Reason/Justification:
The construction industry is one of the most hazardous industries in the world. More
so, in the Middle East, construction accidents and fatality rates have been reported to
be 18.6 per 100,000 workers, compared to 4.2 per 100,000 workers in other
economies. In Saudi Arabia, the construction industry was responsible for over
46.3% of the recorded occupational injuries (GOSI, 2017).
Who should attend:
• Junior to middle level staff of construction and civil engineering firms
• Students majoring in safety, construction, architecture, civil engineering building,
and related fields
• Entrepreneurs in real estate and property development
Venue: Dammam Community College, King Fahd University of Petroleum and
Minerals, KSA.
Duration: 3 Hours x 4 Sessions (12 Hours)
Mode of Instruction: lecture presentation in the English Language, hands on
exercises, and case studies.
Award: Certificate of Participation
About the course
The objective of this course is to develop understanding of
the fundamental concepts of construction safety. Students will
learn about the common hazards in the construction industry,
risk assessment, and control methods.
Course objective
This course will cover areas such as excavations, confined
spaces, underground works, and working at heights,
demolition, risk assessment and principles of control.
Scope
At the end of this course, students should be able to:
 Describe hazards associated with the construction industry
 Evaluate construction tasks to applaud inherent risks
 Select hazard control methods and implementation strategies
 Prepare construction risk assessment reports and methods statement
Course learning outcomes
Course lesson plan
Day 1
Session 01: Overview of the construction industry
Prayer break
Session 02: Excavation works, hazards and controls
Short break
Session 03: Confined spaces, and underground works
Day 2
Session 04: Working at heights and over water
Prayer break
Session 05: Access equipment, precautions and controls
Short break
Session 06: Case studies and round table discussions
Day 3
Session 07: Construction demolition: hazards and controls
Prayer break
Session 08: Blasting and use of explosives
Short break
Session 09: Case studies and round table discussions
Day 4
Session 10: Risk Assessment and Principles of Control
Prayer break
Session 11: Risk Assessment and Methods Statement (RAMS)
Short break
Session 12: Course review/case study done in groups
Introduction to Health and Safety in Construction: The Handbook for the
NEBOSH National Certificate in Construction: Health and Safety
Author(s): Phil Hughes, Ed Ferrett
Publisher: Routledge, 4th Edition, 2011.
Risk Management Tools for Safety Professionals
Author(s): Bruce K. Lyon, Georgi Popov
Publisher: Publisher: American Society of Safety Professionals, 2017.
Saudi Aramco Construction Safety Manual
Loss Prevention Department, Saudi Aramco
2017 Edition.
CALcrete Computer Aided E-Learning – Health and Safety Module. URL:
https://www.concretecentre.com/Publications-Software/Design-tools-and-software/CALcrete.aspx
Recommended reference materials
Dammam Community College
Safety Technology Program
Construction Safety Training
SHORT COURSE
Instructor: Mr. Muizz Anibire, MSc
Tel: +966501296203, Email: muizzanibire10@gmail.com
 Understand the construction industry and its environment
 Understand basic concepts/terminology in the
construction industry
 Identify the various types of construction projects
 Identify various processes involved in construction
 Identify different participants in the construction process
 Identify the various types of equipment used in
construction
 Describe common hazards in the construction industry
Learning objectives
Introduction 1/3
What does construction mean to you ?
Introduction 2/3
 Construction is an art as well as a science.
 It is defined as the process of creating or altering a building, structure,
or object. This includes land clearance, excavation, erection and the
assembly and installation of components and equipment.
 Construction activity is an integral part of a country’s
infrastructure and industrial development.
 The construction industry is vital to a nation’s socio-
economic development.
 It is estimated that the worth of the industry is about US
$8.7 trillion, accounting for 12.2% of the world’s economic
output and providing employment for about 200 million
people worldwide.
Introduction 3/3
 The construction industry also drives growth in other
industries such as the steel, concrete, and timber material
industries; trucking, shipping, manufacturing and mining
industries.
 The following are some of the benefits of the construction
industry:
 Strategic tool to achieving sustainable development
 Contributes significantly to the economy
 Provide outputs to most industries and utilizes the
outputs of many industries
 Income generation and re-distribution
 Employment generation.
Characteristics of the Construction Industry
The construction industry has some characteristics as described in
the table:
Industry related characteristics Project related characteristics
The increasing complexity of the
industry
Projects are temporary in nature
Low entry requirements and small sized
enterprises
Every project is unique
Fierce competition and low profit
margins
Uncertain and inter-dependent
environment
Economic pressures Competitive tendering
Labor intensive processes and health
risks
Mega projects – see example in next
slide
Masculine nature of work
Characteristics of the Construction Industry
The development of the Three Gorges Dam project required the Chinese
government to resettle more than one million people, which led to many
socio-cultural issues, such as ineffective compensation distribution, loss of
employment and inadequate new housing.
Types of Construction
 Construction work can be categorized into four broad areas:
1. Residential buildings (houses, apartments, flats, etc.)
2. Institutional and commercial buildings (offices, shops,
hotels, schools, etc.)
3. Infrastructure and heavy highway construction (roads,
bridges, rails, water and sewerage, etc.)
4. Industrial construction (Refineries, and power plants
etc.)
Residential Buildings
High rise apartments
Institutional and Commercial Buildings
University buildings – New York University, Abu Dhabi
Institutional and Commercial Buildings
The King Abdulaziz Center for World Culture
Infrastructure and Heavy Highway Construction
Highways and bridges
Infrastructure and Heavy Highway Construction
Rail roads and urban transit systems
Infrastructure and Heavy Highway Construction
Rail roads and urban transit systems
Infrastructure and Heavy Highway Construction
Tunnels
Infrastructure and Heavy Highway Construction
Airports
Industrial Construction
Power plant/refineries
Industrial Construction
Power plant/refineries
The Construction Process
 The construction process consists of the building or
assembling of infrastructure.
 Generally the construction process consists of six stages:
 Concepts
 Contracts and bid documents
 Bidding
 Construction
 Construction payments
 Completion
The Construction Process
Source: https://www.strideproperties.com/stages/
The Conceptual Stage 1/2
 The conceptual or design stage is also known as architectural
programming and involves activities that occur before the
actual construction begins.
 Licensed professionals in the conceptual stage may include:
 Architect (for residential, institutional and commercial
facilities)
 Civil/Structural and Construction Engineers
 Mechanical, Electrical and Plumbing (MEP) Engineers
 Industrial/Piping Engineers (for industrial facilities)
 Chemical/Process Engineers (for industrial facilities)
 Facility/Maintenance Engineers
 Safety Engineers
 Etc.
The Conceptual Stage 2/2
 In the conceptual stage, a number of client meetings are
arranged in order to determine the purpose and objective of
the proposed construction. This is referred to as debriefing.
 The preliminary programming produces a list of solutions,
alternatives, feasibility studies and costs estimates.
 After a review of the programming statement, schematic
plans are prepared.
 The final product is a schematic plan which is reviewed and
modified by all concerned stakeholders. The final schematic
plan is known as the preliminary plans.
Contracts and Bid Documents
 All projects (new construction or expansion of an existing structure)
require the preparation of contract documents. The document describes:
 The appearance, layout, equipment, and amenities of the project.
 Design of structural, mechanical, electrical, plumbing, communication
systems and other systems.
 Other relevant issues including: local zoning requirements, local
infrastructure, traffic, environmental and population impact, acoustic,
energy, lighting, and aesthetic considerations.
 Numerous drawing plans are involved in a construction project,
including: architectural; structural; mechanical; electrical; Process
Flow Diagrams (PFDs); Process and Instrument Drawings (P&IDs);
etc.
 Contract specification “specs” are “that portion of
