PROCUREMENT-PRINCIPLE TOWARDS EFFECTIVE
MANAGEMENT OF CONSTRUCTION PROJECTS
G.T.N. Veerendra1
, Ch. Durga Prasad2
, A.Girish Baburao3
1
Assistant Professor, Civil Engineering Department, Gudlavalleru Engineering College, Gudlavalleru, Krishna
District, Andhra Pradesh, 521356
2
Civil Engineering Department, Gudlavalleru Engineering College, Gudlavalleru, Krishna District, Andhra Pradesh,
521356
3
Civil Engineering Department, Gudlavalleru Engineering College, Gudlavalleru, Krishna District, Andhra Pradesh,
521356
Abstract
Success factor of a construction project is the value of the facility from an organisation over time. The primary consideration in a
successful delivery requires an integrated process in the form of procurement route i.e. to obtain the best value for money. Its
necessity is from inception stage itself and the organisation has to choose the right procurement route that suits the client’s
requirements, experience etc. However, selection will depend on the type of project, but today the demand for construction
procurement route is increasing with the trend towards alternative delivery routes such as construction management, design-build
and management contracting etc. This fact sheet after analysing different procurement routes enlightens a particular procurement
route which has most success ratio (or) special interest for different construction projects justified by qualitative and quantitative
approaches.
Keywords— Procurement, Environmental Impact Assessment (EIA), Project manager (PM), Multinational
Corporation (MNC), Small and medium enterprises (SME’s)
---------------------------------------------------------------------***--------------------------------------------------------------------
1. INTRODUCTION
In India, the construction industry is the second largest
industry after agriculture. It makes a significant contribution
to the national economy and provides employment to large
number of people. The use of various new technologies and
deployment of project management strategies has made it
possible to undertake projects of mega scale by overcoming
number of challenges. However, the industry is still facing
with some major challenges; dependent on the infrastructure
growth story, the Indian EPC market has a plethora of
opportunities to offer - an estimated spends of INR17.1
billion. Over the Twelfth Five Year Plan — 50% of such
opportunities are expected to be funded by the private sector.
What will differentiate one player from the other is the
soundness with which such opportunities are secured and
managed. Challenges are inevitable in the current EPC
market scenario, but the approach to management of such
challenges will be the key to continued success. With global
giants entering Indian markets, EPC contractors wanting to
ride the wave of double-digit growth will have to constantly
improvise and improve their modus operandi to maximize
value for their shareholders. (EPC: Driving growth
efficiently, 2011)
2. PROCUREMENT
The Commission for International Building defines
procurement as ‘A strategy to satisfy clients’ development
and/or operational needs with respect to the provision of
constructed facilities for a discrete life-cycle’. Hugh Clamp
(2007) says 'procurement method' is used to describe the
often complex network of relationships which are formed
between clients, consultants and construction companies, to
enable a building project to be realized. Mastermann (2007)
states ‘A procurement system is the organisational structure
adopted by the client for the implementation and at times
eventual operation of a project’. The selected procurement
process will have unique benefits to offer the project strategy
by identifying risks and financial problems, therefore
different projects require different procurement routes, each
route will have its own benefits to offer with respect to the
standards required and also deals with goals and
requirements established for functionality cost, time and
quality.
3. WHAT INFLUENCES THE PROCUREMENT
ROUTE CHOSEN?
There are many factors influencing to choose the
procurement route, ranging from the structure of the client
organization, to risk management, to market trends. The
basic factor is based on the traditional time-cost-quality
model.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Issue: 06 | Jun-2014, Available @ http://www.ijret.org 625
It is generally accepted that only two of the three criteria
above can be achieved, and therefore the procurement route
should be chosen to maximize the most important criteria.
However, these very broad criteria are often used
inappropriately to define project requirements. For this
reason there are a series of pre-procurement strategies which
should be followed to define, for example, the project
requirements prior to choosing the preferred procurement
route. These strategies are described in more detail below.
4. QUANTITATIVE APPROACH
This dissertation consists of the case studies regarding the
construction projects which are following traditional
procurement. All the case studies that were considered are
government and private projects, where traditional
procurement is one main route chosen commonly for every
project; Collection of documents related not an easy task.
Moreover collecting from government officials is much more
difficult. It requires more permission from higher officials in
personnel. The table1 shows valuable case studies
consolidated data sorted to understand in a simple manner by
variables in terms of cost and time analysis. Some
conclusions were made after studying all the case studies; it
was observed that the minority of the projects have
completed earlier, while few of them had exceeded the
estimated deadline. Similarly cost for couple of projects was
less, whereas other projects were exceeded. The reasons or
risks behind may be something; finally client will be affected
for cost over-run. Reasons at the back may be importance of
the project i.e. its need at the earliest, traffic flow
characteristics, political bias, satisfying quality
considerations or not, statutory obligations if any, availability
of resources, environmental conditions, disputes between the
contractors, supply chain, EIA reports, etc.
Table 1: Consolidated data of cost and time analysis of case studies
S.N
o
Project Location of Project
Cost (INR) Time Duration (Months)
Estimated
Cost
Actual Cost
Estimate
d Time
Actual
Time
Status of
project
1
Construction of
High Level
Bridge(HLB)
across Bandar
Canal
Tadigadpa village at 5.2
Kms of Nidmanuru-
Pedapulipaka road in
Krishna District
4,42,87,882 4,60,10,680.
61 12 9
Completed 3
months early
2
Construction of
Road Over Bridge
(R.O.B)
At Gunadala at Railway
5.6-7Km of Vijayawada
– Gudivada Section in
Krishna District
21,14,32,367
19,60,18,947
.45
36 40
Ongoing late
by 4 months
3
Widening &
Strengthening of a
road
A link road connected
NH.9 toNH.5 through
Indrakeeladri tunnel
from 0.0 to 5.44Km in
Krishna District
6,57,44,072
5,68,62,047.
87
18 12
Completed 6
months early
4
Special repairs to
old Madras-
Calcutta road
From 1.223 to 5.6 Km at
Vijayawada, Krishna
District
1,85,18,520
1,94,25,927.
48
12 14 Completed 2
months late
5
Providing water
supply scheme to
26 villages
Koppal District,
Karnataka
22,44,96,000
21,72,89,678
.40 24 29
Completed
late by 5
months
6
Providing water
supply scheme to
83 villages
Koppal District,
Karnataka
17,15,00,000
17,88,74,504
.00 36 32
Ongoing can
be completed
4 months
early
7
Rajiv Gandhi
National Drinking
Water Technology
Mission –Sector
1&2 of Cluster 2
Koppal District,
Karnataka
19,80,00,000
19,33,86,600
.00
18 16
Completed 2
months early
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Issue: 06 | Jun-2014, Available @ http://www.ijret.org 626
The case studies that have been considered are from different
areas of civil engineering. Here it can be observed that the
first two case studies relate to newly construction projects
whereas next two replicate the maintenance and repair works
and the last three are regarding the construction for provision
of water supply to different villages. Following are the
graphs which depict comparison of cost and duration analysis
for each type of construction. These graphs can show the
deviation in cost and also in time for different projects.
Based on the data the deviation can be seen and author can
acquire some inferences for what kind of project is traditional
procurement actually suitable. The behaviour of traditional
procurement in different stages of construction i.e. pre-
construction (design stage), construction stage and post-
construction stage (Handing over the work with required
specifications and approval of work done) can also be studied.
4.1 Newly Construction Projects:
Fig. 2(a) Case Study 1 Fig. 2(b) Case Study 2
4.2 Maintenance and Repair Works
Fig. 3 Comparison of case studies 3&4
4.3 Water Supply Schemes
Fig. 4 Comparison of case studies 5, 6 & 7
So based on the above graphs we can infer that the traditional
procurement is much suitable for the projects which are small;
whereas there can be a slight delay when huge projects are
undertaken. In most of the projects it was found that the
projects are delayed mostly during the construction stage.
Thus procurement has to play a vital role when construction
is going on. Usually with delay in project may increase its
cost. But here the cost is less compared to the estimated. This
implicates it is purely due to lack of man power the
construction stage might have been affected or else long run
projects must have completed earlier. In order to support
authors views a questionnaire survey has been done.
5. QUALITATIVE APPROACH
To understand the rationale behind the cost over runs and the
early finish or delay for the case studies, a qualitative
approach was performed in the form of questionnaire survey..
Out of 100 questionnaires distributed to the professionals
from various Indian government engineering departments of
the projects on which case studies were done, participants are
as fallows-Executive Engineers (EE), Deputy Executive
Engineers (DEE) and Assistant executive engineers (AEE).
Out of which seventy eight (68) valid responses were
received representing a response rate of 68%. This may be
seen as a satisfactory response rate.
To understand the use of procurement by the respondents it
was observed that 87% of the respondents replied by stating
that they use procurement routes in their undertaken projects
whereas 10% people said they are not currently
implementing its use within and 3% people were planning
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Issue: 06 | Jun-2014, Available @ http://www.ijret.org 627
to implement in future. No respondent replied that they were
not interested to use the procurement route. This shows that
procurement route is much needed in any construction
project for its smooth functioning and governance.
5.1 Technical Issues
With respect to the procurement routes, the respondents
were asked to point out the problems that are usually faced at
what stage of construction is shown in the fig 5 , 45%
responded as construction stage, 16% during lending the
payments, 13% each during delivery stage, 18% during
design process and just 5% during pre-construction whereas
3% during inception.
Fig. 5 Problems faced at various stages of construction
Fig 6 illustrates about - which type of procurement route will
