EARTHQUAKE ANALYSIS BY RESPONSE SPECTRUM
1. Generate primary load case EQx
a. Go to load item page- response spectrum load
b. Select code IS 1893:2002
c. Chose SRSS combination
d. Enter value of input spectrum –X (
𝑍
2
) X (
𝐼
𝑅
) (work out manually)
e. Values of Z, I and R to be referred from code spectrum – acceleration
and scale intensity EQ1
2. Generate primary load case EQz
a. (repeat same steps from a to e but here values of input spectrum to be
entered is in Z direction)
3. Dead Load:
a. Create all dead loads on the structure under consideration
4. Live Load:
a. Create live load on the structure under consideration (i.e. Floor load)
5. Create the combination of Load Case of (DL + 0.25LL)
a. First freeze lines related to EQ
6. Now assign pin support to all the nodes of beams and column joints. Get the
supportreaction from postprocessor for combination of (DL + 0.25 LL) and
copy the same from STAAD Pro. to Excel sheet.
7. Now the page will show the table like
Node FX FY FZ MX MY MZ
1
2
3
Delete all the columns except Node No. and FY reactions.
8. The format of tables in Excel would be now
Table No. 1
Node FX Value
1 FX
2 FX
3 FX
4 FX
And so on..........
9. Table No. 2
Node FZ Value
1 FZ
2 FZ
3 FZ
4 FZ
And so on..........
10. Defreeze the earthquake items from input file
a. Copy above two tables from excel sheet to STAAD Pro. Input file
b. The format of input file should be
c. Load 1 EQX
d. Soil type I
e. Joint load (we have to type this string)
f. Table 1
g. Table 2
h. Spectrum load
11.Delete all the pin supports and provide the fixed supports
a. Analyze the structure

Weitere ähnliche Inhalte

Was ist angesagt?

MODAL AND RESPONSE SPECTRUM (IS 18932002) ANALYSIS 0F R.C FRAME BUILDING (IT ...
MODAL AND RESPONSE SPECTRUM (IS 18932002) ANALYSIS 0F R.C FRAME BUILDING (IT ...MODAL AND RESPONSE SPECTRUM (IS 18932002) ANALYSIS 0F R.C FRAME BUILDING (IT ...
MODAL AND RESPONSE SPECTRUM (IS 18932002) ANALYSIS 0F R.C FRAME BUILDING (IT ...
Mintu Choudhury
 
Efficient Mass Participation Ratio of Building with Basement
Efficient Mass Participation Ratio of Building with BasementEfficient Mass Participation Ratio of Building with Basement
Efficient Mass Participation Ratio of Building with Basement
IOSRJMCE
 
Etabs example-rc building seismic load response-
Etabs example-rc building seismic load  response-Etabs example-rc building seismic load  response-
Etabs example-rc building seismic load response-
Bhaskar Alapati
 
Etabs concrete-design
Etabs concrete-designEtabs concrete-design
Etabs concrete-design
mamilli
 
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode IIComparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
ijtsrd
 

Was ist angesagt? (20)

IS 1893 part 1-2016
IS 1893 part 1-2016IS 1893 part 1-2016
IS 1893 part 1-2016
 
Shear wall and its design guidelines
Shear wall and its design guidelinesShear wall and its design guidelines
Shear wall and its design guidelines
 
The Pushover Analysis from basics - Rahul Leslie
The Pushover Analysis from basics - Rahul LeslieThe Pushover Analysis from basics - Rahul Leslie
The Pushover Analysis from basics - Rahul Leslie
 
Machine Foundation Design
Machine Foundation Design Machine Foundation Design
Machine Foundation Design
 
Seismic retrofitting techniques
Seismic retrofitting techniquesSeismic retrofitting techniques
Seismic retrofitting techniques
 
Design of column base plates anchor bolt
Design of column base plates anchor boltDesign of column base plates anchor bolt
Design of column base plates anchor bolt
 
