HOW LOCAL AGENCIES DECIDE
TO USE PCC OVERLAYS
NCPA Concrete Paving Conference
January 16, 2018
Who am I, and how would I know the answer to this
question?
ď‚· Today, 37 years out of Iowa State in 1980 with a BSCE
ď‚· Registered PE in CO, and Iowa (PLS too), Previously in OK,
though about it in several other states, but not really
wanting to collect registrations … , but ….
ď‚· 17 years in Consulting (Land Development, City and IDOT
type projects)
ď‚· 20th year in County Engineering.
That said, …
Specific PCC Overlay Experience?
ď‚· Hired as Dallas County Engineer in 1989, after less than two years in
Montgomery County
ď‚· Within a month of arrival, before I turned 30, Contractors started on 18 miles
of PCC Overlays that had been let before my arrival. All over old HMA.
 It was kind of a “throw the baby in the pool and see if it swims” approach, but
the contracts were in place and the paving plant was being moved in.
 I didn’t make the call, but I learned why it was decided and lived with it ever
since.
ď‚· Since then, I have managed another ten miles or so of PCC Overlays, 16 lane-
miles of widening, plenty of full depth highways and City streets - overall
more than sixty miles of PCC Pavements
 I’ve also done about thirty miles of HMA Overlays over HMA or Seal Coat –
because it was the right thing to do for the situation at hand
So first, decide if an overlay is appropriate, then we will get to what type.
ď‚· Existing pavement (PCC or HMA) not too bad, but not enough.
ď‚· Can the existing hold up during hauling of the mix?
 Good enough structure present that you don’t need to start from
scratch?
ď‚· Future traffic can be accurately estimated.
ď‚· Adjacent access and road-top width can accommodate the additional
thickness?
ď‚· Funding is available to do something more than routine surface
maintenance.
 Is a recycled in place pavement covered with a new slab really “just
another type of overlay”?
Also, need to know what you want out of an overlay, if a reasonable choice.
ď‚· Add structure?
ď‚· Correct grades? If so, isolated or wide spread?
ď‚· Generate smoothness?
ď‚· Good enough condition for an HMA Overlay? PCC Overlay can
accommodate more underlying problems – long term. Less need for prep
patching with PCC onto HMA
ď‚· Minor wheel tracks? Problem to be addressed for HMA, beneficial for
PCC.
ď‚· You can use a little black stuff to buy time.
ď‚· Or, go for an enduring pavement with a true addition of structure
ď‚· HOW MUCH FUNDING IS AVAILABLE WHEN THE WORK IS NEEDED
$$$$$$$$$$$$$$$$
?
Bottom line is Overlays are not the cookbook solution we tend to
get into with standard pavement replacement or new
development.
ď‚· Nice to use some engineering judgement once in a while, with
or without punching a bunch of numbers.
ď‚· Seldom a toss-up based upon pavement condition, but PCC
and HMA industry, as well as ASHTTO and others have
structural number calcs that you can use to compare
outcomes. Please be aware each formula tends to favor their
sponsor!***
HMA Pluses:
1. Shallow “T” potential because strength isn’t an issue
a. Maybe in a residential subdivision
b. Facelift on an already substantial section
2. A Band-aid will do … for now. . Ease of maintenance in ensuing years (but
always doing maintenance?)
3. Maybe save $ short term with a thin overlay – budget pinch with a pending
disaster (avoid “losing a pavement”), but you’ll be back again sooner than
you want.
4. Fewer adjacent grade adjustments, if a couple inches matters?
5. If over a Seal Coat, creates an actual maintainable pavement, as a product
of several Overlays
PCC Pluses:
1. Minimal thickness (<4”) might work in those residential subdivisions or
in a “bonded” situation
2. Longer life cycle which normally means better life cycle costs (totally
market dependent)
3. Less maintenance over the life of slab
4. Annualized cost is almost always less if using honest future maintenance
projections
5. Project access usually much better than on a fresh grade
6. An extra inch will buy years more performance – geometric
improvement on performance
7. Doubtful you need to go back during your career to repave – not so
much with HMA
Ultimately, HMA is a placeholder, short term, or Band-aid – sorry to my friends
that sell the black stuff. Or it can be a way of life, a default process, seldom the
engineered solution. PCC, on the other hand, can only perform well if it has a
proper foundation.
Another point, HMA makes a great base to place PCC on!
If you can afford it, and it fits geometrically, PCC overlays have been a good life-
cycle cost choice (where an improvement is needed) throughout my thirty some
year career, and I don’t see that changing.
$
$
STRUCTURE
$
STRUCTURE
(Fit the)
SITUATION?