they choose for every project that was tackled by the
individual, 50% had highly recommended with project
management procurement route and 16% for Design and
Build procurement route. 8% suggested for depending upon
the client’s experience; yet surprisingly only 21% supported
Traditional procurement and hardly 5% of people backing up
the Public Private Partnership kind of procurement.
Fig. 6 Type of Procurement route suggested by the
respondents
Reply of the respondents for simulation between mechanical
and electrical engineers affecting the procurement route.
Very typical response from fig 7 shows that 12% of them are
not able to link this question to the procurement route 47% of
them says yes they agree to some extent.
Fig. 7 Time consumption for Simulation between M&E,
Main and sub-contractors in design and planning process
Thus the author infers that every stage will have its own
importance but during the construction stage it is more
important that designs should satisfy the executor’s
performance and requirements of the end user. Payments also
play a key role as there are labourers who work as daily wage
workers and few on monthly salary basis; without paying
them on time they can’t show interest towards work or else
they can even go on strike purely affecting the delay in the
planned work and thereby affecting the procurement route. If
the delivery is not as per the client’s requirements then the
work should be done again which creates a lot of depletion of
time. As the work in the pre-construction period and that in
the inception is done using management softwares like MSP,
primavera and schedules by PM’s experience will help him to
handle every tough situation but the situation can’t be
guessed at the earliest hence it does not play a vital role in
creating problems using procurement route. Moreover
inferring that the project management procurement is being
highly preferred it is due to MNC companies will have their
own design engineers, contractors, consultants etc can be
entirely guided by them, so that advantage will create a
greater difference towards whole life cycle of the project.
Hence in such a case author supports the Design and Build
and also project management procurement route. But what is
the case for SME’s, author supports that the traditional
procurement route gives the optimum results and which is
best suited for no-experienced on construction. Furthermore
in the discussion regarding the simulation of mechanical and
electrical engineers to the procurement route; author infers
that yes it has to play a key role because without their
inclusion the schedule for planning increases the duration of
work and thereby affecting the job duration cumulatively.
The reason may be that communication is essential to aid
with data, Knowledge transfer and data sharing from the
different departments is very important.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Issue: 06 | Jun-2014, Available @ http://www.ijret.org 628
It is traced in fig 8, that 53% expressed that they were
strongly agreeing and 34% agreed that the selection of
procurement route will affect the success or failure of the
project. This shows that still there is a lack of knowledge in
the procurement route and methodologies.
Fig. 8 Success/Failure of a project depending upon selection
of procurement route
Respondents are asked to answer, how much emphasis they
are giving to the project in terms of time, budget, required
quality, value of money, management and political bias, fig 9
will illustrate the results.
Fig. 9 Proportion of the project completion
The results show that respondent’s perception on considering
the importance of procurement route in the industry and have
an important role to play within all members of the project
team.
5.2 Discussions
The results of the data analysis are presented to address the
research objectives, and challenges faced by the individuals
when using procurement during the each stage, this paper
was chosen to find some of the problems faced by the
professionals in the current construction industry. Traced that
some of the respondents were not familiar with procurement
where others were, but did not utilize it and need to develop
their skills in order to do so. At the same time procurement is
an important method in the industry and requires lots of
research.
5.3 Limitations
It is acknowledged that the research study has some
limitations. To additional this questionnaire survey process
the use of more case studies and interviews would have been
beneficial. Interviews in particular can trace many issues and
obtain more information from the respondents.
Furthermore, the questionnaire survey itself may also have
some limitations due to its coverage and response received. It
was initially estimated that the response rate would be higher
but that proved satisfactory results. Lack of time for
stakeholders and us to complete our research upon the data
collection approach and survey regrets the data else it would
have given more appropriate results.
5.4 Recommendation for Further Research
The issue of alternate procurement selection needs to be
observed and by applying other research tools to provide the
appropriate procurement route that can fit for construction
environment. It is recommended that such a study should
cover wider range of respondents including players from
different construction companies from different cities, public
sector clients and construction professionals with rich
experience on procurement issues. Furthermore, this research
could be developed to explore more ideals on the other
procurement strategies that can improve the performance in
construction industry and assist in its quest for achieving
value of money, sustainable projects and saving environment.
6. CONCLUSIONS
After the entire paper exclaims that no procurement route
gives the best of the results. Each of has its own flaws and
advantages. Whereas it would have been better if traditional
procurement was used all over to maximum possible extent.
But due to the development in technology and organization
level it has been almost alleviated and just existing to some
extent in some small scale construction projects and won’t
work for international projects and super fast projects. The
basic advantage behind that was found that this is the only
procurement route (traditional) that has the least risk;
whereas it may take more time to complete the project. Here
it was also observed that the quality aspect was also good and
satisfactory for the clients. On the other hand Project
management procurement though was supported by the most
of the respondents; it can be used only if the huge project has
to be completed within a short span of time along with no
extent for capital consideration. But as the base of any
procurement route is traditional it can render to development
of a new procurement route which can subject to futuristic
recommendation. Moreover the survey and case studies that
were collected showed that projects are made up to the
quality as prime importance along with value of money then
conforming to time and budget, political bias are considered
as of least importance in successful completion of a project.
It is recommended that traditional procurement is much
suited for small scale industry related projects; furthermore it
is fully merged in to industry but still needs more research
and dedication from industry players. Value for money is
much important for the projects, if client/ project manager/
key stake holders are having good experience on projects
with project management procurement; it is recommended
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Issue: 06 | Jun-2014, Available @ http://www.ijret.org 629
that traditional procurement is much suited for any kind of
projects.
ACKNOWLEDGMENTS
We would lay our sincere gratitude towards all the employees
of R&B Circle, Vijayawada and Sri Srinivasa Construction(I)
Pvt.Ltd., Karnataka for providing us with necessary case
studies. Our special thanks to the participants from various
localities and individuals who made information available for
our research and assisted by completing the questionnaire for
this dissertation.
REFERENCES
[1] Challenges before construction industry in India,
Arghadeep, LaskarandC.V.R.Murthy, Dept. of civil
engineering, Indian Institute of Technology, Kanpur
2004.
[2] Chartered Institute of Building (2002), Code of
Practice for Project Management for Construction and
Development, 3rd ed. Oxford: Blackwell Publishing.
P11-26.
[3] CIOB (chartered Institute Of Building), a report
exploring procurement in the construction industry.
[4] Cox, A. & Townsend, M. (1998), Strategic
Procurement in Construction. 2nd Ed. Great Britain:
Redwood Books, pp25- 150
[5] Davies, M.B. (2007). Doing a Successful Research
Project using qualitative or quantitative methods,
London: Palgrave Macmillan.p311.
[6] Department of Business and Innovative skills. (2011).
HM Government. Strategy for Sustainable
Construction Progress Report. 1 (1), 15-60
[7] Dorsey, R.W (2004). Project Delivery Systems for
Building Construction. 2nd ed. San Diego, CA:
Associated General Contractors of America. Pp1530.
[8] ERNST & YOUNG, Engineering, and Procurement&
Construction (EPC): Driving growth efficiency.
[9] Hibberd,Z (1991). Procurement effects on co-optation
in client, Oxford: Black well science limited. p240-54
[10] Laedre Ola (Norway), 19th
IPMA World Congress,
New Delhi, India, (13-16 November 2005),
Procurement route in 3 Norwegian Building &
construction projects.
[11] Luis F. Alarcón, Rodrigo Rivas, and Alfredo
Serpell .Evaluation and improvement of the
procurement process in construction projects.
[12] Masterman, J.W.E (2002). An introduction to building
procurement systems. 2nd ed. London: Spon press.
P.17-21.
[13] Masterman, JE 2002, An Introduction to Building
Procurement Systems, Spon Press, eBook Collection
(EBSCOhost), EBSCOhost, viewed 30 July 2012.
[14] Miss. Joanne Larmour (June-2011), A study of
procurement route & their use in the commercial
sector., Thesis
[15] Per Erik Eriksson, Mats Westerberg, Effects of
procurement on construction project performance.
[16] Prince .O. (2007). Validating a model of cooperative
procurement in the construction industry. International
Journal of Project management. 27 (2), 552-559.
[17] Project Management Institute Inc., (2008). A Guide to
the Project Management Body of Knowledge. 4th
edition.
[18] QUT Science & Engineering Centre ., Construction
Procurement Basics - Traditional procurement
methodologies with a non-traditional Case Study
[19] SandeepVerma .Electronic Government Procurement
in India: A framework analysis of access to
knowledge and access to opportunity. India: H. C. M.
Rajasthan State Institute of Public Administration
Jaipur, Rajasthan. Paper#10.
[20] Shenhar, A.J. and Dvir, D. (2007). Project
management research – the challenge and
opportunity. Project Management Journal. 38 (2), pp
93-9.
[21] Taraka. N. VeerendraGanugula , (october2012),The
challenges faced by the Project Manager when using
BIM (Building Information Modelling) during the
Design Stage of a Project Management Procurement
route,.
[22] The Royal Institute of chartered surveyors/Davis
Langdon (2007) ―Contracts in use: a survey of
building contracts in use during 2007‖.
[23] Walker, D.H.T. and Rowlinson, S (2008).
Procurement Systems. New York: Taylor & Francis.
Pp1-18.