the Contract Documents consisting of the written requirements for
materials, equipment, systems, standards and workmanship for the
Work, and performance of related services,” according to AIA
Document A201-2007.
Bidding
 The client/owner solicits bids or proposals from general
contractors and/or specialty contractors.
 The following is the sequence of events to prepare a contract bid:
 The contractor obtains the “specs” and prepares a formal estimate of
the construction cost or bid.
 The contractor reviews the contract plans and specs to determine how
to build the project and to consider all the limitations or conditions
required for the project.
 The contractor solicits bids from subcontractors and evaluates the
ultimate profit potential of the contract.
 The owner evaluates all of the submitted bids and then awards the
contract.
 The contract document and specs contain the project start and
completion dates, the progress billing procedures, the insurance
requirements, and other pertinent information.
Construction (Field Work)
 Building Permits - specifications and blueprints must be provided to
the municipality's building department, along with the application for a
permit. Results of soil testing, environmental impact studies etc. may also
be required. Sometimes, a public hearing is mandated, if there is
opposition to the project.
 A building inspector also verifies that the project is being constructed
according to municipal code.
 Subcontractors - limited scope of work, which usually involves a special
skill, knowledge, or ability. May include plumbers, electricians, framers,
concrete workers etc., and work with the main contractor.
 Shop drawings - detail the specific building components.
 Project submissions - illustrate each item's intended use, function,
method of attachment or installation requirements, and placed-in-service
date.
 Change Orders - The architect/engineer may make modifications or
change orders to the construction plans as needed. Change orders should
be reviewed for any agreed changes to the payment schedule.
Construction Payments
 When a contractor completes a prescribed amount of work, the owner
pays the contractor for the completed work.
 It is to the contractor's benefit that items of construction be broken into
as many parts as possible.
 Document A201 contains AIA Form G702 which requires that the
contractor break down the bid into various parts of work. The project
designer (architect or engineer) critically reviews the G702 schedule of
values that are prepared by the contractor and either accepts or rejects
them.
Completion
 As Built Plans - These plans represent exactly how the facility was
constructed and they also incorporate all the changes to the original
construction plan.
 Notice of Partial Completion - the owner may desire to occupy a
portion of the completed building. In that case, local building officials
conduct an inspection to determine if that portion of the facility meets
all building codes and is safe to be occupied. If approval is granted, a
"Certificate/Notice of Partial Occupancy" is issued.
 Notice of Substantial Completion - local building officials issue this
notice when 95 % of the construction is complete.
 Notice of Completion/Certificate of Occupancy - when the building
is 100% complete, the project must pass a final inspection by local
building officials in order for the "Notice of Completion" and the
"Certificate of Occupancy" to be issued.
Sequence of Construction Work for a Small Project
 Clear the land (which may include demolition of existing structures)
 Excavate the land (which may include digging holes and leveling)
 Pour the foundation
 Frame steel and/or concrete
 Rough framing
 Rough electrical
 Concrete flooring
 Roofing
 Heating and air conditioning
 Ductwork for heating and air conditioning
 Elevators and/or escalators
 Sprinklers and other safety equipment
 Install electrical fixtures
 Insulate and weather-strip
 Frame windows and door sashes
 Install tile and marble
 Install suspended acoustical ceilings
 Install toilets, sinks and other plumbing fixtures
 Paint walls (inside and out)
Construction Equipment
 There are numerous construction equipment used depending on the
nature and scale of work. Some of these may include:
 Earthmoving equipment.
 Roadwork equipment.
 Access equipment.
 Lifting/Hoisting equipment.
 Hauling equipment.
 Concrete Equipment
Construction Equipment
Bulldozer: used to push large quantities of soil, sand, rubble, or other such
material during construction.
Construction Equipment
Back Hoe: is a type of excavating equipment, or digger, consisting of a digging
bucket.
Construction Equipment
Grader: is a construction machine with a long blade used to create a flat surface
during the grading process.
Construction Equipment
Trencher: used to dig trenches, especially for laying pipes or electrical cables, for
installing drainage, or in preparation for trench warfare.
Construction Equipment
Loaders: used in construction to move aside or load materials such as asphalt,
demolition debris, dirt, snow, feed, gravel, logs, raw minerals, recycled material,
rock, sand, woodchips, etc. into or onto another type of machinery.
Construction Equipment
Articulated Dump Trucks (ADT): is a very large heavy duty type of dump
truck used to transport loads over rough terrain, and occasionally on public roads.
Construction Equipment
Asphalt Paver: used to lay asphalt on roads, bridges, parking lots and other such
places.
Construction Equipment
Roller Compactor: used to compact soil, gravel, concrete, or asphalt in
the construction of roads and foundations.
Construction Equipment
Cranes: a type of machine, generally equipped with a hoist rope, wire
ropes or chains, and sheaves, that can be used both to lift and lower materials and to
move them horizontally.
Construction Equipment
Scaffolds: a temporary structure used to support a work crew and materials to aid
in the construction, maintenance and repair of buildings, bridges and all other man
made structures.
Construction Equipment
Mobile Elevating Work Platforms (MEWP): a mechanical device used to
provide temporary access for people or equipment to inaccessible areas, usually at
height.
Construction Equipment
Piling Rig: to drill in sandy soil, clay, silty clay, etc. and widely used cast-in-
place piles, diaphragm walls, foundation reinforcement and other foundation
projects.
Construction Equipment
Pile Driver: used to drive piles into soil to provide foundation support for
buildings or other structures.
Construction Equipment
Hauling Truck: used for transporting construction equipment from job site to
job site.
Construction Equipment
Mobile Concrete Mixer: for transporting ready-mix concrete from the batching
plant to the job site.
Construction Equipment
Concrete Pump: for transferring liquid concrete by pumping.
Accidents in the Construction Industry
 The construction industry is one of the most dangerous
industries worldwide due to deadly fatalities and accidents
recorded yearly.
 Construction related injuries and accidents in the U.S. are
50% higher than those in any other industry (Huang and
Hinze, 2003); in Japan, they are 40% of the total accidents,
50% in Ireland and 25% in the United Kingdom (Agwu and
Olele, 2014).
 More severe situations are recorded in developing countries.
 Occupational accident and fatality rates in the Middle East
have been reported to be 18.6 per 100,000 workers,
compared to 4.2 per 100,000 workers in established
economies (Hämäläinen et al., 2006).
Accidents in the Construction Industry
Makkah Tower Crane Collapse (Photo credit:
https://www.thenational.ae/world/gcc/binladin-group-cleared-of-deadly-makkah-
crane-collapse-1.663484)
Accidents in the Construction Industry
Crane Accident in New York (Photo credit:
https://therealdeal.com/issues_articles/the-cost-of-tragedy/)
OSHA’s Focus Four
 OSHA has identified the 4 leading causes of fatalities in the
Construction Industry. These include:
For more details, see: https://www.osha.gov/dte/outreach/construction/focus_four/
Falls Struck-By
ElectrocutionCaught-In
or-Between
Personal Protective Equipment in Construction
 These are examples of some common PPEs used in the
construction industry:
Personal Protective Equipment in Construction
 These are examples of some common PPEs used in the
construction industry:
Personal Protective Equipment in Construction
 These are examples of some common PPEs used in the
construction industry:
Personal Protective Equipment in Construction
 These are examples of some common PPEs used in the
construction industry:
Knowledge Check
Q1 Construction is defined as the process of creating or
altering a building, structure, or object.
T F
Q2 Power plants and refineries are examples of industrial
construction.
T F
Q3 MEWP is a mechanical device used to provide temporary
access for people or equipment to inaccessible areas,
usually at height.
T F
Q4 Construction accident are more severe in developing
countries.
T F
Q5 Electrocution is one of OSHA’s 4 leading causes of
fatalities in the Construction Industry.
T F
End of Session 01:

