Objectives of the project
• The project cover 3% of the national electricity demand (to produce 117 MW
electricity in Jordan ).
• Growing business opportunities in the region.
• The project will contribute to Jordan's development objective in the energy
sector aiming to increase both electricity production and the share of
renewable energy in its electricity generation portfolio.
• Reduce energy import dependency.
• Reinforce reliability of supply and energy security.
• Reduce greenhouse gas emissions.
Objectives of the project
BENEFICIARIES
• End users of housing units, commercial and
• industrial facilities.
• Local residents (job creation).
• Local farmers and livestock owners (improved access & infrastructure).
Description of the project
Description of the project
IFI : International financial institutions
• Region : Middle East
• Company name (promoter) : JORDAN WIND PROJECT COMPANY PSC
• Country : Jordan
DURATION
• Total Design/Build Phase: 21 months
• Operations Phase: 20 years
• Last Updated Date: January 18, 2013
TOTAL COST
• €209 million (100% funded through private investment and loans provided by IFIs.)
ACTIONS
• Construction of a wind farm in theTafila Governorate (38 turbines with a
total capacity of 117 MW).
• Installation of an internal collection system connecting the turbines to the
transformer substation and to the high voltage transmission network.
• Civil works for access roads and transformer station.
• Provision of installation equipment and transportation of turbines.
Environmental Impact Evaluation
EIV = RI * ECV
RI: Resulting Impact
RI = D*Ce*(A&S + E + In + P + Rv + Pr)
ECV : environmental components value
ECV Relative relevance
0 NULL
1-3 LOW
4-6 Moderate
7-8 High
9-9 Very High
EIV ENVIRONMENTAL
IMPACT
IMPORTANCE
- 301 TO 2100 Negative
signicative
-1 TO -300 Negative
Non signicative
>0 Positive
Evaluation of impacts
Attribute Definition Description
Denotation (D) Indicates if the impact is positive or
negative
Positive Impact (+1)
Negative Impact (-1)
Certainty (Ce) Indicates the probability of
occurrence of the impact
Certain (10)
Very likely (7)
Likely (4)
Unlikely (1)
Accumulation
and synergy
(A&S)
Indicates if the impact is simple,
acculative or synergic
Simple (1)
Cummulative (3)
Synergic (6)
Criteria for the evaluation of Impacts .
Evaluation of impacts
Attribute Definition Description
Extension (E) Defines the magnitud of the area
affected by the impact (surface where
the impact is felt)
Puntual (1)
Partial (2)
Extense (3)
Intensity (In) Indicates the incidence degree
over the environmental component in
the area where the impact is produced
Low (1)
Medium (4)
High (5)
Very high (6)
Total (10)
Persistence (P) Indicates the persistence of the
impact
Fleeting (1)
Temporal (2)
Permanent (4)
Criteria for the evaluation of Impacts .
Evaluation of impacts
Attribute Definition Description
Reversibility
(Rv)
Indicates if the impacted
component has the capacity to
return to their original state
Short term (1)
Medium term (2)
Long term (3)
Irreversible (4)
Periodicity (Pr) Indicates the periodicity of the
impact
Discontinuous (1)
Periodic (2)
Continuous (4)
Criteria for the evaluation of Impacts .
Prediction and assessment of environmental
impacts and risks
Environmental
Component
Code Impact
Air quality A1 Increase in the emission of particulate
material and gasses to the atmosphere
Geomorphology Geo1 Modification of topography
Hydrology Hy1 Alteration of runoff in Chañaral ravine
Soils S1 Loss of soil
Noise No1 Modification of basal noise pressure
• Potential impacts identified – Physical aspects
Prediction and assessment of environmental
impacts and risks
Environmental
Component
Code Impact
Floraand
vegetation
FV1 Loss of vegetational formations
and flora
associated
Fauna Fau1
Fau2
Perturbation to environments
Collision of birds
• Potential impacts identified – Biotic aspects
Prediction and assessment of environmental
impacts and risks
Environmental
Component
Code Impact
Socioeconomic SE1
SE2
Increase of employment
Decrease of touristic activity due to effect on
marine mammals
Basicsocial
well-being
BSWB1
BSWB2
BSWB3
- Improvement in road infraestructure
-Transfer delays due to alterations in local traffic
- Energy generation with low emissions of
greenhouse gasses
Landscape Lan1 Alteration of the landscape quality and
touristic value
• Potential impacts identified – Human aspects
The EIA results
Impact Construction phase Operation phase Closure phase
A1 -252 -56 -252
Hy1 -63
Geo1 -240
S1 -252
No1 -56 -128 -56
FV1 -900
Fau1 -900 -756
Fau2 -684
SE1 +780
SE2 -72
BSWB1 +960 -147 -72
BSWB2 -196 -196
BSWB3 +1820
Lan1 -200 -260
Conclusion
• TheTafila wind farm will contribute significantly to the goal of using the
renewable energy in GENERAL , with each turbin providing power for more
than 2,500 Jordanian households .These households will benefit not only
from the stable price of the energy produced by these turbines , but also
from the reduction of GHG emissions that is caused by using power from
this wind farm insted of fossil-fuel burning power plants .
References
• http://www.inframed.com/investments/11/Tafila_Wind_Farm_%E2%80%9C
Tafila%E2%80%9D_.html
• http://ufmsecretariat.org/tafila-wind-farms/
• http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/651aeb16abd09c1f8525797d0069
76ba/888a87e4e02ad60985257af700703021?opendocument