Weitere ähnliche Inhalte

Mehr von Jill Reeves

PCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. ReconstructionPCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. ReconstructionJill Reeves
 
Thrasher Commercial Group
Thrasher Commercial GroupThrasher Commercial Group
Thrasher Commercial GroupJill Reeves
 
Low Density Cellular Concrete
Low Density Cellular ConcreteLow Density Cellular Concrete
Low Density Cellular ConcreteJill Reeves
 
40th Annual NCPA Workshop
40th Annual NCPA Workshop40th Annual NCPA Workshop
40th Annual NCPA WorkshopJill Reeves
 
Optimization of Pavement Concrete
Optimization of Pavement ConcreteOptimization of Pavement Concrete
Optimization of Pavement ConcreteJill Reeves
 
Concrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing StrategyConcrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing StrategyJill Reeves
 
Slag Cement: Helping Concrete Perform Better
Slag Cement: Helping Concrete Perform BetterSlag Cement: Helping Concrete Perform Better
Slag Cement: Helping Concrete Perform BetterJill Reeves
 
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a ChangePerformance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a ChangeJill Reeves
 
Product Availability: Fly Ash
Product Availability: Fly AshProduct Availability: Fly Ash
Product Availability: Fly AshJill Reeves
 
Federal Motor Carrier Rules and Regulations
Federal Motor Carrier Rules and RegulationsFederal Motor Carrier Rules and Regulations
Federal Motor Carrier Rules and RegulationsJill Reeves
 
Silica Rule Update / Silica Mitigation Equipment
Silica Rule Update / Silica Mitigation EquipmentSilica Rule Update / Silica Mitigation Equipment
Silica Rule Update / Silica Mitigation EquipmentJill Reeves
 
ABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel BridgeABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel BridgeJill Reeves
 
Upcoming Airport Projects
Upcoming Airport ProjectsUpcoming Airport Projects
Upcoming Airport ProjectsJill Reeves
 
Accelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build ProjectAccelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build ProjectJill Reeves
 
Pavement Asset Management
Pavement Asset ManagementPavement Asset Management
Pavement Asset ManagementJill Reeves
 
Iowa DOT - Council Bluffs Border City Agreements
Iowa DOT - Council Bluffs Border City AgreementsIowa DOT - Council Bluffs Border City Agreements
Iowa DOT - Council Bluffs Border City AgreementsJill Reeves
 
2018 Interground/Blended Cements
2018 Interground/Blended Cements2018 Interground/Blended Cements
2018 Interground/Blended CementsJill Reeves
 
Central Plains Cement Company
Central Plains Cement CompanyCentral Plains Cement Company
Central Plains Cement CompanyJill Reeves
 
Smart Concrete and Autonomous Cars: Building the Future of Roads
Smart Concrete and Autonomous Cars: Building the Future of RoadsSmart Concrete and Autonomous Cars: Building the Future of Roads
Smart Concrete and Autonomous Cars: Building the Future of RoadsJill Reeves
 
Repair Options for Concrete Roadways
Repair Options for Concrete RoadwaysRepair Options for Concrete Roadways
Repair Options for Concrete RoadwaysJill Reeves
 

Mehr von Jill Reeves (20)

PCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. ReconstructionPCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. Reconstruction
 
Thrasher Commercial Group
Thrasher Commercial GroupThrasher Commercial Group
Thrasher Commercial Group
 
Low Density Cellular Concrete
Low Density Cellular ConcreteLow Density Cellular Concrete
Low Density Cellular Concrete
 
40th Annual NCPA Workshop
40th Annual NCPA Workshop40th Annual NCPA Workshop
40th Annual NCPA Workshop
 
Optimization of Pavement Concrete
Optimization of Pavement ConcreteOptimization of Pavement Concrete
Optimization of Pavement Concrete
 
Concrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing StrategyConcrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing Strategy
 
Slag Cement: Helping Concrete Perform Better
Slag Cement: Helping Concrete Perform BetterSlag Cement: Helping Concrete Perform Better
Slag Cement: Helping Concrete Perform Better
 
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a ChangePerformance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
 
Product Availability: Fly Ash
Product Availability: Fly AshProduct Availability: Fly Ash
Product Availability: Fly Ash
 
Federal Motor Carrier Rules and Regulations
Federal Motor Carrier Rules and RegulationsFederal Motor Carrier Rules and Regulations
Federal Motor Carrier Rules and Regulations
 
Silica Rule Update / Silica Mitigation Equipment
Silica Rule Update / Silica Mitigation EquipmentSilica Rule Update / Silica Mitigation Equipment
Silica Rule Update / Silica Mitigation Equipment
 
ABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel BridgeABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel Bridge
 
Upcoming Airport Projects
Upcoming Airport ProjectsUpcoming Airport Projects
Upcoming Airport Projects
 
Accelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build ProjectAccelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build Project
 
Pavement Asset Management
Pavement Asset ManagementPavement Asset Management
Pavement Asset Management
 
Iowa DOT - Council Bluffs Border City Agreements
Iowa DOT - Council Bluffs Border City AgreementsIowa DOT - Council Bluffs Border City Agreements
Iowa DOT - Council Bluffs Border City Agreements
 
2018 Interground/Blended Cements
2018 Interground/Blended Cements2018 Interground/Blended Cements
2018 Interground/Blended Cements
 
Central Plains Cement Company
Central Plains Cement CompanyCentral Plains Cement Company
Central Plains Cement Company
 
