SlideShare ist ein Scribd-Unternehmen logo
1 von 4
Risk Factors and Risk Appraisals – HH Field Development Project
Published: February 27, 2016
Introduction
Oil and gas exploration is known to be highly risky and cost-intensive projects that require
capital investment decisions that are evaluated all the way from initiation of upstream
explorations through midstream and downstream activities (Inkpen and Moffett, 2011). Risks
in a project are an uncertain occurrence that can have a negative or positive impact (i.e.
opportunities and threats) on ‘project objectives.’ The risk in a project also includes proactive
management of all stakeholders involved that can have an impact on these goals, positively or
negatively (PMBOK® Guide, 2013).
Risk Factors and Risk Appraisals - Horse Hill Project
Risk management in regards to decision making in the oil industry is conceptually difficult
decisions that management faces because their characteristics are different in most cases
(Walls, Morahan and Dyer, 1995).
Organizations distinguish risks as a consequence of uncertainty in a project and organizational
objectives. That means both organizations and stakeholders can have a different approach to
risks or perceive risks differently. PMBOK® Guide (2013, p.311) classifies these attitudes as
‘three themes,’ i.e. “risk appetite, risk tolerance and risks thresholds” in projects. Whereas “risk
appetite” is an organisations and stakeholder acceptance of uncertainties in projects and the
‘risk tolerance’ is the ‘amount’ and organisation or stakeholders in a project will endure and
‘risk threshold’ is a measurement of the level of uncertainties that can impact stakeholder’s
interests that corporations can accept or not accept the risks that are set (PMBOK® Guide,
2013).
UKOG has conservatively estimated oil reserves (i.e. 50 mmbbl) on the Horse Hill licenses to
have a tremendous impact on the UK’s economy (Moylan, 2015).
Components of risk probabilities in the Horse Hill development projects are:
 Stakeholder’s involvements and ownership structure in HHD Ltd., including its equity
and debt partners – High impact.
 Exploration, i.e. a reservoir may be smaller than anticipated, the quality of oil and well
characteristics – High Impact (Suslick and Schiozer, 2004).
 Infrastructure, i.e. planning, schedule, EPCI constructions for drilling site, pipeline, the
refinery and choice of technologies – High Impact (Suslick and Schiozer, 2004).
 Environmental, i.e. drilling, pipelines and refineries could cause harm on “groundwater,
soils, surface, air pollution, vegetation and wildlife’s” – High impact (Van Hinte,
Gunton and Day, 2007).
Different stakeholders are identified in the Horse Hill development as shown in Table 1
(UKOG, n.d.). These are stakeholders that can influence the project and is presented with a
various level of risk probabilities in the decision-making process:
Stakeholder’s Interests in the Project Stakeholders Influence
Horse Hill Developments Ltd.
(‘HHD’)
Operator of Horse Hill 65%
participating interests
High
UK Oil & Gas Investments
(‘UKOG’)
30% direct interest in ‘HHD,'
and 1.02% interest through
Angus Energy
High
Angus Energy 6% direct Interests in ‘HHD.' Low
Stellar Resources plc
10% direct interests in
‘HHD.'
High
Alba Mineral Resources plc
10% direct interests in
‘HHD.'
High
Solo Oil Plc 10% direct interests in
‘HHD.'
High
Evocutis Plc 2% direct interests in ‘HHD.' Low
Publically held Equity
32% direct interests in
‘HHD.'
High
UK Government
License owner and Fiscal
Regime.
High
Surrey County Council
Environmental and Social
interests in the project.
High
Oil and Gas Authority (“OGA”) Approval for the flow test High
Environment Agency (“EA”)
Consent to a flow test in the
project.
High
Schlumberger
Exclusively Service
Contractor to UKOG.
Medium
Xodus Group Ltd ("Xodus")
Service Contractor for
Petrophysical evaluations, 2D
Seismic.
Medium
NUTECH
Service Contractor Rock
Sample Analyses and
Interpretation.
