SlideShare ist ein Scribd-Unternehmen logo
1 von 56
 In New York State, building construction, heating
plants, HVAC, etc., are regulated by the following;
 The Building Code
 The Existing Building Code
 The Fire Code
 The Fuel and Gas Code
 The Mechanical Code
 The Plumbing Code
 The Residential Code
 The Energy Conservation Code
CodesCodes
 also Reference Standards (NFPA, ANSI, ASME, etc..)
 Additionally, we also have to comply with;
 NYS approved “more restrictive” local codes (i.e.,
county, town, city, village)
 These codes provide minimum requirements.
 As with all codes, there are exceptions, such as, the
NYS Building Code does not apply to detached one-and
two-family dwellings and multiple single-family dwelling
(townhouses) not more than three stories in height with
separate means of egress. These buildings fall under the
Residential Code of New York State.
 To alert you to potential construction hazards,
 To enable a safe and effective fire attack,
 By knowing basic building construction types, we
can approximate how fire will spread and allow us
to extinguish it quickly,
 “The building is your enemy… know your enemy”
Francis L. Brannigan.
 There are TWO basic types of construction: “It either
burns (combustible) or it does not burn
(noncombustible)”
 All buildings in the US are constructed by one of the
five construction categories;
 Type “1” - Fire Resistive – Least Combustible
 Type “2” - Non-Combustible
 Type “3” - Ordinary
 Type “4” - Heavy Timber
 Type “5” - Wood Frame – Most Combustible
 Four of the five types have subgroups “A” & “B”.
 Means Protected;
 all structural members have an additional fire
rated coating or cover by means of sheetrock,
spray on, or other approved method,
 the additional fire rated coating or cover
extends the fire resistance of the structural
members by at least 1 hour.
 Means Unprotected;
 all structural members have no additional fire
rated coating or cover,
 exposed members are only fire resistant
according to their natural ability, characteristics,
and fire rating.
STRUCTURAL CHARACTERISTICS AND
HAZARDS
Type “3”- (A)Type “3”- (A) (protected)(protected) – Ordinary– Ordinary
(ISO Class 2)
(#211, NFPA 5000 “Building & Safety Code”)
 structural frame, columns, etc. - 1 hour rating
 exterior bearing walls – 2 hour rated
 interior bearing walls – 1 hour rated
 floor construction, beams and joists – 1 hour rated
 roof construction, beams and joists – 1 hour rated
2010 New York State Building Code
Type “3”- (B)Type “3”- (B) (unprotected)(unprotected) – Ordinary– Ordinary
(ISO Class 2)
(#200, NFPA 5000 “Building & Safety Code”)
 structural frame, columns, etc. - 0 hour rating
 exterior bearing walls – 2 hour rated
 interior bearing walls – 0 hour rated
 floor construction, beams and joists – 0 hour rated
 roof construction, beams and joists – 0 hour rated
2010 New York State Building Code
 predominate and common construction type,
 also know as “brick and joist” structure, (common
terms “Main Street, USA” or “Downtown, USA” and
“Taxpayer”
 exterior load bearing walls are of masonry and
some or all other structural components are
combustible (wood),
 masonry walls can be brick, stone, or concrete
block and terra cotta block in some older buildings,
 interior structural members almost all wood,
 wood used has smaller dimensions than Type “IV”.
TYPE “3” - OrdinaryTYPE “3” - Ordinary
 Characteristics;
 normally used for larger, sometimes multi-story,
commercial or multi-family structures,
 has also been used for one and two family
buildings,
 if floor and roof construction and their supports
and all openings through floors (stairwells) are
enclosed with one-hour fire resistive materials, the
construction is classified as “Protected”,
 generally built no higher than 6 to 8 stories, most
are 2 to 4 stories high,
 typically wall thickness range from 6” to 30”,
Type 3 ConstructionType 3 Construction
 rarely protected by a sprinkler system,
 many have been remodeled and altered,
 roof often similar to floor construction,
 hazards reduced by using fire-stops,
 unstable under fire conditions,
 highly damageable buildings,
 primary fire hazard - fire and smoke spread through
concealed spaces,
 fire load – construction materials and contents,
TYPE “3” - OrdinaryTYPE “3” - Ordinary
 typically will have two load-bearing walls (long
walls) and two curtain walls (short walls).
Type 3 ConstructionType 3 Construction
Residential Type “3” building
One &
Two
Family
Type “3” Multiple Residence
Type “3” Commercial and Residential
Two story commercial Type “3” building
TYPE “3” - OrdinaryTYPE “3” - Ordinary
 Type “3” buildings have been constructed in two
distinct types;
 Older – late 19th
and early 20th
century and,
 Newer.
 “Older” buildings;
 tongue and grove floor boards,
 solid lumber joists and rafters ( can be 3” x 10”),
 columns could be added for additional support
 room size limited by span of supporting element,
TYPE “3” - OrdinaryTYPE “3” - Ordinary
 floor joists commonly have a “fire cut” on each
end to keep floor joists from pushing the wall
down,
 1” to 1 ½” wooden planks commonly used in
the roof assembly.
TYPE “3” - OrdinaryTYPE “3” - Ordinary
 “Newer” buildings;
 flooring may consist of plywood, oriented
strand board (OSB),
 laminated veneer lumber (LVL), and parallel
strand lumber (PSL), supported by
 lightweight wooden trusses, and wooden I-
beams,
 these supports are more likely to collapse
sooner than larger solid lumber joists,