Weitere ähnliche Inhalte

Was ist angesagt?

Session 03_Risk Assessment Program for YSP_Risk Identification
Session 03_Risk Assessment Program for YSP_Risk IdentificationSession 03_Risk Assessment Program for YSP_Risk Identification
Session 03_Risk Assessment Program for YSP_Risk IdentificationMuizz Anibire
 
Construction hazards and_safety_by_isti
Construction hazards and_safety_by_istiConstruction hazards and_safety_by_isti
Construction hazards and_safety_by_istiSYED HAIDER ABBAS
 
Construction Accident Risk Management
Construction Accident Risk ManagementConstruction Accident Risk Management
Construction Accident Risk Managementhansza
 
Construction safety
Construction  safetyConstruction  safety
Construction safetyRanty Poddar
 
Health, Safety and Environmental Management Plan
Health, Safety and Environmental Management PlanHealth, Safety and Environmental Management Plan
Health, Safety and Environmental Management PlanFlevy.com Best Practices
 
Fall Protection Refresher Orientation Training by Rafael Coll & John Cassidy
Fall Protection Refresher Orientation Training by Rafael Coll & John CassidyFall Protection Refresher Orientation Training by Rafael Coll & John Cassidy
Fall Protection Refresher Orientation Training by Rafael Coll & John CassidyAtlantic Training, LLC.
 
Safety in Excavations
Safety in Excavations Safety in Excavations
Safety in Excavations Amol Pawar
 
Occupational Safety and Health Management in Construction Industry
Occupational Safety and Health Management in Construction IndustryOccupational Safety and Health Management in Construction Industry
Occupational Safety and Health Management in Construction IndustryNorrazman Zaiha Zainol
 
Safety and Health During Construction
Safety and Health During ConstructionSafety and Health During Construction
Safety and Health During ConstructionDr K M SONI
 
Risk assessment-training
Risk assessment-trainingRisk assessment-training
Risk assessment-trainingIshah Khaliq
 
Excavation Safety Training Module 1
Excavation Safety Training Module 1Excavation Safety Training Module 1
Excavation Safety Training Module 1Melissa Lewis
 
Confined space entry natt7029
Confined space entry   natt7029Confined space entry   natt7029
Confined space entry natt7029Piyushjauhari3
 
Excavation and-trenching safety 03
Excavation and-trenching safety 03Excavation and-trenching safety 03
Excavation and-trenching safety 03vppradeepkumar
 
Construction safety management_Construction Management (2180611) (Semester-8)...
Construction safety management_Construction Management (2180611) (Semester-8)...Construction safety management_Construction Management (2180611) (Semester-8)...
Construction safety management_Construction Management (2180611) (Semester-8)...A Makwana
 
HEALTH HAZARDS IN CONSTRUCTION
HEALTH  HAZARDS IN CONSTRUCTIONHEALTH  HAZARDS IN CONSTRUCTION
HEALTH HAZARDS IN CONSTRUCTIONDeepthi Athuluwage
 
Construction safety lecture-1
Construction safety  lecture-1Construction safety  lecture-1
Construction safety lecture-1Saleem Malik
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety inductionGanesan Raju
 

Was ist angesagt? (20)

Session 03_Risk Assessment Program for YSP_Risk Identification
Session 03_Risk Assessment Program for YSP_Risk IdentificationSession 03_Risk Assessment Program for YSP_Risk Identification
Session 03_Risk Assessment Program for YSP_Risk Identification
 
Construction hazards and_safety_by_isti
Construction hazards and_safety_by_istiConstruction hazards and_safety_by_isti
Construction hazards and_safety_by_isti
 
Construction Accident Risk Management
Construction Accident Risk ManagementConstruction Accident Risk Management
Construction Accident Risk Management
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
OSHA Trenching and Excavation Requirements
OSHA Trenching and Excavation Requirements OSHA Trenching and Excavation Requirements
OSHA Trenching and Excavation Requirements
 
Construction safety
Construction  safetyConstruction  safety
Construction safety
 
Health, Safety and Environmental Management Plan
Health, Safety and Environmental Management PlanHealth, Safety and Environmental Management Plan
Health, Safety and Environmental Management Plan
 
