Questionare from the Demogrape meeting taken place in Auckland the 25th of August 2014. 
Participants: Emilia Correia, Pier Cilliers, Lucilla Alfonsi, Olivier Terzo, Vincenzo Romano 
Updated the 10 of October 
Next telco meetings: 12 of November at 10:30 UT (South Africa) and 13:30 UT (Brazil) 
Items: 
1) Technical requirements for station installation 
1.1)Logistics requirements for persons and equipments 
2) Technical requirements for server installation 
3) Technical requirements for data communication from Antarctica 
4) Technical requirements for data access and storage 
5) Technical requirements for cloud management 
6) Technical requirements for Applications/Processors 
7) Hardware procurement and shipping 
8) Technical requirements for hardware for the measurements campaign 
1) The installation of the receiver is well known by the participants. Summarising the requirements for 
the site: 
‐ The ideal site installation of the antenna is on the top of a roof. Describe where the antenna 
will be installed: 
…………………………………………………………………………………………………………………………………………………. 
‐ The mast length has not to exceed 2 m, in order to avoid vibration effects. Is the mast available 
locally? 
…………………………………………………………………………………………………………………………………………………. 
‐ The antenna needs a view free over the horizon at 360°, at least over an angle of 10° 
How is the surround of the antenna in terms of obstacles? 
………………………………………………………………………………………………………………………………………………… 
‐ Others GNSS antenna and metallic structures, around the antenna, must stay at least at 3 
meters distance. 
How is the surround of the antenna in terms of other antennas? 
………………………………………………………………………………………………………………………………………………… 
Do you already have an GNSS antenna installed? What kind of antenna? 
Is the GNSS antenna installed active or passive? 
Can eventually add a splitter to the existing GNSS antenna? 
‐ No electromagnetic emission (radio links, wifi,…) have to be in the direction of the antenna or 
close to it. 
How is the surround of the antenna in terms of electromagnetic interference? 
………………………………………………………………………………………………………………………………………………… 
‐ The distance between the antenna and the receiver place is installed can’t exceed 30 meters. 
How far is the antenna from the place where the receiver will be installed? 
………………………………………………………………………………………………………………………………………………… 
‐ The receiver site needs to be internal with this requirements: 
Available space around 40x40x40 cm. Is a surface area of 40x40 cm 
available?.......................................... 
Power needis around 200W, possibly by UPS net. Is such available?....................................
Is eventually possible to install an UPS?.......................................................... 
Is the local network connection available via Ethernet?.................................................. 
Can we obtain an IP address? Static or dynamic?........................................... 
Can we have the remote control of the PC (i.e. by teamviewer)?..................................... 
Is the environmental temperature of the site over 5°?................................................... 
‐ The installation of the GNSS station requires a person with IT/electronic skill trained for the 
scope in addition to the local support of generic technicians. 
Can your Antarctic program identify and support the installation of the GNSS identifying a 
person to be trained?.................................................... 
Has this a cost for the project?................................. 
When can we recruit this person?.................... 
Is this person available to come to Italy for four weeks for the training? (Cost is covered by the 
project)………………………………………………….. 
Can we arrange one week of training in your institute? (Cost is covered by the project) 
...................................... 
When the installation in the Antarctic base is foreseen?................................ 
Could the Antarctic station host an Italian expert for the installation?.............................. 
Which are the rules and procedure to send a foreigner expert to the base (cost, time, warranty, 
medical requirements,…) ?.............................................................................. 
Can the personnel involved stay one month in the base to cover the installation and the 
measurement campaign?................................................. 
Is technical support guaranteed during the installation phase?...................................... 
Mechanic to antenna installation (20 hours)…………………………………………………. 
Electrician to Cable installation (4 hours)…………………….. 
Electrician to PC and receiver installation (2 hours)……………. 
IT technician for network configuration (8 hours)………………. 
Is the maintenance of the measurement station guarantee during the entire year (ordinary 
maintenance is around 2 hours/months)?................................................... 
2) The option we adopted is a full federated infrastructure based on 3 private servers installed in Italy, 
Brazil and South Africa. 
‐ Is the place for a 2U rack server available in your center?........... 
‐ Have we firewall limitation?........... 
‐ What bandwidth we have?............ 
‐ Is the Power and net guarantee continuously? 
‐ Can we have a remote control of the server?........... 
‐ Has your centre available a cloud infrastructure?.............. 
3) The data communication between Antarctica and the servers is based on the existing data 
infrastructure 
‐ Is data transfer based by FTP possible? 
‐ What bandwidth is possible to have? 
‐ Is the transfer available all the time of during preferred time? 
‐ Can we install of the PC automatic procedures to manage the data transfer? 
‐ I the connection between Antarctica and your centre reliable? 
4) The technical requirements for data access and storage depends on the data archive structure. 
‐ What is the dimension of the entire data archive? 
‐ Is it a DB or just data archive? 
‐ The data checking procedure is automatic? 
5) The technical requirements for cloud management consist in the connection between the 3 
servers.
Is a point to poit connection possible at the IP level? 
What kind of protocol (tcp/ip, udp)? 
6) The technical requirements for Applications/Processors is referred to what kind of application we 
want to realised on the cloud infrastructure. 
‐ Which kind of processor we want to integrate in the infrastructure (GBSC, Scint‐Proxies)? 
‐ What language it use? 
‐ In which OS it is realised? 
‐ What libraries? 
‐ Are other data available for the infrastructure (rinex, geomagnetic, auroral, ionosonde) 
‐ If yes can we use them? 
‐ What is the rule to use these data? 
‐ Do you agree to share the processors among the 3 centers? 
7) This part is related to the administrative and custom aspect for the procurements of the 
instrumentation. 
‐ Can we send the hardware directly from the factory to your center? 
‐ Do you have particularly problems concerning custom? 
‐ Can we ask to your polar administration to buy the instrumentation respecting the rules of 
Italian Antarctic Program? 
‐ Do you have a local seller for PC and servers?

