THE APPLICATION OF VALUE ENGINEERING TO HIGHWAY PROJECTS
AND PROGRAMS
Gopal A. Kandle1, Shital V. Patel2
1Bharati Vidyapeeth College of Engineering, Navi Mumbai
2Prof. Dept. of Mechanical Engineering, Bharati Vidyapeeth College of Engineering, Navi Mumbai
-----------------------------------------------------------------------***--------------------------------------------------------------------
Abstract - A big challenge to all highway agencies
is to face the needs exceeding the funds made available to
them. In developing nations, like India, the imbalance of
required funds and available funds results into an inability to
maintain and upgrade existing highways or construct new
highways. In a developed nation, thisimbalancemayaffectthe
maintenance and expansion of an existing highway network.
Large budget is allocated to Highway programs
even in the poor nations. Highway resources are generally
considered as limitless. But, every highway authority is
completely aware of the resources available to their program
are finite. To keep highway project and program costs within
available funding, they are frequently forced to eliminate or
drastically reduce the scope of projects or entire programs.
There is an alternative, to controltheexpendituresby
effective means of identifying unneededand unwantedcostsat
the same time preserving the essential elements of projects.
This process is known as value engineering (VE), and it has
been applied efficiently for over 40 years by various industries
as an engineering and management tool for cost control and
increasing profit margins, while assuring that essential
product functions are maintained.
Key Words: value engineering, improve construction,
highway construction
WHAT IS VALUE ENGINEERING?
Value engineering is a systematic and organized
approach for providing the necessary functions in a project
at the possible lowest cost. Value engineering promotes the
alternative of materials and methods with less expensive
replacement, without compromising functionality. It is
focuses on the functions of various components and
materials, rather than their physical properties. Value
engineering may also be called as value analysis.
In the highway context, products and services
include the structural elements of highways as well as the
processes, equipment, and supplies used in their
development, from concept through operation and
maintenance. The required function should be achieved at
the lowest possible cost and max life-cycle as required for
performance, maintenance, safety, and aesthetics.
This techniquewasdevelopedbyLawrenceD.Miles,
a General Electric staff engineer, in 1947. VE is greatly
recognized in manufacturing and industry throughout the
world. But its application to public works, particularly
highways, is largely limited to the United States and just
recently the Republic of Indonesia till now.
The process of VE is carried out by a multi-
disciplinary team of technical experts following a set of
procedures referred to as the VE job plan. The job plan
consists of eight phases: Selection,Investigation,Creative,
Evaluation, Development, Presentation, Close out/
Implementation.
SELECTION PHASE:
The selection phase identifieswhichprojectswill be
studied. Value engineering or value analysis is not free so
careful selection of study object must be done. It should
assure maximum returns on the investment of agency’s
resources. Projects which are good objects for VE study are
ones that:
 Significantly exceeds initial cost of estimates;
 Which have complicated designs;
 High cost & critical material requirement;
 Are difficult to construct or fabricate;
 Have questionable justification;
 Have record seeking design;
 Appear too costly to build or maintain; or
An effective tool for identifying valuestudyobjectis
Pareto’s law of distribution. Pareto’s law is based upon the
principle that approximately 20 percent of the elements in a
construction project or program will account for about 80
percent of its total cost. An example would be a highway
agency. The total cost of the 20% most expensive projects
will equal about 80 % of the total cost of all the program.
INVESTIGATION PHASE:
The investigation phase is the first of five phases
performed by the VE study team. It is also the foundation
upon which the remainder of the study will be carried out.
Three activities are performed during the investigation
phase:
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3828
1) All applicable information regarding the project
and its major elements is gathered;
2) The functions of the project and its major
elements are determined; and
3) The cost and worth of the functions of the major
elements are determined,andthefunctionswiththegreatest
potential for value improvement are identified.
Function analysis is a technique whichsetsVEapart
from other cost reduction efforts. It asks the questions,
“What must this project or project element do or
accomplish” and “What else does this project or project
