SlideShare ist ein Scribd-Unternehmen logo
1 von 8
Downloaden Sie, um offline zu lesen
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 02 | Feb-2016 www.irjet.net p-ISSN: 2395-0072
© 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 252
Problem Identification of Traffic and Transport:
Muzaffarpur City, Bihar
Ar. Nishant Nathani1, Prof. S K Gupta2, Prof. Sangeeta Bagga Mehta3
1 Ph.D. Scholar, Amity School of Architecture & Planning, Amity University Haryana, Manesar, Gurgaon, India
2 Dean and Director, Amity School of Architecture & Planning Amity University Haryana , Manesar, Gurgaon, India
3Associate Professor, Chandigarh College of Architecture, Chandigarh, India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - India is a fast developing country. With the
growth of city its need for traffic management has increaseda
lot especially in Tier-2 city. This study will talk about the
identification of issuesofTrafficandTransport ofMuzaffarpur
city. Survey has been conducted and photographs have been
taken to understand the existing scenario and the problems
which can be rectified very easily if the local authority took
interest for the same.
Key Words: Traffic and Transport, Right of way, congestion
road, problem identification, Muzaffarpur, Traffic issues
1. INTRODUCTION
Solutions could be given only if the problems are identified.
To understand the existing developmentscenarioisthebasic
and prime requirement of any Traffic and transport related
study.
The development of fast growing area is based on movement
i.e. Traffic and transport. The problem of Traffic and
transport is felt in almost all major cities across the India.
This is primarily because growth of infrastructure is slow
compared to growth in number of vehicles. The role of traffic
and transport planning has a very wide scope; for instance
improving safety and health, reducing emissions from
vehicles, improving equity, enhancing economic
opportunities, improving community livability, promoting
mobility are all valid. This paper will talk about the existing
scenario of Traffic and Transport, Road conditions and the
issues related to each condition specific to the Muzaffarpur
city..
2. ABOUT MUZAFFARPUR
Muzaffarpur urban area is the centreofcommercial,business
and educationalactivitiesofalargehinterlandofMuzaffarpur
district. Muzaffarpur is the largest town in northern Bihar
and fourth largest city in termsofpopulationaftercapitalcity
Patna, Gaya and Bhagalpur. The districtproducesnearlyone-
third of the entire Litchi production of the country. The total
area under the jurisdiction of Muzaffarpur Municipal
Corporation (MMC) is about 26.68 Km2 (2668.44Ha). The
town is divided into 49 wards. The Muzaffarpur Municipal
Corporation (MMC) is surrounded by River BudhiGandakon
north, Dighra Rampur Sah village on south, the National
Highway (NH) 57 and railway line on west and extends upto
reserve police station on eastern limit.
1.1 Rail and Road Connectivity
Muzaffarpur district has well developed means of
communication. It has a network of railways and roads.
Regional Network of Muzaffarpur
· Muzaffarpur – Hajipur Highway (NH – 77)
· Muzaffarpur – Sitamarhi Highway (NH – 77)
· Muzaffarpur – Rewaghat road (NH – 102)
· Muzaffarpur – Darbhanga Highway (NH – 57)
· Muzaffarpur – Samastipur Highway (NH – 28)
· Muzaffarpur – Motihari Highway (NH – 28)
Map1: Indicating NH and Rail Connectivity of Muzaffarpur
Source : www.muzaffarpuronline.in
3. TRANSPORT SYSTEM IN MUZAFFAPUR
Muzaffarpur City is connected by NH-28, NH-57, NH-77 and
NH-102. The total road network of Muzaffarpur city is
approximately 72.17 km jointly managed by Muzaffarpur
Municipal Corporation (38 km), Public Works Department
(17.12 km) and the District Council (16.69 km).
Approximately 99% of the roads under the jurisdictionofthe
corporation are pucca roads. The town has two intercity bus
stands, one under BSRTC and the other for privately owned
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 02 | Feb-2016 www.irjet.net p-ISSN: 2395-0072
© 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 253
buses. The key issues affecting the sector are heavy
congestion, parking problems especially in the market areas
and along the main thoroughfare. Encroachment ofroadsfor
commercial activities and for residential use by slum
dwellers, lack of parking places, no traffic signals, no road
signage and inefficient traffic management are some of the
key issues. The situation worsens with water logging and
overflow of drains in the rains.
Sl.
No.
Roads
looked
after by
Number
of
Roads
Length
(km)
Remarks
1 Municipal
Corporation
Roads
74 38.091 RoW varies
between 4
and 25 m
2 PWD Roads 12 17.123 RoW varies
between 8
and 30 m
3 District
Council
Roads
13 16.961 RoW varies
between 5
and 24 m
4 Total 99 72.175
Table-1:Roads under Various Authorities in Muzaffarpur
Source: Municipal Corporation, Muzaffarpur
3.1 Major Roads In Muzaffarpur
Compiled data of roads, their right of way, construction
material and length of road under each department like
Municipal corporation, PWD and district council is listed
below:
S.N
o.
Name of the Road Type
of
Road
Leng
th
(m)
Widt
h
(m)
1 Lalit Narayan Mishra
Road (Malgodawn Chowk
to Kalyani Chowk)
Pitch
&
PCC
1642 20-14
2 Mahender Marg Sadar
Hospital Road (Lalit
Narayan Mishra Road to
Dak Ghar Chowk)
Pitch
&
PCC
476 17-19
3 Bank Road (Dharamshala
Chowk to Mahatma
Gandhi Road)
PCC 557 14-16
4 Nathu Chaudhary Road
(Dharamshala Chowk to
Chatha Chowk
PCC 562 12-13
5 Laxmi Narayan Road
(Dharamshala Chowk to
Achal Chowk)
PCC 517 7-10
6 Tilak Maidan Road
(Town Thana Chowk to
Navyukth Samiti)
Pitch 370 7-12
7 Sariyaganj Road (Tower
Chowk to Navyukth
Samiti)
PCC 215 10-14
8 Jawaharlal Chowk
(Navyukth Samiti to
Kalyani Chowk)
PCC 685 10-12
9 Sutapatti Road (Bank
Road to Sarriyaganj
Road)
PCC 256 6-11
10 Balughat Road
(Akharaghat Road to
Budhigandak )
Pitch
&
PCC
608 6-7
11 Yogender Mukherjee
Road (Jawaharlal Road to
Raghuvansh Road)
PCC 282 6-11
12 Gola Bandh Road PCC 650 5-7
13 Raghuvansh Road PCC 510 6-13
14 Kripnath Mishr Lane
(Gudri Road to
Raghuvansh Road)
PCC 180 4-8
15 Garibsthan Road(Chatha
Bazaar Chowk to Purani
Bazaar Chowk)
PCC 285 6-11
16 Kaidarnath Banerjee
Road(Kalyani Chowk to
Durgasthan Chowk)
PCC 780 9-12
17 Yadhupati Road(Nayi
Bazaar Road Majhan Toil
Road to Banaras Bank
Chowk)
Pitch 310 6-12
18 Roti Wali Lane) PCC 150 8-10
19 Mahajan Toil Road
(Jumma Masjid Chowk to
Pakki Sarai)
Pitch 458 9-11
20 Lakdi-Dhai Road (Nawab
Road to Uttarbhaya
Bandh)
PCC 265 10-11
21 Nawab Road (Banaras
Bank Chowk to Church
Road)
Pitch
&
PCC
586 11-12
22 Azad Road (Pakki Sarai
Road to Church Road)
PCC 447 11
23 Maharaja Road (Azad
Road to Gandak Bandh)
PCC 405 10-12
24 Kurbaan Road (Bhola
Chowk to Nawab Chowk)
PCC 450 11
25 Church Road (Jail Chowk
to Lakdi-Dhai Road)
PCC 634 5-18
26 Pakki Sarai Road PCC 1053 12
27 Ali Mirza Road (Nayi
Bazaar Chowk to Pakki
Sarai Road)
PCC 261 11-16