Weitere ähnliche Inhalte

Andere mochten auch

Questionnaire on npa
Questionnaire on npaQuestionnaire on npa
Questionnaire on npavandivarun
 
Non perfoming assets @ uti bank project report mba finance
Non perfoming assets  @ uti bank project report mba financeNon perfoming assets  @ uti bank project report mba finance
Non perfoming assets @ uti bank project report mba financeBabasab Patil
 
A Project Report on NPA Management in J & K Bank
A Project Report on NPA Management in J & K BankA Project Report on NPA Management in J & K Bank
A Project Report on NPA Management in J & K BankRaoufnaikoo
 
Npa final-report (1)
Npa final-report (1)Npa final-report (1)
Npa final-report (1)Dapinder Deep
 
Project report on working capital management
Project report on working capital managementProject report on working capital management
Project report on working capital managementProjects Kart
 
36883180 non-performing-assets-in-sbi-group
36883180 non-performing-assets-in-sbi-group36883180 non-performing-assets-in-sbi-group
36883180 non-performing-assets-in-sbi-groupAditya Shukla
 
Change Readiness Questionaire
Change Readiness QuestionaireChange Readiness Questionaire
Change Readiness Questionairedmdk12
 
Non-performing-assets-of-banks
Non-performing-assets-of-banksNon-performing-assets-of-banks
Non-performing-assets-of-banksJunaid Khan
 
A PROJECT REPORT ON MARKETING RESEARCH
A PROJECT REPORT ON MARKETING RESEARCHA PROJECT REPORT ON MARKETING RESEARCH
A PROJECT REPORT ON MARKETING RESEARCHsanjay3017
 
Working capital management project report mba
Working capital management project report mbaWorking capital management project report mba
Working capital management project report mbaBabasab Patil
 
working capital management project
working capital management projectworking capital management project
working capital management projectsatishgedela
 
WORKING CAPITAL MANAGEMENT
WORKING CAPITAL MANAGEMENTWORKING CAPITAL MANAGEMENT
WORKING CAPITAL MANAGEMENTipermeeta
 

Andere mochten auch (16)

Questionnaire on npa
Questionnaire on npaQuestionnaire on npa
Questionnaire on npa
 
Questionare
QuestionareQuestionare
Questionare
 
Non perfoming assets @ uti bank project report mba finance
Non perfoming assets  @ uti bank project report mba financeNon perfoming assets  @ uti bank project report mba finance
Non perfoming assets @ uti bank project report mba finance
 
A Project Report on NPA Management in J & K Bank
A Project Report on NPA Management in J & K BankA Project Report on NPA Management in J & K Bank
A Project Report on NPA Management in J & K Bank
 
Npa final-report (1)
Npa final-report (1)Npa final-report (1)
Npa final-report (1)
 
Project report on working capital management
Project report on working capital managementProject report on working capital management
Project report on working capital management
 