Weitere ähnliche Inhalte

Was ist angesagt?

Diagnose the causes of cost deviation in highway construction
Diagnose the causes of cost deviation in highway constructionDiagnose the causes of cost deviation in highway construction
Diagnose the causes of cost deviation in highway constructionFaiq M. S. Al-Zwainy
 
Conference_Paper
Conference_PaperConference_Paper
Conference_PaperPinak Dutta
 
Probabilistic fatigue design of shaft for bending and torsion
Probabilistic fatigue design of shaft for bending and torsionProbabilistic fatigue design of shaft for bending and torsion
Probabilistic fatigue design of shaft for bending and torsioneSAT Publishing House
 
17 decision support system for optimum soft clay improvement technique
17 decision support system for optimum soft clay improvement technique17 decision support system for optimum soft clay improvement technique
17 decision support system for optimum soft clay improvement techniqueAhmed Ebid
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET Journal
 
STUDY AND ANALYSIS OF CONCRETE STRENGTH PARAMETERS USING VETIVER GRASS ASH AS...
STUDY AND ANALYSIS OF CONCRETE STRENGTH PARAMETERS USING VETIVER GRASS ASH AS...STUDY AND ANALYSIS OF CONCRETE STRENGTH PARAMETERS USING VETIVER GRASS ASH AS...
STUDY AND ANALYSIS OF CONCRETE STRENGTH PARAMETERS USING VETIVER GRASS ASH AS...Vamsi Kovalam
 
Effect of project cost and time monitoring on progress of construction projct
Effect of project cost and time monitoring on progress of construction projctEffect of project cost and time monitoring on progress of construction projct
Effect of project cost and time monitoring on progress of construction projcteSAT Journals
 
Effect of project cost and time monitoring on
Effect of project cost and time monitoring onEffect of project cost and time monitoring on
Effect of project cost and time monitoring oneSAT Publishing House
 