28 Bhaukla Road (Sahu
Road to Chaturbhusthan
Chowk)
PCC 513 8-10
29 Kalibadi Road
(Chaturbhusthan Chowk
to Malighat
Chowk)
PCC 948 8-10
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 02 | Feb-2016 www.irjet.net p-ISSN: 2395-0072
© 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 254
30 Rambagh Road (Pakki
Sarai Road to Sanskrit
College)
PCC 522 6-13
31 Kachhi Sarai Road(Chhoti
Kalyani Chowk to Amar
Talkis)
PCC 479 8-15
32 Gudri Bazaar
Road(Prabhat Sinera
Road to Pakki Sarai
Road)
PCC 979 6-9
33 Bahel Khana Road(Gudri
Bazaar Road to Kachhi
Sarai Road)
PCC 330 6-7
34 Pachrang Patti
Road(Gaushala Chowk to
Malighat Chowk)
PCC 1032 19-25
35 Purani Bazaar
Road(Kaidarnath Road to
Sahu Road)
PCC 180 9-10
36 Club Road (Kalyani
Chowk to Jubbasahni
Park)
PCC 1061 10-12
37 Rajju Saha Lane (Club
Road to Railway Line)
PCC 360 5-6
38 Mukherjee Seminary
Road (Club Road to Sarai
Road)
PCC 235 7-9
39 Society Road (Pani Tanki
Chowk to Gaushala Road)
PCC 550 8-9
40 Diwan Road (Club Road
to Amgola Railway
Sampar)
Pitch
&
PCC
400 8-10
41 Bhayamnandan Road
(Town Thana Chowk to
Nathu Choudhary Road)
Pitch
&
PCC
598 10-15
42 Nitivar Marg (Chanderlok
Chowk to Kalambagh
Chowk)
PCC 551 20-24
43 Padav Pokhar Road(Nim
Chowk to Kalam Bagh
Road)
PCC 814 4-5
44 Nandan Shah Marg (Nim
Chowk to Atardah ke
Siman )
PCC 1271 4-7
45 Refugee Road (Kalam
Bagh Chowk to
Ramdayalu Nagar
Station)
Pitch 1121 5-25
46 Chaturbhuj Thakur Marg
(Kalam Bagh Road to
Refugee Marg)
Pitch 473 3-4
47 Damu Chowk Road
(Chata Chowk to
Vivekanand Road)
Pitch
&
PCC
963 9-11
48 Maujhaulia Road (Kalam
Bagh Road to Railway
Pitch
&
1186 6-9
Sampar No-5) PCC
49 Chaturbhuj Sthan Road
(Chaturbhuj Sthan Road
to Kalibadi Road)
Pitch 235 8-11
50 Khabda Road (Kalam
Baghroad to Railway
Sampar No-6)
Pitch 883 4-10
51 Spekar Road (Kalam
Bagh Road to Bhayam
Nandan Road)
PCC 335 6-7
52 Choti Kalyani Road
(Kalyani to Choti
Kalyani)
PCC 200 5-9
53 Imli Chatti Road (Bus
Stand Chowk to Mahbub
Chowk)
Pitch
&
PCC
446 12-14
54 Mahendi Hassan Road
(Motihari Road to Laxmi
Chowk)
Pitch 820 9
55 Iqbal Hussain Road Pitch 480 3-5
56 Soda Godaam Road Pitch 318 3-4
57 Jhatakiya Road Pitch 408 5-7
58 Juran Chapra Road-1 PCC 211 5-7
69 Juran Chapra Road-2 Pitch 202 5-6
60 Juran Chapra Road-3 PCC 257 5-6
61 Juran Chapra Road-4 Pitch 305 5-7
62 Ayodhaya Prasad Lane PCC 290 3-4
63 Majlis Sahay Lane PCC 140 3-4
64 Krishan Toil Road Pitch 647 4-9
65 Madipura School Road PCC 172 4-5
66 Chitragupt Puri Road PCC 477 7-15
67 Ram Raji Road PCC 464 3-5
68 Professor Colony Road Solin
g
233 4-5
69 Bela Road PCC 529 4-6
70 Pankha Toli Road PCC 863 4-6
71 Orient Club Lane PCC 225 4-5
72 Patwa Toli Lane PCC 273 4-5
73 Pitambar Babu Lane Pitch 318 5-6
74 Data Lambal Shah Mazar
Road
PCC 200 6-7
Table -2 : Major Roads under Muzaffarpur Municipal
Corporation
Source: Draft Master Plan, Muzaffarpur –-2027
Sl.
No.
Name of the Road Type
of
Road
Leng
th
(m)
Widt
h
(m)
1 Motihari Road (Juran
Chapra Chowk to Laxmi
Chowk)
Pitch 2583 14-
30
2 Rewa Ghat Road (Juran
Chapra Chowk to
Bhagwanpur
Chowk)
Pitch 1637 10-
18
3 Kachhari Road (Juran Pitch 2575 12-
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 02 | Feb-2016 www.irjet.net p-ISSN: 2395-0072
© 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 255
Chapra Chowk to
Banaras Bank
Chowk)
24
4 Hajipur Road (Purani
Thana Chowk to
Ramdayalu Nagar
over bridge)
PCC
&
Pitch
3294 8-22
5 Devaria Road
(Brahampura Thana
Chowk to Damodarpur)
Pitch 1028 12-
25
6 Gaushala Road Pitch 976 16-
19
7 Madipur Chowk to Butler
Chowk
Pitch 615 9-12
8 Dak Bangle
Road(Malgodam Chowk
to Dak Bangla Chowk)
Pitch 376 15-
22
9 Butler Chowk to Butler
Railway Gumati
Pitch 332 12-
13
10 Chakkar Road Pitch 1262 8-24
11 Sikandarpur Road Pitch 978 9-19
12 Akhada Ghat
Road(Tower Chowk to
Zero mile)
Pitch 1467 13-
31
Table-3 : Major roads under PWD, Muzaffarpur
Source: Draft Master Plan, Muzaffarpur –-2027
Sl.
No.
Name of the Road Type
of
Road
Length
(m)
Width
(m)
1 Kalam Bagh Road
(Butler Chowk to
Mithan Pura Chowk)
PCC &
Pitch
3523 5-17
2 Ladora Road
(Madipur Power
House Chowk to
Railway Gumti)
PCC &
Pitch
782 13-15
3 Dalsingh Sarai Road
(Masjid Chowk to
Gulgula Chowk)
PCC &
Pitch
2314 20
4 Padmoula Road
(Kachhi Pucki Road)
PCC 2314 20
5 Sahpur Road (Jubba
Sahnipark to Nigam
Limit)
PCC &
Pitch
595 19-22
6 Brahampura Thana
Chowk to N.H.-28
Pitch 1000 12-14
7 Ashram Road Pitch 2263 20
8 Kathal Road PCC 725 12-16
9 Major Ganj PCC &
Pitch
860 8-24
10 Khadi Board to Ram
Bagh Chowk
Soling 439 17
11 Satpura to Bhorpur Soling 570 4-7
12 Madipur Chowk to
N.H.-28
PCC 509 5-6
13 Mithan Pura Road
(Bela Road to
Gaushala Road)
PCC 1067 11-19
Table -4: Major roads under District Council, Muzaffarpur
Source: Draft Master Plan, Muzaffarpur –-2027
3.2 Classification of Urban Roads and Traffic
Characteristics
The type of construction of roads within Muzaffarpur is
shown in Table 5. The town has about 26 km long concrete
roads and 24.4 km long black top roads, together, which
constitutes more than 70% of total road network. In
addition, road stretches of 18 km length have been
categorised as both concrete / blacktop construction.Nearly
3.7% road length (2.7 km) is kutcha.
Sl.
No.
Surface Type Length of
Roads (km)
Percentage
1 Concrete Roads
(PCC)
26.738 37.05%
2 Concrete Roads +
Blacktop
18.273 25.32%
3 Black Topped/
Bituminous
24.440 33.86%
4 Earthen Road 2.724 3.77%
Total 72.175 100%
Table 2.45 Division of Roads based on Surface Type
Source: Municipal Corporation Muzaffarpur
4. ISSUES IDENTIFICATION
This section of the paper will talk about the issues of traffic
and transport in Muzaffarpur for this author has surveyed
the area and clicked photographs to address the issues.
4.1 Garbage Collection Issue
There is a lack of garbage collection points in the city.
Garbage pits has not been found throughout the city except
some places, figure 1,2 &3 describes the scenario of garbage
in the city.
Figure-1: Garbage on road
Source: Author
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 02 | Feb-2016 www.irjet.net p-ISSN: 2395-0072
© 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 256
Figure-3: Garbage in between road, Chhata Bazar
Source: Author
Figure-3: Garbage on road, Shukla road
Source: Author
4.1.1 Issues:
1) No space for pedestrian
2) Very difficult to ride non motorized vehicle
3) Less Carriage way for movements
4) Cause of traffic congestions
5) Creates Unhygienic conditions as the animals take
their food out of the garbage
6) Slow traffic as animals sits over the garbage.
7) No pedestrian movement
8) Difficult to travel NMT modes
9) Unhygienic condition
10) Movement of traffic is slow
11) Foul smell to traveller
4.2 Street Vendor Issue
Most of the major roads of the city is captured by street
vendors. They capture 20% -30% Right of way, where as
city is already facing the narrow roads and streets. Figure 4
& 5 is indicating such street vendors on the road.
4.2.1 Issues:
1) No space for pedestrian
