IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 242
PORTABLE WIRELESS TRAFFIC LIGHT SYSTEM (PWTLS)
Ida S.Md Isa1
, N.Latif A.Shaari2
, A.T.I Fayeez3
, N.Azlin4
1, 3, 4
Faculty of Electronics and Computer Engineering,Universiti Teknikal Malaysia Melaka (UTeM)
2
Faculty of Electrical Engineering,Universiti Teknikal Malaysia Melaka (UTeM)
Abstract
A Portable Wireless Traffic Light System using a microcontroller and wireless ZigBee is the best system to control the traffic flow
during the road construction or maintenance. This traffic light is designed to solve the various type of hazard which may happen to
the worker, flagman and also road users during the road construction. The communication between these two traffic lights is via
wireless. Due to this it can be deployed anywhere because no wire is used. This system is equipped with the safety purpose where it is
equipped with motion and infrared sensor to detect and count the number of vehicles to avoid any collision. This automated system
can be used 24-hours in various weather conditions. This eliminate the limited working hours when using the flagman. This system is
a low cost system where it uses microcontroller to control the system.
Keywords—Portable Wireless Traffic Light, PIC Microcontroller, flagman.
----------------------------------------------------------------------***-----------------------------------------------------------------------
1. INTRODUCTION
The process of developing the safety and comfort road for user
involved a road construction. Currently, the flagman who acts
as a traffic controller is a must to ensure the traffic went smooth
during the road construction besides optimized the safety.
Road construction might happen everywhere either at highway,
two-way road, and hilly road. Due to this the traffic need to be
monitored and controlled. This flagman is used to control and
monitored the flow of traffic. The cost needed for man power
utilization is high. Because of this, most of the flagman hired is
not well trained due to the high cost of training session. Various
type of hazard can happen to the flagman, workers and also
road users during the construction road. Besides, the
possibilities of flagman, workers and also road users involve in
an accident are high during the road construction.
Road construction may happen for overnight or sometime 24-
hours in different weather condition. So, it is not applicable to
use flagman especially at night or on rainy day. This portable
traffic light system is more effective to be used for two way
road where one way is under construction or maintenance and
the other ways is use for vehicles traffic.
Fig 1: One person was injured when a pickup truck collide a
sweeper in a construction zone
Fig 2: Road user not follow the flagman instruction and
accident occur during road construction
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 243
2. CURRENT SYSTEM DURING ROAD
CONSTRCUTION
Until now, during road construction the flagman is used to
monitor and control the flow of traffic until the session of
construction or maintenance is finished. Usually the flagman is
highly visible in their bright orange vests, as they stood up with
their “Stop” and “Go” signs. Sometimes they will use flag red
and green color. As an alternative, some contractors practice the
usage of flaggers with a custom flags to alerts and direct the
drivers when bypass the road to a single line [1].
Fig 3: Flagman with sign and flag when control the traffic.
There are some regulations contained of legal requirement
created by The Department of Occupational Safety and Health
(DOSH), which needed to be followed by the contractor in
order to ensure the safety of the workers at work zone. During
the road construction there should be a minimum of 10 safety
alert sign boards which must be placed on specific locations at
the construction area. In most cases the contractors may
overlook the safety regulations and rules appointed by Ministry
of Works. This irresponsible attitude may also causes problem
to numerous parties. Also, the flagman who is appointed by the
contractors might not be well trained by their employment.
These untrained flagmen could be harmful for the road users
and themselves. At times the flagman‟s concentration on
controlling the traffic flow also can result in various miseries
not only to his life but also to the public. For an example, when
the flagman works under the hot sun, they get tired easily and
lose their concentration on work [2].
Fig 4: Several safety alert sign that will use during road
construction
During the road construction, the driver must follow the
instruction given by flagman to avoid an accident involved of
flagman, worker and also road user [2]. However, some drivers
do not follow the instructions from the flagman and drive with
reckless and this may cause an accidents.
Fig 5: Flagman controlled the traffic during road construction
3. PWTLs SYSTEM
Portable Wireless Traffic Light System (PWTLs) is design to
develop a smart system that can be used during the road
construction in order to reduce the amount of flagman use and
also to smooth the flow of traffic.
The system proposed used two traffic lights. The
communication between these two traffic lights is via wireless.
Due to this, the traffic light is portable since there is no wire
used. Besides, this may eliminate the limit usage of the traffic
light and it can be deployed anywhere. The system of the traffic
lights is fully automated and will operate without human
control at all times. Usually, the flow of traffic especially on a
two-way road is difficult to be monitored and controlled during
a rainy day and also extremely hot weather. So, with this
proposed system, the traffic problem can be solved. Besides,
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 244
the system is designed to help in the effort to control the traffic
and decrease the number of accident without having a flagman
during the road construction.
PWTLs consist of hardware and software part. For hardware
part, the PIC (Programmable Interface Controllers)
microcontroller, IEEE 802.15.4 device, light emitting diode
(LED), infrared sensor and motion sensor are used. PIC
microcontrollers can be programmed to be timers or to control a
production line and much more. Most of the traffic light which
has been proposed is using the PLC (Programmable Logic
Circuit) instead of microcontroller. In this project the PIC
Microcontrollers is used since it is cheaper compare to the PLC
and also can be as pre-built circuits. The entire program has
been created and downloads to the PIC microcontroller circuit.