Fall Protection Refresher Orientation Training by Rafael Coll & John Cassidy
Fall Protection Refresher Orientation Training by Rafael Coll & John CassidyFall Protection Refresher Orientation Training by Rafael Coll & John Cassidy
Fall Protection Refresher Orientation Training by Rafael Coll & John Cassidy
 
Safety in Excavations
Safety in Excavations Safety in Excavations
Safety in Excavations
 
JSA- SAFETY ASSESSMENT
JSA- SAFETY ASSESSMENTJSA- SAFETY ASSESSMENT
JSA- SAFETY ASSESSMENT
 
Occupational Safety and Health Management in Construction Industry
Occupational Safety and Health Management in Construction IndustryOccupational Safety and Health Management in Construction Industry
Occupational Safety and Health Management in Construction Industry
 
Safety and Health During Construction
Safety and Health During ConstructionSafety and Health During Construction
Safety and Health During Construction
 
Risk assessment-training
Risk assessment-trainingRisk assessment-training
Risk assessment-training
 
Excavation Safety Training Module 1
Excavation Safety Training Module 1Excavation Safety Training Module 1
Excavation Safety Training Module 1
 
Confined space entry natt7029
Confined space entry   natt7029Confined space entry   natt7029
Confined space entry natt7029
 
Excavation and-trenching safety 03
Excavation and-trenching safety 03Excavation and-trenching safety 03
Excavation and-trenching safety 03
 
Construction safety management_Construction Management (2180611) (Semester-8)...
Construction safety management_Construction Management (2180611) (Semester-8)...Construction safety management_Construction Management (2180611) (Semester-8)...
Construction safety management_Construction Management (2180611) (Semester-8)...
 
HEALTH HAZARDS IN CONSTRUCTION
HEALTH  HAZARDS IN CONSTRUCTIONHEALTH  HAZARDS IN CONSTRUCTION
HEALTH HAZARDS IN CONSTRUCTION
 
Construction safety lecture-1
Construction safety  lecture-1Construction safety  lecture-1
Construction safety lecture-1
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety induction
 

Ähnlich wie Construction Safety Training_Session 01_Overview of the Construction Industry

Lecture 1 overview of the construction industry
Lecture 1  overview of the construction industryLecture 1  overview of the construction industry
Lecture 1 overview of the construction industryJB Juanzon Builders Inc.
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONVijayfan2
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONVijayfan2
 
EXPLORING THE NATIONAL BUILDING CODE- text of paper 2012 (1)
EXPLORING THE NATIONAL BUILDING CODE- text of paper 2012 (1)EXPLORING THE NATIONAL BUILDING CODE- text of paper 2012 (1)
EXPLORING THE NATIONAL BUILDING CODE- text of paper 2012 (1)Abass Adeolu Ologbenla. CPM
 
2009 41.Content.05215
2009 41.Content.052152009 41.Content.05215
2009 41.Content.05215lk314
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONVijayfan2
 
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET-  	  To Study the Causes and Effects of Delays in Construction ProjectIRJET-  	  To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction ProjectIRJET Journal
 
BIM based organizational learning
BIM based organizational learningBIM based organizational learning
BIM based organizational learningIJRES Journal
 
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Alexander Decker
 
(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 Sigma(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 SigmaDimitrios Kordas
 
Reasons for Delaying the Constriction Projects in Iraq
Reasons for Delaying the Constriction Projects in IraqReasons for Delaying the Constriction Projects in Iraq
Reasons for Delaying the Constriction Projects in IraqDr. Amarjeet Singh
 
1347 notes ii_ppe_304
1347 notes ii_ppe_3041347 notes ii_ppe_304
1347 notes ii_ppe_304kriti201
 
IRJET- Effect of Pre-Planning in High Rise Building for Time Management
IRJET- Effect of Pre-Planning in High Rise Building for Time ManagementIRJET- Effect of Pre-Planning in High Rise Building for Time Management
IRJET- Effect of Pre-Planning in High Rise Building for Time ManagementIRJET Journal
 
IRJET- A Study on Labour Safety in Construction Industry
IRJET- A Study on Labour Safety in Construction IndustryIRJET- A Study on Labour Safety in Construction Industry
IRJET- A Study on Labour Safety in Construction IndustryIRJET Journal
 
Civil10
Civil10Civil10
Civil10saihem
 
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET Journal
 

Ähnlich wie Construction Safety Training_Session 01_Overview of the Construction Industry (20)

CHAPTER-1 INTRODUCTION.pdf
CHAPTER-1 INTRODUCTION.pdfCHAPTER-1 INTRODUCTION.pdf
CHAPTER-1 INTRODUCTION.pdf
 
Lecture 1 overview of the construction industry
Lecture 1  overview of the construction industryLecture 1  overview of the construction industry
Lecture 1 overview of the construction industry
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTION
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTION
 
EXPLORING THE NATIONAL BUILDING CODE- text of paper 2012 (1)
EXPLORING THE NATIONAL BUILDING CODE- text of paper 2012 (1)EXPLORING THE NATIONAL BUILDING CODE- text of paper 2012 (1)
EXPLORING THE NATIONAL BUILDING CODE- text of paper 2012 (1)
 
2009 41.Content.05215
2009 41.Content.052152009 41.Content.05215
2009 41.Content.05215
 
SRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTIONSRI AARUTHRAA CONSTRUCTION
SRI AARUTHRAA CONSTRUCTION
 
ACH 216 Lecture 01 (Intro To CM)
ACH 216 Lecture 01 (Intro To CM)ACH 216 Lecture 01 (Intro To CM)
ACH 216 Lecture 01 (Intro To CM)
 
Essay Construction
Essay ConstructionEssay Construction
Essay Construction
 
1153 3330-1-pb
1153 3330-1-pb1153 3330-1-pb
1153 3330-1-pb
 
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET-  	  To Study the Causes and Effects of Delays in Construction ProjectIRJET-  	  To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction Project
 
BIM based organizational learning
BIM based organizational learningBIM based organizational learning
BIM based organizational learning
 
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...
 