2) Less Carriage way for movements
3) Cause of traffic congestions
4) 30% to 40% ROW is occupied by the vendors and
the customers’
Figure-4: Vegetable street vendor, Chhoti Sariaya Ganj
Source: Author
Figure-5: Street Food vendor
Source: Author
4.3 Bottle neck at major road
Bottle neck in the city is one of the major causes of slow
traffic and traffic congestions. Muzaffarpur is also having
such bottlenecks in the city figure 6 indicates the bottleneck
point in the city
4.3.1 Issues:
1) No space for pedestrian
2) Suddenly traffic gets slow
3) Cause of traffic congestions
4) Accident prone area
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 02 | Feb-2016 www.irjet.net p-ISSN: 2395-0072
© 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 257
Figure-6: bottle neck at Saraiyajang
Source: Author
4.4 Electric Poles On Carriage Way
It has een observed that in many place the electrical poles
are standing in between carrige way. Without considering
the it will craete another king of bottle neck. It has aldo been
observed people use space aroudthepoleasa garbagedump
area , since there is no movement of vehicle near the pole.
Figure 7 & 8 are showing the condition of electric pole
standing in between the road.
4.4.1 Issues:
1) Place used as a garbage dump area
2) Suddenly traffic gets slow
3) Accident prone area
4) Carriage way is not utilized properly
5) Area near the pole used as a parking space
Figure-7: Electric Pole on caraigeway
Source: Author
4.5 Water logging Issue
Drains of muzaffarpur are not designed and cleaned
properly. Most of the area is facing the issue of overflow of
drainge. Drains are open in nature and clogged due to non
maintance issue. Grey and black water on the road creates
trouble to the padestrian and other vehicular movements
some of the area like Kedar nath road is facing this broblem
Figure-8: Electric Pole on caraigeway
Source: Author
Figure-9: Overflow of drain, Kaidar Nath Road
Source: Author
Figure-10: Overflow of Drain
Source: Author
through out the year. Now the traffic and move through that
road is negligible as the peaople dont want to opt theat
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 02 | Feb-2016 www.irjet.net p-ISSN: 2395-0072
© 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 258
route. Figure 9,10 and 11shows the scenario of water
looging in usual days.
4.5.1 Issues:
1) Around the pole area used as a garbage dump area
2) Suddenly movement of traffic gets slow
3) Accident prone area
4) Carriage way is not utilized properly
5) Difficult to travel NMT modes
6) Unhygienic condition
7) Foul smell to traveller
8) Almost unused lane by travellers
9) Movement of Public transport is nil
Figure-11: Open and clogged drain
Source: Author
4.6 Un-organized Traffic
In the city traffic is not managed properly . enforcement of
traffic rule is voilated most of time by the users, this leads to
trffic jam and cogestions. User dont follw their lane
especially teo wheelers, bicycle and cycle rikshaw. Figure 12
indiactes the scenario of un-organized traffic
Figure-12: Un-organized traffic
Source: Author
4.6.1 Issues:
1) Traffic Jam
2) Pollution noise and fossil fuel
4.7 Movement of NMT modes on Flyover
While designing the flyover the movement space for NMT
was not provided in sufficient below the flyover so the NMT
are bound to use the flyover which is difficult due to
elevation of flyover. Figure 13 shows that NMT using the
flyover
Figure-13: Movemnt of NMT on motijheel fly over
Source: Author
4.6.1 Issues:
1) Extra effort to the user
2) De-motivate the user to use NMT
3) Compelling to use motorised vehicle for travelling
4) Traffic gets slow as the NMT moves very slow in
ascending direction.
5) To control NMT on descending direction is another
difficult task.
4.8 Rope as a divider
Due to minimal width of right of way (ROW) to design
proper divider is difficult as divider will take some of the
area of carriage way. So the smart solution wasthoughtof by
the authority to control the traffic by dividing the road into
two way road system. But in the rush hour rope isnotableto
serve its purpose. Figure 14 shows the use of rope as a
divider
Figure-14: Rope as a divider at Tower Chowk
Source: Author
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 02 | Feb-2016 www.irjet.net p-ISSN: 2395-0072
© 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 259
4.9 Other Issues
 No proper parking space in the town
 Intercity bus has not plied on the road
 Traffic is not managed properly
 No space for pedestrian to move
 Minimal carriage way to move motorised 4 wheeler
 IPT modes does not have proper route designated
 Lack in traffic signals on squares
 Zebra crossing is missing from entire city
 No speed limit
 Mix transport modes
 Right of way is shared by Cows in dogs, authority does
not take proper care
 Garbage collection system is not proper so it is usually
dumped on the ROW.
 Instead of tricycle electric rickshaw should be promoted
 Building norms and byelaws as not beenfollowedproper
ly most of the building has illegal construction eating up
right of way
 Open Drainage system which eats up the pedestrian
space.
 Improper drainage system due to this 20% of the roads
or lane are used seldom for movement
 Fly over is used as parking space.
 Poor traffic management
 Big poth holes, slows the traffic
 Speed breakers are not designed properly creates
trouble for NMT as well as mechanically driven
vehicle.
 Big vehicles like MUV’s and SUV’s are having big
share on the roads eating up much of the space of
limited carriageway
 Squares are not designed properly, so movement
from one direction to another is difficult and slows
down the traffic
 On an average length of roads are 500 mtrs. 60% -
70 % of the roads/lanes are of less than 500 mtrs.
Number of turnings is higher.
 Bus stand is not designed properly with platforms
 Street vendors eating up the movement space of
narrow streets
5. CONCLUSIONS
It has been identified that most of the issues are related to
management of traffic and transport. If the executing body
and maintaining authority will work properly many of the
issues may be resolved without much expenditure. Issues
like open drain, overflow of drain, street vendors, electric
pole etc. these issues could be resolved without much
hindrance. So If the concern authority look with in and
analyze the problems of traffic and transportitcanbesolved
easily.
REFERENCES
[1] Nishant Nathani, Prof. S K Gupta, Prof. Sangeeta Bagga
Mehta “Seamless Transport System for Feasible Moblity:
Case Study” Volume : 6, Issue : 1, JANUARY 2016, pp
69-74, Indian Journal Of Applied Research, Journal DOI :
10.15373/2249555X
[2] Prof. S K Gupta and Ar. Nishant Nathani, Urban Transport
Green: India, ICETET’2013, Phuket, Thailand, pp 103-108
[3] CDP, Muzaffarpur; Urban Development and Housing
Department Government of Bihar
[4] National urban Transport Policy, Govt. of India
[5] Draft Master Plan- Muzaffarpur-2027