Design notes for seismic design of building accordance to Eurocode 8
Design notes for seismic design of building accordance to Eurocode 8 Design notes for seismic design of building accordance to Eurocode 8
Design notes for seismic design of building accordance to Eurocode 8
 
MODAL AND RESPONSE SPECTRUM (IS 18932002) ANALYSIS 0F R.C FRAME BUILDING (IT ...
MODAL AND RESPONSE SPECTRUM (IS 18932002) ANALYSIS 0F R.C FRAME BUILDING (IT ...MODAL AND RESPONSE SPECTRUM (IS 18932002) ANALYSIS 0F R.C FRAME BUILDING (IT ...
MODAL AND RESPONSE SPECTRUM (IS 18932002) ANALYSIS 0F R.C FRAME BUILDING (IT ...
 
Design of footing as per IS 456-2000
Design of footing as per IS 456-2000Design of footing as per IS 456-2000
Design of footing as per IS 456-2000
 
Efficient Mass Participation Ratio of Building with Basement
Efficient Mass Participation Ratio of Building with BasementEfficient Mass Participation Ratio of Building with Basement
Efficient Mass Participation Ratio of Building with Basement
 
ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8
ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8 ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8
ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8
 
Lecture 1 design loads
Lecture 1   design loadsLecture 1   design loads
Lecture 1 design loads
 
RETROFITTING OF CONCRETE STRUCTURE
RETROFITTING OFCONCRETE STRUCTURERETROFITTING OFCONCRETE STRUCTURE
RETROFITTING OF CONCRETE STRUCTURE
 
AITC Coupling Beam Design Procedure (20151106)
AITC Coupling Beam Design Procedure (20151106)AITC Coupling Beam Design Procedure (20151106)
AITC Coupling Beam Design Procedure (20151106)
 
Etabs example-rc building seismic load response-
Etabs example-rc building seismic load  response-Etabs example-rc building seismic load  response-
Etabs example-rc building seismic load response-
 
Analysis of 3+ story building in staad pro
Analysis of 3+ story building in staad proAnalysis of 3+ story building in staad pro
Analysis of 3+ story building in staad pro
 
Etabs concrete-design
Etabs concrete-designEtabs concrete-design
Etabs concrete-design
 
Design and analysis of reinforced concrete multistory commercial building usi...
Design and analysis of reinforced concrete multistory commercial building usi...Design and analysis of reinforced concrete multistory commercial building usi...
Design and analysis of reinforced concrete multistory commercial building usi...
 
Non linear static pushover analysis
Non linear static pushover analysisNon linear static pushover analysis
Non linear static pushover analysis
 
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode IIComparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
 

Andere mochten auch (7)

residential buliding by stadd pro
residential buliding by stadd proresidential buliding by stadd pro
residential buliding by stadd pro
 
Use of STAAD-PRO v8i and sketchup 2014
Use of STAAD-PRO v8i and sketchup 2014Use of STAAD-PRO v8i and sketchup 2014
Use of STAAD-PRO v8i and sketchup 2014
 
Analysis and Desin of Multi purpose Auditorium
Analysis and Desin of Multi purpose AuditoriumAnalysis and Desin of Multi purpose Auditorium
Analysis and Desin of Multi purpose Auditorium
 
Staad.pro v8i dynamic response sesmic analysis-course contents
Staad.pro v8i dynamic response sesmic analysis-course contentsStaad.pro v8i dynamic response sesmic analysis-course contents
Staad.pro v8i dynamic response sesmic analysis-course contents
 
Staad pro
Staad proStaad pro
Staad pro
 
Design and analasys of a g+3 residential building using staad
Design and analasys of a g+3 residential building using staadDesign and analasys of a g+3 residential building using staad
Design and analasys of a g+3 residential building using staad
 
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRODESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
 

Ähnlich wie Earthquake analysis by Response Spectrum Method

Evaluation of Fixed Base vs. Base Isolated Building Systems
Evaluation of Fixed Base vs. Base Isolated Building SystemsEvaluation of Fixed Base vs. Base Isolated Building Systems
Evaluation of Fixed Base vs. Base Isolated Building Systems
IJERD Editor
 