The advantage of the PIC is its fast performance since it uses
RISC architecture and the power conception is also less
compare to other microcontroller [6]. Besides, the PIC
microcontroller is used in this project to reduce the cost of
traffic light. It also uses low power which is only at 5 volts. Due
to this, the PIC may use the battery to function. Figure 6 shows
an overview of PIC microcontroller.
Fig 6: Pic microcontroller
The IEEE 802.15.4 device, Zigbee is used in this project for
communication purpose. Zigbee is a communications standard
that provides a short range cost effective networking capability.
It has been developed with the emphasis on low-cost battery
powered applications. X-bee is also under the Zigbee wireless
network [6]. This Zigbee defines mesh, star and cluster tree
network topologies with data security features and interoperable
application profiles [3]. It requires longer battery life, lower
data rates and less complexity than those from existing
standards. The Zigbee network node is designed for battery
powered or high energy savings, searches for available
networks, transfers data from its application as necessary,
determines whether data is pending, requests data from the
network coordinator, can sleep for extended periods [4].
Besides, this type of device is used in this project because it has
a wide range of radio communication where the outdoor range
can be up to 750m. The Zigbee is controlled by the PIC
microcontroller. Most of the implementation of wireless traffic
light use RF module where the radio range is only 100m.
However, is not applicable to be used at a road construction.
This is because the maximum range according to the United
Stated Department Of Labor (Occupational Safety & Health
Administration) the maximum length for the road construction
for one-way road is 400 feet or around 122 m [10]. Due to this,
the Zigbee module is used in this project since the maximum
radio range is up to 750m as mentioned before. Figure 7 shows
the overview of the Zigbee device.
Fig 7: Zigbee (Xbee)
Infrared sensor is used in PWTLs system. This sensor is
implementing at both traffic lights and is control by the PIC
microcontroller. This sensor is used to detect vehicles that
passed thought each of the traffic light. When this sensor
detects vehicles, it will be count by the PIC microcontroller.
The number of vehicles passed at the first traffic light will be
transmitted to the second traffic light and it will be compared
with the number of vehicles passed at the second traffic light. If
the number of vehicles are equal at both traffic lights, then only
the second traffic light turn green and vice versa. This is to
ensure the safety and to avoid any collision especially at hilly
road.
The motion sensor is used in this system for the safety purpose.
This sensor will be put at a maximum height of the traffic light.
This sensor is also implementing at both traffic light. This
sensor is used to sense the vehicles along the single lane used.
The sensor will sense the vehicles when both of the traffic
lights are red. Even if the numbers of vehicles are equal at both
side, but there are still vehicles detection on that single lane
road, the system will not let any of the traffic light turns green.
Figure 8 shows an overview of motion sensor used in this
system.
Fig 8: Motion Sensor
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 245
For the software part, C programming using the MPLAB
software is developed for the system of the traffic light. The
software is then embedded in the PIC Microcontroller. This PIC
microcontroller will control the system as programmed. Figure
9 shows the system design of the PWTLs which consists of PIC
microcontroller, Zigbee module, infrared and motion sensor.
Fig 9: System Design of PWTLs
3.1 Advantages of PWTLs
The advantages of this system are it can be one of the effective
practices in road construction traffic control systems. The main
factor of developing this system is to reduce the amount of
accident which mostly involved the flagman. So, this system is
suitable to be used at the road construction where the risk and
limitation of a flagman can be reduced. Moreover, it can be
used overnight or 24-hours operation at any environmental and
weather factors since it uses low power to operate. Besides, by
using this system the working hours are unlimited compared to
flagman.
The system in PWTLs is equipped with a safety purpose where
the green light at both side will only turn on when the road is
clear. This is by having the IR sensor which can be used for
counting purpose and motion sensor which is used for vehicles
detection along the single lane road.
Most of the traffic lights are using the programmable logic
circuit which is much more expensive compared to PIC
microcontroller. So, this system is not only good in term of
safety but also low in cost. Besides, these systems also use low
power and this makes the system operate by only using
batteries instead of having generator.
3.2 Operation of PWTLs during road construction
The PWTLs system is proposed to be used at a two-way road
which is on construction. Figure 10 and Figure 11 shows the
critical zone in a two-way road at a construction site.
Fig 10: A straight two-way road
Fig 11: A curve two-way road
Figure 10 shows the overview of a straight two-way road where
the road construction is held and block one of the roads. In this
situation, only one road is available for both ways. As
mentioned before, usually the road will be control by a flagman.
But this can be replaced by having the traffic light to control the
traffic. One traffic light will acts as the master and the other
traffic light will acts as a slave.
Figure 11 shows an overview of a curve or hilly two-way road.
The road construction is held on one of the road. So, as
explained in Figure 10, only one of the roads can be used for
both ways. In this situation, the traffic is hard to be controlled.