 roof construction using lightweight materials.
 Stability of masonry walls,
 Stability of interior column, girder and beam
system,
 Void spaces,
 Excessive fire loads, “dead” loads (HVAC, Solar Arrays)
 Bow string truss roof,
 Alterations can have an effect on the building,
 The largest concealed space is the “Cockloft”, an
open space for fire and smoke spread,
 Braced Wall Spreaders- danger – wall can be out
of alignment.
Solar Arrays and
HVAC Units
Braced
Walls
A basic sign that a wall is in distress
Braces of unprotected steel or cable will fail at fire
temperatures
Arrows mark locations where star-shaped anchor plates were
located on the west-side of the theater building that was
adjacent to the fire building. The anchor plates appear to have
been attached to the ends of the heavy timber roof trusses
supporting the roof and also to some of the second-floor joists.
NIOSH F2011-15
Photo shows star-shaped anchor plates located on the D-
side wall in the area that collapsed. NIOSH F2011-15
Photo shows star-shaped anchor
plate attached to end of floor joist.
Photo shows star-shaped
anchor plate attached to end
of heavy timber roof truss.
Type “3” Bowstring truss
roof
Collapse scene as viewed from building rear
facing building front. Note portion of bowstring
truss leaning against wall at right side of photo.
(Photo courtesy of fire department) NIOSH F2010-38
Photo shows the wall that supported western end of the bowstring truss roof.
The two arrows indicate the truss-end pockets in the brick masonry wall at
the top of the brick pilasters where the ends of the two bowstring trusses
rested. The roof was supported in the middle by the two bowstring trusses
while the north and south ends were supported by the front and rear non-load
bearing walls. The line indicates the approximate curvature of the roof.
(NIOSH photo F2010-38)
NIOSH F2009-21 Photo
–STRUCTURAL CHARACTERISTICS
AND HAZARDS
Type “4” - Heavy TimberType “4” - Heavy Timber
(ISO Class 2)
(#2HH, NFPA 5000 “Building & Safety Code”)
 structural frame, columns, etc. – heavy timber
 exterior bearing walls – 1 hour heavy timber
 interior bearing walls – 2 hour rated
 floor construction, beams and joists – heavy timber
 roof construction, beams and joists – heavy timber
2010 New York State Building Code
 Characteristics;
 heavy timber construction is one of the oldest
types of buildings used in this country,
 heavy timber buildings were originally designed
and used as multi-story industrial or storage
occupancies,
 fire resistance is attained by placing limitations
of minimum sizes on wood structural members and
minimum thickness and composition of wood
floors and roofs,
 will have four bearing exterior walls,
construction includes columns not less than 8”
thick in any dimension,
 beams and girders not less than 6” x 10”,
 roof framing is not less than 6” wide x 8” depth,
 floors and roofs have thicker than normal
construction consisting of varying layers of
materials that build up to a deck of 3” thick to 4”
wide,
 arches and trusses not less than 8” thick in any
dimension.
 usage of approved fastenings and adhesives,
 lumber may be sawn or laminated,
 usually found in very old mills, factories, and
warehouse, and in older churches,
 exterior walls are noncombustible,
 interior structures made of solid or laminated
wood with no concealed spaces,
 does not have plaster walls & ceilings covering
interior framework,
TYPE “4” - Heavy TimberTYPE “4” - Heavy Timber
 wood has large dimensions, much heavier, more
difficult to ignite, can withstand fire for longer time
frames,
 primary fire hazard - combustible contents of
structural members,
 does not fail early in a fire,
 because of massive amount of combustible
materials there will be serious heat given off and may
pose exposure protection problems,
TYPE “4” - Heavy TimberTYPE “4” - Heavy Timber
Heavy Timber Frame building
Heavy Timber
columns, beams
& girders
Masonry walls
Large open spaces, lack of
hidden voids
 Heavy fire loading,
 Combustible finishes and furnishings,
 Wooden floors/ceilings and coverings,
 Large open spaces,
 Unprotected openings
 Heavy content loading;
 combustibles stored in high piles next to each
other,
 usually found in commercial and storage facilities,
 this may override sprinkler system and provide
access problems,
 proper inspection and enforcement effective in
these types of facilities.
 Combustible furnishings/finishes;
 contribute to fire spread and smoke production.
 Wooden floors and ceilings;
 contribute to fire loading,
 prolonged exposure may result in collapse,
 Large open spaces;
 contributes to spread,
 warehouses, churches, large atriums, common
attics, and theaters.
 Unprotected openings;
 floor openings for stairwells, freight elevators or
conveyor devices
 SIZEUP – read a building to identify important
factors;
 class of building construction,
 resistance to fire, heat to critical structural
members,
 renovations that may have created void areas,
 movement of heat, smoke and fire within the
building,
Summary
 areas around utility services should be suspected
as areas where fire can spread,
 many older buildings have new plumbing and
electrical systems installed,
 knowledge of potential building concerns can be
attained by performing inspections during new
construction or in existing buildings,
 Lastly, information my be available through your
local fire inspector and/or building department.
Summary
Prepared By Llyod Cassidy
Manager Jgking Homes.
07/10/13