36883180 non-performing-assets-in-sbi-group
36883180 non-performing-assets-in-sbi-group36883180 non-performing-assets-in-sbi-group
36883180 non-performing-assets-in-sbi-group
 
Change Readiness Questionaire
Change Readiness QuestionaireChange Readiness Questionaire
Change Readiness Questionaire
 
Non-performing-assets-of-banks
Non-performing-assets-of-banksNon-performing-assets-of-banks
Non-performing-assets-of-banks
 
A PROJECT REPORT ON MARKETING RESEARCH
A PROJECT REPORT ON MARKETING RESEARCHA PROJECT REPORT ON MARKETING RESEARCH
A PROJECT REPORT ON MARKETING RESEARCH
 
Mcp 1617 questionaire
Mcp 1617 questionaireMcp 1617 questionaire
Mcp 1617 questionaire
 
Questionaire
QuestionaireQuestionaire
Questionaire
 
Working Capital Mgt
Working Capital MgtWorking Capital Mgt
Working Capital Mgt
 
Working capital management project report mba
Working capital management project report mbaWorking capital management project report mba
Working capital management project report mba
 
working capital management project
working capital management projectworking capital management project
working capital management project
 
WORKING CAPITAL MANAGEMENT
WORKING CAPITAL MANAGEMENTWORKING CAPITAL MANAGEMENT
WORKING CAPITAL MANAGEMENT
 

Ähnlich wie DGromano Gnss installation questionaire v2

Thesis-Vamsi
Thesis-VamsiThesis-Vamsi
Thesis-Vamsichagari
 
Antenna test selection guide 2012
Antenna test selection guide 2012Antenna test selection guide 2012
Antenna test selection guide 2012janvavqa
 
FFM_–_Technical_Brief_–_Network_Solutions_for_Intelligence_Surveillance_and_R...
FFM_–_Technical_Brief_–_Network_Solutions_for_Intelligence_Surveillance_and_R...FFM_–_Technical_Brief_–_Network_Solutions_for_Intelligence_Surveillance_and_R...
FFM_–_Technical_Brief_–_Network_Solutions_for_Intelligence_Surveillance_and_R...Vince Garr
 
White Paper: Indoor Positioning in Industry & Logistics
White Paper: Indoor Positioning in Industry & LogisticsWhite Paper: Indoor Positioning in Industry & Logistics
White Paper: Indoor Positioning in Industry & Logisticsinfsoft GmbH
 
Wide area protection & Control technologies
Wide area protection & Control technologiesWide area protection & Control technologies
Wide area protection & Control technologiesPower System Operation
 
Extended summary of "Cloudy with a chance of short RTTs Analyzing Cloud Conne...
Extended summary of "Cloudy with a chance of short RTTs Analyzing Cloud Conne...Extended summary of "Cloudy with a chance of short RTTs Analyzing Cloud Conne...
Extended summary of "Cloudy with a chance of short RTTs Analyzing Cloud Conne...IsabellaFilippo
 
Real-Time Map Building using Ultrasound Scanning
Real-Time Map Building using Ultrasound ScanningReal-Time Map Building using Ultrasound Scanning
Real-Time Map Building using Ultrasound ScanningIRJET Journal
 
Ultrasonic radar mini project
Ultrasonic radar  mini projectUltrasonic radar  mini project
Ultrasonic radar mini projectvishnuchiluka
 
Bb report broadband_satelliteregulation-e
Bb report broadband_satelliteregulation-eBb report broadband_satelliteregulation-e
Bb report broadband_satelliteregulation-eSumit Roy
 
Plugin anrit sitemasterseri30416
Plugin anrit sitemasterseri30416Plugin anrit sitemasterseri30416
Plugin anrit sitemasterseri30416Rohit Chintu
 
[PFE] Design and implementation of an AoA, AS and DS estimator on FPGA-based...
[PFE]  Design and implementation of an AoA, AS and DS estimator on FPGA-based...[PFE]  Design and implementation of an AoA, AS and DS estimator on FPGA-based...
[PFE] Design and implementation of an AoA, AS and DS estimator on FPGA-based...Yassine Selmi
 
Solar School Bell using IOT Automation
Solar School Bell using IOT AutomationSolar School Bell using IOT Automation
Solar School Bell using IOT Automationnsmd waqas
 