Weitere ähnliche Inhalte

Andere mochten auch

Presentació
PresentacióPresentació
Presentació
ESO1
 
Icebreakingpenyegaransua 111024053019-phpapp02
Icebreakingpenyegaransua 111024053019-phpapp02Icebreakingpenyegaransua 111024053019-phpapp02
Icebreakingpenyegaransua 111024053019-phpapp02
anita sriwaty
 

Andere mochten auch (12)

SIAA Business Meeting 2016
SIAA Business Meeting 2016SIAA Business Meeting 2016
SIAA Business Meeting 2016
 
Dp pub
Dp pubDp pub
Dp pub
 
Program diet 13 hari
Program diet 13 hariProgram diet 13 hari
Program diet 13 hari
 
Powerful spell-attract-money-babajivashikaran
Powerful spell-attract-money-babajivashikaranPowerful spell-attract-money-babajivashikaran
Powerful spell-attract-money-babajivashikaran
 
Florida ds
Florida dsFlorida ds
Florida ds
 
Presentació
PresentacióPresentació
Presentació
 
Cracking the QR Code- Event Slides
Cracking the QR Code- Event SlidesCracking the QR Code- Event Slides
Cracking the QR Code- Event Slides
 
безопасность
безопасностьбезопасность
безопасность
 
Asepeyo. guia absentismo.
Asepeyo. guia absentismo.Asepeyo. guia absentismo.
Asepeyo. guia absentismo.
 
Icebreakingpenyegaransua 111024053019-phpapp02
Icebreakingpenyegaransua 111024053019-phpapp02Icebreakingpenyegaransua 111024053019-phpapp02
Icebreakingpenyegaransua 111024053019-phpapp02
 
Main menu 0913
Main menu 0913Main menu 0913
Main menu 0913
 
Leadville Presentation
Leadville PresentationLeadville Presentation
Leadville Presentation
 

Ähnlich wie EIA for Al Tafila wind farm

(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS
Aiman Ali
 
Krasilnikov global soil security
Krasilnikov global soil securityKrasilnikov global soil security
Krasilnikov global soil security
LandDegradation
 
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxUnit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
ssuser65cc68
 

Ähnlich wie EIA for Al Tafila wind farm (20)

Internship Presentation
Internship PresentationInternship Presentation
Internship Presentation
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
EVALUATION OF ENVIRONMENTAL IMPACT ASSESSMENT ON INDUSTRIAL PROJECTS: A MODEL...
EVALUATION OF ENVIRONMENTAL IMPACT ASSESSMENT ON INDUSTRIAL PROJECTS: A MODEL...EVALUATION OF ENVIRONMENTAL IMPACT ASSESSMENT ON INDUSTRIAL PROJECTS: A MODEL...
EVALUATION OF ENVIRONMENTAL IMPACT ASSESSMENT ON INDUSTRIAL PROJECTS: A MODEL...
 