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET Journal
 
IRJET- A Comparative Study on Precast Construction and Conventional Construction
IRJET- A Comparative Study on Precast Construction and Conventional ConstructionIRJET- A Comparative Study on Precast Construction and Conventional Construction
IRJET- A Comparative Study on Precast Construction and Conventional ConstructionIRJET Journal
 

Was ist angesagt? (11)

Diagnose the causes of cost deviation in highway construction
Diagnose the causes of cost deviation in highway constructionDiagnose the causes of cost deviation in highway construction
Diagnose the causes of cost deviation in highway construction
 
Conference_Paper
Conference_PaperConference_Paper
Conference_Paper
 
Probabilistic fatigue design of shaft for bending and torsion
Probabilistic fatigue design of shaft for bending and torsionProbabilistic fatigue design of shaft for bending and torsion
Probabilistic fatigue design of shaft for bending and torsion
 
17 decision support system for optimum soft clay improvement technique
17 decision support system for optimum soft clay improvement technique17 decision support system for optimum soft clay improvement technique
17 decision support system for optimum soft clay improvement technique
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
STUDY AND ANALYSIS OF CONCRETE STRENGTH PARAMETERS USING VETIVER GRASS ASH AS...
STUDY AND ANALYSIS OF CONCRETE STRENGTH PARAMETERS USING VETIVER GRASS ASH AS...STUDY AND ANALYSIS OF CONCRETE STRENGTH PARAMETERS USING VETIVER GRASS ASH AS...
STUDY AND ANALYSIS OF CONCRETE STRENGTH PARAMETERS USING VETIVER GRASS ASH AS...
 
D012522433
D012522433D012522433
D012522433
 
Effect of project cost and time monitoring on progress of construction projct
Effect of project cost and time monitoring on progress of construction projctEffect of project cost and time monitoring on progress of construction projct
Effect of project cost and time monitoring on progress of construction projct
 
Effect of project cost and time monitoring on
Effect of project cost and time monitoring onEffect of project cost and time monitoring on
Effect of project cost and time monitoring on
 
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
 
IRJET- A Comparative Study on Precast Construction and Conventional Construction
IRJET- A Comparative Study on Precast Construction and Conventional ConstructionIRJET- A Comparative Study on Precast Construction and Conventional Construction
IRJET- A Comparative Study on Precast Construction and Conventional Construction
 

Andere mochten auch

Speaker identification system using close set
Speaker identification system using close setSpeaker identification system using close set
Speaker identification system using close seteSAT Publishing House
 
Design and implementation of an ancrchitecture of embedded web server for wir...
Design and implementation of an ancrchitecture of embedded web server for wir...Design and implementation of an ancrchitecture of embedded web server for wir...
Design and implementation of an ancrchitecture of embedded web server for wir...eSAT Publishing House
 
Influence of alkaline substances (carbonates and bicarbonates of sodium) in w...
Influence of alkaline substances (carbonates and bicarbonates of sodium) in w...Influence of alkaline substances (carbonates and bicarbonates of sodium) in w...
Influence of alkaline substances (carbonates and bicarbonates of sodium) in w...eSAT Publishing House
 
Production and characterization of nano copper powder using electric explosio...
Production and characterization of nano copper powder using electric explosio...Production and characterization of nano copper powder using electric explosio...
Production and characterization of nano copper powder using electric explosio...eSAT Publishing House
 
Parameter study of stable walking gaits for nao
Parameter study of stable walking gaits for naoParameter study of stable walking gaits for nao
Parameter study of stable walking gaits for naoeSAT Publishing House
 
Static analysis of c s short cylindrical shell under internal liquid pressure...
Static analysis of c s short cylindrical shell under internal liquid pressure...Static analysis of c s short cylindrical shell under internal liquid pressure...
Static analysis of c s short cylindrical shell under internal liquid pressure...eSAT Publishing House
 
Security constrained optimal load dispatch using hpso technique for thermal s...
Security constrained optimal load dispatch using hpso technique for thermal s...Security constrained optimal load dispatch using hpso technique for thermal s...
Security constrained optimal load dispatch using hpso technique for thermal s...eSAT Publishing House
 
Growth and physical properties of pure and manganese doped strontium tartrate...
Growth and physical properties of pure and manganese doped strontium tartrate...Growth and physical properties of pure and manganese doped strontium tartrate...
Growth and physical properties of pure and manganese doped strontium tartrate...eSAT Publishing House
 
Emission characteristics of a diesel engine using soyabean oil and diesel blends
Emission characteristics of a diesel engine using soyabean oil and diesel blendsEmission characteristics of a diesel engine using soyabean oil and diesel blends
Emission characteristics of a diesel engine using soyabean oil and diesel blendseSAT Publishing House
 
A novel approach for efficient skull stripping using
A novel approach for efficient skull stripping usingA novel approach for efficient skull stripping using
A novel approach for efficient skull stripping usingeSAT Publishing House
 
Performance comparison of row per slave and rows set
Performance comparison of row per slave and rows setPerformance comparison of row per slave and rows set
Performance comparison of row per slave and rows seteSAT Publishing House
 
A review on managed aquifer recharge by check dams a case study near chennai,...
A review on managed aquifer recharge by check dams a case study near chennai,...A review on managed aquifer recharge by check dams a case study near chennai,...
A review on managed aquifer recharge by check dams a case study near chennai,...eSAT Publishing House
 
An algorithm for solving integer linear programming
An algorithm for solving integer linear programmingAn algorithm for solving integer linear programming
An algorithm for solving integer linear programmingeSAT Publishing House
 
Relative superior mandelbrot sets and relative
Relative superior mandelbrot sets and relativeRelative superior mandelbrot sets and relative
Relative superior mandelbrot sets and relativeeSAT Publishing House
 
Effect of mobile phone and bts radiation on heart rate
Effect of mobile phone and bts radiation on heart rateEffect of mobile phone and bts radiation on heart rate
Effect of mobile phone and bts radiation on heart rateeSAT Publishing House
 
Self runtime environment using android
Self runtime environment using androidSelf runtime environment using android
Self runtime environment using androideSAT Publishing House
 
Analysis of physical characteristics of bamboo
Analysis of physical characteristics of bambooAnalysis of physical characteristics of bamboo
Analysis of physical characteristics of bambooeSAT Publishing House
 
An experiental investigation of effect of cutting parameters and tool materia...
An experiental investigation of effect of cutting parameters and tool materia...An experiental investigation of effect of cutting parameters and tool materia...
An experiental investigation of effect of cutting parameters and tool materia...eSAT Publishing House
 

Andere mochten auch (20)

Speaker identification system using close set
Speaker identification system using close setSpeaker identification system using close set
Speaker identification system using close set
 
Design and implementation of an ancrchitecture of embedded web server for wir...
Design and implementation of an ancrchitecture of embedded web server for wir...Design and implementation of an ancrchitecture of embedded web server for wir...
Design and implementation of an ancrchitecture of embedded web server for wir...
 