(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 Sigma(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 Sigma
 
Reasons for Delaying the Constriction Projects in Iraq
Reasons for Delaying the Constriction Projects in IraqReasons for Delaying the Constriction Projects in Iraq
Reasons for Delaying the Constriction Projects in Iraq
 
1347 notes ii_ppe_304
1347 notes ii_ppe_3041347 notes ii_ppe_304
1347 notes ii_ppe_304
 
IRJET- Effect of Pre-Planning in High Rise Building for Time Management
IRJET- Effect of Pre-Planning in High Rise Building for Time ManagementIRJET- Effect of Pre-Planning in High Rise Building for Time Management
IRJET- Effect of Pre-Planning in High Rise Building for Time Management
 
IRJET- A Study on Labour Safety in Construction Industry
IRJET- A Study on Labour Safety in Construction IndustryIRJET- A Study on Labour Safety in Construction Industry
IRJET- A Study on Labour Safety in Construction Industry
 
Civil10
Civil10Civil10
Civil10
 
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
 

Mehr von Muizz Anibire

Questionnaire Template.docx
Questionnaire Template.docxQuestionnaire Template.docx
Questionnaire Template.docxMuizz Anibire
 
Turing’s Computing Machinery and Intelligence.pdf
Turing’s Computing Machinery and Intelligence.pdfTuring’s Computing Machinery and Intelligence.pdf
Turing’s Computing Machinery and Intelligence.pdfMuizz Anibire
 
أحكام الجنائز -FUNERAL RITES
أحكام الجنائز   -FUNERAL RITESأحكام الجنائز   -FUNERAL RITES
أحكام الجنائز -FUNERAL RITESMuizz Anibire
 
ISO 31000 risk management process
ISO 31000 risk management processISO 31000 risk management process
ISO 31000 risk management processMuizz Anibire
 
A MACHINE LEARNING-BASED FRAMEWORK FOR DELAY MITIGATION IN TALL BUILDING PROJ...
A MACHINE LEARNING-BASED FRAMEWORK FOR DELAY MITIGATION IN TALL BUILDING PROJ...A MACHINE LEARNING-BASED FRAMEWORK FOR DELAY MITIGATION IN TALL BUILDING PROJ...
A MACHINE LEARNING-BASED FRAMEWORK FOR DELAY MITIGATION IN TALL BUILDING PROJ...Muizz Anibire
 
CAUSES OF DELAY IN TALL BUILDING PROJECTS IN GCC COUNTRIES
CAUSES OF DELAY IN TALL BUILDING PROJECTS IN GCC COUNTRIESCAUSES OF DELAY IN TALL BUILDING PROJECTS IN GCC COUNTRIES
CAUSES OF DELAY IN TALL BUILDING PROJECTS IN GCC COUNTRIESMuizz Anibire
 
Guidelines on writing a research paper
Guidelines on writing a research paperGuidelines on writing a research paper
Guidelines on writing a research paperMuizz Anibire
 
Tall buildings in urban context
Tall buildings in urban contextTall buildings in urban context
Tall buildings in urban contextMuizz Anibire
 
Session 09_Risk Assessment Program for YSP_Risk Assessment Tools and Practica...
Session 09_Risk Assessment Program for YSP_Risk Assessment Tools and Practica...Session 09_Risk Assessment Program for YSP_Risk Assessment Tools and Practica...
Session 09_Risk Assessment Program for YSP_Risk Assessment Tools and Practica...Muizz Anibire
 
Session 08_Risk Assessment Program for YSP_Risk Treatment and Communication
Session 08_Risk Assessment Program for YSP_Risk Treatment and CommunicationSession 08_Risk Assessment Program for YSP_Risk Treatment and Communication
Session 08_Risk Assessment Program for YSP_Risk Treatment and CommunicationMuizz Anibire
 
Session 07_Risk Assessment Program for YSP_Risk Evaluation
Session 07_Risk Assessment Program for YSP_Risk EvaluationSession 07_Risk Assessment Program for YSP_Risk Evaluation
Session 07_Risk Assessment Program for YSP_Risk EvaluationMuizz Anibire
 
Session 06_Risk Assessment Program for YSP_Risk Analysis III
Session 06_Risk Assessment Program for YSP_Risk Analysis IIISession 06_Risk Assessment Program for YSP_Risk Analysis III
Session 06_Risk Assessment Program for YSP_Risk Analysis IIIMuizz Anibire
 
Session 05_Risk Assessment Program for YSP_Risk Analysis II
Session 05_Risk Assessment Program for YSP_Risk Analysis IISession 05_Risk Assessment Program for YSP_Risk Analysis II
Session 05_Risk Assessment Program for YSP_Risk Analysis IIMuizz Anibire
 
Session 04_Risk Assessment Program for YSP_Risk Analysis I
Session 04_Risk Assessment Program for YSP_Risk Analysis ISession 04_Risk Assessment Program for YSP_Risk Analysis I
Session 04_Risk Assessment Program for YSP_Risk Analysis IMuizz Anibire
 
Session 02 Risk Assessment Program for YSP_The Risk Assessment Process
Session 02 Risk Assessment Program for YSP_The Risk Assessment ProcessSession 02 Risk Assessment Program for YSP_The Risk Assessment Process
Session 02 Risk Assessment Program for YSP_The Risk Assessment ProcessMuizz Anibire
 
Session 01 _Risk Assessment Program for YSP_Introduction, Definitions and Sta...
Session 01 _Risk Assessment Program for YSP_Introduction, Definitions and Sta...Session 01 _Risk Assessment Program for YSP_Introduction, Definitions and Sta...
Session 01 _Risk Assessment Program for YSP_Introduction, Definitions and Sta...Muizz Anibire
 
Risk Assessment Program For Young Safety Professionals (YSP)
Risk Assessment Program For Young Safety Professionals (YSP)Risk Assessment Program For Young Safety Professionals (YSP)
Risk Assessment Program For Young Safety Professionals (YSP)Muizz Anibire
 
Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...
Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...
Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...Muizz Anibire
 
Construction Safety Training_Session 08_Demolition using Explosives
Construction Safety Training_Session 08_Demolition using ExplosivesConstruction Safety Training_Session 08_Demolition using Explosives
Construction Safety Training_Session 08_Demolition using ExplosivesMuizz Anibire
 
Sample risk assessment report for dcc safety students
Sample risk assessment report for dcc safety studentsSample risk assessment report for dcc safety students
Sample risk assessment report for dcc safety studentsMuizz Anibire
 

Mehr von Muizz Anibire (20)

Questionnaire Template.docx
Questionnaire Template.docxQuestionnaire Template.docx
Questionnaire Template.docx
 
Turing’s Computing Machinery and Intelligence.pdf
Turing’s Computing Machinery and Intelligence.pdfTuring’s Computing Machinery and Intelligence.pdf
Turing’s Computing Machinery and Intelligence.pdf
 
أحكام الجنائز -FUNERAL RITES
أحكام الجنائز   -FUNERAL RITESأحكام الجنائز   -FUNERAL RITES
أحكام الجنائز -FUNERAL RITES
 
ISO 31000 risk management process
ISO 31000 risk management processISO 31000 risk management process
ISO 31000 risk management process
 
A MACHINE LEARNING-BASED FRAMEWORK FOR DELAY MITIGATION IN TALL BUILDING PROJ...
A MACHINE LEARNING-BASED FRAMEWORK FOR DELAY MITIGATION IN TALL BUILDING PROJ...A MACHINE LEARNING-BASED FRAMEWORK FOR DELAY MITIGATION IN TALL BUILDING PROJ...
A MACHINE LEARNING-BASED FRAMEWORK FOR DELAY MITIGATION IN TALL BUILDING PROJ...
 