Weitere ähnliche Inhalte

Was ist angesagt? (20)

Roofs
RoofsRoofs
Roofs
 
Roof and roof coverings
Roof and roof coveringsRoof and roof coverings
Roof and roof coverings
 
Brick work Notes Tutorial PDF Free Donwnload Presentation
Brick work Notes Tutorial PDF Free Donwnload PresentationBrick work Notes Tutorial PDF Free Donwnload Presentation
Brick work Notes Tutorial PDF Free Donwnload Presentation
 
Study of rebars in construction
Study of rebars in constructionStudy of rebars in construction
Study of rebars in construction
 
Lintels and arches in construction
Lintels and arches in constructionLintels and arches in construction
Lintels and arches in construction
 
Wall cladding
Wall claddingWall cladding
Wall cladding
 
Bricklaying: Step by Step
Bricklaying: Step by StepBricklaying: Step by Step
Bricklaying: Step by Step
 
FIRE RESISTING BUILDINGS
FIRE RESISTING BUILDINGSFIRE RESISTING BUILDINGS
FIRE RESISTING BUILDINGS
 
Lintels
LintelsLintels
Lintels
 
Types of roof
Types of roofTypes of roof
Types of roof
 
Roof structures and Types of roofs
Roof structures and Types of roofsRoof structures and Types of roofs
Roof structures and Types of roofs
 