Medium
Table 1. Stakeholders in Horse Hill Development Project
Source: UKOG (n.d.)
The different level of influences and the probabilities is defined as follows:
 High Level - Direct interest in the project and have an impact on the decision-making
process and its financial objectives and the outcome of the project.
 Medium Level – Does not have a direct effect on commercial financing or decisions
making of the project other than supporting the decision based on findings and
operational impact, cost and time.
 Low Level – Little effect on the project decision-making other than advice and
supporting roles due to its low level of a stake in the project.
All stakeholders have different needs and interests of the project, and their needs must be
managed accordingly through the creation of a ‘risks register’ that will identify, plan, manage
and control stakeholders. That would typically be performed through a stakeholder analysis
process where one have identified stakeholder expectations and their impact. Moreover, the
project manager must develop appropriate strategies that will engage them throughout the
process and also built a communications plan for continuous communications to understand
their expectations and needs (PMBOK® Guide, 2013).
Concluding remarks for the Horse Hill development projects
Copeland and Weston (1983, p. 17) stated, “The investment decision is essentially how much
not to consume in the present so that more can be consumed in the future which is to maximize
the present value of lifetime consumption.” With this in mind and based on the structure that
the fiscal regime of UK that has “concession regime based on profit-based special taxes and
corporate income tax and ring-fencing rate” and its political stability (EY, 2014). It would be
useful based on the tax structure for HHD that can defer losses and spread their risks between
stakeholders should preferably negotiate a typical joint venture contract between the
government and its stakeholders.
References
Copeland, T., E., & Weston, J.,F. (1983) ‘Financial Theory and Corporate Policy,’ Addison-
Wesley Publishing Company Inc., [Online]. Available from:
http://afa.cwslive.wiley.com.liverpool.idm.oclc.org/SpringboardWebApp/userfiles/afa/file/Free%
20Textbooks/Financial%20Theory%20and%20Corporate%20Policy_Copeland.pdf (Accessed: 27
February 2016)
EY. (2014) Global oil and gas tax guide [Online]. Available
from:https://web.archive.org/web/20150501041355/http://www.ey.com/Publication/vwLUAs
sets/EY-Global-oil-and-gas-tax-guide-2014/$FILE/EY-Global-oil-and-gas-tax-guide-
2014.pdf (Accessed: 27 February 2016).
Inkpen, A.C. & Moffett, M.H. (2011) The global oil & gas industry: management, strategy &
finance. Tulsa, OK: PennWell [Online]. Available from:
http://library.liv.ac.uk.ezproxy.liv.ac.uk/record=b2632439~S8 (Accessed: 27 February 2016).
Moylan, J. (2015) ‘Oil discovery near Gatwick airport “significant”’ [Online]. Available
from: http://www.bbc.com/news/business-32229203 (Accessed: 27 February 2016).
Project Management Institute. (2013) A guide to the project management book of knowledge
(PMBOK® Guide). 5th ed. Newton Square, PA: Project Management Institute, pp. 125 – 131.
Suslick, S., B., & Schiozer, D., J. (2004) ‘Risk Analysis Applied to Petroleum Exploration and
Production: An Overview,’ Journal of Petroleum Science and Engineering, Vol. 44, No. 2,
pp. 1 – 9.
UKOG (n.d.) ‘2015 RNS News; 2016 RNS News,’[Online]. Available from:
http://www.ukogplc.com/page.php?pID=88; http://www.ukogplc.com/page.php?pID=110
(Accessed: 27 February 2016).
Van Hinte, T., Gunton, T., I., & Day, J., C. (2007) Evaluation of the assessment process for
major projects: a case study of oil and gas pipelines in Canada,’ Impact
Assessment and Project Appraisal, 25:2, pp. 123 – 137.
Walls, M.R., Morahan, G.T. & Dyer, J.S. (1995) ‘Decision analysis of exploration
opportunities in the onshore US at Phillips Petroleum Company’, Interfaces, 25 (6), pp. 39-
56.