Weitere ähnliche Inhalte

Was ist angesagt?

Aditi Garg_Portfolio
Aditi Garg_PortfolioAditi Garg_Portfolio
Aditi Garg_Portfolio
Aditi Garg
 
Integrated township- atali-dahej-phase-II
Integrated township- atali-dahej-phase-IIIntegrated township- atali-dahej-phase-II
Integrated township- atali-dahej-phase-II
Outlook Menia
 
Kolkata-the city of joy
Kolkata-the city of joyKolkata-the city of joy
Kolkata-the city of joy
sunnik
 
Thesis 2016
Thesis 2016Thesis 2016
Thesis 2016
live4fun
 

Was ist angesagt? (20)

Aditi Garg_Portfolio
Aditi Garg_PortfolioAditi Garg_Portfolio
Aditi Garg_Portfolio
 
Nala (sewerage) plantation designs
Nala (sewerage) plantation designsNala (sewerage) plantation designs
Nala (sewerage) plantation designs
 
Integrated township- atali-dahej-phase-II
Integrated township- atali-dahej-phase-IIIntegrated township- atali-dahej-phase-II
Integrated township- atali-dahej-phase-II
 
Rani Ki Vav
Rani Ki VavRani Ki Vav
Rani Ki Vav
 
Houses of goa
Houses of goaHouses of goa
Houses of goa
 
Kolkata-the city of joy
Kolkata-the city of joyKolkata-the city of joy
Kolkata-the city of joy
 
Hyderabad City
Hyderabad CityHyderabad City
Hyderabad City
 
Puri
PuriPuri
Puri
 
Bhedaghat.pptx
Bhedaghat.pptxBhedaghat.pptx
Bhedaghat.pptx
 
Tera village sandeep kulkarni
Tera village   sandeep kulkarniTera village   sandeep kulkarni
Tera village sandeep kulkarni
 
Physical Infrastructure Assessment Report: A case study of Gaya, Bihar
Physical Infrastructure Assessment Report: A case study of Gaya, BiharPhysical Infrastructure Assessment Report: A case study of Gaya, Bihar
Physical Infrastructure Assessment Report: A case study of Gaya, Bihar
 
Bodhgaya case study
Bodhgaya case studyBodhgaya case study
Bodhgaya case study
 
Case Study Of Haridwar
Case Study Of HaridwarCase Study Of Haridwar
Case Study Of Haridwar
 
Varanasi Riverfront Development
Varanasi Riverfront DevelopmentVaranasi Riverfront Development
Varanasi Riverfront Development
 
Kashi vishwanath
Kashi vishwanathKashi vishwanath
Kashi vishwanath
 
Thesis 2016
Thesis 2016Thesis 2016
Thesis 2016
 
Ambedkar memorial park, lucknow
Ambedkar memorial park, lucknowAmbedkar memorial park, lucknow
Ambedkar memorial park, lucknow
 
House to Home Design Competition for Autism Speaks
House to Home Design Competition for Autism SpeaksHouse to Home Design Competition for Autism Speaks
House to Home Design Competition for Autism Speaks
 
Varanasi
VaranasiVaranasi
Varanasi
 
RIVER FRONT DEVELOPMENT
RIVER FRONT DEVELOPMENT RIVER FRONT DEVELOPMENT
RIVER FRONT DEVELOPMENT
 

Ähnlich wie Problem Identification of Traffic and Transport : Muzaffarpur City, Bihar

Construction of joka majherhat phase-i metro corridor considering the requir...
Construction of joka  majherhat phase-i metro corridor considering the requir...Construction of joka  majherhat phase-i metro corridor considering the requir...
Construction of joka majherhat phase-i metro corridor considering the requir...
Rajesh Prasad
 