Brick walling and joints
Brick walling and jointsBrick walling and joints
Brick walling and joints
 
Passive fire measures vs active fire measues
Passive fire measures vs active fire measuesPassive fire measures vs active fire measues
Passive fire measures vs active fire measues
 
Types of bricks and its bonds
Types of bricks and its bondsTypes of bricks and its bonds
Types of bricks and its bonds
 
Brick masonry
Brick masonryBrick masonry
Brick masonry
 
Fire resistant material
Fire resistant materialFire resistant material
Fire resistant material
 
formwork centering and scaffolding by khalid
formwork centering and scaffolding by khalid formwork centering and scaffolding by khalid
formwork centering and scaffolding by khalid
 
slab concrete
slab concreteslab concrete
slab concrete
 
Building Construction
Building Construction Building Construction
Building Construction
 
Bricks
BricksBricks
Bricks
 

Andere mochten auch

Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
Building construction ppt
Building construction pptBuilding construction ppt
Building construction pptgyan singh
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1Nabeel Joomun
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction Mereia Kali
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)Soh Shing
 
Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1 Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1 Dexter Ng
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.Hagi Sahib
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building ConstructionEsmael Aragaw
 
Chapter 05- Foundations of Firefighting Tactics and Strategies
Chapter 05- Foundations of Firefighting Tactics and StrategiesChapter 05- Foundations of Firefighting Tactics and Strategies
Chapter 05- Foundations of Firefighting Tactics and Strategiessnoshoesam
 
building construction,ppt
building construction,pptbuilding construction,ppt
building construction,pptPawankumarm65
 
Project on construction of 3 block house report
Project on construction of 3 block house reportProject on construction of 3 block house report
Project on construction of 3 block house reportHagi Sahib
 
Ppt of mini project.
Ppt of mini project.Ppt of mini project.
Ppt of mini project.saikiran_gone
 
Construction Activities and Process
Construction Activities and ProcessConstruction Activities and Process
Construction Activities and ProcessJ.j. Hayashi
 
Construction activities and Process
Construction activities and ProcessConstruction activities and Process
Construction activities and ProcessIbrahim Adhnan
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential buildingShariful Haque Robin
 
Building methods and construction technology 1
Building methods and construction technology 1Building methods and construction technology 1
Building methods and construction technology 1hpinn
 

Andere mochten auch (20)

Building Construction
Building ConstructionBuilding Construction
Building Construction
 
Building construction ppt
Building construction pptBuilding construction ppt
Building construction ppt
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1 Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1
 
Construction process
Construction processConstruction process
Construction process
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
 
Chapter 05- Foundations of Firefighting Tactics and Strategies
Chapter 05- Foundations of Firefighting Tactics and StrategiesChapter 05- Foundations of Firefighting Tactics and Strategies
Chapter 05- Foundations of Firefighting Tactics and Strategies
 
building construction,ppt
building construction,pptbuilding construction,ppt
building construction,ppt
 
Building construction
Building constructionBuilding construction
Building construction
 
Project on construction of 3 block house report
Project on construction of 3 block house reportProject on construction of 3 block house report
Project on construction of 3 block house report
 
Ppt of mini project.
Ppt of mini project.Ppt of mini project.
Ppt of mini project.
 