Lte-Dimensionnement EMERSON EDUARDO RODRIGUES
Lte-Dimensionnement EMERSON EDUARDO RODRIGUESLte-Dimensionnement EMERSON EDUARDO RODRIGUES
Lte-Dimensionnement EMERSON EDUARDO RODRIGUESEMERSON EDUARDO RODRIGUES
 
INOVA GIS Platform - TeleCAD-GIS & IGS (2018)
INOVA GIS Platform - TeleCAD-GIS & IGS (2018)INOVA GIS Platform - TeleCAD-GIS & IGS (2018)
INOVA GIS Platform - TeleCAD-GIS & IGS (2018)Maksim Sestic
 
Arpan pal roboticsensing_sw2015
Arpan pal roboticsensing_sw2015Arpan pal roboticsensing_sw2015
Arpan pal roboticsensing_sw2015Arpan Pal
 
Distance Measurement Using Ultrasonic Sensor and Nodemcu
Distance Measurement Using Ultrasonic Sensor and NodemcuDistance Measurement Using Ultrasonic Sensor and Nodemcu
Distance Measurement Using Ultrasonic Sensor and NodemcuIRJET Journal
 
Empath prospectus - Earliest Requirements Document
Empath prospectus - Earliest Requirements DocumentEmpath prospectus - Earliest Requirements Document
Empath prospectus - Earliest Requirements DocumentDavid Bychkov, PhD
 

Ähnlich wie DGromano Gnss installation questionaire v2 (20)

Thesis-Vamsi
Thesis-VamsiThesis-Vamsi
Thesis-Vamsi
 
Antenna test selection guide 2012
Antenna test selection guide 2012Antenna test selection guide 2012
Antenna test selection guide 2012
 
FFM_–_Technical_Brief_–_Network_Solutions_for_Intelligence_Surveillance_and_R...
FFM_–_Technical_Brief_–_Network_Solutions_for_Intelligence_Surveillance_and_R...FFM_–_Technical_Brief_–_Network_Solutions_for_Intelligence_Surveillance_and_R...
FFM_–_Technical_Brief_–_Network_Solutions_for_Intelligence_Surveillance_and_R...
 
White Paper: Indoor Positioning in Industry & Logistics
White Paper: Indoor Positioning in Industry & LogisticsWhite Paper: Indoor Positioning in Industry & Logistics
White Paper: Indoor Positioning in Industry & Logistics
 
Wide area protection & Control technologies
Wide area protection & Control technologiesWide area protection & Control technologies
Wide area protection & Control technologies
 
Extended summary of "Cloudy with a chance of short RTTs Analyzing Cloud Conne...
Extended summary of "Cloudy with a chance of short RTTs Analyzing Cloud Conne...Extended summary of "Cloudy with a chance of short RTTs Analyzing Cloud Conne...
Extended summary of "Cloudy with a chance of short RTTs Analyzing Cloud Conne...
 
Real-Time Map Building using Ultrasound Scanning
Real-Time Map Building using Ultrasound ScanningReal-Time Map Building using Ultrasound Scanning
Real-Time Map Building using Ultrasound Scanning
 
Ultrasonic radar mini project
Ultrasonic radar  mini projectUltrasonic radar  mini project
Ultrasonic radar mini project
 
Bb report broadband_satelliteregulation-e
Bb report broadband_satelliteregulation-eBb report broadband_satelliteregulation-e
Bb report broadband_satelliteregulation-e
 
Guide otn ang
Guide otn angGuide otn ang
Guide otn ang
 
Plugin anrit sitemasterseri30416
Plugin anrit sitemasterseri30416Plugin anrit sitemasterseri30416
Plugin anrit sitemasterseri30416
 
[PFE] Design and implementation of an AoA, AS and DS estimator on FPGA-based...
[PFE]  Design and implementation of an AoA, AS and DS estimator on FPGA-based...[PFE]  Design and implementation of an AoA, AS and DS estimator on FPGA-based...
[PFE] Design and implementation of an AoA, AS and DS estimator on FPGA-based...
 