Nha road-network-maps-of-projects-02.01.2012-part-01
Nha road-network-maps-of-projects-02.01.2012-part-01Nha road-network-maps-of-projects-02.01.2012-part-01
Nha road-network-maps-of-projects-02.01.2012-part-01
ABDULRAHMAN1233
 
Surabaya mass rapid transportation (smart)
Surabaya mass rapid transportation (smart)Surabaya mass rapid transportation (smart)
Surabaya mass rapid transportation (smart)
Irvan Wahyu
 
GMLR PPT MC 22-06-15-final
GMLR PPT MC 22-06-15-finalGMLR PPT MC 22-06-15-final
GMLR PPT MC 22-06-15-final
Durgesh Gawde
 
pdfcoffee.com_road-construction-7-pdf-free.pdf
pdfcoffee.com_road-construction-7-pdf-free.pdfpdfcoffee.com_road-construction-7-pdf-free.pdf
pdfcoffee.com_road-construction-7-pdf-free.pdf
mymail34
 

Ähnlich wie Problem Identification of Traffic and Transport : Muzaffarpur City, Bihar (20)

Construction of joka majherhat phase-i metro corridor considering the requir...
Construction of joka  majherhat phase-i metro corridor considering the requir...Construction of joka  majherhat phase-i metro corridor considering the requir...
Construction of joka majherhat phase-i metro corridor considering the requir...
 
Nha road-network-maps-of-projects-02.01.2012-part-01
Nha road-network-maps-of-projects-02.01.2012-part-01Nha road-network-maps-of-projects-02.01.2012-part-01
Nha road-network-maps-of-projects-02.01.2012-part-01
 
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation  Planning as Effective Mean to Rejuvenate a Pilgrimage TownTransportation  Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage Town
 
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
 
Safety presentation
Safety presentationSafety presentation
Safety presentation
 
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
 
Outer ring road network in valley
Outer ring road network in valleyOuter ring road network in valley
Outer ring road network in valley
 
Surat BRTS - Abhijit Lokre
Surat BRTS - Abhijit LokreSurat BRTS - Abhijit Lokre
Surat BRTS - Abhijit Lokre
 
IRJET-Feasibility Study of Metro Rail Project in Pune City
IRJET-Feasibility Study of Metro Rail Project in Pune City IRJET-Feasibility Study of Metro Rail Project in Pune City
IRJET-Feasibility Study of Metro Rail Project in Pune City
 
ASSET MAPPING FOR DECENTRILIZED PLANNING BY DESIGNING THE BYPASS ROAD USING Q...
ASSET MAPPING FOR DECENTRILIZED PLANNING BY DESIGNING THE BYPASS ROAD USING Q...ASSET MAPPING FOR DECENTRILIZED PLANNING BY DESIGNING THE BYPASS ROAD USING Q...
ASSET MAPPING FOR DECENTRILIZED PLANNING BY DESIGNING THE BYPASS ROAD USING Q...
 
Comprehensive mobility plan for thiruvananthapuram
Comprehensive mobility plan for thiruvananthapuramComprehensive mobility plan for thiruvananthapuram
Comprehensive mobility plan for thiruvananthapuram
 
Surabaya mass rapid transportation (smart)
Surabaya mass rapid transportation (smart)Surabaya mass rapid transportation (smart)
Surabaya mass rapid transportation (smart)
 
GMLR PPT MC 22-06-15-final
GMLR PPT MC 22-06-15-finalGMLR PPT MC 22-06-15-final
GMLR PPT MC 22-06-15-final
 
Planning & Design of Storm water Drainage system for Valsad city
Planning & Design of Storm water Drainage system for Valsad cityPlanning & Design of Storm water Drainage system for Valsad city
Planning & Design of Storm water Drainage system for Valsad city
 
Traffic Characteristics
Traffic CharacteristicsTraffic Characteristics
Traffic Characteristics
 
Sealdah railway platform aminities
Sealdah railway platform aminitiesSealdah railway platform aminities
Sealdah railway platform aminities
 
SOLVING CONGESTION AT 4 LEGGED FATAL INTERSECTION BASED ON PROPORTIONATE TRA...
 SOLVING CONGESTION AT 4 LEGGED FATAL INTERSECTION BASED ON PROPORTIONATE TRA... SOLVING CONGESTION AT 4 LEGGED FATAL INTERSECTION BASED ON PROPORTIONATE TRA...
SOLVING CONGESTION AT 4 LEGGED FATAL INTERSECTION BASED ON PROPORTIONATE TRA...
 
Introduction to drr 2013
Introduction to drr 2013Introduction to drr 2013
Introduction to drr 2013
 
Mysore City :: Traffic and Transportation
Mysore City :: Traffic and TransportationMysore City :: Traffic and Transportation
Mysore City :: Traffic and Transportation
 
pdfcoffee.com_road-construction-7-pdf-free.pdf
pdfcoffee.com_road-construction-7-pdf-free.pdfpdfcoffee.com_road-construction-7-pdf-free.pdf
pdfcoffee.com_road-construction-7-pdf-free.pdf
 

Mehr von IRJET Journal

Mehr von IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Kürzlich hochgeladen

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 

Kürzlich hochgeladen (20)