Construction Activities and Process
Construction Activities and ProcessConstruction Activities and Process
Construction Activities and Process
 
Construction activities and Process
Construction activities and ProcessConstruction activities and Process
Construction activities and Process
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential building
 
Foundation
FoundationFoundation
Foundation
 
TYPES OF FOUNDATION(PPT)
TYPES OF FOUNDATION(PPT)TYPES OF FOUNDATION(PPT)
TYPES OF FOUNDATION(PPT)
 
Building methods and construction technology 1
Building methods and construction technology 1Building methods and construction technology 1
Building methods and construction technology 1
 

Ähnlich wie Understanding Building construction

Ch 06 Wood Frame Construction
Ch 06 Wood Frame ConstructionCh 06 Wood Frame Construction
Ch 06 Wood Frame Constructionsnoshoesam
 
Fire guidelines by nbc part 2
Fire guidelines by nbc part 2Fire guidelines by nbc part 2
Fire guidelines by nbc part 2R821992
 
Fireprotection 170419080622
Fireprotection 170419080622Fireprotection 170419080622
Fireprotection 170419080622vishramsingh3
 
Type iv building construction
Type iv building constructionType iv building construction
Type iv building constructionBrianna Mason
 
2120 Ch 11 PowerPoint.pptx
2120 Ch 11 PowerPoint.pptx2120 Ch 11 PowerPoint.pptx
2120 Ch 11 PowerPoint.pptxNickPalmisano2
 
Type iv building construction FINAL
Type iv building construction FINALType iv building construction FINAL
Type iv building construction FINALBrianna Mason
 
Fire Safety and Performance of Wood
Fire Safety and Performance of WoodFire Safety and Performance of Wood
Fire Safety and Performance of WoodFWPA
 
A Beginner's Guide to Components of Passive Fire Protection
A Beginner's Guide to Components of Passive Fire ProtectionA Beginner's Guide to Components of Passive Fire Protection
A Beginner's Guide to Components of Passive Fire ProtectionMatthew Barnett
 
Free video lectures for b.tech
Free video lectures for b.techFree video lectures for b.tech
Free video lectures for b.techEdhole.com
 
DBUU_SOAD_2022-23_III_LECT_1-7_25_08_2022.pdf
DBUU_SOAD_2022-23_III_LECT_1-7_25_08_2022.pdfDBUU_SOAD_2022-23_III_LECT_1-7_25_08_2022.pdf
DBUU_SOAD_2022-23_III_LECT_1-7_25_08_2022.pdfMohdZiyaul
 
Top schools in ghaziabad
Top schools in ghaziabadTop schools in ghaziabad
Top schools in ghaziabadEdhole.com
 
Visual Dictionary-Sp10skylight
Visual Dictionary-Sp10skylightVisual Dictionary-Sp10skylight
Visual Dictionary-Sp10skylightRiley Cisco
 

Ähnlich wie Understanding Building construction (20)

Ch 06 Wood Frame Construction
Ch 06 Wood Frame ConstructionCh 06 Wood Frame Construction
Ch 06 Wood Frame Construction
 
Fire guidelines by nbc part 2
Fire guidelines by nbc part 2Fire guidelines by nbc part 2
Fire guidelines by nbc part 2
 
Fire protection
Fire protectionFire protection
Fire protection
 
Fireprotection 170419080622
Fireprotection 170419080622Fireprotection 170419080622
Fireprotection 170419080622
 
Type iv building construction
Type iv building constructionType iv building construction
Type iv building construction
 
2120 Ch 11 PowerPoint.pptx
2120 Ch 11 PowerPoint.pptx2120 Ch 11 PowerPoint.pptx
2120 Ch 11 PowerPoint.pptx
 
Type iv building construction FINAL
Type iv building construction FINALType iv building construction FINAL
Type iv building construction FINAL
 
Fire Safety and Performance of Wood
Fire Safety and Performance of WoodFire Safety and Performance of Wood
Fire Safety and Performance of Wood
 
Fire resistive construction
Fire resistive constructionFire resistive construction
Fire resistive construction
 
A Beginner's Guide to Components of Passive Fire Protection
A Beginner's Guide to Components of Passive Fire ProtectionA Beginner's Guide to Components of Passive Fire Protection
A Beginner's Guide to Components of Passive Fire Protection
 
Free video lectures for b.tech
Free video lectures for b.techFree video lectures for b.tech
Free video lectures for b.tech
 