element do?” The functions can be classified as utility,
aesthetic, esteem, and unwanted. In highway applications,
the utility function is the most important and the aesthetic
and esteem functions are secondary. The function is defined
in the simple term, a verb and a noun. The basic function ofa
bridge is to “cross the obstacle.” If it is designed to be the
longest, highest, etc.,structure,thentheesteemfunction may
also add the cost to the project. The heat generated bya light
bulb or the disposal of excess excavation are examples of
unwanted functions. Both are costly, but these do not
contribute to the performance of the basic functions of the
light bulb or highway.
Cost and worth are often confused, but in VE they
are very distinct. Cost is the amount of money that spent to
achieve a function using the present design, and worthis the
minimum amount that must be expended to attain the
required function. Cost will always exceed worth, but when
cost substantially exceeds worth, the potential for value
improvement is high. Those functions with costs
substantially exceeding worth are selected for further
evaluation in the VE study.
CREATIVE:
In this phase, the study team speculatesondifferent
ways of performing the functions which are having high
potential for value improvement. The team applies
brainstorming techniques to develop more efficient
alternatives to the current project design. Brainstorming
forces people to be creative. The mechanism that produces
this phenomenon is called synergism --one idea triggers
other ideas through similarities or like ideas.
The VE study team uses brainstormingtogeneratea
large list of potential solutions to the problem described by
the two-word function, which preparestheteamtoenter the
next phase.
EVALUATION:
In the Evaluation Phase, the advantages and
disadvantages of each remaining alternative are enlisted.
Each and every advantage or disadvantage is described in
general terms. The team can perform a weighted matrix
analysis depending upon the need to determine which
alternative is best. If the disadvantages are more than the
advantages of any alternative, then that alternative is
dropped from further consideration at this point.
Conducting this analysis ensures the VE objective--
to achieve the best blend of performance, cost,andschedule.
Perfection should not be the objective of the VE study team.
DEVELOPMENT:
Once the team made the selection of the best
alternatives, they are fully prepared with sketches, cost
estimates, validation of test data, and other technical work
for determining if any of the assumptions made during the
study or development phase are in fact valid or not. The
Development Phase is the final step. Team presents its
recommendations to the agency's management. The study
team construct an implementation plan which describesthe
processes that the agency must follow to implement any
recommendations.
PRESENTATION:
The final product of a VE study is the official VE
Report with the presentation of the team's
recommendations. In this phase, the VE team presents their
findings to the project decision makers,andtriestoconvince
them that their ideas should be adopted.
While making the presentation, the study team
should take care when presenting estimated cost savings or,
in some cases, increased costs associated with
recommendations. Overstating or double counting savings
must be avoided. For VE studies which take longer time to
complete, it is always better for the study team to provide
progress updates in certain intervals to the appropriate
project management staff.
The VE Report serves as a step-by-step recordofthe
work executed during the preceding phases. The report
provides documentation to support the team's
recommendations, tracks the team's deliberations and/or
considerations, and supports in implementation of the
recommendations. It can also be a useful reference tool for
future projects and VE studies for similar topics.
CLOSE OUT/IMPLEMENTATION:
No recommendation for cost savings can achieve
savings unless and until it has been implemented. However,
it may not be possible to implement each and every
recommendation proposed by team, the project decision
makers must take the appropriate decision to ensure that a
fair and serious consideration of the proposed
recommendations have taken. Main activity of the
Implementation Phase is the information sharing within the
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3829
agency as the recommendations have to be implemented on
projects. Not only does this activity promote the benefits
associated with conducting the VE studies but also it will
provide benefit to future transportation projects.
The final phase of the Job Plan also involves
determining the actual amount of savings estimated by the
VE analysis. This may depend on the amount of
recommendations implemented in the construction project
and evaluatingtheoutcomeoftherecommendationachieved
in the project.
APPLYING VE TO HIGHWAY PROJECTS AND