CAUSES OF DELAY IN TALL BUILDING PROJECTS IN GCC COUNTRIES
CAUSES OF DELAY IN TALL BUILDING PROJECTS IN GCC COUNTRIESCAUSES OF DELAY IN TALL BUILDING PROJECTS IN GCC COUNTRIES
CAUSES OF DELAY IN TALL BUILDING PROJECTS IN GCC COUNTRIES
 
Guidelines on writing a research paper
Guidelines on writing a research paperGuidelines on writing a research paper
Guidelines on writing a research paper
 
Tall buildings in urban context
Tall buildings in urban contextTall buildings in urban context
Tall buildings in urban context
 
Session 09_Risk Assessment Program for YSP_Risk Assessment Tools and Practica...
Session 09_Risk Assessment Program for YSP_Risk Assessment Tools and Practica...Session 09_Risk Assessment Program for YSP_Risk Assessment Tools and Practica...
Session 09_Risk Assessment Program for YSP_Risk Assessment Tools and Practica...
 
Session 08_Risk Assessment Program for YSP_Risk Treatment and Communication
Session 08_Risk Assessment Program for YSP_Risk Treatment and CommunicationSession 08_Risk Assessment Program for YSP_Risk Treatment and Communication
Session 08_Risk Assessment Program for YSP_Risk Treatment and Communication
 
Session 07_Risk Assessment Program for YSP_Risk Evaluation
Session 07_Risk Assessment Program for YSP_Risk EvaluationSession 07_Risk Assessment Program for YSP_Risk Evaluation
Session 07_Risk Assessment Program for YSP_Risk Evaluation
 
Session 06_Risk Assessment Program for YSP_Risk Analysis III
Session 06_Risk Assessment Program for YSP_Risk Analysis IIISession 06_Risk Assessment Program for YSP_Risk Analysis III
Session 06_Risk Assessment Program for YSP_Risk Analysis III
 
Session 05_Risk Assessment Program for YSP_Risk Analysis II
Session 05_Risk Assessment Program for YSP_Risk Analysis IISession 05_Risk Assessment Program for YSP_Risk Analysis II
Session 05_Risk Assessment Program for YSP_Risk Analysis II
 
Session 04_Risk Assessment Program for YSP_Risk Analysis I
Session 04_Risk Assessment Program for YSP_Risk Analysis ISession 04_Risk Assessment Program for YSP_Risk Analysis I
Session 04_Risk Assessment Program for YSP_Risk Analysis I
 
Session 02 Risk Assessment Program for YSP_The Risk Assessment Process
Session 02 Risk Assessment Program for YSP_The Risk Assessment ProcessSession 02 Risk Assessment Program for YSP_The Risk Assessment Process
Session 02 Risk Assessment Program for YSP_The Risk Assessment Process
 
Session 01 _Risk Assessment Program for YSP_Introduction, Definitions and Sta...
Session 01 _Risk Assessment Program for YSP_Introduction, Definitions and Sta...Session 01 _Risk Assessment Program for YSP_Introduction, Definitions and Sta...
Session 01 _Risk Assessment Program for YSP_Introduction, Definitions and Sta...
 
Risk Assessment Program For Young Safety Professionals (YSP)
Risk Assessment Program For Young Safety Professionals (YSP)Risk Assessment Program For Young Safety Professionals (YSP)
Risk Assessment Program For Young Safety Professionals (YSP)
 
Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...
Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...
Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...
 
Construction Safety Training_Session 08_Demolition using Explosives
Construction Safety Training_Session 08_Demolition using ExplosivesConstruction Safety Training_Session 08_Demolition using Explosives
Construction Safety Training_Session 08_Demolition using Explosives
 
Sample risk assessment report for dcc safety students
Sample risk assessment report for dcc safety studentsSample risk assessment report for dcc safety students
Sample risk assessment report for dcc safety students
 

Kürzlich hochgeladen

(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 

Kürzlich hochgeladen (20)