Influence of alkaline substances (carbonates and bicarbonates of sodium) in w...
Influence of alkaline substances (carbonates and bicarbonates of sodium) in w...Influence of alkaline substances (carbonates and bicarbonates of sodium) in w...
Influence of alkaline substances (carbonates and bicarbonates of sodium) in w...
 
Enhancement of power quality in a
Enhancement of power quality in aEnhancement of power quality in a
Enhancement of power quality in a
 
Production and characterization of nano copper powder using electric explosio...
Production and characterization of nano copper powder using electric explosio...Production and characterization of nano copper powder using electric explosio...
Production and characterization of nano copper powder using electric explosio...
 
Parameter study of stable walking gaits for nao
Parameter study of stable walking gaits for naoParameter study of stable walking gaits for nao
Parameter study of stable walking gaits for nao
 
Static analysis of c s short cylindrical shell under internal liquid pressure...
Static analysis of c s short cylindrical shell under internal liquid pressure...Static analysis of c s short cylindrical shell under internal liquid pressure...
Static analysis of c s short cylindrical shell under internal liquid pressure...
 
Security constrained optimal load dispatch using hpso technique for thermal s...
Security constrained optimal load dispatch using hpso technique for thermal s...Security constrained optimal load dispatch using hpso technique for thermal s...
Security constrained optimal load dispatch using hpso technique for thermal s...
 
Growth and physical properties of pure and manganese doped strontium tartrate...
Growth and physical properties of pure and manganese doped strontium tartrate...Growth and physical properties of pure and manganese doped strontium tartrate...
Growth and physical properties of pure and manganese doped strontium tartrate...
 
Language identification using g lda
Language identification using g ldaLanguage identification using g lda
Language identification using g lda
 
Emission characteristics of a diesel engine using soyabean oil and diesel blends
Emission characteristics of a diesel engine using soyabean oil and diesel blendsEmission characteristics of a diesel engine using soyabean oil and diesel blends
Emission characteristics of a diesel engine using soyabean oil and diesel blends
 
A novel approach for efficient skull stripping using
A novel approach for efficient skull stripping usingA novel approach for efficient skull stripping using
A novel approach for efficient skull stripping using
 
Performance comparison of row per slave and rows set
Performance comparison of row per slave and rows setPerformance comparison of row per slave and rows set
Performance comparison of row per slave and rows set
 
A review on managed aquifer recharge by check dams a case study near chennai,...
A review on managed aquifer recharge by check dams a case study near chennai,...A review on managed aquifer recharge by check dams a case study near chennai,...
A review on managed aquifer recharge by check dams a case study near chennai,...
 
An algorithm for solving integer linear programming
An algorithm for solving integer linear programmingAn algorithm for solving integer linear programming
An algorithm for solving integer linear programming
 
Relative superior mandelbrot sets and relative
Relative superior mandelbrot sets and relativeRelative superior mandelbrot sets and relative
Relative superior mandelbrot sets and relative
 
Effect of mobile phone and bts radiation on heart rate
Effect of mobile phone and bts radiation on heart rateEffect of mobile phone and bts radiation on heart rate
Effect of mobile phone and bts radiation on heart rate
 
Self runtime environment using android
Self runtime environment using androidSelf runtime environment using android
Self runtime environment using android
 
Analysis of physical characteristics of bamboo
Analysis of physical characteristics of bambooAnalysis of physical characteristics of bamboo
Analysis of physical characteristics of bamboo
 
An experiental investigation of effect of cutting parameters and tool materia...
An experiental investigation of effect of cutting parameters and tool materia...An experiental investigation of effect of cutting parameters and tool materia...
An experiental investigation of effect of cutting parameters and tool materia...
 

Ähnlich wie Procurement principle towards effective management of construction projects

Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsIRJET Journal
 
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET Journal
 
Causes of delay in indian transportation infrastructure projects
Causes of delay in indian transportation infrastructure projectsCauses of delay in indian transportation infrastructure projects
Causes of delay in indian transportation infrastructure projectseSAT Journals
 
Causes of delay in indian transportation
Causes of delay in indian transportationCauses of delay in indian transportation
Causes of delay in indian transportationeSAT Publishing House
 
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET Journal
 
IRJET- Critical Chain Project Management in Construction Projects
IRJET- Critical Chain Project Management in Construction ProjectsIRJET- Critical Chain Project Management in Construction Projects
IRJET- Critical Chain Project Management in Construction ProjectsIRJET Journal
 
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...IRJET Journal
 
Contractual implications of cash flow on owner and contractor in villa constr...
Contractual implications of cash flow on owner and contractor in villa constr...Contractual implications of cash flow on owner and contractor in villa constr...
Contractual implications of cash flow on owner and contractor in villa constr...eSAT Publishing House
 
Performance evaluation of design build projects with and without agency const...
Performance evaluation of design build projects with and without agency const...Performance evaluation of design build projects with and without agency const...
Performance evaluation of design build projects with and without agency const...IAEME Publication
 
Performance evaluation of design build (d-b) projects
Performance evaluation of design build (d-b) projectsPerformance evaluation of design build (d-b) projects
Performance evaluation of design build (d-b) projectsiaemedu
 
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET-  	  Study on Economic Sustainability of Industrial BuildingsIRJET-  	  Study on Economic Sustainability of Industrial Buildings
IRJET- Study on Economic Sustainability of Industrial BuildingsIRJET Journal
 
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...IRJET Journal
 
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTSA STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTSAmy Roman
 
A study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projectsA study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projectseSAT Journals
 
Systematic Study of Factors Causing Cost Overrun and Delay in Pune Metro Line...
Systematic Study of Factors Causing Cost Overrun and Delay in Pune Metro Line...Systematic Study of Factors Causing Cost Overrun and Delay in Pune Metro Line...
Systematic Study of Factors Causing Cost Overrun and Delay in Pune Metro Line...ijtsrd
 
Quality – cost trade off (qct) for contractor selection
Quality – cost trade off (qct) for contractor selectionQuality – cost trade off (qct) for contractor selection
Quality – cost trade off (qct) for contractor selectioneSAT Journals
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...IRJET Journal
 
Value stream mapping a case study of automotive
Value stream mapping a case study of automotiveValue stream mapping a case study of automotive
Value stream mapping a case study of automotiveeSAT Publishing House
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mappingeSAT Journals
 

Ähnlich wie Procurement principle towards effective management of construction projects (20)

Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
 
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
 
Causes of delay in indian transportation infrastructure projects
Causes of delay in indian transportation infrastructure projectsCauses of delay in indian transportation infrastructure projects
Causes of delay in indian transportation infrastructure projects
 
Causes of delay in indian transportation
Causes of delay in indian transportationCauses of delay in indian transportation
Causes of delay in indian transportation
 
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
 
IRJET- Critical Chain Project Management in Construction Projects
IRJET- Critical Chain Project Management in Construction ProjectsIRJET- Critical Chain Project Management in Construction Projects
IRJET- Critical Chain Project Management in Construction Projects
 
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
 
Contractual implications of cash flow on owner and contractor in villa constr...
Contractual implications of cash flow on owner and contractor in villa constr...Contractual implications of cash flow on owner and contractor in villa constr...
Contractual implications of cash flow on owner and contractor in villa constr...
 