PROGRAMS:
Excellency in design isthegoal ofeverydesigner.No
designer would knowingly incorporate poor value into his
work, but the experiences have shownthathighwayprojects
are not different than buildings, military hardware,
automobiles, etc. Due to following reasons, poor value clips,
in the best designer’s work,commonlyattributedtohighway
projects:
 Lack of information;
 Shortage of time;
 Habitual thinking;
 Emphasis on performance at any cost;
 Changing technology;
 Misunderstood project requirements;
 Changes in conditions or project scope over
time; and
 Decisions made before the costs and/or value
of alternatives are known.
As highway professionals, designer will analyse
items on this list and then their influence on his projects.
This is not an allegation of his ability as engineers, but a
reflection of the world he must all work in. Value
engineering provides a tool for the reasonable evaluation of
our work and helps to preserve the design excellence for
which highway engineers are so rightfully proud. VE is the
early decisions taken that have the greatest influence on a
project’s life-cycle & cost.
Experience has also shown that recommendations
from VE studies done early in the project development
process have a much better chance of acceptance than ones
from studies done later. Logically, the selection of projects
for VE study should occur early in the project development
process so that the study can be conducted when the
potential for savings and acceptance is greatest. When the
design of a project has advanced to about 30 percent
completion, it is quite likely ready for VE review. For large
improvements requiring several construction projects to
complete, two or more VE studies may be appropriate: one
during early design and others as the design progresses.
Nearly all highway projects are designed by several
individual firms or small groups working independently to
achieve a more or less common goal. There is frequently a
lack of effective communication, and information sharing
between two designers, because they are not aware of its
existence; misunderstandings occur; and individual design
elements are maximized without consideration for the
project as a whole. The multi-disciplinary team approach
used in VE can overcome these communication
breakdowns. Also, working as a trueteam,theVEstudyteam
can generate more and better ideas than as individuals
working separately. This is most clearly demonstrated
during the speculation phase.
Value engineering teams are generally made up of
five to eight members from various backgrounds. Areas of
highway expertisethatshouldbeconsideredwhenforminga
team are traffic, structures, hydraulics, right-of-way,
environment, geometries, geotechnical construction,
maintenance, materials cost estimating, and many others.
The team members’ attitudes are as important as their
technical backgrounds. Members should be open-minded
and willing to work in a team environment. To assure
objectivity, it is recommended that none of the members
have direct involvement in the project being studied.
Leadership is also a critical factor in the success of the VE
study. The leader must be technically competent,
experienced in the value process, and have good leadership
qualities.
Gathering information for the VE study in Highway
projects can be a difficult task. The team must be thorough
but tactful. The required information will probably be
distributed to several offices as well. Some designersmaybe
antipathetic to provide information for a variety of reasons.
The level of development of VE recommendations can vary
depending on the needs of the highway agency. Some
develop the proposal to a point where an informed decision
can be made, but additional effort will be needed to
implement it. Others fully develop the idea into a nearly
complete design before presentation to management.Either
procedure is satisfactory as long as management knows
what they are getting and the team knows what is expected
of them. The real results of a VE program are not study
recommendations but value actually achieved.
Implementation of a VE proposal does not happen by itself.
Management must accept the proposal, the approved
proposal must be communicated to the designer, and the
designer must incorporate the proposal into the plans.
Making sure that all this happens will avoid wastage of
effort.
Following are the some parts of Highway
construction
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3830
REFERENCES:
1. Value Engineering for Highways, U.S. Department of
Transportation, Federal Highway Administration, 1983.
2. “Poor Value in Construction,” R. H. Mitchell, CVS, and D. M.
Hood, CVS; Value World, October/November/December
1986.
3. Value Engineering the Construction Industry, 3rd edition,
Alphonse J. Dell ‘Isola.
4. “Developing A Formal ValueEngineering OrganizationinA
State Highway Agency,” B. A. Lind, P.E., CVS; 1987.
5. Value Engineering Workshops ’82 to ’86, Kempter-Rossm