Solar School Bell using IOT Automation
Solar School Bell using IOT AutomationSolar School Bell using IOT Automation
Solar School Bell using IOT Automation
 
Lte-Dimensionnement EMERSON EDUARDO RODRIGUES
Lte-Dimensionnement EMERSON EDUARDO RODRIGUESLte-Dimensionnement EMERSON EDUARDO RODRIGUES
Lte-Dimensionnement EMERSON EDUARDO RODRIGUES
 
LTE Dimensioning
LTE DimensioningLTE Dimensioning
LTE Dimensioning
 
INOVA GIS Platform - TeleCAD-GIS & IGS (2018)
INOVA GIS Platform - TeleCAD-GIS & IGS (2018)INOVA GIS Platform - TeleCAD-GIS & IGS (2018)
INOVA GIS Platform - TeleCAD-GIS & IGS (2018)
 
Price tapr 2016
Price tapr 2016Price tapr 2016
Price tapr 2016
 
Arpan pal roboticsensing_sw2015
Arpan pal roboticsensing_sw2015Arpan pal roboticsensing_sw2015
Arpan pal roboticsensing_sw2015
 
Distance Measurement Using Ultrasonic Sensor and Nodemcu
Distance Measurement Using Ultrasonic Sensor and NodemcuDistance Measurement Using Ultrasonic Sensor and Nodemcu
Distance Measurement Using Ultrasonic Sensor and Nodemcu
 
Empath prospectus - Earliest Requirements Document
Empath prospectus - Earliest Requirements DocumentEmpath prospectus - Earliest Requirements Document
Empath prospectus - Earliest Requirements Document
 

Mehr von Massimo Crescimbene (7)

DGterzo
DGterzoDGterzo
DGterzo
 
DGcilliers
DGcilliersDGcilliers
DGcilliers
 
DGcorreia
DGcorreiaDGcorreia
DGcorreia
 
DGdovis
DGdovisDGdovis
DGdovis
 
DGrafanelli
DGrafanelliDGrafanelli
DGrafanelli
 
DGalfonsi
DGalfonsiDGalfonsi
DGalfonsi
 
DGdefranceschi
DGdefranceschiDGdefranceschi
DGdefranceschi
 

Kürzlich hochgeladen

biology HL practice questions IB BIOLOGY
biology HL practice questions IB BIOLOGYbiology HL practice questions IB BIOLOGY
biology HL practice questions IB BIOLOGY1301aanya
 
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 b
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 bAsymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 b
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 bSérgio Sacani
 
pumpkin fruit fly, water melon fruit fly, cucumber fruit fly
pumpkin fruit fly, water melon fruit fly, cucumber fruit flypumpkin fruit fly, water melon fruit fly, cucumber fruit fly
pumpkin fruit fly, water melon fruit fly, cucumber fruit flyPRADYUMMAURYA1
 
Call Girls Ahmedabad +917728919243 call me Independent Escort Service
Call Girls Ahmedabad +917728919243 call me Independent Escort ServiceCall Girls Ahmedabad +917728919243 call me Independent Escort Service
Call Girls Ahmedabad +917728919243 call me Independent Escort Serviceshivanisharma5244
 
Dr. E. Muralinath_ Blood indices_clinical aspects
Dr. E. Muralinath_ Blood indices_clinical  aspectsDr. E. Muralinath_ Blood indices_clinical  aspects
Dr. E. Muralinath_ Blood indices_clinical aspectsmuralinath2
 
Locating and isolating a gene, FISH, GISH, Chromosome walking and jumping, te...
Locating and isolating a gene, FISH, GISH, Chromosome walking and jumping, te...Locating and isolating a gene, FISH, GISH, Chromosome walking and jumping, te...
Locating and isolating a gene, FISH, GISH, Chromosome walking and jumping, te...Silpa
 
Thyroid Physiology_Dr.E. Muralinath_ Associate Professor
Thyroid Physiology_Dr.E. Muralinath_ Associate ProfessorThyroid Physiology_Dr.E. Muralinath_ Associate Professor
Thyroid Physiology_Dr.E. Muralinath_ Associate Professormuralinath2
 
FAIRSpectra - Enabling the FAIRification of Spectroscopy and Spectrometry
FAIRSpectra - Enabling the FAIRification of Spectroscopy and SpectrometryFAIRSpectra - Enabling the FAIRification of Spectroscopy and Spectrometry
FAIRSpectra - Enabling the FAIRification of Spectroscopy and SpectrometryAlex Henderson
 
Exploring Criminology and Criminal Behaviour.pdf
Exploring Criminology and Criminal Behaviour.pdfExploring Criminology and Criminal Behaviour.pdf
Exploring Criminology and Criminal Behaviour.pdfrohankumarsinghrore1
 
Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE In Bhiwan...
Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE In Bhiwan...Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE In Bhiwan...
Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE In Bhiwan...Monika Rani
 