Weitere ähnliche Inhalte

Andere mochten auch

8 4 angles of elevation and depression concepts day 2
8 4 angles of elevation and depression concepts day 28 4 angles of elevation and depression concepts day 2
8 4 angles of elevation and depression concepts day 2LomasGeomConc16
 
Manejo de-powerpoimt-diego cardenas
Manejo de-powerpoimt-diego cardenasManejo de-powerpoimt-diego cardenas
Manejo de-powerpoimt-diego cardenasDiego Cardenas
 
Thriving in the Circular Economy: Product Design and Business Practices for “...
Thriving in the Circular Economy: Product Design and Business Practices for “...Thriving in the Circular Economy: Product Design and Business Practices for “...
Thriving in the Circular Economy: Product Design and Business Practices for “...Antea Group
 
Thomas Tate: Builder and Designer of Handcrafted Homes
Thomas Tate: Builder and Designer of Handcrafted HomesThomas Tate: Builder and Designer of Handcrafted Homes
Thomas Tate: Builder and Designer of Handcrafted HomesThomas Tate
 
Rango de celdas y graficos
Rango de celdas y graficosRango de celdas y graficos
Rango de celdas y graficosDiego Cardenas
 
ロール適用ツール ~ansible art~
ロール適用ツール ~ansible art~ロール適用ツール ~ansible art~
ロール適用ツール ~ansible art~辰徳 斎藤
 
Экспериментальная версия презентации к диплому MBA Успешный
Экспериментальная версия презентации к диплому MBA УспешныйЭкспериментальная версия презентации к диплому MBA Успешный
Экспериментальная версия презентации к диплому MBA УспешныйIRCIT.Uspeshnyy
 
Ivan játiva documento excel
Ivan játiva documento excel Ivan játiva documento excel
Ivan játiva documento excel Iván Játiva
 
Práctica: Asignar Rango celdas, Autorellenar, Gráficos
Práctica: Asignar Rango celdas, Autorellenar, GráficosPráctica: Asignar Rango celdas, Autorellenar, Gráficos
Práctica: Asignar Rango celdas, Autorellenar, GráficosDAYCIQUISHPE
 

Andere mochten auch (14)

Trauma mata
Trauma mataTrauma mata
Trauma mata
 
8 4 angles of elevation and depression concepts day 2
8 4 angles of elevation and depression concepts day 28 4 angles of elevation and depression concepts day 2
8 4 angles of elevation and depression concepts day 2
 
Diego cardenas
Diego cardenasDiego cardenas
Diego cardenas
 
Manejo de-powerpoimt-diego cardenas
Manejo de-powerpoimt-diego cardenasManejo de-powerpoimt-diego cardenas
Manejo de-powerpoimt-diego cardenas
 
Thriving in the Circular Economy: Product Design and Business Practices for “...
Thriving in the Circular Economy: Product Design and Business Practices for “...Thriving in the Circular Economy: Product Design and Business Practices for “...
Thriving in the Circular Economy: Product Design and Business Practices for “...
 
Thomas Tate: Builder and Designer of Handcrafted Homes
Thomas Tate: Builder and Designer of Handcrafted HomesThomas Tate: Builder and Designer of Handcrafted Homes
Thomas Tate: Builder and Designer of Handcrafted Homes
 
Rango de celdas y graficos
Rango de celdas y graficosRango de celdas y graficos
Rango de celdas y graficos
 
ロール適用ツール ~ansible art~
ロール適用ツール ~ansible art~ロール適用ツール ~ansible art~
ロール適用ツール ~ansible art~
 
Trabajo internet (1)
Trabajo internet (1)Trabajo internet (1)
Trabajo internet (1)
 
Emerald Publishing
Emerald PublishingEmerald Publishing
Emerald Publishing
 
Экспериментальная версия презентации к диплому MBA Успешный
Экспериментальная версия презентации к диплому MBA УспешныйЭкспериментальная версия презентации к диплому MBA Успешный
Экспериментальная версия презентации к диплому MBA Успешный
 