Weitere ähnliche Inhalte

Was ist angesagt?

Cost Engineering Financing and Risk Management in Upstream Oil & Gas Projects
Cost Engineering Financing and Risk Management in Upstream Oil & Gas ProjectsCost Engineering Financing and Risk Management in Upstream Oil & Gas Projects
Cost Engineering Financing and Risk Management in Upstream Oil & Gas ProjectspetroEDGE
 
Fast diagram, Work Design and Measurement
Fast diagram, Work Design and MeasurementFast diagram, Work Design and Measurement
Fast diagram, Work Design and MeasurementYagnik Savaliya
 
Controling productivity in construction projects
Controling productivity in construction projectsControling productivity in construction projects
Controling productivity in construction projectsEssam Lotffy, PMP®, CCP®
 
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate IndustryIRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate IndustryIRJET Journal
 
Whole life performance lecture south bank university
Whole life performance lecture   south bank universityWhole life performance lecture   south bank university
Whole life performance lecture south bank universityKim Newman
 
Advanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life ImplementationAdvanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life ImplementationCCT International
 
Session W1 - Reliable Risk Quantification For Project Cost and Schedule
Session W1 - Reliable Risk Quantification For Project Cost and ScheduleSession W1 - Reliable Risk Quantification For Project Cost and Schedule
Session W1 - Reliable Risk Quantification For Project Cost and ScheduleProject Controls Expo
 
Advanced Work Packaging (AWP): An Illustration of the Mortar Concept(c)
Advanced Work Packaging (AWP): An Illustration of the Mortar Concept(c)Advanced Work Packaging (AWP): An Illustration of the Mortar Concept(c)
Advanced Work Packaging (AWP): An Illustration of the Mortar Concept(c)The Advanced Work Packaging Institute
 
Practical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital ProjectsPractical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital ProjectsPMA Consultants
 
Diego Tool Milne Award 2011 Presentation1
Diego Tool Milne Award 2011 Presentation1Diego Tool Milne Award 2011 Presentation1
Diego Tool Milne Award 2011 Presentation1Diego Calandrino
 
iEVM (Integrated Earned Value Management) An approach for integrating quality...
iEVM (Integrated Earned Value Management) An approach for integrating quality...iEVM (Integrated Earned Value Management) An approach for integrating quality...
iEVM (Integrated Earned Value Management) An approach for integrating quality...IRJET Journal
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
Quality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementQuality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementEdwinJacob5
 
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET Journal
 
EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...
EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...
EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...Sibo Kanyambari Aimable
 
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET Journal
 

Was ist angesagt? (18)

Cost Engineering Financing and Risk Management in Upstream Oil & Gas Projects
Cost Engineering Financing and Risk Management in Upstream Oil & Gas ProjectsCost Engineering Financing and Risk Management in Upstream Oil & Gas Projects
Cost Engineering Financing and Risk Management in Upstream Oil & Gas Projects
 
Fast diagram, Work Design and Measurement
Fast diagram, Work Design and MeasurementFast diagram, Work Design and Measurement
Fast diagram, Work Design and Measurement
 
Controling productivity in construction projects
Controling productivity in construction projectsControling productivity in construction projects
Controling productivity in construction projects
 
Oil & Gas Engineering
Oil & Gas EngineeringOil & Gas Engineering
Oil & Gas Engineering
 
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate IndustryIRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
 
Whole life performance lecture south bank university
Whole life performance lecture   south bank universityWhole life performance lecture   south bank university
Whole life performance lecture south bank university
 
Advanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life ImplementationAdvanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life Implementation
 
Session W1 - Reliable Risk Quantification For Project Cost and Schedule
Session W1 - Reliable Risk Quantification For Project Cost and ScheduleSession W1 - Reliable Risk Quantification For Project Cost and Schedule
Session W1 - Reliable Risk Quantification For Project Cost and Schedule
 
Advanced Work Packaging (AWP): An Illustration of the Mortar Concept(c)
Advanced Work Packaging (AWP): An Illustration of the Mortar Concept(c)Advanced Work Packaging (AWP): An Illustration of the Mortar Concept(c)
Advanced Work Packaging (AWP): An Illustration of the Mortar Concept(c)
 
Practical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital ProjectsPractical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital Projects
 
Diego Tool Milne Award 2011 Presentation1
Diego Tool Milne Award 2011 Presentation1Diego Tool Milne Award 2011 Presentation1
Diego Tool Milne Award 2011 Presentation1
 
iEVM (Integrated Earned Value Management) An approach for integrating quality...
iEVM (Integrated Earned Value Management) An approach for integrating quality...iEVM (Integrated Earned Value Management) An approach for integrating quality...
iEVM (Integrated Earned Value Management) An approach for integrating quality...
 