Environmental Engineering eia report italy 09.pptx
Environmental Engineering eia report italy 09.pptxEnvironmental Engineering eia report italy 09.pptx
Environmental Engineering eia report italy 09.pptx
 
Interaction of climate and wind power
Interaction of climate and wind powerInteraction of climate and wind power
Interaction of climate and wind power
 
(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS
 
Promoting Climate Resilient Rural Infrastructure in Northern Vietnam: Final W...
Promoting Climate Resilient Rural Infrastructure in Northern Vietnam: Final W...Promoting Climate Resilient Rural Infrastructure in Northern Vietnam: Final W...
Promoting Climate Resilient Rural Infrastructure in Northern Vietnam: Final W...
 
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.sEsia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
 
EIA report on thermal power project
EIA report on thermal power projectEIA report on thermal power project
EIA report on thermal power project
 
Krasilnikov global soil security
Krasilnikov global soil securityKrasilnikov global soil security
Krasilnikov global soil security
 
epug_33
epug_33epug_33
epug_33
 
The Importance of Risk Management in the Pipeline Industry
The Importance of Risk Management in the Pipeline IndustryThe Importance of Risk Management in the Pipeline Industry
The Importance of Risk Management in the Pipeline Industry
 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projects
 
Skourtos adaptation in greece ccisc
Skourtos adaptation in greece cciscSkourtos adaptation in greece ccisc
Skourtos adaptation in greece ccisc
 
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)
 
Environmental Risk Assessment - BOSH
Environmental Risk Assessment - BOSH Environmental Risk Assessment - BOSH
Environmental Risk Assessment - BOSH
 
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxUnit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
 
IRJET-Environmental Impact Assessment for Infrastructure Development project...
IRJET-Environmental Impact Assessment for Infrastructure  Development project...IRJET-Environmental Impact Assessment for Infrastructure  Development project...
IRJET-Environmental Impact Assessment for Infrastructure Development project...
 
TAICCAT 2015期末簡報
TAICCAT 2015期末簡報TAICCAT 2015期末簡報
TAICCAT 2015期末簡報
 
KISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIAKISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIA
 

Mehr von Mohamed Herzallah (11)

Aartselaar Aquafin water , Environmental water plant .
Aartselaar Aquafin water , Environmental water plant .Aartselaar Aquafin water , Environmental water plant .
Aartselaar Aquafin water , Environmental water plant .
 
Report Tidal power .
Report Tidal power . Report Tidal power .
Report Tidal power .
 
Tidal power - Renewable energy .
Tidal power - Renewable energy  . Tidal power - Renewable energy  .
Tidal power - Renewable energy .
 
Mohammed herzallah doroteya
Mohammed herzallah   doroteyaMohammed herzallah   doroteya
Mohammed herzallah doroteya
 
Diabetes in the Arabs world .
Diabetes in the Arabs world .Diabetes in the Arabs world .
Diabetes in the Arabs world .
 
Household waste in PALESTINE .
Household waste in PALESTINE .Household waste in PALESTINE .
Household waste in PALESTINE .
 
Asia .
Asia . Asia .
Asia .
 
Microbiology .
Microbiology . Microbiology .
Microbiology .
 
Ecological Risk Assessment
Ecological Risk Assessment Ecological Risk Assessment
Ecological Risk Assessment
 
Ameril herzallah ludevese_nicomel_rifai (applied statistics project)
Ameril herzallah ludevese_nicomel_rifai (applied statistics project)Ameril herzallah ludevese_nicomel_rifai (applied statistics project)
Ameril herzallah ludevese_nicomel_rifai (applied statistics project)
 
Milk analysis
Milk analysisMilk analysis
Milk analysis
 

Kürzlich hochgeladen

Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Anamikakaur10
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
kauryashika82
 

Kürzlich hochgeladen (20)

Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
Deforestation
DeforestationDeforestation
Deforestation
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
 