(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 

Construction Safety Training_Session 01_Overview of the Construction Industry

  • 1. Construction Safety Training SHORT COURSE Instructor: Mr. Muizz Anibire, MSc Tel: +966501296203, Email: muizzanibire10@gmail.com Dammam Community College Safety Technology Program
  • 2. Reason/Justification: The construction industry is one of the most hazardous industries in the world. More so, in the Middle East, construction accidents and fatality rates have been reported to be 18.6 per 100,000 workers, compared to 4.2 per 100,000 workers in other economies. In Saudi Arabia, the construction industry was responsible for over 46.3% of the recorded occupational injuries (GOSI, 2017). Who should attend: • Junior to middle level staff of construction and civil engineering firms • Students majoring in safety, construction, architecture, civil engineering building, and related fields • Entrepreneurs in real estate and property development Venue: Dammam Community College, King Fahd University of Petroleum and Minerals, KSA. Duration: 3 Hours x 4 Sessions (12 Hours) Mode of Instruction: lecture presentation in the English Language, hands on exercises, and case studies. Award: Certificate of Participation About the course
  • 3. The objective of this course is to develop understanding of the fundamental concepts of construction safety. Students will learn about the common hazards in the construction industry, risk assessment, and control methods. Course objective
  • 4. This course will cover areas such as excavations, confined spaces, underground works, and working at heights, demolition, risk assessment and principles of control. Scope
  • 5. At the end of this course, students should be able to:  Describe hazards associated with the construction industry  Evaluate construction tasks to applaud inherent risks  Select hazard control methods and implementation strategies  Prepare construction risk assessment reports and methods statement Course learning outcomes
  • 6. Course lesson plan Day 1 Session 01: Overview of the construction industry Prayer break Session 02: Excavation works, hazards and controls Short break Session 03: Confined spaces, and underground works Day 2 Session 04: Working at heights and over water Prayer break Session 05: Access equipment, precautions and controls Short break Session 06: Case studies and round table discussions Day 3 Session 07: Construction demolition: hazards and controls Prayer break Session 08: Blasting and use of explosives Short break Session 09: Case studies and round table discussions Day 4 Session 10: Risk Assessment and Principles of Control Prayer break Session 11: Risk Assessment and Methods Statement (RAMS) Short break Session 12: Course review/case study done in groups
  • 7. Introduction to Health and Safety in Construction: The Handbook for the NEBOSH National Certificate in Construction: Health and Safety Author(s): Phil Hughes, Ed Ferrett Publisher: Routledge, 4th Edition, 2011. Risk Management Tools for Safety Professionals Author(s): Bruce K. Lyon, Georgi Popov Publisher: Publisher: American Society of Safety Professionals, 2017. Saudi Aramco Construction Safety Manual Loss Prevention Department, Saudi Aramco 2017 Edition. CALcrete Computer Aided E-Learning – Health and Safety Module. URL: https://www.concretecentre.com/Publications-Software/Design-tools-and-software/CALcrete.aspx Recommended reference materials
  • 8. Dammam Community College Safety Technology Program Construction Safety Training SHORT COURSE Instructor: Mr. Muizz Anibire, MSc Tel: +966501296203, Email: muizzanibire10@gmail.com
  • 9.  Understand the construction industry and its environment  Understand basic concepts/terminology in the construction industry  Identify the various types of construction projects  Identify various processes involved in construction  Identify different participants in the construction process  Identify the various types of equipment used in construction  Describe common hazards in the construction industry Learning objectives
  • 10. Introduction 1/3 What does construction mean to you ?
  • 11. Introduction 2/3  Construction is an art as well as a science.  It is defined as the process of creating or altering a building, structure, or object. This includes land clearance, excavation, erection and the assembly and installation of components and equipment.  Construction activity is an integral part of a country’s infrastructure and industrial development.  The construction industry is vital to a nation’s socio- economic development.  It is estimated that the worth of the industry is about US $8.7 trillion, accounting for 12.2% of the world’s economic output and providing employment for about 200 million people worldwide.
  • 12. Introduction 3/3  The construction industry also drives growth in other industries such as the steel, concrete, and timber material industries; trucking, shipping, manufacturing and mining industries.  The following are some of the benefits of the construction industry:  Strategic tool to achieving sustainable development  Contributes significantly to the economy  Provide outputs to most industries and utilizes the outputs of many industries  Income generation and re-distribution  Employment generation.
  • 13. Characteristics of the Construction Industry The construction industry has some characteristics as described in the table: Industry related characteristics Project related characteristics The increasing complexity of the industry Projects are temporary in nature Low entry requirements and small sized enterprises Every project is unique Fierce competition and low profit margins Uncertain and inter-dependent environment Economic pressures Competitive tendering Labor intensive processes and health risks Mega projects – see example in next slide Masculine nature of work
  • 14. Characteristics of the Construction Industry The development of the Three Gorges Dam project required the Chinese government to resettle more than one million people, which led to many socio-cultural issues, such as ineffective compensation distribution, loss of employment and inadequate new housing.
  • 15. Types of Construction  Construction work can be categorized into four broad areas: 1. Residential buildings (houses, apartments, flats, etc.) 2. Institutional and commercial buildings (offices, shops, hotels, schools, etc.) 3. Infrastructure and heavy highway construction (roads, bridges, rails, water and sewerage, etc.) 4. Industrial construction (Refineries, and power plants etc.)
  • 17. Institutional and Commercial Buildings University buildings – New York University, Abu Dhabi
  • 18. Institutional and Commercial Buildings The King Abdulaziz Center for World Culture
  • 19. Infrastructure and Heavy Highway Construction Highways and bridges
  • 20. Infrastructure and Heavy Highway Construction Rail roads and urban transit systems
  • 21. Infrastructure and Heavy Highway Construction Rail roads and urban transit systems
  • 22. Infrastructure and Heavy Highway Construction Tunnels
  • 23. Infrastructure and Heavy Highway Construction Airports
  • 26. The Construction Process  The construction process consists of the building or assembling of infrastructure.  Generally the construction process consists of six stages:  Concepts  Contracts and bid documents  Bidding  Construction  Construction payments  Completion
  • 27. The Construction Process Source: https://www.strideproperties.com/stages/
  • 28. The Conceptual Stage 1/2  The conceptual or design stage is also known as architectural programming and involves activities that occur before the actual construction begins.  Licensed professionals in the conceptual stage may include:  Architect (for residential, institutional and commercial facilities)  Civil/Structural and Construction Engineers  Mechanical, Electrical and Plumbing (MEP) Engineers  Industrial/Piping Engineers (for industrial facilities)  Chemical/Process Engineers (for industrial facilities)  Facility/Maintenance Engineers  Safety Engineers  Etc.
  • 29. The Conceptual Stage 2/2  In the conceptual stage, a number of client meetings are arranged in order to determine the purpose and objective of the proposed construction. This is referred to as debriefing.  The preliminary programming produces a list of solutions, alternatives, feasibility studies and costs estimates.  After a review of the programming statement, schematic plans are prepared.  The final product is a schematic plan which is reviewed and modified by all concerned stakeholders. The final schematic plan is known as the preliminary plans.
  • 30. Contracts and Bid Documents  All projects (new construction or expansion of an existing structure) require the preparation of contract documents. The document describes:  The appearance, layout, equipment, and amenities of the project.  Design of structural, mechanical, electrical, plumbing, communication systems and other systems.  Other relevant issues including: local zoning requirements, local infrastructure, traffic, environmental and population impact, acoustic, energy, lighting, and aesthetic considerations.  Numerous drawing plans are involved in a construction project, including: architectural; structural; mechanical; electrical; Process Flow Diagrams (PFDs); Process and Instrument Drawings (P&IDs); etc.  Contract specification “specs” are “that portion of the Contract Documents consisting of the written requirements for materials, equipment, systems, standards and workmanship for the Work, and performance of related services,” according to AIA Document A201-2007.