DBUU_SOAD_2022-23_III_LECT_1-7_25_08_2022.pdf
DBUU_SOAD_2022-23_III_LECT_1-7_25_08_2022.pdfDBUU_SOAD_2022-23_III_LECT_1-7_25_08_2022.pdf
DBUU_SOAD_2022-23_III_LECT_1-7_25_08_2022.pdf
 
Top schools in ghaziabad
Top schools in ghaziabadTop schools in ghaziabad
Top schools in ghaziabad
 
BCT - Module 5 special treatment part 3
BCT - Module 5 special treatment part 3BCT - Module 5 special treatment part 3
BCT - Module 5 special treatment part 3
 
Visual Dictionary-Sp10skylight
Visual Dictionary-Sp10skylightVisual Dictionary-Sp10skylight
Visual Dictionary-Sp10skylight
 
Built-in furniture
Built-in furnitureBuilt-in furniture
Built-in furniture
 
Fire pro
Fire proFire pro
Fire pro
 
Fire pro
Fire proFire pro
Fire pro
 
Fire pro
Fire proFire pro
Fire pro
 
Fire and safety management
Fire and safety managementFire and safety management
Fire and safety management
 

Kürzlich hochgeladen

Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...pujan9679
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannaBusinessPlans
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...ssuserf63bd7
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecZurliaSoop
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSpanmisemningshen123
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxCynthia Clay
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowranineha57744
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSkajalroy875762
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTSkajalroy875762
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 

Kürzlich hochgeladen (20)

Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 

Understanding Building construction

  • 1.
  • 2.
  • 3.  In New York State, building construction, heating plants, HVAC, etc., are regulated by the following;  The Building Code  The Existing Building Code  The Fire Code  The Fuel and Gas Code  The Mechanical Code  The Plumbing Code  The Residential Code  The Energy Conservation Code CodesCodes
  • 4.  also Reference Standards (NFPA, ANSI, ASME, etc..)  Additionally, we also have to comply with;  NYS approved “more restrictive” local codes (i.e., county, town, city, village)  These codes provide minimum requirements.  As with all codes, there are exceptions, such as, the NYS Building Code does not apply to detached one-and two-family dwellings and multiple single-family dwelling (townhouses) not more than three stories in height with separate means of egress. These buildings fall under the Residential Code of New York State.
  • 5.
  • 6.  To alert you to potential construction hazards,  To enable a safe and effective fire attack,  By knowing basic building construction types, we can approximate how fire will spread and allow us to extinguish it quickly,  “The building is your enemy… know your enemy” Francis L. Brannigan.
  • 7.  There are TWO basic types of construction: “It either burns (combustible) or it does not burn (noncombustible)”  All buildings in the US are constructed by one of the five construction categories;  Type “1” - Fire Resistive – Least Combustible  Type “2” - Non-Combustible  Type “3” - Ordinary  Type “4” - Heavy Timber  Type “5” - Wood Frame – Most Combustible  Four of the five types have subgroups “A” & “B”.
  • 8.
  • 9.  Means Protected;  all structural members have an additional fire rated coating or cover by means of sheetrock, spray on, or other approved method,  the additional fire rated coating or cover extends the fire resistance of the structural members by at least 1 hour.
  • 10.  Means Unprotected;  all structural members have no additional fire rated coating or cover,  exposed members are only fire resistant according to their natural ability, characteristics, and fire rating.
  • 12. Type “3”- (A)Type “3”- (A) (protected)(protected) – Ordinary– Ordinary (ISO Class 2) (#211, NFPA 5000 “Building & Safety Code”)  structural frame, columns, etc. - 1 hour rating  exterior bearing walls – 2 hour rated  interior bearing walls – 1 hour rated  floor construction, beams and joists – 1 hour rated  roof construction, beams and joists – 1 hour rated 2010 New York State Building Code
  • 13. Type “3”- (B)Type “3”- (B) (unprotected)(unprotected) – Ordinary– Ordinary (ISO Class 2) (#200, NFPA 5000 “Building & Safety Code”)  structural frame, columns, etc. - 0 hour rating  exterior bearing walls – 2 hour rated  interior bearing walls – 0 hour rated  floor construction, beams and joists – 0 hour rated  roof construction, beams and joists – 0 hour rated 2010 New York State Building Code
  • 14.
  • 15.  predominate and common construction type,  also know as “brick and joist” structure, (common terms “Main Street, USA” or “Downtown, USA” and “Taxpayer”  exterior load bearing walls are of masonry and some or all other structural components are combustible (wood),  masonry walls can be brick, stone, or concrete block and terra cotta block in some older buildings,  interior structural members almost all wood,  wood used has smaller dimensions than Type “IV”. TYPE “3” - OrdinaryTYPE “3” - Ordinary  Characteristics;
  • 16.  normally used for larger, sometimes multi-story, commercial or multi-family structures,  has also been used for one and two family buildings,  if floor and roof construction and their supports and all openings through floors (stairwells) are enclosed with one-hour fire resistive materials, the construction is classified as “Protected”,  generally built no higher than 6 to 8 stories, most are 2 to 4 stories high,  typically wall thickness range from 6” to 30”, Type 3 ConstructionType 3 Construction
  • 17.  rarely protected by a sprinkler system,  many have been remodeled and altered,  roof often similar to floor construction,  hazards reduced by using fire-stops,  unstable under fire conditions,  highly damageable buildings,  primary fire hazard - fire and smoke spread through concealed spaces,  fire load – construction materials and contents, TYPE “3” - OrdinaryTYPE “3” - Ordinary
  • 18.  typically will have two load-bearing walls (long walls) and two curtain walls (short walls). Type 3 ConstructionType 3 Construction
  • 19. Residential Type “3” building One & Two Family
  • 21. Type “3” Commercial and Residential
  • 22. Two story commercial Type “3” building
  • 23. TYPE “3” - OrdinaryTYPE “3” - Ordinary  Type “3” buildings have been constructed in two distinct types;  Older – late 19th and early 20th century and,  Newer.  “Older” buildings;  tongue and grove floor boards,  solid lumber joists and rafters ( can be 3” x 10”),  columns could be added for additional support  room size limited by span of supporting element,
  • 24. TYPE “3” - OrdinaryTYPE “3” - Ordinary  floor joists commonly have a “fire cut” on each end to keep floor joists from pushing the wall down,  1” to 1 ½” wooden planks commonly used in the roof assembly.
  • 25. TYPE “3” - OrdinaryTYPE “3” - Ordinary  “Newer” buildings;  flooring may consist of plywood, oriented strand board (OSB),  laminated veneer lumber (LVL), and parallel strand lumber (PSL), supported by  lightweight wooden trusses, and wooden I- beams,  these supports are more likely to collapse sooner than larger solid lumber joists,  roof construction using lightweight materials.