Ivan játiva documento excel
Ivan játiva documento excel Ivan játiva documento excel
Ivan játiva documento excel
 
Acciones de control
Acciones de controlAcciones de control
Acciones de control
 
Práctica: Asignar Rango celdas, Autorellenar, Gráficos
Práctica: Asignar Rango celdas, Autorellenar, GráficosPráctica: Asignar Rango celdas, Autorellenar, Gráficos
Práctica: Asignar Rango celdas, Autorellenar, Gráficos
 

Ähnlich wie Risk Factors and Risk Appraisals – HH Field Development Project

EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...
EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...
EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...Sibo Kanyambari Aimable
 
UNIVERSITY OF PHOENIXCOLLEGE OF EDUCATION AND EXTERNAL STUDIES.docx
UNIVERSITY OF PHOENIXCOLLEGE OF EDUCATION AND EXTERNAL STUDIES.docxUNIVERSITY OF PHOENIXCOLLEGE OF EDUCATION AND EXTERNAL STUDIES.docx
UNIVERSITY OF PHOENIXCOLLEGE OF EDUCATION AND EXTERNAL STUDIES.docxdickonsondorris
 
The Identification of Risks and its Criticality in the Nigeria Construction I...
The Identification of Risks and its Criticality in the Nigeria Construction I...The Identification of Risks and its Criticality in the Nigeria Construction I...
The Identification of Risks and its Criticality in the Nigeria Construction I...Dr. Amarjeet Singh
 
KIIID Key Impact Investor Information Document (explained)
KIIID Key Impact Investor Information Document (explained)KIIID Key Impact Investor Information Document (explained)
KIIID Key Impact Investor Information Document (explained)Drs Alcanne Houtzaager MA
 
AN INTEGRATED PROJECT EVALUATION TOOL FOR PFI SEAPORT PROJECTS
AN INTEGRATED PROJECT EVALUATION TOOL FOR PFI SEAPORT PROJECTSAN INTEGRATED PROJECT EVALUATION TOOL FOR PFI SEAPORT PROJECTS
AN INTEGRATED PROJECT EVALUATION TOOL FOR PFI SEAPORT PROJECTSFredy Kurniawan
 
An Integrated Project Evaluation Tool for PFI Seaport Project
An Integrated Project Evaluation Tool for PFI Seaport ProjectAn Integrated Project Evaluation Tool for PFI Seaport Project
An Integrated Project Evaluation Tool for PFI Seaport ProjectFredy Kurniawan
 
Effect or Risk Management Methods on project performance in Rwandan Construct...
Effect or Risk Management Methods on project performance in Rwandan Construct...Effect or Risk Management Methods on project performance in Rwandan Construct...
Effect or Risk Management Methods on project performance in Rwandan Construct...Sibo Kanyambari Aimable
 
SKYMT|Analyzing and investing in global infrastructure projects
SKYMT|Analyzing and investing in global infrastructure projectsSKYMT|Analyzing and investing in global infrastructure projects
SKYMT|Analyzing and investing in global infrastructure projectsDestinyNixon
 
Establishing risk management factors for construction projects in iraq
Establishing risk management factors for construction projects in iraqEstablishing risk management factors for construction projects in iraq
Establishing risk management factors for construction projects in iraqIAEME Publication
 
ESTABLISHING RISK MANAGEMENT FACTORS FOR CONSTRUCTION PROJECTS IN IRAQ
ESTABLISHING RISK MANAGEMENT FACTORS FOR CONSTRUCTION PROJECTS IN IRAQ ESTABLISHING RISK MANAGEMENT FACTORS FOR CONSTRUCTION PROJECTS IN IRAQ
ESTABLISHING RISK MANAGEMENT FACTORS FOR CONSTRUCTION PROJECTS IN IRAQ IAEME Publication
 