Smart Concrete and Autonomous Cars: Building the Future of Roads
Smart Concrete and Autonomous Cars: Building the Future of RoadsSmart Concrete and Autonomous Cars: Building the Future of Roads
Smart Concrete and Autonomous Cars: Building the Future of Roads
 
Repair Options for Concrete Roadways
Repair Options for Concrete RoadwaysRepair Options for Concrete Roadways
Repair Options for Concrete Roadways
 

KĂĽrzlich hochgeladen

8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxsomshekarkn64
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 

KĂĽrzlich hochgeladen (20)

8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptx
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 

How Local Agencies Decide to Use PCC Overlays

  • 1. HOW LOCAL AGENCIES DECIDE TO USE PCC OVERLAYS NCPA Concrete Paving Conference January 16, 2018
  • 2. Who am I, and how would I know the answer to this question? ď‚· Today, 37 years out of Iowa State in 1980 with a BSCE ď‚· Registered PE in CO, and Iowa (PLS too), Previously in OK, though about it in several other states, but not really wanting to collect registrations … , but …. ď‚· 17 years in Consulting (Land Development, City and IDOT type projects) ď‚· 20th year in County Engineering. That said, …
  • 3. Specific PCC Overlay Experience? ď‚· Hired as Dallas County Engineer in 1989, after less than two years in Montgomery County ď‚· Within a month of arrival, before I turned 30, Contractors started on 18 miles of PCC Overlays that had been let before my arrival. All over old HMA. ď‚· It was kind of a “throw the baby in the pool and see if it swims” approach, but the contracts were in place and the paving plant was being moved in. ď‚· I didn’t make the call, but I learned why it was decided and lived with it ever since. ď‚· Since then, I have managed another ten miles or so of PCC Overlays, 16 lane- miles of widening, plenty of full depth highways and City streets - overall more than sixty miles of PCC Pavements ď‚· I’ve also done about thirty miles of HMA Overlays over HMA or Seal Coat – because it was the right thing to do for the situation at hand
  • 4. So first, decide if an overlay is appropriate, then we will get to what type. ď‚· Existing pavement (PCC or HMA) not too bad, but not enough. ď‚· Can the existing hold up during hauling of the mix? ď‚· Good enough structure present that you don’t need to start from scratch? ď‚· Future traffic can be accurately estimated. ď‚· Adjacent access and road-top width can accommodate the additional thickness? ď‚· Funding is available to do something more than routine surface maintenance. ď‚· Is a recycled in place pavement covered with a new slab really “just another type of overlay”?
  • 5. Also, need to know what you want out of an overlay, if a reasonable choice. ď‚· Add structure? ď‚· Correct grades? If so, isolated or wide spread? ď‚· Generate smoothness? ď‚· Good enough condition for an HMA Overlay? PCC Overlay can accommodate more underlying problems – long term. Less need for prep patching with PCC onto HMA ď‚· Minor wheel tracks? Problem to be addressed for HMA, beneficial for PCC. ď‚· You can use a little black stuff to buy time. ď‚· Or, go for an enduring pavement with a true addition of structure
  • 6. ď‚· HOW MUCH FUNDING IS AVAILABLE WHEN THE WORK IS NEEDED $$$$$$$$$$$$$$$$ ?
  • 7. Bottom line is Overlays are not the cookbook solution we tend to get into with standard pavement replacement or new development. ď‚· Nice to use some engineering judgement once in a while, with or without punching a bunch of numbers. ď‚· Seldom a toss-up based upon pavement condition, but PCC and HMA industry, as well as ASHTTO and others have structural number calcs that you can use to compare outcomes. Please be aware each formula tends to favor their sponsor!***
  • 8. HMA Pluses: 1. Shallow “T” potential because strength isn’t an issue a. Maybe in a residential subdivision b. Facelift on an already substantial section 2. A Band-aid will do … for now. . Ease of maintenance in ensuing years (but always doing maintenance?) 3. Maybe save $ short term with a thin overlay – budget pinch with a pending disaster (avoid “losing a pavement”), but you’ll be back again sooner than you want. 4. Fewer adjacent grade adjustments, if a couple inches matters? 5. If over a Seal Coat, creates an actual maintainable pavement, as a product of several Overlays
  • 9. PCC Pluses: 1. Minimal thickness (<4”) might work in those residential subdivisions or in a “bonded” situation 2. Longer life cycle which normally means better life cycle costs (totally market dependent) 3. Less maintenance over the life of slab 4. Annualized cost is almost always less if using honest future maintenance projections 5. Project access usually much better than on a fresh grade 6. An extra inch will buy years more performance – geometric improvement on performance 7. Doubtful you need to go back during your career to repave – not so much with HMA
  • 10. Ultimately, HMA is a placeholder, short term, or Band-aid – sorry to my friends that sell the black stuff. Or it can be a way of life, a default process, seldom the engineered solution. PCC, on the other hand, can only perform well if it has a proper foundation. Another point, HMA makes a great base to place PCC on! If you can afford it, and it fits geometrically, PCC overlays have been a good life- cycle cost choice (where an improvement is needed) throughout my thirty some year career, and I don’t see that changing.
  • 11. $