Boolean Algebra by SUKHDEEP SINGH
Boolean Algebra by SUKHDEEP SINGHBoolean Algebra by SUKHDEEP SINGH
Boolean Algebra by SUKHDEEP SINGH
Sukhdeep Bisht
 
Program Computing Project 4 builds upon CP3 to develop a program to .docx
Program Computing Project 4 builds upon CP3 to develop a program to .docxProgram Computing Project 4 builds upon CP3 to develop a program to .docx
Program Computing Project 4 builds upon CP3 to develop a program to .docx
dessiechisomjj4
 

Ähnlich wie Earthquake analysis by Response Spectrum Method (20)

Earthquake analysis by psudeo static method
Earthquake analysis by psudeo static methodEarthquake analysis by psudeo static method
Earthquake analysis by psudeo static method
 
Evaluation of Fixed Base vs. Base Isolated Building Systems
Evaluation of Fixed Base vs. Base Isolated Building SystemsEvaluation of Fixed Base vs. Base Isolated Building Systems
Evaluation of Fixed Base vs. Base Isolated Building Systems
 
2020 preTEST1A
2020 preTEST1A2020 preTEST1A
2020 preTEST1A
 
preTEST1A Solved Multivariable Calculus
preTEST1A Solved Multivariable CalculuspreTEST1A Solved Multivariable Calculus
preTEST1A Solved Multivariable Calculus
 
preTEST1A Multivariable Calculus
preTEST1A Multivariable CalculuspreTEST1A Multivariable Calculus
preTEST1A Multivariable Calculus
 
Axial member
Axial memberAxial member
Axial member
 
Wien2k getting started
Wien2k getting startedWien2k getting started
Wien2k getting started
 
Boolean Algebra by SUKHDEEP SINGH
Boolean Algebra by SUKHDEEP SINGHBoolean Algebra by SUKHDEEP SINGH
Boolean Algebra by SUKHDEEP SINGH
 
Final
FinalFinal
Final
 
Control assignment#2
Control assignment#2Control assignment#2
Control assignment#2
 
DS & Algo 1 - Offline Assignment 1
DS & Algo 1 - Offline Assignment 1DS & Algo 1 - Offline Assignment 1
DS & Algo 1 - Offline Assignment 1
 
Problem and solution i ph o 28
Problem and solution i ph o 28Problem and solution i ph o 28
Problem and solution i ph o 28
 
Ies conventional-electrical-engineering-2012
Ies conventional-electrical-engineering-2012Ies conventional-electrical-engineering-2012
Ies conventional-electrical-engineering-2012
 
Quiz
QuizQuiz
Quiz
 
Assignment2 control
Assignment2 controlAssignment2 control
Assignment2 control
 
Introduction to HSPICE
Introduction to HSPICEIntroduction to HSPICE
Introduction to HSPICE
 
Lecture5-FEA.pdf
Lecture5-FEA.pdfLecture5-FEA.pdf
Lecture5-FEA.pdf
 
Kistler
KistlerKistler
Kistler
 
Finite element analysis qb
Finite element analysis qbFinite element analysis qb
Finite element analysis qb
 
Program Computing Project 4 builds upon CP3 to develop a program to .docx
Program Computing Project 4 builds upon CP3 to develop a program to .docxProgram Computing Project 4 builds upon CP3 to develop a program to .docx
Program Computing Project 4 builds upon CP3 to develop a program to .docx
 

Mehr von Pralhad Kore

Mehr von Pralhad Kore (20)

Transportation engineering
Transportation engineeringTransportation engineering
Transportation engineering
 
Chapter wise question papers_bce
Chapter wise question papers_bceChapter wise question papers_bce
Chapter wise question papers_bce
 
Design of staircase_practical_example
Design of staircase_practical_exampleDesign of staircase_practical_example
Design of staircase_practical_example
 
Presentation "Use of coupler Splices for Reinforcement"
Presentation "Use of coupler Splices for Reinforcement"Presentation "Use of coupler Splices for Reinforcement"
Presentation "Use of coupler Splices for Reinforcement"
 