  • 31. Bidding  The client/owner solicits bids or proposals from general contractors and/or specialty contractors.  The following is the sequence of events to prepare a contract bid:  The contractor obtains the “specs” and prepares a formal estimate of the construction cost or bid.  The contractor reviews the contract plans and specs to determine how to build the project and to consider all the limitations or conditions required for the project.  The contractor solicits bids from subcontractors and evaluates the ultimate profit potential of the contract.  The owner evaluates all of the submitted bids and then awards the contract.  The contract document and specs contain the project start and completion dates, the progress billing procedures, the insurance requirements, and other pertinent information.
  • 32. Construction (Field Work)  Building Permits - specifications and blueprints must be provided to the municipality's building department, along with the application for a permit. Results of soil testing, environmental impact studies etc. may also be required. Sometimes, a public hearing is mandated, if there is opposition to the project.  A building inspector also verifies that the project is being constructed according to municipal code.  Subcontractors - limited scope of work, which usually involves a special skill, knowledge, or ability. May include plumbers, electricians, framers, concrete workers etc., and work with the main contractor.  Shop drawings - detail the specific building components.  Project submissions - illustrate each item's intended use, function, method of attachment or installation requirements, and placed-in-service date.  Change Orders - The architect/engineer may make modifications or change orders to the construction plans as needed. Change orders should be reviewed for any agreed changes to the payment schedule.
  • 33. Construction Payments  When a contractor completes a prescribed amount of work, the owner pays the contractor for the completed work.  It is to the contractor's benefit that items of construction be broken into as many parts as possible.  Document A201 contains AIA Form G702 which requires that the contractor break down the bid into various parts of work. The project designer (architect or engineer) critically reviews the G702 schedule of values that are prepared by the contractor and either accepts or rejects them.
  • 34. Completion  As Built Plans - These plans represent exactly how the facility was constructed and they also incorporate all the changes to the original construction plan.  Notice of Partial Completion - the owner may desire to occupy a portion of the completed building. In that case, local building officials conduct an inspection to determine if that portion of the facility meets all building codes and is safe to be occupied. If approval is granted, a "Certificate/Notice of Partial Occupancy" is issued.  Notice of Substantial Completion - local building officials issue this notice when 95 % of the construction is complete.  Notice of Completion/Certificate of Occupancy - when the building is 100% complete, the project must pass a final inspection by local building officials in order for the "Notice of Completion" and the "Certificate of Occupancy" to be issued.
  • 35. Sequence of Construction Work for a Small Project  Clear the land (which may include demolition of existing structures)  Excavate the land (which may include digging holes and leveling)  Pour the foundation  Frame steel and/or concrete  Rough framing  Rough electrical  Concrete flooring  Roofing  Heating and air conditioning  Ductwork for heating and air conditioning  Elevators and/or escalators  Sprinklers and other safety equipment  Install electrical fixtures  Insulate and weather-strip  Frame windows and door sashes  Install tile and marble  Install suspended acoustical ceilings  Install toilets, sinks and other plumbing fixtures  Paint walls (inside and out)
  • 36. Construction Equipment  There are numerous construction equipment used depending on the nature and scale of work. Some of these may include:  Earthmoving equipment.  Roadwork equipment.  Access equipment.  Lifting/Hoisting equipment.  Hauling equipment.  Concrete Equipment
  • 37. Construction Equipment Bulldozer: used to push large quantities of soil, sand, rubble, or other such material during construction.
  • 38. Construction Equipment Back Hoe: is a type of excavating equipment, or digger, consisting of a digging bucket.
  • 39. Construction Equipment Grader: is a construction machine with a long blade used to create a flat surface during the grading process.
  • 40. Construction Equipment Trencher: used to dig trenches, especially for laying pipes or electrical cables, for installing drainage, or in preparation for trench warfare.
  • 41. Construction Equipment Loaders: used in construction to move aside or load materials such as asphalt, demolition debris, dirt, snow, feed, gravel, logs, raw minerals, recycled material, rock, sand, woodchips, etc. into or onto another type of machinery.
  • 42. Construction Equipment Articulated Dump Trucks (ADT): is a very large heavy duty type of dump truck used to transport loads over rough terrain, and occasionally on public roads.
  • 43. Construction Equipment Asphalt Paver: used to lay asphalt on roads, bridges, parking lots and other such places.
  • 44. Construction Equipment Roller Compactor: used to compact soil, gravel, concrete, or asphalt in the construction of roads and foundations.
  • 45. Construction Equipment Cranes: a type of machine, generally equipped with a hoist rope, wire ropes or chains, and sheaves, that can be used both to lift and lower materials and to move them horizontally.
  • 46. Construction Equipment Scaffolds: a temporary structure used to support a work crew and materials to aid in the construction, maintenance and repair of buildings, bridges and all other man made structures.
  • 47. Construction Equipment Mobile Elevating Work Platforms (MEWP): a mechanical device used to provide temporary access for people or equipment to inaccessible areas, usually at height.
  • 48. Construction Equipment Piling Rig: to drill in sandy soil, clay, silty clay, etc. and widely used cast-in- place piles, diaphragm walls, foundation reinforcement and other foundation projects.
  • 49. Construction Equipment Pile Driver: used to drive piles into soil to provide foundation support for buildings or other structures.
  • 50. Construction Equipment Hauling Truck: used for transporting construction equipment from job site to job site.
  • 51. Construction Equipment Mobile Concrete Mixer: for transporting ready-mix concrete from the batching plant to the job site.
  • 52. Construction Equipment Concrete Pump: for transferring liquid concrete by pumping.
  • 53. Accidents in the Construction Industry  The construction industry is one of the most dangerous industries worldwide due to deadly fatalities and accidents recorded yearly.  Construction related injuries and accidents in the U.S. are 50% higher than those in any other industry (Huang and Hinze, 2003); in Japan, they are 40% of the total accidents, 50% in Ireland and 25% in the United Kingdom (Agwu and Olele, 2014).  More severe situations are recorded in developing countries.  Occupational accident and fatality rates in the Middle East have been reported to be 18.6 per 100,000 workers, compared to 4.2 per 100,000 workers in established economies (Hämäläinen et al., 2006).
  • 54. Accidents in the Construction Industry Makkah Tower Crane Collapse (Photo credit: https://www.thenational.ae/world/gcc/binladin-group-cleared-of-deadly-makkah- crane-collapse-1.663484)
  • 55. Accidents in the Construction Industry Crane Accident in New York (Photo credit: https://therealdeal.com/issues_articles/the-cost-of-tragedy/)
  • 56. OSHA’s Focus Four  OSHA has identified the 4 leading causes of fatalities in the Construction Industry. These include: For more details, see: https://www.osha.gov/dte/outreach/construction/focus_four/ Falls Struck-By ElectrocutionCaught-In or-Between
  • 57. Personal Protective Equipment in Construction  These are examples of some common PPEs used in the construction industry:
  • 58. Personal Protective Equipment in Construction  These are examples of some common PPEs used in the construction industry:
  • 59. Personal Protective Equipment in Construction  These are examples of some common PPEs used in the construction industry:
  • 60. Personal Protective Equipment in Construction  These are examples of some common PPEs used in the construction industry:
  • 61. Knowledge Check Q1 Construction is defined as the process of creating or altering a building, structure, or object. T F Q2 Power plants and refineries are examples of industrial construction. T F Q3 MEWP is a mechanical device used to provide temporary access for people or equipment to inaccessible areas, usually at height. T F Q4 Construction accident are more severe in developing countries. T F Q5 Electrocution is one of OSHA’s 4 leading causes of fatalities in the Construction Industry. T F