(May 9, 2024) Enhanced Ultrafast Vector Flow Imaging (VFI) Using Multi-Angle ...
(May 9, 2024) Enhanced Ultrafast Vector Flow Imaging (VFI) Using Multi-Angle ...(May 9, 2024) Enhanced Ultrafast Vector Flow Imaging (VFI) Using Multi-Angle ...
(May 9, 2024) Enhanced Ultrafast Vector Flow Imaging (VFI) Using Multi-Angle ...Scintica Instrumentation
 
Introduction of DNA analysis in Forensic's .pptx
Introduction of DNA analysis in Forensic's .pptxIntroduction of DNA analysis in Forensic's .pptx
Introduction of DNA analysis in Forensic's .pptxrohankumarsinghrore1
 
Proteomics: types, protein profiling steps etc.
Proteomics: types, protein profiling steps etc.Proteomics: types, protein profiling steps etc.
Proteomics: types, protein profiling steps etc.Silpa
 
PSYCHOSOCIAL NEEDS. in nursing II sem pptx
PSYCHOSOCIAL NEEDS. in nursing II sem pptxPSYCHOSOCIAL NEEDS. in nursing II sem pptx
PSYCHOSOCIAL NEEDS. in nursing II sem pptxSuji236384
 
Factory Acceptance Test( FAT).pptx .
Factory Acceptance Test( FAT).pptx       .Factory Acceptance Test( FAT).pptx       .
Factory Acceptance Test( FAT).pptx .Poonam Aher Patil
 
Selaginella: features, morphology ,anatomy and reproduction.
Selaginella: features, morphology ,anatomy and reproduction.Selaginella: features, morphology ,anatomy and reproduction.
Selaginella: features, morphology ,anatomy and reproduction.Silpa
 
The Mariana Trench remarkable geological features on Earth.pptx
The Mariana Trench remarkable geological features on Earth.pptxThe Mariana Trench remarkable geological features on Earth.pptx
The Mariana Trench remarkable geological features on Earth.pptxseri bangash
 
CURRENT SCENARIO OF POULTRY PRODUCTION IN INDIA
CURRENT SCENARIO OF POULTRY PRODUCTION IN INDIACURRENT SCENARIO OF POULTRY PRODUCTION IN INDIA
CURRENT SCENARIO OF POULTRY PRODUCTION IN INDIADr. TATHAGAT KHOBRAGADE
 

Kürzlich hochgeladen (20)

biology HL practice questions IB BIOLOGY
biology HL practice questions IB BIOLOGYbiology HL practice questions IB BIOLOGY
biology HL practice questions IB BIOLOGY
 
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 b
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 bAsymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 b
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 b
 
pumpkin fruit fly, water melon fruit fly, cucumber fruit fly
pumpkin fruit fly, water melon fruit fly, cucumber fruit flypumpkin fruit fly, water melon fruit fly, cucumber fruit fly
pumpkin fruit fly, water melon fruit fly, cucumber fruit fly
 
Call Girls Ahmedabad +917728919243 call me Independent Escort Service
Call Girls Ahmedabad +917728919243 call me Independent Escort ServiceCall Girls Ahmedabad +917728919243 call me Independent Escort Service
Call Girls Ahmedabad +917728919243 call me Independent Escort Service
 
Dr. E. Muralinath_ Blood indices_clinical aspects
Dr. E. Muralinath_ Blood indices_clinical  aspectsDr. E. Muralinath_ Blood indices_clinical  aspects
Dr. E. Muralinath_ Blood indices_clinical aspects
 
Clean In Place(CIP).pptx .
Clean In Place(CIP).pptx                 .Clean In Place(CIP).pptx                 .
Clean In Place(CIP).pptx .
 
Locating and isolating a gene, FISH, GISH, Chromosome walking and jumping, te...
Locating and isolating a gene, FISH, GISH, Chromosome walking and jumping, te...Locating and isolating a gene, FISH, GISH, Chromosome walking and jumping, te...
Locating and isolating a gene, FISH, GISH, Chromosome walking and jumping, te...
 