Robbins9 ppt09
Robbins9 ppt09Robbins9 ppt09
Robbins9 ppt09
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
Quality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementQuality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract management
 
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
 
EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...
EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...
EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...
 
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
 

Ähnlich wie IRJET- The Application of Value Engineering to Highway Projects and Programs

Application of Value Engineering in Commercial Building Projects
Application of Value Engineering in  Commercial Building ProjectsApplication of Value Engineering in  Commercial Building Projects
Application of Value Engineering in Commercial Building Projectsnitinrane33
 
Application of Value Engineering in Construction Projects
Application of Value Engineering in Construction ProjectsApplication of Value Engineering in Construction Projects
Application of Value Engineering in Construction Projectsnitinrane33
 
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTIONVALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTIONIAEME Publication
 
IRJET- Overview of Value Engineering and Value Analysis
IRJET- Overview of Value Engineering and Value AnalysisIRJET- Overview of Value Engineering and Value Analysis
IRJET- Overview of Value Engineering and Value AnalysisIRJET Journal
 
Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Minn Lwin
 
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...IRJET Journal
 
041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)Dr Fereidoun Dejahang
 
041 integrating lean construction (2)
041 integrating lean construction (2)041 integrating lean construction (2)
041 integrating lean construction (2)drdej19
 
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementIRJET Journal
 
Concept of Value Engineering with Case Study
Concept of Value Engineering with Case StudyConcept of Value Engineering with Case Study
Concept of Value Engineering with Case StudyAditya Deshpande
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsIRJET Journal
 
valueengineeringandvalueanalysis-090821134729-phpapp02 (1).pptx
valueengineeringandvalueanalysis-090821134729-phpapp02 (1).pptxvalueengineeringandvalueanalysis-090821134729-phpapp02 (1).pptx
valueengineeringandvalueanalysis-090821134729-phpapp02 (1).pptxDEEPAKS18MCD1038
 
valueengineeringandvalueanalysis-090821134729-phpapp02.pdf
valueengineeringandvalueanalysis-090821134729-phpapp02.pdfvalueengineeringandvalueanalysis-090821134729-phpapp02.pdf
valueengineeringandvalueanalysis-090821134729-phpapp02.pdfZainJamal6
 
Earned Value Management for Design and Construction Project
Earned Value Management for Design and Construction ProjectEarned Value Management for Design and Construction Project
Earned Value Management for Design and Construction Projectijtsrd
 
A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)Avijeet Suryavanshi
 
THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTION
THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTIONTHE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTION
THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTIONAnkit Singhai
 
Review Application of value engineering in construction project.
Review Application of value engineering in construction project.Review Application of value engineering in construction project.
Review Application of value engineering in construction project.IRJET Journal
 
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...IRJET Journal
 
Front-End Loading in the Oil and Gas Industry
Front-End Loading in the Oil and Gas IndustryFront-End Loading in the Oil and Gas Industry
Front-End Loading in the Oil and Gas IndustryDavid Pires
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET Journal
 

Ähnlich wie IRJET- The Application of Value Engineering to Highway Projects and Programs (20)

Application of Value Engineering in Commercial Building Projects
Application of Value Engineering in  Commercial Building ProjectsApplication of Value Engineering in  Commercial Building Projects
Application of Value Engineering in Commercial Building Projects
 
Application of Value Engineering in Construction Projects
Application of Value Engineering in Construction ProjectsApplication of Value Engineering in Construction Projects
Application of Value Engineering in Construction Projects
 
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTIONVALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
 
IRJET- Overview of Value Engineering and Value Analysis
IRJET- Overview of Value Engineering and Value AnalysisIRJET- Overview of Value Engineering and Value Analysis
IRJET- Overview of Value Engineering and Value Analysis
 
Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725
 
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
 
041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)
 
041 integrating lean construction (2)
041 integrating lean construction (2)041 integrating lean construction (2)
041 integrating lean construction (2)
 