Guidelines_for_building_design
Guidelines_for_building_designGuidelines_for_building_design
Guidelines_for_building_design
 
Strength of materials_I
Strength of materials_IStrength of materials_I
Strength of materials_I
 
Presentation_on_Cellwise_Braced_frames
Presentation_on_Cellwise_Braced_framesPresentation_on_Cellwise_Braced_frames
Presentation_on_Cellwise_Braced_frames
 
Study of MORT_&_H
Study of MORT_&_HStudy of MORT_&_H
Study of MORT_&_H
 
List of various_IRCs_&_sps
List of various_IRCs_&_spsList of various_IRCs_&_sps
List of various_IRCs_&_sps
 
Analysis of multi storey building frames subjected to gravity and seismic loa...
Analysis of multi storey building frames subjected to gravity and seismic loa...Analysis of multi storey building frames subjected to gravity and seismic loa...
Analysis of multi storey building frames subjected to gravity and seismic loa...
 
Seismic response of _reinforced_concrete_concentrically_a_braced_frames
Seismic  response  of _reinforced_concrete_concentrically_a_braced_framesSeismic  response  of _reinforced_concrete_concentrically_a_braced_frames
Seismic response of _reinforced_concrete_concentrically_a_braced_frames
 
Use of mechanical_splices_for_reinforcing_steel
Use of mechanical_splices_for_reinforcing_steelUse of mechanical_splices_for_reinforcing_steel
Use of mechanical_splices_for_reinforcing_steel
 
Guide lines bridge_design
Guide lines bridge_designGuide lines bridge_design
Guide lines bridge_design
 
Dissertation report
Dissertation reportDissertation report
Dissertation report
 
Seismic response of cellwise braced reinforced concrete frames
Seismic response of cellwise braced reinforced concrete framesSeismic response of cellwise braced reinforced concrete frames
Seismic response of cellwise braced reinforced concrete frames
 
Water Management
Water ManagementWater Management
Water Management
 
Chaper wise qpapers_bce
Chaper wise qpapers_bceChaper wise qpapers_bce
Chaper wise qpapers_bce
 
Basic Loads Cases
Basic Loads CasesBasic Loads Cases
Basic Loads Cases
 
Basic Civil Engineering MCQ
Basic Civil Engineering MCQBasic Civil Engineering MCQ
Basic Civil Engineering MCQ
 
PROBLEMS ON BEARINGS
PROBLEMS ON BEARINGSPROBLEMS ON BEARINGS
PROBLEMS ON BEARINGS
 

Kürzlich hochgeladen

TECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service providerTECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service provider
mohitmore19
 

Kürzlich hochgeladen (20)

8257 interfacing 2 in microprocessor for btech students
8257 interfacing 2 in microprocessor for btech students8257 interfacing 2 in microprocessor for btech students
8257 interfacing 2 in microprocessor for btech students
 
%in kaalfontein+277-882-255-28 abortion pills for sale in kaalfontein
%in kaalfontein+277-882-255-28 abortion pills for sale in kaalfontein%in kaalfontein+277-882-255-28 abortion pills for sale in kaalfontein
%in kaalfontein+277-882-255-28 abortion pills for sale in kaalfontein
 
Exploring the Best Video Editing App.pdf
Exploring the Best Video Editing App.pdfExploring the Best Video Editing App.pdf
Exploring the Best Video Editing App.pdf
 
%in kempton park+277-882-255-28 abortion pills for sale in kempton park
%in kempton park+277-882-255-28 abortion pills for sale in kempton park %in kempton park+277-882-255-28 abortion pills for sale in kempton park
%in kempton park+277-882-255-28 abortion pills for sale in kempton park
 
MarTech Trend 2024 Book : Marketing Technology Trends (2024 Edition) How Data...
MarTech Trend 2024 Book : Marketing Technology Trends (2024 Edition) How Data...MarTech Trend 2024 Book : Marketing Technology Trends (2024 Edition) How Data...
MarTech Trend 2024 Book : Marketing Technology Trends (2024 Edition) How Data...
 