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HEIRA...
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HEIRA...ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HEIRA...
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HEIRA...A Makwana
 
IRJET- Review on Developing a Model of Risk Allocation and Risk Handling for ...
IRJET- Review on Developing a Model of Risk Allocation and Risk Handling for ...IRJET- Review on Developing a Model of Risk Allocation and Risk Handling for ...
IRJET- Review on Developing a Model of Risk Allocation and Risk Handling for ...IRJET Journal
 
PAPERS20 April 2013 ■ Project Management Jou.docx
PAPERS20 April 2013 ■ Project Management Jou.docxPAPERS20 April 2013 ■ Project Management Jou.docx
PAPERS20 April 2013 ■ Project Management Jou.docxdanhaley45372
 
16Risk Management Methods of Risk Identific
16Risk Management  Methods of Risk Identific16Risk Management  Methods of Risk Identific
16Risk Management Methods of Risk IdentificEttaBenton28
 
pbl-2016-scaling-up-investments-in-ecosystem-restoration_2088
pbl-2016-scaling-up-investments-in-ecosystem-restoration_2088pbl-2016-scaling-up-investments-in-ecosystem-restoration_2088
pbl-2016-scaling-up-investments-in-ecosystem-restoration_2088Annelies Sewell
 
Risk analysis and managements large epc projects
Risk analysis and managements  large epc projectsRisk analysis and managements  large epc projects
Risk analysis and managements large epc projectsPALLA NARASIMHUDU
 
Effect of ecodesign practices on the financial performance of manufacturing f...
Effect of ecodesign practices on the financial performance of manufacturing f...Effect of ecodesign practices on the financial performance of manufacturing f...
Effect of ecodesign practices on the financial performance of manufacturing f...Martin Otundo
 

Ähnlich wie Risk Factors and Risk Appraisals – HH Field Development Project (20)

EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...
EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...
EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...
 
UNIVERSITY OF PHOENIXCOLLEGE OF EDUCATION AND EXTERNAL STUDIES.docx
UNIVERSITY OF PHOENIXCOLLEGE OF EDUCATION AND EXTERNAL STUDIES.docxUNIVERSITY OF PHOENIXCOLLEGE OF EDUCATION AND EXTERNAL STUDIES.docx
UNIVERSITY OF PHOENIXCOLLEGE OF EDUCATION AND EXTERNAL STUDIES.docx
 
Reputational risk
Reputational riskReputational risk
Reputational risk
 
The Identification of Risks and its Criticality in the Nigeria Construction I...
The Identification of Risks and its Criticality in the Nigeria Construction I...The Identification of Risks and its Criticality in the Nigeria Construction I...
The Identification of Risks and its Criticality in the Nigeria Construction I...
 
KIIID Key Impact Investor Information Document (explained)
KIIID Key Impact Investor Information Document (explained)KIIID Key Impact Investor Information Document (explained)
KIIID Key Impact Investor Information Document (explained)
 
AN INTEGRATED PROJECT EVALUATION TOOL FOR PFI SEAPORT PROJECTS
AN INTEGRATED PROJECT EVALUATION TOOL FOR PFI SEAPORT PROJECTSAN INTEGRATED PROJECT EVALUATION TOOL FOR PFI SEAPORT PROJECTS
AN INTEGRATED PROJECT EVALUATION TOOL FOR PFI SEAPORT PROJECTS
 
An Integrated Project Evaluation Tool for PFI Seaport Project
An Integrated Project Evaluation Tool for PFI Seaport ProjectAn Integrated Project Evaluation Tool for PFI Seaport Project
An Integrated Project Evaluation Tool for PFI Seaport Project
 
Effect or Risk Management Methods on project performance in Rwandan Construct...
Effect or Risk Management Methods on project performance in Rwandan Construct...Effect or Risk Management Methods on project performance in Rwandan Construct...
Effect or Risk Management Methods on project performance in Rwandan Construct...
 