  • 26.
  • 27.  Stability of masonry walls,  Stability of interior column, girder and beam system,  Void spaces,  Excessive fire loads, “dead” loads (HVAC, Solar Arrays)  Bow string truss roof,  Alterations can have an effect on the building,  The largest concealed space is the “Cockloft”, an open space for fire and smoke spread,  Braced Wall Spreaders- danger – wall can be out of alignment.
  • 29. Braced Walls A basic sign that a wall is in distress Braces of unprotected steel or cable will fail at fire temperatures
  • 30. Arrows mark locations where star-shaped anchor plates were located on the west-side of the theater building that was adjacent to the fire building. The anchor plates appear to have been attached to the ends of the heavy timber roof trusses supporting the roof and also to some of the second-floor joists. NIOSH F2011-15
  • 31. Photo shows star-shaped anchor plates located on the D- side wall in the area that collapsed. NIOSH F2011-15
  • 32. Photo shows star-shaped anchor plate attached to end of floor joist. Photo shows star-shaped anchor plate attached to end of heavy timber roof truss.
  • 34. Collapse scene as viewed from building rear facing building front. Note portion of bowstring truss leaning against wall at right side of photo. (Photo courtesy of fire department) NIOSH F2010-38
  • 35. Photo shows the wall that supported western end of the bowstring truss roof. The two arrows indicate the truss-end pockets in the brick masonry wall at the top of the brick pilasters where the ends of the two bowstring trusses rested. The roof was supported in the middle by the two bowstring trusses while the north and south ends were supported by the front and rear non-load bearing walls. The line indicates the approximate curvature of the roof. (NIOSH photo F2010-38)
  • 38. Type “4” - Heavy TimberType “4” - Heavy Timber (ISO Class 2) (#2HH, NFPA 5000 “Building & Safety Code”)  structural frame, columns, etc. – heavy timber  exterior bearing walls – 1 hour heavy timber  interior bearing walls – 2 hour rated  floor construction, beams and joists – heavy timber  roof construction, beams and joists – heavy timber 2010 New York State Building Code
  • 39.  Characteristics;  heavy timber construction is one of the oldest types of buildings used in this country,  heavy timber buildings were originally designed and used as multi-story industrial or storage occupancies,  fire resistance is attained by placing limitations of minimum sizes on wood structural members and minimum thickness and composition of wood floors and roofs,
  • 40.  will have four bearing exterior walls, construction includes columns not less than 8” thick in any dimension,  beams and girders not less than 6” x 10”,  roof framing is not less than 6” wide x 8” depth,  floors and roofs have thicker than normal construction consisting of varying layers of materials that build up to a deck of 3” thick to 4” wide,  arches and trusses not less than 8” thick in any dimension.
  • 41.  usage of approved fastenings and adhesives,  lumber may be sawn or laminated,  usually found in very old mills, factories, and warehouse, and in older churches,  exterior walls are noncombustible,  interior structures made of solid or laminated wood with no concealed spaces,  does not have plaster walls & ceilings covering interior framework, TYPE “4” - Heavy TimberTYPE “4” - Heavy Timber
  • 42.  wood has large dimensions, much heavier, more difficult to ignite, can withstand fire for longer time frames,  primary fire hazard - combustible contents of structural members,  does not fail early in a fire,  because of massive amount of combustible materials there will be serious heat given off and may pose exposure protection problems, TYPE “4” - Heavy TimberTYPE “4” - Heavy Timber
  • 43. Heavy Timber Frame building
  • 46. Large open spaces, lack of hidden voids
  • 47.
  • 48.
  • 49.  Heavy fire loading,  Combustible finishes and furnishings,  Wooden floors/ceilings and coverings,  Large open spaces,  Unprotected openings
  • 50.  Heavy content loading;  combustibles stored in high piles next to each other,  usually found in commercial and storage facilities,  this may override sprinkler system and provide access problems,  proper inspection and enforcement effective in these types of facilities.
  • 51.  Combustible furnishings/finishes;  contribute to fire spread and smoke production.  Wooden floors and ceilings;  contribute to fire loading,  prolonged exposure may result in collapse,
  • 52.  Large open spaces;  contributes to spread,  warehouses, churches, large atriums, common attics, and theaters.  Unprotected openings;  floor openings for stairwells, freight elevators or conveyor devices
  • 53.
  • 54.  SIZEUP – read a building to identify important factors;  class of building construction,  resistance to fire, heat to critical structural members,  renovations that may have created void areas,  movement of heat, smoke and fire within the building, Summary
  • 55.  areas around utility services should be suspected as areas where fire can spread,  many older buildings have new plumbing and electrical systems installed,  knowledge of potential building concerns can be attained by performing inspections during new construction or in existing buildings,  Lastly, information my be available through your local fire inspector and/or building department. Summary
  • 56. Prepared By Llyod Cassidy Manager Jgking Homes. 07/10/13

Hinweis der Redaktion

  1. 2010 New York State Building Code