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value Management
 
Concept of Value Engineering with Case Study
Concept of Value Engineering with Case StudyConcept of Value Engineering with Case Study
Concept of Value Engineering with Case Study
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
 
valueengineeringandvalueanalysis-090821134729-phpapp02 (1).pptx
valueengineeringandvalueanalysis-090821134729-phpapp02 (1).pptxvalueengineeringandvalueanalysis-090821134729-phpapp02 (1).pptx
valueengineeringandvalueanalysis-090821134729-phpapp02 (1).pptx
 
valueengineeringandvalueanalysis-090821134729-phpapp02.pdf
valueengineeringandvalueanalysis-090821134729-phpapp02.pdfvalueengineeringandvalueanalysis-090821134729-phpapp02.pdf
valueengineeringandvalueanalysis-090821134729-phpapp02.pdf
 
Earned Value Management for Design and Construction Project
Earned Value Management for Design and Construction ProjectEarned Value Management for Design and Construction Project
Earned Value Management for Design and Construction Project
 
A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)
 
THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTION
THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTIONTHE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTION
THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTION
 
Review Application of value engineering in construction project.
Review Application of value engineering in construction project.Review Application of value engineering in construction project.
Review Application of value engineering in construction project.
 
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
 
Front-End Loading in the Oil and Gas Industry
Front-End Loading in the Oil and Gas IndustryFront-End Loading in the Oil and Gas Industry
Front-End Loading in the Oil and Gas Industry
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
 

Mehr von IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

Mehr von IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Kürzlich hochgeladen

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Kürzlich hochgeladen (20)