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 

EIA for Al Tafila wind farm

  • 1. Environmental Impact assessment TafilaWind Farm Tafila – Kingdom of Jordan By: Mohammed Akram Herzallah. 2014-2015
  • 2. Objectives of the project • The project cover 3% of the national electricity demand (to produce 117 MW electricity in Jordan ). • Growing business opportunities in the region. • The project will contribute to Jordan's development objective in the energy sector aiming to increase both electricity production and the share of renewable energy in its electricity generation portfolio.
  • 3. • Reduce energy import dependency. • Reinforce reliability of supply and energy security. • Reduce greenhouse gas emissions. Objectives of the project
  • 4. BENEFICIARIES • End users of housing units, commercial and • industrial facilities. • Local residents (job creation). • Local farmers and livestock owners (improved access & infrastructure).
  • 6. Description of the project IFI : International financial institutions • Region : Middle East • Company name (promoter) : JORDAN WIND PROJECT COMPANY PSC • Country : Jordan DURATION • Total Design/Build Phase: 21 months • Operations Phase: 20 years • Last Updated Date: January 18, 2013 TOTAL COST • €209 million (100% funded through private investment and loans provided by IFIs.)
  • 7. ACTIONS • Construction of a wind farm in theTafila Governorate (38 turbines with a total capacity of 117 MW). • Installation of an internal collection system connecting the turbines to the transformer substation and to the high voltage transmission network. • Civil works for access roads and transformer station. • Provision of installation equipment and transportation of turbines.
  • 8. Environmental Impact Evaluation EIV = RI * ECV RI: Resulting Impact RI = D*Ce*(A&S + E + In + P + Rv + Pr) ECV : environmental components value ECV Relative relevance 0 NULL 1-3 LOW 4-6 Moderate 7-8 High 9-9 Very High EIV ENVIRONMENTAL IMPACT IMPORTANCE - 301 TO 2100 Negative signicative -1 TO -300 Negative Non signicative >0 Positive
  • 9. Evaluation of impacts Attribute Definition Description Denotation (D) Indicates if the impact is positive or negative Positive Impact (+1) Negative Impact (-1) Certainty (Ce) Indicates the probability of occurrence of the impact Certain (10) Very likely (7) Likely (4) Unlikely (1) Accumulation and synergy (A&S) Indicates if the impact is simple, acculative or synergic Simple (1) Cummulative (3) Synergic (6) Criteria for the evaluation of Impacts .
  • 10. Evaluation of impacts Attribute Definition Description Extension (E) Defines the magnitud of the area affected by the impact (surface where the impact is felt) Puntual (1) Partial (2) Extense (3) Intensity (In) Indicates the incidence degree over the environmental component in the area where the impact is produced Low (1) Medium (4) High (5) Very high (6) Total (10) Persistence (P) Indicates the persistence of the impact Fleeting (1) Temporal (2) Permanent (4) Criteria for the evaluation of Impacts .
  • 11. Evaluation of impacts Attribute Definition Description Reversibility (Rv) Indicates if the impacted component has the capacity to return to their original state Short term (1) Medium term (2) Long term (3) Irreversible (4) Periodicity (Pr) Indicates the periodicity of the impact Discontinuous (1) Periodic (2) Continuous (4) Criteria for the evaluation of Impacts .
  • 12. Prediction and assessment of environmental impacts and risks Environmental Component Code Impact Air quality A1 Increase in the emission of particulate material and gasses to the atmosphere Geomorphology Geo1 Modification of topography Hydrology Hy1 Alteration of runoff in Chañaral ravine Soils S1 Loss of soil Noise No1 Modification of basal noise pressure • Potential impacts identified – Physical aspects
  • 13. Prediction and assessment of environmental impacts and risks Environmental Component Code Impact Floraand vegetation FV1 Loss of vegetational formations and flora associated Fauna Fau1 Fau2 Perturbation to environments Collision of birds • Potential impacts identified – Biotic aspects
  • 14. Prediction and assessment of environmental impacts and risks Environmental Component Code Impact Socioeconomic SE1 SE2 Increase of employment Decrease of touristic activity due to effect on marine mammals Basicsocial well-being BSWB1 BSWB2 BSWB3 - Improvement in road infraestructure -Transfer delays due to alterations in local traffic - Energy generation with low emissions of greenhouse gasses Landscape Lan1 Alteration of the landscape quality and touristic value • Potential impacts identified – Human aspects
  • 15. The EIA results Impact Construction phase Operation phase Closure phase A1 -252 -56 -252 Hy1 -63 Geo1 -240 S1 -252 No1 -56 -128 -56 FV1 -900 Fau1 -900 -756 Fau2 -684 SE1 +780 SE2 -72 BSWB1 +960 -147 -72 BSWB2 -196 -196 BSWB3 +1820 Lan1 -200 -260
  • 16. Conclusion • TheTafila wind farm will contribute significantly to the goal of using the renewable energy in GENERAL , with each turbin providing power for more than 2,500 Jordanian households .These households will benefit not only from the stable price of the energy produced by these turbines , but also from the reduction of GHG emissions that is caused by using power from this wind farm insted of fossil-fuel burning power plants .