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 

Problem Identification of Traffic and Transport : Muzaffarpur City, Bihar

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 02 | Feb-2016 www.irjet.net p-ISSN: 2395-0072 © 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 252 Problem Identification of Traffic and Transport: Muzaffarpur City, Bihar Ar. Nishant Nathani1, Prof. S K Gupta2, Prof. Sangeeta Bagga Mehta3 1 Ph.D. Scholar, Amity School of Architecture & Planning, Amity University Haryana, Manesar, Gurgaon, India 2 Dean and Director, Amity School of Architecture & Planning Amity University Haryana , Manesar, Gurgaon, India 3Associate Professor, Chandigarh College of Architecture, Chandigarh, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - India is a fast developing country. With the growth of city its need for traffic management has increaseda lot especially in Tier-2 city. This study will talk about the identification of issuesofTrafficandTransport ofMuzaffarpur city. Survey has been conducted and photographs have been taken to understand the existing scenario and the problems which can be rectified very easily if the local authority took interest for the same. Key Words: Traffic and Transport, Right of way, congestion road, problem identification, Muzaffarpur, Traffic issues 1. INTRODUCTION Solutions could be given only if the problems are identified. To understand the existing developmentscenarioisthebasic and prime requirement of any Traffic and transport related study. The development of fast growing area is based on movement i.e. Traffic and transport. The problem of Traffic and transport is felt in almost all major cities across the India. This is primarily because growth of infrastructure is slow compared to growth in number of vehicles. The role of traffic and transport planning has a very wide scope; for instance improving safety and health, reducing emissions from vehicles, improving equity, enhancing economic opportunities, improving community livability, promoting mobility are all valid. This paper will talk about the existing scenario of Traffic and Transport, Road conditions and the issues related to each condition specific to the Muzaffarpur city.. 2. ABOUT MUZAFFARPUR Muzaffarpur urban area is the centreofcommercial,business and educationalactivitiesofalargehinterlandofMuzaffarpur district. Muzaffarpur is the largest town in northern Bihar and fourth largest city in termsofpopulationaftercapitalcity Patna, Gaya and Bhagalpur. The districtproducesnearlyone- third of the entire Litchi production of the country. The total area under the jurisdiction of Muzaffarpur Municipal Corporation (MMC) is about 26.68 Km2 (2668.44Ha). The town is divided into 49 wards. The Muzaffarpur Municipal Corporation (MMC) is surrounded by River BudhiGandakon north, Dighra Rampur Sah village on south, the National Highway (NH) 57 and railway line on west and extends upto reserve police station on eastern limit. 1.1 Rail and Road Connectivity Muzaffarpur district has well developed means of communication. It has a network of railways and roads. Regional Network of Muzaffarpur · Muzaffarpur – Hajipur Highway (NH – 77) · Muzaffarpur – Sitamarhi Highway (NH – 77) · Muzaffarpur – Rewaghat road (NH – 102) · Muzaffarpur – Darbhanga Highway (NH – 57) · Muzaffarpur – Samastipur Highway (NH – 28) · Muzaffarpur – Motihari Highway (NH – 28) Map1: Indicating NH and Rail Connectivity of Muzaffarpur Source : www.muzaffarpuronline.in 3. TRANSPORT SYSTEM IN MUZAFFAPUR Muzaffarpur City is connected by NH-28, NH-57, NH-77 and NH-102. The total road network of Muzaffarpur city is approximately 72.17 km jointly managed by Muzaffarpur Municipal Corporation (38 km), Public Works Department (17.12 km) and the District Council (16.69 km). Approximately 99% of the roads under the jurisdictionofthe corporation are pucca roads. The town has two intercity bus stands, one under BSRTC and the other for privately owned
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 02 | Feb-2016 www.irjet.net p-ISSN: 2395-0072 © 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 253 buses. The key issues affecting the sector are heavy congestion, parking problems especially in the market areas and along the main thoroughfare. Encroachment ofroadsfor commercial activities and for residential use by slum dwellers, lack of parking places, no traffic signals, no road signage and inefficient traffic management are some of the key issues. The situation worsens with water logging and overflow of drains in the rains. Sl. No. Roads looked after by Number of Roads Length (km) Remarks 1 Municipal Corporation Roads 74 38.091 RoW varies between 4 and 25 m 2 PWD Roads 12 17.123 RoW varies between 8 and 30 m 3 District Council Roads 13 16.961 RoW varies between 5 and 24 m 4 Total 99 72.175 Table-1:Roads under Various Authorities in Muzaffarpur Source: Municipal Corporation, Muzaffarpur 3.1 Major Roads In Muzaffarpur Compiled data of roads, their right of way, construction material and length of road under each department like Municipal corporation, PWD and district council is listed below: S.N o. Name of the Road Type of Road Leng th (m) Widt h (m) 1 Lalit Narayan Mishra Road (Malgodawn Chowk to Kalyani Chowk) Pitch & PCC 1642 20-14 2 Mahender Marg Sadar Hospital Road (Lalit Narayan Mishra Road to Dak Ghar Chowk) Pitch & PCC 476 17-19 3 Bank Road (Dharamshala Chowk to Mahatma Gandhi Road) PCC 557 14-16 4 Nathu Chaudhary Road (Dharamshala Chowk to Chatha Chowk PCC 562 12-13 5 Laxmi Narayan Road (Dharamshala Chowk to Achal Chowk) PCC 517 7-10 6 Tilak Maidan Road (Town Thana Chowk to Navyukth Samiti) Pitch 370 7-12 7 Sariyaganj Road (Tower Chowk to Navyukth Samiti) PCC 215 10-14 8 Jawaharlal Chowk (Navyukth Samiti to Kalyani Chowk) PCC 685 10-12 9 Sutapatti Road (Bank Road to Sarriyaganj Road) PCC 256 6-11 10 Balughat Road (Akharaghat Road to Budhigandak ) Pitch & PCC 608 6-7 11 Yogender Mukherjee Road (Jawaharlal Road to Raghuvansh Road) PCC 282 6-11 12 Gola Bandh Road PCC 650 5-7 13 Raghuvansh Road PCC 510 6-13 14 Kripnath Mishr Lane (Gudri Road to Raghuvansh Road) PCC 180 4-8 15 Garibsthan Road(Chatha Bazaar Chowk to Purani Bazaar Chowk) PCC 285 6-11 16 Kaidarnath Banerjee Road(Kalyani Chowk to Durgasthan Chowk) PCC 780 9-12 17 Yadhupati Road(Nayi Bazaar Road Majhan Toil Road to Banaras Bank Chowk) Pitch 310 6-12 18 Roti Wali Lane) PCC 150 8-10 19 Mahajan Toil Road (Jumma Masjid Chowk to Pakki Sarai) Pitch 458 9-11 20 Lakdi-Dhai Road (Nawab Road to Uttarbhaya Bandh) PCC 265 10-11 21 Nawab Road (Banaras Bank Chowk to Church Road) Pitch & PCC 586 11-12 22 Azad Road (Pakki Sarai Road to Church Road) PCC 447 11 23 Maharaja Road (Azad Road to Gandak Bandh) PCC 405 10-12 24 Kurbaan Road (Bhola Chowk to Nawab Chowk) PCC 450 11 25 Church Road (Jail Chowk to Lakdi-Dhai Road) PCC 634 5-18 26 Pakki Sarai Road PCC 1053 12 27 Ali Mirza Road (Nayi Bazaar Chowk to Pakki Sarai Road) PCC 261 11-16 28 Bhaukla Road (Sahu Road to Chaturbhusthan Chowk) PCC 513 8-10 29 Kalibadi Road (Chaturbhusthan Chowk to Malighat Chowk) PCC 948 8-10