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 

IRJET- The Application of Value Engineering to Highway Projects and Programs

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3827 THE APPLICATION OF VALUE ENGINEERING TO HIGHWAY PROJECTS AND PROGRAMS Gopal A. Kandle1, Shital V. Patel2 1Bharati Vidyapeeth College of Engineering, Navi Mumbai 2Prof. Dept. of Mechanical Engineering, Bharati Vidyapeeth College of Engineering, Navi Mumbai -----------------------------------------------------------------------***-------------------------------------------------------------------- Abstract - A big challenge to all highway agencies is to face the needs exceeding the funds made available to them. In developing nations, like India, the imbalance of required funds and available funds results into an inability to maintain and upgrade existing highways or construct new highways. In a developed nation, thisimbalancemayaffectthe maintenance and expansion of an existing highway network. Large budget is allocated to Highway programs even in the poor nations. Highway resources are generally considered as limitless. But, every highway authority is completely aware of the resources available to their program are finite. To keep highway project and program costs within available funding, they are frequently forced to eliminate or drastically reduce the scope of projects or entire programs. There is an alternative, to controltheexpendituresby effective means of identifying unneededand unwantedcostsat the same time preserving the essential elements of projects. This process is known as value engineering (VE), and it has been applied efficiently for over 40 years by various industries as an engineering and management tool for cost control and increasing profit margins, while assuring that essential product functions are maintained. Key Words: value engineering, improve construction, highway construction WHAT IS VALUE ENGINEERING? Value engineering is a systematic and organized approach for providing the necessary functions in a project at the possible lowest cost. Value engineering promotes the alternative of materials and methods with less expensive replacement, without compromising functionality. It is focuses on the functions of various components and materials, rather than their physical properties. Value engineering may also be called as value analysis. In the highway context, products and services include the structural elements of highways as well as the processes, equipment, and supplies used in their development, from concept through operation and maintenance. The required function should be achieved at the lowest possible cost and max life-cycle as required for performance, maintenance, safety, and aesthetics. This techniquewasdevelopedbyLawrenceD.Miles, a General Electric staff engineer, in 1947. VE is greatly recognized in manufacturing and industry throughout the world. But its application to public works, particularly highways, is largely limited to the United States and just recently the Republic of Indonesia till now. The process of VE is carried out by a multi- disciplinary team of technical experts following a set of procedures referred to as the VE job plan. The job plan consists of eight phases: Selection,Investigation,Creative, Evaluation, Development, Presentation, Close out/ Implementation. SELECTION PHASE: The selection phase identifieswhichprojectswill be studied. Value engineering or value analysis is not free so careful selection of study object must be done. It should assure maximum returns on the investment of agency’s resources. Projects which are good objects for VE study are ones that:  Significantly exceeds initial cost of estimates;  Which have complicated designs;  High cost & critical material requirement;  Are difficult to construct or fabricate;  Have questionable justification;  Have record seeking design;  Appear too costly to build or maintain; or An effective tool for identifying valuestudyobjectis Pareto’s law of distribution. Pareto’s law is based upon the principle that approximately 20 percent of the elements in a construction project or program will account for about 80 percent of its total cost. An example would be a highway agency. The total cost of the 20% most expensive projects will equal about 80 % of the total cost of all the program. INVESTIGATION PHASE: The investigation phase is the first of five phases performed by the VE study team. It is also the foundation upon which the remainder of the study will be carried out. Three activities are performed during the investigation phase:
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3828 1) All applicable information regarding the project and its major elements is gathered; 2) The functions of the project and its major elements are determined; and 3) The cost and worth of the functions of the major elements are determined,andthefunctionswiththegreatest potential for value improvement are identified. Function analysis is a technique whichsetsVEapart from other cost reduction efforts. It asks the questions, “What must this project or project element do or accomplish” and “What else does this project or project element do?” The functions can be classified as utility, aesthetic, esteem, and unwanted. In highway applications, the utility function is the most important and the aesthetic and esteem functions are secondary. The function is defined in the simple term, a verb and a noun. The basic function ofa bridge is to “cross the obstacle.” If it is designed to be the longest, highest, etc.,structure,thentheesteemfunction may also add the cost to the project. The heat generated bya light bulb or the disposal of excess excavation are examples of unwanted functions. Both are costly, but these do not contribute to the performance of the basic functions of the light bulb or highway. Cost and worth are often confused, but in VE they are very distinct. Cost is the amount of money that spent to achieve a function using the present design, and worthis the minimum amount that must be expended to attain the required function. Cost will always exceed worth, but when cost substantially exceeds worth, the potential for value improvement is high. Those functions with costs substantially exceeding worth are selected for further evaluation in the VE study. CREATIVE: In this phase, the study team speculatesondifferent ways of performing the functions which are having high potential for value improvement. The team applies brainstorming techniques to develop more efficient alternatives to the current project design. Brainstorming forces people to be creative. The mechanism that produces this phenomenon is called synergism --one idea triggers other ideas through similarities or like ideas. The VE study team uses brainstormingtogeneratea large list of potential solutions to the problem described by the two-word function, which preparestheteamtoenter the next phase. EVALUATION: In the Evaluation Phase, the advantages and disadvantages of each remaining alternative are enlisted. Each and every advantage or disadvantage is described in general terms. The team can perform a weighted matrix analysis depending upon the need to determine which alternative is best. If the disadvantages are more than the advantages of any alternative, then that alternative is dropped from further consideration at this point. Conducting this analysis ensures the VE objective-- to achieve the best blend of performance, cost,andschedule. Perfection should not be the objective of the VE study team. DEVELOPMENT: Once the team made the selection of the best alternatives, they are fully prepared with sketches, cost estimates, validation of test data, and other technical work for determining if any of the assumptions made during the study or development phase are in fact valid or not. The Development Phase is the final step. Team presents its recommendations to the agency's management. The study team construct an implementation plan which describesthe processes that the agency must follow to implement any recommendations. PRESENTATION: The final product of a VE study is the official VE Report with the presentation of the team's recommendations. In this phase, the VE team presents their findings to the project decision makers,andtriestoconvince them that their ideas should be adopted. While making the presentation, the study team should take care when presenting estimated cost savings or, in some cases, increased costs associated with recommendations. Overstating or double counting savings must be avoided. For VE studies which take longer time to complete, it is always better for the study team to provide progress updates in certain intervals to the appropriate project management staff. The VE Report serves as a step-by-step recordofthe work executed during the preceding phases. The report provides documentation to support the team's recommendations, tracks the team's deliberations and/or considerations, and supports in implementation of the recommendations. It can also be a useful reference tool for future projects and VE studies for similar topics. CLOSE OUT/IMPLEMENTATION: No recommendation for cost savings can achieve savings unless and until it has been implemented. However, it may not be possible to implement each and every recommendation proposed by team, the project decision makers must take the appropriate decision to ensure that a fair and serious consideration of the proposed recommendations have taken. Main activity of the Implementation Phase is the information sharing within the
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3829 agency as the recommendations have to be implemented on projects. Not only does this activity promote the benefits associated with conducting the VE studies but also it will provide benefit to future transportation projects. The final phase of the Job Plan also involves determining the actual amount of savings estimated by the VE analysis. This may depend on the amount of recommendations implemented in the construction project and evaluatingtheoutcomeoftherecommendationachieved in the project. APPLYING VE TO HIGHWAY PROJECTS AND PROGRAMS: Excellency in design isthegoal ofeverydesigner.No designer would knowingly incorporate poor value into his work, but the experiences have shownthathighwayprojects are not different than buildings, military hardware, automobiles, etc. Due to following reasons, poor value clips, in the best designer’s work,commonlyattributedtohighway projects:  Lack of information;  Shortage of time;  Habitual thinking;  Emphasis on performance at any cost;  Changing technology;  Misunderstood project requirements;  Changes in conditions or project scope over time; and  Decisions made before the costs and/or value of alternatives are known. As highway professionals, designer will analyse items on this list and then their influence on his projects. This is not an allegation of his ability as engineers, but a reflection of the world he must all work in. Value engineering provides a tool for the reasonable evaluation of our work and helps to preserve the design excellence for which highway engineers are so rightfully proud. VE is the early decisions taken that have the greatest influence on a project’s life-cycle & cost. Experience has also shown that recommendations from VE studies done early in the project development process have a much better chance of acceptance than ones from studies done later. Logically, the selection of projects for VE study should occur early in the project development process so that the study can be conducted when the potential for savings and acceptance is greatest. When the design of a project has advanced to about 30 percent completion, it is quite likely ready for VE review. For large improvements requiring several construction projects to complete, two or more VE studies may be appropriate: one during early design and others as the design progresses. Nearly all highway projects are designed by several individual firms or small groups working independently to achieve a more or less common goal. There is frequently a lack of effective communication, and information sharing between two designers, because they are not aware of its existence; misunderstandings occur; and individual design elements are maximized without consideration for the project as a whole. The multi-disciplinary team approach used in VE can overcome these communication breakdowns. Also, working as a trueteam,theVEstudyteam can generate more and better ideas than as individuals working separately. This is most clearly demonstrated during the speculation phase. Value engineering teams are generally made up of five to eight members from various backgrounds. Areas of highway expertisethatshouldbeconsideredwhenforminga team are traffic, structures, hydraulics, right-of-way, environment, geometries, geotechnical construction, maintenance, materials cost estimating, and many others. The team members’ attitudes are as important as their technical backgrounds. Members should be open-minded and willing to work in a team environment. To assure objectivity, it is recommended that none of the members have direct involvement in the project being studied. Leadership is also a critical factor in the success of the VE study. The leader must be technically competent, experienced in the value process, and have good leadership qualities. Gathering information for the VE study in Highway projects can be a difficult task. The team must be thorough but tactful. The required information will probably be distributed to several offices as well. Some designersmaybe antipathetic to provide information for a variety of reasons. The level of development of VE recommendations can vary depending on the needs of the highway agency. Some develop the proposal to a point where an informed decision can be made, but additional effort will be needed to implement it. Others fully develop the idea into a nearly complete design before presentation to management.Either procedure is satisfactory as long as management knows what they are getting and the team knows what is expected of them. The real results of a VE program are not study recommendations but value actually achieved. Implementation of a VE proposal does not happen by itself. Management must accept the proposal, the approved proposal must be communicated to the designer, and the designer must incorporate the proposal into the plans. Making sure that all this happens will avoid wastage of effort. Following are the some parts of Highway construction
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3830 REFERENCES: 1. Value Engineering for Highways, U.S. Department of Transportation, Federal Highway Administration, 1983. 2. “Poor Value in Construction,” R. H. Mitchell, CVS, and D. M. Hood, CVS; Value World, October/November/December 1986. 3. Value Engineering the Construction Industry, 3rd edition, Alphonse J. Dell ‘Isola. 4. “Developing A Formal ValueEngineering OrganizationinA State Highway Agency,” B. A. Lind, P.E., CVS; 1987. 5. Value Engineering Workshops ’82 to ’86, Kempter-Rossm