PATNA CALL GIRLS 8617370543 LOW PRICE ESCORT SERVICE
PATNA CALL GIRLS 8617370543 LOW PRICE ESCORT SERVICEPATNA CALL GIRLS 8617370543 LOW PRICE ESCORT SERVICE
PATNA CALL GIRLS 8617370543 LOW PRICE ESCORT SERVICE
 
Thyroid Physiology_Dr.E. Muralinath_ Associate Professor
Thyroid Physiology_Dr.E. Muralinath_ Associate ProfessorThyroid Physiology_Dr.E. Muralinath_ Associate Professor
Thyroid Physiology_Dr.E. Muralinath_ Associate Professor
 
FAIRSpectra - Enabling the FAIRification of Spectroscopy and Spectrometry
FAIRSpectra - Enabling the FAIRification of Spectroscopy and SpectrometryFAIRSpectra - Enabling the FAIRification of Spectroscopy and Spectrometry
FAIRSpectra - Enabling the FAIRification of Spectroscopy and Spectrometry
 
Exploring Criminology and Criminal Behaviour.pdf
Exploring Criminology and Criminal Behaviour.pdfExploring Criminology and Criminal Behaviour.pdf
Exploring Criminology and Criminal Behaviour.pdf
 
Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE In Bhiwan...
Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE In Bhiwan...Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE In Bhiwan...
Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE In Bhiwan...
 
(May 9, 2024) Enhanced Ultrafast Vector Flow Imaging (VFI) Using Multi-Angle ...
(May 9, 2024) Enhanced Ultrafast Vector Flow Imaging (VFI) Using Multi-Angle ...(May 9, 2024) Enhanced Ultrafast Vector Flow Imaging (VFI) Using Multi-Angle ...
(May 9, 2024) Enhanced Ultrafast Vector Flow Imaging (VFI) Using Multi-Angle ...
 
Introduction of DNA analysis in Forensic's .pptx
Introduction of DNA analysis in Forensic's .pptxIntroduction of DNA analysis in Forensic's .pptx
Introduction of DNA analysis in Forensic's .pptx
 
Proteomics: types, protein profiling steps etc.
Proteomics: types, protein profiling steps etc.Proteomics: types, protein profiling steps etc.
Proteomics: types, protein profiling steps etc.
 
PSYCHOSOCIAL NEEDS. in nursing II sem pptx
PSYCHOSOCIAL NEEDS. in nursing II sem pptxPSYCHOSOCIAL NEEDS. in nursing II sem pptx
PSYCHOSOCIAL NEEDS. in nursing II sem pptx
 
Factory Acceptance Test( FAT).pptx .
Factory Acceptance Test( FAT).pptx       .Factory Acceptance Test( FAT).pptx       .
Factory Acceptance Test( FAT).pptx .
 
Selaginella: features, morphology ,anatomy and reproduction.
Selaginella: features, morphology ,anatomy and reproduction.Selaginella: features, morphology ,anatomy and reproduction.
Selaginella: features, morphology ,anatomy and reproduction.
 
The Mariana Trench remarkable geological features on Earth.pptx
The Mariana Trench remarkable geological features on Earth.pptxThe Mariana Trench remarkable geological features on Earth.pptx
The Mariana Trench remarkable geological features on Earth.pptx
 
CURRENT SCENARIO OF POULTRY PRODUCTION IN INDIA
CURRENT SCENARIO OF POULTRY PRODUCTION IN INDIACURRENT SCENARIO OF POULTRY PRODUCTION IN INDIA
CURRENT SCENARIO OF POULTRY PRODUCTION IN INDIA
 

