciduous canopy and minority coconut trees. TOPOGRAPHY, VEGETATION AND DRAINAGE
  • 22.  Greater Bangalore (77°37’19.54’’ E and 12°59’09.76’’ N) is the principal administrative, cultural, commercial, industrial, and knowledge capital of the state of Karnataka with an area of 741 sq. km.  Morphology:  Bangalore has grown spatially more than ten times since 1949 (69 square kilometers) and is a part of both the Bangalore urban and rural districts.  Now, Bangalore is the fifth largest metropolis in India currently with a population of about 7 million.  Climate:  The mean annual total rainfall is about 880 mm with about 60 rainy days a year over the last ten years.  The summer temperature ranges from 18° C – 38° C, while the winter temperature ranges from 12° C – 25° C.  Bangalore is located at an altitude of 920 metres above mean sea level.  Thus, Bangalore enjoys a salubrious climate all round the year.  Topography and Drainage:  There are four delineating watersheds, viz. Hebbal, Koramangala, Challaghatta and Vrishabhavathi watersheds  The undulating terrain in the region has facilitated creation of a large number of tanks providing for the traditional uses of irrigation, drinking, fishing and washing.  This led to Bangalore having hundreds of such water bodies through the centuries.  Even in early second half of 20th century, in 1961, the number of lakes and tanks in the city stood at 262 (and spatial extent of Bangalore was 112 sq km). However, number of lakes and tanks in 1985 was 81 (and spatial extent of Bangalore was 161 sq km). SUMMARY
  • 23.  India Meteorological Department  Centre for Policy Research, India  Centre for Ecological Sciences, IISc, Bangalore  Census of India  Google maps  eksparsh.wordpress.com REFERENCES