Performance evaluation of design build projects with and without agency const...
Performance evaluation of design build projects with and without agency const...Performance evaluation of design build projects with and without agency const...
Performance evaluation of design build projects with and without agency const...
 
Performance evaluation of design build (d-b) projects
Performance evaluation of design build (d-b) projectsPerformance evaluation of design build (d-b) projects
Performance evaluation of design build (d-b) projects
 
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET-  	  Study on Economic Sustainability of Industrial BuildingsIRJET-  	  Study on Economic Sustainability of Industrial Buildings
IRJET- Study on Economic Sustainability of Industrial Buildings
 
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...
 
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTSA STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
 
A study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projectsA study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projects
 
Systematic Study of Factors Causing Cost Overrun and Delay in Pune Metro Line...
Systematic Study of Factors Causing Cost Overrun and Delay in Pune Metro Line...Systematic Study of Factors Causing Cost Overrun and Delay in Pune Metro Line...
Systematic Study of Factors Causing Cost Overrun and Delay in Pune Metro Line...
 
Quality – cost trade off (qct) for contractor selection
Quality – cost trade off (qct) for contractor selectionQuality – cost trade off (qct) for contractor selection
Quality – cost trade off (qct) for contractor selection
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
 
Value stream mapping a case study of automotive
Value stream mapping a case study of automotiveValue stream mapping a case study of automotive
Value stream mapping a case study of automotive
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 
20320140503025
2032014050302520320140503025
20320140503025
 

Mehr von eSAT Publishing House

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnameSAT Publishing House
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...eSAT Publishing House
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnameSAT Publishing House
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...eSAT Publishing House
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaeSAT Publishing House
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingeSAT Publishing House
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...eSAT Publishing House
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...eSAT Publishing House
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...eSAT Publishing House
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a revieweSAT Publishing House
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...eSAT Publishing House
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard managementeSAT Publishing House
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallseSAT Publishing House
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...eSAT Publishing House
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...eSAT Publishing House
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaeSAT Publishing House
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structureseSAT Publishing House
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingseSAT Publishing House
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...eSAT Publishing House
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...eSAT Publishing House
 

Mehr von eSAT Publishing House (20)

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
 

Kürzlich hochgeladen

Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 

Kürzlich hochgeladen (20)