SKYMT|Analyzing and investing in global infrastructure projects
SKYMT|Analyzing and investing in global infrastructure projectsSKYMT|Analyzing and investing in global infrastructure projects
SKYMT|Analyzing and investing in global infrastructure projects
 
Establishing risk management factors for construction projects in iraq
Establishing risk management factors for construction projects in iraqEstablishing risk management factors for construction projects in iraq
Establishing risk management factors for construction projects in iraq
 
ESTABLISHING RISK MANAGEMENT FACTORS FOR CONSTRUCTION PROJECTS IN IRAQ
ESTABLISHING RISK MANAGEMENT FACTORS FOR CONSTRUCTION PROJECTS IN IRAQ ESTABLISHING RISK MANAGEMENT FACTORS FOR CONSTRUCTION PROJECTS IN IRAQ
ESTABLISHING RISK MANAGEMENT FACTORS FOR CONSTRUCTION PROJECTS IN IRAQ
 
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HEIRA...
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HEIRA...ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HEIRA...
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HEIRA...
 
IRJET- Review on Developing a Model of Risk Allocation and Risk Handling for ...
IRJET- Review on Developing a Model of Risk Allocation and Risk Handling for ...IRJET- Review on Developing a Model of Risk Allocation and Risk Handling for ...
IRJET- Review on Developing a Model of Risk Allocation and Risk Handling for ...
 
PAPERS20 April 2013 ■ Project Management Jou.docx
PAPERS20 April 2013 ■ Project Management Jou.docxPAPERS20 April 2013 ■ Project Management Jou.docx
PAPERS20 April 2013 ■ Project Management Jou.docx
 
16Risk Management Methods of Risk Identific
16Risk Management  Methods of Risk Identific16Risk Management  Methods of Risk Identific
16Risk Management Methods of Risk Identific
 
FACTORS AFFECTING ODA PROJECT PERFORMANCE
FACTORS AFFECTING ODA PROJECT PERFORMANCEFACTORS AFFECTING ODA PROJECT PERFORMANCE
FACTORS AFFECTING ODA PROJECT PERFORMANCE
 
Tcfd report-overview-dec.-2016
Tcfd report-overview-dec.-2016Tcfd report-overview-dec.-2016
Tcfd report-overview-dec.-2016
 
pbl-2016-scaling-up-investments-in-ecosystem-restoration_2088
pbl-2016-scaling-up-investments-in-ecosystem-restoration_2088pbl-2016-scaling-up-investments-in-ecosystem-restoration_2088
pbl-2016-scaling-up-investments-in-ecosystem-restoration_2088
 
Risk analysis and managements large epc projects
Risk analysis and managements  large epc projectsRisk analysis and managements  large epc projects
Risk analysis and managements large epc projects
 
Effect of ecodesign practices on the financial performance of manufacturing f...
Effect of ecodesign practices on the financial performance of manufacturing f...Effect of ecodesign practices on the financial performance of manufacturing f...
Effect of ecodesign practices on the financial performance of manufacturing f...
 

Mehr von Kjell Sudenius MSc - Project Management (6)

Organizational Culture
Organizational CultureOrganizational Culture
Organizational Culture
 
Groups and Teams
Groups and TeamsGroups and Teams
Groups and Teams
 
A View of Corporate Strategy and Risk
A View of Corporate Strategy and RiskA View of Corporate Strategy and Risk
A View of Corporate Strategy and Risk
 
Simple Decision Tree Analysis
Simple Decision Tree AnalysisSimple Decision Tree Analysis
Simple Decision Tree Analysis
 
Thoughts - Renewable Energy
Thoughts - Renewable EnergyThoughts - Renewable Energy
Thoughts - Renewable Energy
 
ETK's Steps
ETK's StepsETK's Steps
ETK's Steps
 

Kürzlich hochgeladen

Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxCynthia Clay
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...NadhimTaha
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannaBusinessPlans
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateCannaBusinessPlans
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecZurliaSoop
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdflaloo_007
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challengeshemanthkumar470700
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareWorkforce Group
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 