DGromano Gnss installation questionaire v2

  • 1. Questionare from the Demogrape meeting taken place in Auckland the 25th of August 2014. Participants: Emilia Correia, Pier Cilliers, Lucilla Alfonsi, Olivier Terzo, Vincenzo Romano Updated the 10 of October Next telco meetings: 12 of November at 10:30 UT (South Africa) and 13:30 UT (Brazil) Items: 1) Technical requirements for station installation 1.1)Logistics requirements for persons and equipments 2) Technical requirements for server installation 3) Technical requirements for data communication from Antarctica 4) Technical requirements for data access and storage 5) Technical requirements for cloud management 6) Technical requirements for Applications/Processors 7) Hardware procurement and shipping 8) Technical requirements for hardware for the measurements campaign 1) The installation of the receiver is well known by the participants. Summarising the requirements for the site: ‐ The ideal site installation of the antenna is on the top of a roof. Describe where the antenna will be installed: …………………………………………………………………………………………………………………………………………………. ‐ The mast length has not to exceed 2 m, in order to avoid vibration effects. Is the mast available locally? …………………………………………………………………………………………………………………………………………………. ‐ The antenna needs a view free over the horizon at 360°, at least over an angle of 10° How is the surround of the antenna in terms of obstacles? ………………………………………………………………………………………………………………………………………………… ‐ Others GNSS antenna and metallic structures, around the antenna, must stay at least at 3 meters distance. How is the surround of the antenna in terms of other antennas? ………………………………………………………………………………………………………………………………………………… Do you already have an GNSS antenna installed? What kind of antenna? Is the GNSS antenna installed active or passive? Can eventually add a splitter to the existing GNSS antenna? ‐ No electromagnetic emission (radio links, wifi,…) have to be in the direction of the antenna or close to it. How is the surround of the antenna in terms of electromagnetic interference? ………………………………………………………………………………………………………………………………………………… ‐ The distance between the antenna and the receiver place is installed can’t exceed 30 meters. How far is the antenna from the place where the receiver will be installed? ………………………………………………………………………………………………………………………………………………… ‐ The receiver site needs to be internal with this requirements: Available space around 40x40x40 cm. Is a surface area of 40x40 cm available?.......................................... Power needis around 200W, possibly by UPS net. Is such available?....................................
  • 2. Is eventually possible to install an UPS?.......................................................... Is the local network connection available via Ethernet?.................................................. Can we obtain an IP address? Static or dynamic?........................................... Can we have the remote control of the PC (i.e. by teamviewer)?..................................... Is the environmental temperature of the site over 5°?................................................... ‐ The installation of the GNSS station requires a person with IT/electronic skill trained for the scope in addition to the local support of generic technicians. Can your Antarctic program identify and support the installation of the GNSS identifying a person to be trained?.................................................... Has this a cost for the project?................................. When can we recruit this person?.................... Is this person available to come to Italy for four weeks for the training? (Cost is covered by the project)………………………………………………….. Can we arrange one week of training in your institute? (Cost is covered by the project) ...................................... When the installation in the Antarctic base is foreseen?................................ Could the Antarctic station host an Italian expert for the installation?.............................. Which are the rules and procedure to send a foreigner expert to the base (cost, time, warranty, medical requirements,…) ?.............................................................................. Can the personnel involved stay one month in the base to cover the installation and the measurement campaign?................................................. Is technical support guaranteed during the installation phase?...................................... Mechanic to antenna installation (20 hours)…………………………………………………. Electrician to Cable installation (4 hours)…………………….. Electrician to PC and receiver installation (2 hours)……………. IT technician for network configuration (8 hours)………………. Is the maintenance of the measurement station guarantee during the entire year (ordinary maintenance is around 2 hours/months)?................................................... 2) The option we adopted is a full federated infrastructure based on 3 private servers installed in Italy, Brazil and South Africa. ‐ Is the place for a 2U rack server available in your center?........... ‐ Have we firewall limitation?........... ‐ What bandwidth we have?............ ‐ Is the Power and net guarantee continuously? ‐ Can we have a remote control of the server?........... ‐ Has your centre available a cloud infrastructure?.............. 3) The data communication between Antarctica and the servers is based on the existing data infrastructure ‐ Is data transfer based by FTP possible? ‐ What bandwidth is possible to have? ‐ Is the transfer available all the time of during preferred time? ‐ Can we install of the PC automatic procedures to manage the data transfer? ‐ I the connection between Antarctica and your centre reliable? 4) The technical requirements for data access and storage depends on the data archive structure. ‐ What is the dimension of the entire data archive? ‐ Is it a DB or just data archive? ‐ The data checking procedure is automatic? 5) The technical requirements for cloud management consist in the connection between the 3 servers.
  • 3. Is a point to poit connection possible at the IP level? What kind of protocol (tcp/ip, udp)? 6) The technical requirements for Applications/Processors is referred to what kind of application we want to realised on the cloud infrastructure. ‐ Which kind of processor we want to integrate in the infrastructure (GBSC, Scint‐Proxies)? ‐ What language it use? ‐ In which OS it is realised? ‐ What libraries? ‐ Are other data available for the infrastructure (rinex, geomagnetic, auroral, ionosonde) ‐ If yes can we use them? ‐ What is the rule to use these data? ‐ Do you agree to share the processors among the 3 centers? 7) This part is related to the administrative and custom aspect for the procurements of the instrumentation. ‐ Can we send the hardware directly from the factory to your center? ‐ Do you have particularly problems concerning custom? ‐ Can we ask to your polar administration to buy the instrumentation respecting the rules of Italian Antarctic Program? ‐ Do you have a local seller for PC and servers?