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 

Procurement principle towards effective management of construction projects

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 06 | Jun-2014, Available @ http://www.ijret.org 624 PROCUREMENT-PRINCIPLE TOWARDS EFFECTIVE MANAGEMENT OF CONSTRUCTION PROJECTS G.T.N. Veerendra1 , Ch. Durga Prasad2 , A.Girish Baburao3 1 Assistant Professor, Civil Engineering Department, Gudlavalleru Engineering College, Gudlavalleru, Krishna District, Andhra Pradesh, 521356 2 Civil Engineering Department, Gudlavalleru Engineering College, Gudlavalleru, Krishna District, Andhra Pradesh, 521356 3 Civil Engineering Department, Gudlavalleru Engineering College, Gudlavalleru, Krishna District, Andhra Pradesh, 521356 Abstract Success factor of a construction project is the value of the facility from an organisation over time. The primary consideration in a successful delivery requires an integrated process in the form of procurement route i.e. to obtain the best value for money. Its necessity is from inception stage itself and the organisation has to choose the right procurement route that suits the client’s requirements, experience etc. However, selection will depend on the type of project, but today the demand for construction procurement route is increasing with the trend towards alternative delivery routes such as construction management, design-build and management contracting etc. This fact sheet after analysing different procurement routes enlightens a particular procurement route which has most success ratio (or) special interest for different construction projects justified by qualitative and quantitative approaches. Keywords— Procurement, Environmental Impact Assessment (EIA), Project manager (PM), Multinational Corporation (MNC), Small and medium enterprises (SME’s) ---------------------------------------------------------------------***-------------------------------------------------------------------- 1. INTRODUCTION In India, the construction industry is the second largest industry after agriculture. It makes a significant contribution to the national economy and provides employment to large number of people. The use of various new technologies and deployment of project management strategies has made it possible to undertake projects of mega scale by overcoming number of challenges. However, the industry is still facing with some major challenges; dependent on the infrastructure growth story, the Indian EPC market has a plethora of opportunities to offer - an estimated spends of INR17.1 billion. Over the Twelfth Five Year Plan — 50% of such opportunities are expected to be funded by the private sector. What will differentiate one player from the other is the soundness with which such opportunities are secured and managed. Challenges are inevitable in the current EPC market scenario, but the approach to management of such challenges will be the key to continued success. With global giants entering Indian markets, EPC contractors wanting to ride the wave of double-digit growth will have to constantly improvise and improve their modus operandi to maximize value for their shareholders. (EPC: Driving growth efficiently, 2011) 2. PROCUREMENT The Commission for International Building defines procurement as ‘A strategy to satisfy clients’ development and/or operational needs with respect to the provision of constructed facilities for a discrete life-cycle’. Hugh Clamp (2007) says 'procurement method' is used to describe the often complex network of relationships which are formed between clients, consultants and construction companies, to enable a building project to be realized. Mastermann (2007) states ‘A procurement system is the organisational structure adopted by the client for the implementation and at times eventual operation of a project’. The selected procurement process will have unique benefits to offer the project strategy by identifying risks and financial problems, therefore different projects require different procurement routes, each route will have its own benefits to offer with respect to the standards required and also deals with goals and requirements established for functionality cost, time and quality. 3. WHAT INFLUENCES THE PROCUREMENT ROUTE CHOSEN? There are many factors influencing to choose the procurement route, ranging from the structure of the client organization, to risk management, to market trends. The basic factor is based on the traditional time-cost-quality model.
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 06 | Jun-2014, Available @ http://www.ijret.org 625 It is generally accepted that only two of the three criteria above can be achieved, and therefore the procurement route should be chosen to maximize the most important criteria. However, these very broad criteria are often used inappropriately to define project requirements. For this reason there are a series of pre-procurement strategies which should be followed to define, for example, the project requirements prior to choosing the preferred procurement route. These strategies are described in more detail below. 4. QUANTITATIVE APPROACH This dissertation consists of the case studies regarding the construction projects which are following traditional procurement. All the case studies that were considered are government and private projects, where traditional procurement is one main route chosen commonly for every project; Collection of documents related not an easy task. Moreover collecting from government officials is much more difficult. It requires more permission from higher officials in personnel. The table1 shows valuable case studies consolidated data sorted to understand in a simple manner by variables in terms of cost and time analysis. Some conclusions were made after studying all the case studies; it was observed that the minority of the projects have completed earlier, while few of them had exceeded the estimated deadline. Similarly cost for couple of projects was less, whereas other projects were exceeded. The reasons or risks behind may be something; finally client will be affected for cost over-run. Reasons at the back may be importance of the project i.e. its need at the earliest, traffic flow characteristics, political bias, satisfying quality considerations or not, statutory obligations if any, availability of resources, environmental conditions, disputes between the contractors, supply chain, EIA reports, etc. Table 1: Consolidated data of cost and time analysis of case studies S.N o Project Location of Project Cost (INR) Time Duration (Months) Estimated Cost Actual Cost Estimate d Time Actual Time Status of project 1 Construction of High Level Bridge(HLB) across Bandar Canal Tadigadpa village at 5.2 Kms of Nidmanuru- Pedapulipaka road in Krishna District 4,42,87,882 4,60,10,680. 61 12 9 Completed 3 months early 2 Construction of Road Over Bridge (R.O.B) At Gunadala at Railway 5.6-7Km of Vijayawada – Gudivada Section in Krishna District 21,14,32,367 19,60,18,947 .45 36 40 Ongoing late by 4 months 3 Widening & Strengthening of a road A link road connected NH.9 toNH.5 through Indrakeeladri tunnel from 0.0 to 5.44Km in Krishna District 6,57,44,072 5,68,62,047. 87 18 12 Completed 6 months early 4 Special repairs to old Madras- Calcutta road From 1.223 to 5.6 Km at Vijayawada, Krishna District 1,85,18,520 1,94,25,927. 48 12 14 Completed 2 months late 5 Providing water supply scheme to 26 villages Koppal District, Karnataka 22,44,96,000 21,72,89,678 .40 24 29 Completed late by 5 months 6 Providing water supply scheme to 83 villages Koppal District, Karnataka 17,15,00,000 17,88,74,504 .00 36 32 Ongoing can be completed 4 months early 7 Rajiv Gandhi National Drinking Water Technology Mission –Sector 1&2 of Cluster 2 Koppal District, Karnataka 19,80,00,000 19,33,86,600 .00 18 16 Completed 2 months early
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 06 | Jun-2014, Available @ http://www.ijret.org 626 The case studies that have been considered are from different areas of civil engineering. Here it can be observed that the first two case studies relate to newly construction projects whereas next two replicate the maintenance and repair works and the last three are regarding the construction for provision of water supply to different villages. Following are the graphs which depict comparison of cost and duration analysis for each type of construction. These graphs can show the deviation in cost and also in time for different projects. Based on the data the deviation can be seen and author can acquire some inferences for what kind of project is traditional procurement actually suitable. The behaviour of traditional procurement in different stages of construction i.e. pre- construction (design stage), construction stage and post- construction stage (Handing over the work with required specifications and approval of work done) can also be studied. 4.1 Newly Construction Projects: Fig. 2(a) Case Study 1 Fig. 2(b) Case Study 2 4.2 Maintenance and Repair Works Fig. 3 Comparison of case studies 3&4 4.3 Water Supply Schemes Fig. 4 Comparison of case studies 5, 6 & 7 So based on the above graphs we can infer that the traditional procurement is much suitable for the projects which are small; whereas there can be a slight delay when huge projects are undertaken. In most of the projects it was found that the projects are delayed mostly during the construction stage. Thus procurement has to play a vital role when construction is going on. Usually with delay in project may increase its cost. But here the cost is less compared to the estimated. This implicates it is purely due to lack of man power the construction stage might have been affected or else long run projects must have completed earlier. In order to support authors views a questionnaire survey has been done. 5. QUALITATIVE APPROACH To understand the rationale behind the cost over runs and the early finish or delay for the case studies, a qualitative approach was performed in the form of questionnaire survey.. Out of 100 questionnaires distributed to the professionals from various Indian government engineering departments of the projects on which case studies were done, participants are as fallows-Executive Engineers (EE), Deputy Executive Engineers (DEE) and Assistant executive engineers (AEE). Out of which seventy eight (68) valid responses were received representing a response rate of 68%. This may be seen as a satisfactory response rate. To understand the use of procurement by the respondents it was observed that 87% of the respondents replied by stating that they use procurement routes in their undertaken projects whereas 10% people said they are not currently implementing its use within and 3% people were planning