Kürzlich hochgeladen (20)

Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 

Risk Factors and Risk Appraisals – HH Field Development Project

  • 1. Risk Factors and Risk Appraisals – HH Field Development Project Published: February 27, 2016 Introduction Oil and gas exploration is known to be highly risky and cost-intensive projects that require capital investment decisions that are evaluated all the way from initiation of upstream explorations through midstream and downstream activities (Inkpen and Moffett, 2011). Risks in a project are an uncertain occurrence that can have a negative or positive impact (i.e. opportunities and threats) on ‘project objectives.’ The risk in a project also includes proactive management of all stakeholders involved that can have an impact on these goals, positively or negatively (PMBOK® Guide, 2013). Risk Factors and Risk Appraisals - Horse Hill Project Risk management in regards to decision making in the oil industry is conceptually difficult decisions that management faces because their characteristics are different in most cases (Walls, Morahan and Dyer, 1995). Organizations distinguish risks as a consequence of uncertainty in a project and organizational objectives. That means both organizations and stakeholders can have a different approach to risks or perceive risks differently. PMBOK® Guide (2013, p.311) classifies these attitudes as ‘three themes,’ i.e. “risk appetite, risk tolerance and risks thresholds” in projects. Whereas “risk appetite” is an organisations and stakeholder acceptance of uncertainties in projects and the ‘risk tolerance’ is the ‘amount’ and organisation or stakeholders in a project will endure and ‘risk threshold’ is a measurement of the level of uncertainties that can impact stakeholder’s interests that corporations can accept or not accept the risks that are set (PMBOK® Guide, 2013). UKOG has conservatively estimated oil reserves (i.e. 50 mmbbl) on the Horse Hill licenses to have a tremendous impact on the UK’s economy (Moylan, 2015). Components of risk probabilities in the Horse Hill development projects are:
  • 2.  Stakeholder’s involvements and ownership structure in HHD Ltd., including its equity and debt partners – High impact.  Exploration, i.e. a reservoir may be smaller than anticipated, the quality of oil and well characteristics – High Impact (Suslick and Schiozer, 2004).  Infrastructure, i.e. planning, schedule, EPCI constructions for drilling site, pipeline, the refinery and choice of technologies – High Impact (Suslick and Schiozer, 2004).  Environmental, i.e. drilling, pipelines and refineries could cause harm on “groundwater, soils, surface, air pollution, vegetation and wildlife’s” – High impact (Van Hinte, Gunton and Day, 2007). Different stakeholders are identified in the Horse Hill development as shown in Table 1 (UKOG, n.d.). These are stakeholders that can influence the project and is presented with a various level of risk probabilities in the decision-making process: Stakeholder’s Interests in the Project Stakeholders Influence Horse Hill Developments Ltd. (‘HHD’) Operator of Horse Hill 65% participating interests High UK Oil & Gas Investments (‘UKOG’) 30% direct interest in ‘HHD,' and 1.02% interest through Angus Energy High Angus Energy 6% direct Interests in ‘HHD.' Low Stellar Resources plc 10% direct interests in ‘HHD.' High Alba Mineral Resources plc 10% direct interests in ‘HHD.' High Solo Oil Plc 10% direct interests in ‘HHD.' High Evocutis Plc 2% direct interests in ‘HHD.' Low Publically held Equity 32% direct interests in ‘HHD.' High UK Government License owner and Fiscal Regime. High Surrey County Council Environmental and Social interests in the project. High Oil and Gas Authority (“OGA”) Approval for the flow test High Environment Agency (“EA”) Consent to a flow test in the project. High Schlumberger Exclusively Service Contractor to UKOG. Medium Xodus Group Ltd ("Xodus") Service Contractor for Petrophysical evaluations, 2D Seismic. Medium NUTECH Service Contractor Rock Sample Analyses and Interpretation. Medium Table 1. Stakeholders in Horse Hill Development Project Source: UKOG (n.d.)