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 02 | Feb-2016 www.irjet.net p-ISSN: 2395-0072 © 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 254 30 Rambagh Road (Pakki Sarai Road to Sanskrit College) PCC 522 6-13 31 Kachhi Sarai Road(Chhoti Kalyani Chowk to Amar Talkis) PCC 479 8-15 32 Gudri Bazaar Road(Prabhat Sinera Road to Pakki Sarai Road) PCC 979 6-9 33 Bahel Khana Road(Gudri Bazaar Road to Kachhi Sarai Road) PCC 330 6-7 34 Pachrang Patti Road(Gaushala Chowk to Malighat Chowk) PCC 1032 19-25 35 Purani Bazaar Road(Kaidarnath Road to Sahu Road) PCC 180 9-10 36 Club Road (Kalyani Chowk to Jubbasahni Park) PCC 1061 10-12 37 Rajju Saha Lane (Club Road to Railway Line) PCC 360 5-6 38 Mukherjee Seminary Road (Club Road to Sarai Road) PCC 235 7-9 39 Society Road (Pani Tanki Chowk to Gaushala Road) PCC 550 8-9 40 Diwan Road (Club Road to Amgola Railway Sampar) Pitch & PCC 400 8-10 41 Bhayamnandan Road (Town Thana Chowk to Nathu Choudhary Road) Pitch & PCC 598 10-15 42 Nitivar Marg (Chanderlok Chowk to Kalambagh Chowk) PCC 551 20-24 43 Padav Pokhar Road(Nim Chowk to Kalam Bagh Road) PCC 814 4-5 44 Nandan Shah Marg (Nim Chowk to Atardah ke Siman ) PCC 1271 4-7 45 Refugee Road (Kalam Bagh Chowk to Ramdayalu Nagar Station) Pitch 1121 5-25 46 Chaturbhuj Thakur Marg (Kalam Bagh Road to Refugee Marg) Pitch 473 3-4 47 Damu Chowk Road (Chata Chowk to Vivekanand Road) Pitch & PCC 963 9-11 48 Maujhaulia Road (Kalam Bagh Road to Railway Pitch & 1186 6-9 Sampar No-5) PCC 49 Chaturbhuj Sthan Road (Chaturbhuj Sthan Road to Kalibadi Road) Pitch 235 8-11 50 Khabda Road (Kalam Baghroad to Railway Sampar No-6) Pitch 883 4-10 51 Spekar Road (Kalam Bagh Road to Bhayam Nandan Road) PCC 335 6-7 52 Choti Kalyani Road (Kalyani to Choti Kalyani) PCC 200 5-9 53 Imli Chatti Road (Bus Stand Chowk to Mahbub Chowk) Pitch & PCC 446 12-14 54 Mahendi Hassan Road (Motihari Road to Laxmi Chowk) Pitch 820 9 55 Iqbal Hussain Road Pitch 480 3-5 56 Soda Godaam Road Pitch 318 3-4 57 Jhatakiya Road Pitch 408 5-7 58 Juran Chapra Road-1 PCC 211 5-7 69 Juran Chapra Road-2 Pitch 202 5-6 60 Juran Chapra Road-3 PCC 257 5-6 61 Juran Chapra Road-4 Pitch 305 5-7 62 Ayodhaya Prasad Lane PCC 290 3-4 63 Majlis Sahay Lane PCC 140 3-4 64 Krishan Toil Road Pitch 647 4-9 65 Madipura School Road PCC 172 4-5 66 Chitragupt Puri Road PCC 477 7-15 67 Ram Raji Road PCC 464 3-5 68 Professor Colony Road Solin g 233 4-5 69 Bela Road PCC 529 4-6 70 Pankha Toli Road PCC 863 4-6 71 Orient Club Lane PCC 225 4-5 72 Patwa Toli Lane PCC 273 4-5 73 Pitambar Babu Lane Pitch 318 5-6 74 Data Lambal Shah Mazar Road PCC 200 6-7 Table -2 : Major Roads under Muzaffarpur Municipal Corporation Source: Draft Master Plan, Muzaffarpur –-2027 Sl. No. Name of the Road Type of Road Leng th (m) Widt h (m) 1 Motihari Road (Juran Chapra Chowk to Laxmi Chowk) Pitch 2583 14- 30 2 Rewa Ghat Road (Juran Chapra Chowk to Bhagwanpur Chowk) Pitch 1637 10- 18 3 Kachhari Road (Juran Pitch 2575 12-
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 02 | Feb-2016 www.irjet.net p-ISSN: 2395-0072 © 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 255 Chapra Chowk to Banaras Bank Chowk) 24 4 Hajipur Road (Purani Thana Chowk to Ramdayalu Nagar over bridge) PCC & Pitch 3294 8-22 5 Devaria Road (Brahampura Thana Chowk to Damodarpur) Pitch 1028 12- 25 6 Gaushala Road Pitch 976 16- 19 7 Madipur Chowk to Butler Chowk Pitch 615 9-12 8 Dak Bangle Road(Malgodam Chowk to Dak Bangla Chowk) Pitch 376 15- 22 9 Butler Chowk to Butler Railway Gumati Pitch 332 12- 13 10 Chakkar Road Pitch 1262 8-24 11 Sikandarpur Road Pitch 978 9-19 12 Akhada Ghat Road(Tower Chowk to Zero mile) Pitch 1467 13- 31 Table-3 : Major roads under PWD, Muzaffarpur Source: Draft Master Plan, Muzaffarpur –-2027 Sl. No. Name of the Road Type of Road Length (m) Width (m) 1 Kalam Bagh Road (Butler Chowk to Mithan Pura Chowk) PCC & Pitch 3523 5-17 2 Ladora Road (Madipur Power House Chowk to Railway Gumti) PCC & Pitch 782 13-15 3 Dalsingh Sarai Road (Masjid Chowk to Gulgula Chowk) PCC & Pitch 2314 20 4 Padmoula Road (Kachhi Pucki Road) PCC 2314 20 5 Sahpur Road (Jubba Sahnipark to Nigam Limit) PCC & Pitch 595 19-22 6 Brahampura Thana Chowk to N.H.-28 Pitch 1000 12-14 7 Ashram Road Pitch 2263 20 8 Kathal Road PCC 725 12-16 9 Major Ganj PCC & Pitch 860 8-24 10 Khadi Board to Ram Bagh Chowk Soling 439 17 11 Satpura to Bhorpur Soling 570 4-7 12 Madipur Chowk to N.H.-28 PCC 509 5-6 13 Mithan Pura Road (Bela Road to Gaushala Road) PCC 1067 11-19 Table -4: Major roads under District Council, Muzaffarpur Source: Draft Master Plan, Muzaffarpur –-2027 3.2 Classification of Urban Roads and Traffic Characteristics The type of construction of roads within Muzaffarpur is shown in Table 5. The town has about 26 km long concrete roads and 24.4 km long black top roads, together, which constitutes more than 70% of total road network. In addition, road stretches of 18 km length have been categorised as both concrete / blacktop construction.Nearly 3.7% road length (2.7 km) is kutcha. Sl. No. Surface Type Length of Roads (km) Percentage 1 Concrete Roads (PCC) 26.738 37.05% 2 Concrete Roads + Blacktop 18.273 25.32% 3 Black Topped/ Bituminous 24.440 33.86% 4 Earthen Road 2.724 3.77% Total 72.175 100% Table 2.45 Division of Roads based on Surface Type Source: Municipal Corporation Muzaffarpur 4. ISSUES IDENTIFICATION This section of the paper will talk about the issues of traffic and transport in Muzaffarpur for this author has surveyed the area and clicked photographs to address the issues. 4.1 Garbage Collection Issue There is a lack of garbage collection points in the city. Garbage pits has not been found throughout the city except some places, figure 1,2 &3 describes the scenario of garbage in the city. Figure-1: Garbage on road Source: Author
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 02 | Feb-2016 www.irjet.net p-ISSN: 2395-0072 © 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 256 Figure-3: Garbage in between road, Chhata Bazar Source: Author Figure-3: Garbage on road, Shukla road Source: Author 4.1.1 Issues: 1) No space for pedestrian 2) Very difficult to ride non motorized vehicle 3) Less Carriage way for movements 4) Cause of traffic congestions 5) Creates Unhygienic conditions as the animals take their food out of the garbage 6) Slow traffic as animals sits over the garbage. 7) No pedestrian movement 8) Difficult to travel NMT modes 9) Unhygienic condition 10) Movement of traffic is slow 11) Foul smell to traveller 4.2 Street Vendor Issue Most of the major roads of the city is captured by street vendors. They capture 20% -30% Right of way, where as city is already facing the narrow roads and streets. Figure 4 & 5 is indicating such street vendors on the road. 4.2.1 Issues: 1) No space for pedestrian 2) Less Carriage way for movements 3) Cause of traffic congestions 4) 30% to 40% ROW is occupied by the vendors and the customers’ Figure-4: Vegetable street vendor, Chhoti Sariaya Ganj Source: Author Figure-5: Street Food vendor Source: Author 4.3 Bottle neck at major road Bottle neck in the city is one of the major causes of slow traffic and traffic congestions. Muzaffarpur is also having such bottlenecks in the city figure 6 indicates the bottleneck point in the city 4.3.1 Issues: 1) No space for pedestrian 2) Suddenly traffic gets slow 3) Cause of traffic congestions 4) Accident prone area