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
 
%in ivory park+277-882-255-28 abortion pills for sale in ivory park
%in ivory park+277-882-255-28 abortion pills for sale in ivory park %in ivory park+277-882-255-28 abortion pills for sale in ivory park
%in ivory park+277-882-255-28 abortion pills for sale in ivory park
 
%in Bahrain+277-882-255-28 abortion pills for sale in Bahrain
%in Bahrain+277-882-255-28 abortion pills for sale in Bahrain%in Bahrain+277-882-255-28 abortion pills for sale in Bahrain
%in Bahrain+277-882-255-28 abortion pills for sale in Bahrain
 
The Top App Development Trends Shaping the Industry in 2024-25 .pdf
The Top App Development Trends Shaping the Industry in 2024-25 .pdfThe Top App Development Trends Shaping the Industry in 2024-25 .pdf
The Top App Development Trends Shaping the Industry in 2024-25 .pdf
 
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
 
Optimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTVOptimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTV
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfThe Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
 
%in Midrand+277-882-255-28 abortion pills for sale in midrand
%in Midrand+277-882-255-28 abortion pills for sale in midrand%in Midrand+277-882-255-28 abortion pills for sale in midrand
%in Midrand+277-882-255-28 abortion pills for sale in midrand
 
Unlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language ModelsUnlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language Models
 
TECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service providerTECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service provider
 
HR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comHR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.com
 
The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...
The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...
The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...
 
Direct Style Effect Systems - The Print[A] Example - A Comprehension Aid
Direct Style Effect Systems -The Print[A] Example- A Comprehension AidDirect Style Effect Systems -The Print[A] Example- A Comprehension Aid
Direct Style Effect Systems - The Print[A] Example - A Comprehension Aid
 
Azure_Native_Qumulo_High_Performance_Compute_Benchmarks.pdf
Azure_Native_Qumulo_High_Performance_Compute_Benchmarks.pdfAzure_Native_Qumulo_High_Performance_Compute_Benchmarks.pdf
Azure_Native_Qumulo_High_Performance_Compute_Benchmarks.pdf
 

Earthquake analysis by Response Spectrum Method

  • 1. STAAD v8i EARTHQUAKE ANALYSIS BY RESPONSE SPECTRUM 1. Generate primary load case EQx a. Go to load item page- response spectrum load b. Select code IS 1893:2002 c. Chose SRSS combination d. Enter value of input spectrum –X ( 𝑍 2 ) X ( 𝐼 𝑅 ) (work out manually) e. Values of Z, I and R to be referred from code spectrum – acceleration and scale intensity EQ1 2. Generate primary load case EQz a. (repeat same steps from a to e but here values of input spectrum to be entered is in Z direction) 3. Dead Load: a. Create all dead loads on the structure under consideration 4. Live Load: a. Create live load on the structure under consideration (i.e. Floor load) 5. Create the combination of Load Case of (DL + 0.25LL) a. First freeze lines related to EQ 6. Now assign pin support to all the nodes of beams and column joints. Get the supportreaction from postprocessor for combination of (DL + 0.25 LL) and copy the same from STAAD Pro. to Excel sheet. 7. Now the page will show the table like Node FX FY FZ MX MY MZ 1 2 3 Delete all the columns except Node No. and FY reactions. 8. The format of tables in Excel would be now Table No. 1 Node FX Value 1 FX 2 FX 3 FX 4 FX
  • 2. And so on.......... 9. Table No. 2 Node FZ Value 1 FZ 2 FZ 3 FZ 4 FZ And so on.......... 10. Defreeze the earthquake items from input file a. Copy above two tables from excel sheet to STAAD Pro. Input file b. The format of input file should be c. Load 1 EQX d. Soil type I e. Joint load (we have to type this string) f. Table 1 g. Table 2 h. Spectrum load 11.Delete all the pin supports and provide the fixed supports a. Analyze the structure