  • 3. The different level of influences and the probabilities is defined as follows:  High Level - Direct interest in the project and have an impact on the decision-making process and its financial objectives and the outcome of the project.  Medium Level – Does not have a direct effect on commercial financing or decisions making of the project other than supporting the decision based on findings and operational impact, cost and time.  Low Level – Little effect on the project decision-making other than advice and supporting roles due to its low level of a stake in the project. All stakeholders have different needs and interests of the project, and their needs must be managed accordingly through the creation of a ‘risks register’ that will identify, plan, manage and control stakeholders. That would typically be performed through a stakeholder analysis process where one have identified stakeholder expectations and their impact. Moreover, the project manager must develop appropriate strategies that will engage them throughout the process and also built a communications plan for continuous communications to understand their expectations and needs (PMBOK® Guide, 2013). Concluding remarks for the Horse Hill development projects Copeland and Weston (1983, p. 17) stated, “The investment decision is essentially how much not to consume in the present so that more can be consumed in the future which is to maximize the present value of lifetime consumption.” With this in mind and based on the structure that the fiscal regime of UK that has “concession regime based on profit-based special taxes and corporate income tax and ring-fencing rate” and its political stability (EY, 2014). It would be useful based on the tax structure for HHD that can defer losses and spread their risks between stakeholders should preferably negotiate a typical joint venture contract between the government and its stakeholders. References Copeland, T., E., & Weston, J.,F. (1983) ‘Financial Theory and Corporate Policy,’ Addison- Wesley Publishing Company Inc., [Online]. Available from: http://afa.cwslive.wiley.com.liverpool.idm.oclc.org/SpringboardWebApp/userfiles/afa/file/Free% 20Textbooks/Financial%20Theory%20and%20Corporate%20Policy_Copeland.pdf (Accessed: 27 February 2016) EY. (2014) Global oil and gas tax guide [Online]. Available from:https://web.archive.org/web/20150501041355/http://www.ey.com/Publication/vwLUAs sets/EY-Global-oil-and-gas-tax-guide-2014/$FILE/EY-Global-oil-and-gas-tax-guide- 2014.pdf (Accessed: 27 February 2016). Inkpen, A.C. & Moffett, M.H. (2011) The global oil & gas industry: management, strategy & finance. Tulsa, OK: PennWell [Online]. Available from: http://library.liv.ac.uk.ezproxy.liv.ac.uk/record=b2632439~S8 (Accessed: 27 February 2016). Moylan, J. (2015) ‘Oil discovery near Gatwick airport “significant”’ [Online]. Available from: http://www.bbc.com/news/business-32229203 (Accessed: 27 February 2016). Project Management Institute. (2013) A guide to the project management book of knowledge (PMBOK® Guide). 5th ed. Newton Square, PA: Project Management Institute, pp. 125 – 131.
  • 4. Suslick, S., B., & Schiozer, D., J. (2004) ‘Risk Analysis Applied to Petroleum Exploration and Production: An Overview,’ Journal of Petroleum Science and Engineering, Vol. 44, No. 2, pp. 1 – 9. UKOG (n.d.) ‘2015 RNS News; 2016 RNS News,’[Online]. Available from: http://www.ukogplc.com/page.php?pID=88; http://www.ukogplc.com/page.php?pID=110 (Accessed: 27 February 2016). Van Hinte, T., Gunton, T., I., & Day, J., C. (2007) Evaluation of the assessment process for major projects: a case study of oil and gas pipelines in Canada,’ Impact Assessment and Project Appraisal, 25:2, pp. 123 – 137. Walls, M.R., Morahan, G.T. & Dyer, J.S. (1995) ‘Decision analysis of exploration opportunities in the onshore US at Phillips Petroleum Company’, Interfaces, 25 (6), pp. 39- 56.