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 06 | Jun-2014, Available @ http://www.ijret.org 627 to implement in future. No respondent replied that they were not interested to use the procurement route. This shows that procurement route is much needed in any construction project for its smooth functioning and governance. 5.1 Technical Issues With respect to the procurement routes, the respondents were asked to point out the problems that are usually faced at what stage of construction is shown in the fig 5 , 45% responded as construction stage, 16% during lending the payments, 13% each during delivery stage, 18% during design process and just 5% during pre-construction whereas 3% during inception. Fig. 5 Problems faced at various stages of construction Fig 6 illustrates about - which type of procurement route will they choose for every project that was tackled by the individual, 50% had highly recommended with project management procurement route and 16% for Design and Build procurement route. 8% suggested for depending upon the client’s experience; yet surprisingly only 21% supported Traditional procurement and hardly 5% of people backing up the Public Private Partnership kind of procurement. Fig. 6 Type of Procurement route suggested by the respondents Reply of the respondents for simulation between mechanical and electrical engineers affecting the procurement route. Very typical response from fig 7 shows that 12% of them are not able to link this question to the procurement route 47% of them says yes they agree to some extent. Fig. 7 Time consumption for Simulation between M&E, Main and sub-contractors in design and planning process Thus the author infers that every stage will have its own importance but during the construction stage it is more important that designs should satisfy the executor’s performance and requirements of the end user. Payments also play a key role as there are labourers who work as daily wage workers and few on monthly salary basis; without paying them on time they can’t show interest towards work or else they can even go on strike purely affecting the delay in the planned work and thereby affecting the procurement route. If the delivery is not as per the client’s requirements then the work should be done again which creates a lot of depletion of time. As the work in the pre-construction period and that in the inception is done using management softwares like MSP, primavera and schedules by PM’s experience will help him to handle every tough situation but the situation can’t be guessed at the earliest hence it does not play a vital role in creating problems using procurement route. Moreover inferring that the project management procurement is being highly preferred it is due to MNC companies will have their own design engineers, contractors, consultants etc can be entirely guided by them, so that advantage will create a greater difference towards whole life cycle of the project. Hence in such a case author supports the Design and Build and also project management procurement route. But what is the case for SME’s, author supports that the traditional procurement route gives the optimum results and which is best suited for no-experienced on construction. Furthermore in the discussion regarding the simulation of mechanical and electrical engineers to the procurement route; author infers that yes it has to play a key role because without their inclusion the schedule for planning increases the duration of work and thereby affecting the job duration cumulatively. The reason may be that communication is essential to aid with data, Knowledge transfer and data sharing from the different departments is very important.
  • 5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 06 | Jun-2014, Available @ http://www.ijret.org 628 It is traced in fig 8, that 53% expressed that they were strongly agreeing and 34% agreed that the selection of procurement route will affect the success or failure of the project. This shows that still there is a lack of knowledge in the procurement route and methodologies. Fig. 8 Success/Failure of a project depending upon selection of procurement route Respondents are asked to answer, how much emphasis they are giving to the project in terms of time, budget, required quality, value of money, management and political bias, fig 9 will illustrate the results. Fig. 9 Proportion of the project completion The results show that respondent’s perception on considering the importance of procurement route in the industry and have an important role to play within all members of the project team. 5.2 Discussions The results of the data analysis are presented to address the research objectives, and challenges faced by the individuals when using procurement during the each stage, this paper was chosen to find some of the problems faced by the professionals in the current construction industry. Traced that some of the respondents were not familiar with procurement where others were, but did not utilize it and need to develop their skills in order to do so. At the same time procurement is an important method in the industry and requires lots of research. 5.3 Limitations It is acknowledged that the research study has some limitations. To additional this questionnaire survey process the use of more case studies and interviews would have been beneficial. Interviews in particular can trace many issues and obtain more information from the respondents. Furthermore, the questionnaire survey itself may also have some limitations due to its coverage and response received. It was initially estimated that the response rate would be higher but that proved satisfactory results. Lack of time for stakeholders and us to complete our research upon the data collection approach and survey regrets the data else it would have given more appropriate results. 5.4 Recommendation for Further Research The issue of alternate procurement selection needs to be observed and by applying other research tools to provide the appropriate procurement route that can fit for construction environment. It is recommended that such a study should cover wider range of respondents including players from different construction companies from different cities, public sector clients and construction professionals with rich experience on procurement issues. Furthermore, this research could be developed to explore more ideals on the other procurement strategies that can improve the performance in construction industry and assist in its quest for achieving value of money, sustainable projects and saving environment. 6. CONCLUSIONS After the entire paper exclaims that no procurement route gives the best of the results. Each of has its own flaws and advantages. Whereas it would have been better if traditional procurement was used all over to maximum possible extent. But due to the development in technology and organization level it has been almost alleviated and just existing to some extent in some small scale construction projects and won’t work for international projects and super fast projects. The basic advantage behind that was found that this is the only procurement route (traditional) that has the least risk; whereas it may take more time to complete the project. Here it was also observed that the quality aspect was also good and satisfactory for the clients. On the other hand Project management procurement though was supported by the most of the respondents; it can be used only if the huge project has to be completed within a short span of time along with no extent for capital consideration. But as the base of any procurement route is traditional it can render to development of a new procurement route which can subject to futuristic recommendation. Moreover the survey and case studies that were collected showed that projects are made up to the quality as prime importance along with value of money then conforming to time and budget, political bias are considered as of least importance in successful completion of a project. It is recommended that traditional procurement is much suited for small scale industry related projects; furthermore it is fully merged in to industry but still needs more research and dedication from industry players. Value for money is much important for the projects, if client/ project manager/ key stake holders are having good experience on projects with project management procurement; it is recommended
  • 6. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 06 | Jun-2014, Available @ http://www.ijret.org 629 that traditional procurement is much suited for any kind of projects. ACKNOWLEDGMENTS We would lay our sincere gratitude towards all the employees of R&B Circle, Vijayawada and Sri Srinivasa Construction(I) Pvt.Ltd., Karnataka for providing us with necessary case studies. Our special thanks to the participants from various localities and individuals who made information available for our research and assisted by completing the questionnaire for this dissertation. REFERENCES [1] Challenges before construction industry in India, Arghadeep, LaskarandC.V.R.Murthy, Dept. of civil engineering, Indian Institute of Technology, Kanpur 2004. [2] Chartered Institute of Building (2002), Code of Practice for Project Management for Construction and Development, 3rd ed. Oxford: Blackwell Publishing. P11-26. [3] CIOB (chartered Institute Of Building), a report exploring procurement in the construction industry. [4] Cox, A. & Townsend, M. (1998), Strategic Procurement in Construction. 2nd Ed. Great Britain: Redwood Books, pp25- 150 [5] Davies, M.B. (2007). Doing a Successful Research Project using qualitative or quantitative methods, London: Palgrave Macmillan.p311. [6] Department of Business and Innovative skills. (2011). HM Government. Strategy for Sustainable Construction Progress Report. 1 (1), 15-60 [7] Dorsey, R.W (2004). Project Delivery Systems for Building Construction. 2nd ed. San Diego, CA: Associated General Contractors of America. Pp1530. [8] ERNST & YOUNG, Engineering, and Procurement& Construction (EPC): Driving growth efficiency. [9] Hibberd,Z (1991). Procurement effects on co-optation in client, Oxford: Black well science limited. p240-54 [10] Laedre Ola (Norway), 19th IPMA World Congress, New Delhi, India, (13-16 November 2005), Procurement route in 3 Norwegian Building & construction projects. [11] Luis F. Alarcón, Rodrigo Rivas, and Alfredo Serpell .Evaluation and improvement of the procurement process in construction projects. [12] Masterman, J.W.E (2002). An introduction to building procurement systems. 2nd ed. London: Spon press. P.17-21. [13] Masterman, JE 2002, An Introduction to Building Procurement Systems, Spon Press, eBook Collection (EBSCOhost), EBSCOhost, viewed 30 July 2012. [14] Miss. Joanne Larmour (June-2011), A study of procurement route & their use in the commercial sector., Thesis [15] Per Erik Eriksson, Mats Westerberg, Effects of procurement on construction project performance. [16] Prince .O. (2007). Validating a model of cooperative procurement in the construction industry. International Journal of Project management. 27 (2), 552-559. [17] Project Management Institute Inc., (2008). A Guide to the Project Management Body of Knowledge. 4th edition. [18] QUT Science & Engineering Centre ., Construction Procurement Basics - Traditional procurement methodologies with a non-traditional Case Study [19] SandeepVerma .Electronic Government Procurement in India: A framework analysis of access to knowledge and access to opportunity. India: H. C. M. Rajasthan State Institute of Public Administration Jaipur, Rajasthan. Paper#10. [20] Shenhar, A.J. and Dvir, D. (2007). Project management research – the challenge and opportunity. Project Management Journal. 38 (2), pp 93-9. [21] Taraka. N. VeerendraGanugula , (october2012),The challenges faced by the Project Manager when using BIM (Building Information Modelling) during the Design Stage of a Project Management Procurement route,. [22] The Royal Institute of chartered surveyors/Davis Langdon (2007) ―Contracts in use: a survey of building contracts in use during 2007‖. [23] Walker, D.H.T. and Rowlinson, S (2008). Procurement Systems. New York: Taylor & Francis. Pp1-18.