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 02 | Feb-2016 www.irjet.net p-ISSN: 2395-0072 © 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 257 Figure-6: bottle neck at Saraiyajang Source: Author 4.4 Electric Poles On Carriage Way It has een observed that in many place the electrical poles are standing in between carrige way. Without considering the it will craete another king of bottle neck. It has aldo been observed people use space aroudthepoleasa garbagedump area , since there is no movement of vehicle near the pole. Figure 7 & 8 are showing the condition of electric pole standing in between the road. 4.4.1 Issues: 1) Place used as a garbage dump area 2) Suddenly traffic gets slow 3) Accident prone area 4) Carriage way is not utilized properly 5) Area near the pole used as a parking space Figure-7: Electric Pole on caraigeway Source: Author 4.5 Water logging Issue Drains of muzaffarpur are not designed and cleaned properly. Most of the area is facing the issue of overflow of drainge. Drains are open in nature and clogged due to non maintance issue. Grey and black water on the road creates trouble to the padestrian and other vehicular movements some of the area like Kedar nath road is facing this broblem Figure-8: Electric Pole on caraigeway Source: Author Figure-9: Overflow of drain, Kaidar Nath Road Source: Author Figure-10: Overflow of Drain Source: Author through out the year. Now the traffic and move through that road is negligible as the peaople dont want to opt theat
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 02 | Feb-2016 www.irjet.net p-ISSN: 2395-0072 © 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 258 route. Figure 9,10 and 11shows the scenario of water looging in usual days. 4.5.1 Issues: 1) Around the pole area used as a garbage dump area 2) Suddenly movement of traffic gets slow 3) Accident prone area 4) Carriage way is not utilized properly 5) Difficult to travel NMT modes 6) Unhygienic condition 7) Foul smell to traveller 8) Almost unused lane by travellers 9) Movement of Public transport is nil Figure-11: Open and clogged drain Source: Author 4.6 Un-organized Traffic In the city traffic is not managed properly . enforcement of traffic rule is voilated most of time by the users, this leads to trffic jam and cogestions. User dont follw their lane especially teo wheelers, bicycle and cycle rikshaw. Figure 12 indiactes the scenario of un-organized traffic Figure-12: Un-organized traffic Source: Author 4.6.1 Issues: 1) Traffic Jam 2) Pollution noise and fossil fuel 4.7 Movement of NMT modes on Flyover While designing the flyover the movement space for NMT was not provided in sufficient below the flyover so the NMT are bound to use the flyover which is difficult due to elevation of flyover. Figure 13 shows that NMT using the flyover Figure-13: Movemnt of NMT on motijheel fly over Source: Author 4.6.1 Issues: 1) Extra effort to the user 2) De-motivate the user to use NMT 3) Compelling to use motorised vehicle for travelling 4) Traffic gets slow as the NMT moves very slow in ascending direction. 5) To control NMT on descending direction is another difficult task. 4.8 Rope as a divider Due to minimal width of right of way (ROW) to design proper divider is difficult as divider will take some of the area of carriage way. So the smart solution wasthoughtof by the authority to control the traffic by dividing the road into two way road system. But in the rush hour rope isnotableto serve its purpose. Figure 14 shows the use of rope as a divider Figure-14: Rope as a divider at Tower Chowk Source: Author
  • 8. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 02 | Feb-2016 www.irjet.net p-ISSN: 2395-0072 © 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 259 4.9 Other Issues  No proper parking space in the town  Intercity bus has not plied on the road  Traffic is not managed properly  No space for pedestrian to move  Minimal carriage way to move motorised 4 wheeler  IPT modes does not have proper route designated  Lack in traffic signals on squares  Zebra crossing is missing from entire city  No speed limit  Mix transport modes  Right of way is shared by Cows in dogs, authority does not take proper care  Garbage collection system is not proper so it is usually dumped on the ROW.  Instead of tricycle electric rickshaw should be promoted  Building norms and byelaws as not beenfollowedproper ly most of the building has illegal construction eating up right of way  Open Drainage system which eats up the pedestrian space.  Improper drainage system due to this 20% of the roads or lane are used seldom for movement  Fly over is used as parking space.  Poor traffic management  Big poth holes, slows the traffic  Speed breakers are not designed properly creates trouble for NMT as well as mechanically driven vehicle.  Big vehicles like MUV’s and SUV’s are having big share on the roads eating up much of the space of limited carriageway  Squares are not designed properly, so movement from one direction to another is difficult and slows down the traffic  On an average length of roads are 500 mtrs. 60% - 70 % of the roads/lanes are of less than 500 mtrs. Number of turnings is higher.  Bus stand is not designed properly with platforms  Street vendors eating up the movement space of narrow streets 5. CONCLUSIONS It has been identified that most of the issues are related to management of traffic and transport. If the executing body and maintaining authority will work properly many of the issues may be resolved without much expenditure. Issues like open drain, overflow of drain, street vendors, electric pole etc. these issues could be resolved without much hindrance. So If the concern authority look with in and analyze the problems of traffic and transportitcanbesolved easily. REFERENCES [1] Nishant Nathani, Prof. S K Gupta, Prof. Sangeeta Bagga Mehta “Seamless Transport System for Feasible Moblity: Case Study” Volume : 6, Issue : 1, JANUARY 2016, pp 69-74, Indian Journal Of Applied Research, Journal DOI : 10.15373/2249555X [2] Prof. S K Gupta and Ar. Nishant Nathani, Urban Transport Green: India, ICETET’2013, Phuket, Thailand, pp 103-108 [3] CDP, Muzaffarpur; Urban Development and Housing Department Government of Bihar [4] National urban Transport Policy, Govt. of India [5] Draft Master Plan- Muzaffarpur-2027