Usually at this situation, at least two flagman need to be place
at each of the side. The communication between the flagman
must be strong so that there will be no collision to avoid
accidents to happen. This situation can be replaced with the
portable wireless traffic light system. Since the communication
range for the Zigbee is up to 750m, then the signal transmit and
receive at both side will faced no problem.
Since the system is made as portable, there will be no usage of
wire. So the workers can place the traffic light at anywhere with
range limited to 750m. The system is supplied with a power
voltage of 12 Volt. Once the system is on, the master traffic
light will be turning green while the slave traffic light will turn
red. There will be three type of condition that is considered in
this design which is normal condition, unequal condition and
equal condition after time limited. These conditions are
different in terms of time delay in turning the light sequence.
There will be two types of signal which will be sending and
received at both side of traffic lights. The first signal is used to
inform the other traffic light that it has turned red. This is also
to give the other traffic light permission to turn into green. The
second signal is the number of vehicles passed through it. These
two signals are important in order to let the other traffic light to
turn into green. The delay time is set in programming and is
controlled by the PIC Microcontroller. The delay time is
important for safety purpose in controlling the turning of green
signal at both sides. A motion sensor is also added at both
traffic lights to sense if there are any vehicles still using the
single lane road.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 246
Fig 12: Normal Condition
Fig 13: Normal Condition 2
Figure 12 and Figure 13 shows the overview of normal
condition of the system. In this system, the time for each
sequence of light is setting at 5 seconds. This condition is
where the number of vehicles passed at both traffic lights is
equal. When the first traffic light is green and yellow, the
number of vehicles passed thought it will be counted using
infrared sensor. When it turn red, the microcontroller will stop
counting and send a signal to the second traffic light to inform
that the first traffic light has turn red. Then it will also send the
second signal to inform the number of vehicle counted. At
second traffic light, before receiving the signal it will also count
the number of vehicle passed through it. When it received the
first signal, it will wait for the second signal. At the same time,
it will still count the number of vehicles passed through it. Once
received the number of vehicles from the first traffic light, it
will compared with the number of vehicles passed through it.
At the same time the motion sensor will also sense the vehicles
on the single road. When the number is equal and there is no
vehicles using that single road, it will automatically turn into
green. This is continuous for the first and second traffic light in
sending signal, receiving signal also change the state of light
color. This is also happened when there is no vehicle passed
through both traffic lights.
Fig 14: Unequal Condition
Figure 14 show the condition where the number vehicles passed
through both traffic lights is not equal. At this condition, there
are still two types of signal will be send and received. For
example, there are 10 vehicles passed through the first traffic
light before it turns into red. At the second traffic light, there
are only 8 vehicles passed through it until it received the second
signal which contain the number of vehicles at the first traffic
light. In this situation, the second traffic light will not
automatically turn into green but there will be delayed. In this
system, the maximum delay is set to 15 second. After 15
seconds and there is no vehicle detection on that road, then only
the second traffic light will turns green even the number of
vehicles is not equal. This is for the safety purpose.
Fig 15: Equal Condition
Figure 15 shows the condition where the numbers of vehicles
passed at both traffic lights are equal after both traffic lights are
turning into red. As mentioned before, the second traffic lights
will still counting the number of vehicles passed through it even
it received the second signal from the first traffic light. This is
also vice versa. For example, if there are 10 vehicles passed
through the first traffic light before it turns red, the first traffic
light will send the second signal with the number of vehicles is
10 to the second traffic light. When the second traffic light
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 247
received the signal, it will then compare with the number of
vehicles passed through it. If it is not equal, then it will wait for
another 15 seconds and still counting. In between 15 second if
the number of vehicles is equal and there is no vehicle detection
on that road, then it will automatically turn into green. The
system of the second traffic light will not wait until the
maximum delay.
4. CONCLUSIONS
Road construction process will happen every day on hilly road,
straight road or highway. These processes are needed in order
to repair the damaged or upgrading the existing road or
highway. Road construction process will involve many people,
including road users, workers and the flagman.
Individuals involved are often faced with the risk of an accident
while they were working especially flagman. During the
process of road construction, the traffic will be controlled by a
flagman manually by using the flag (red and green) or signals
(stop and go). They will control traffic throughout the day
regardless of time and weather to avoid traffic congestion.
Many ways is use to prevent the occurrence of safety accidents.
The safety features are done by wearing protective clothing to
facilitate the road users to see the flagman and putting the
warning signs before the construction of roads and so on.
However, accidents are still occurs during the road
construction.
The usage of flagman is important and until now, Malaysia still
uses the flagman to control the flow of traffic during road
construction. Nowadays technologies have become more and
more advanced and sophisticated. With the skills and
knowledge available, various methods are created to facilitate
many type of work.
With the existing technologies, a Portable Wireless Traffic
Light System was created. This system was implemented to
replace the work done by a flagman. This system was created
based on the safety and it is use to minimize the number of
accident happen which involved flagman, worker and also the
road user. Moreover, this is a low cost system compares to the
others traffic since it use microcontroller to controlled the
system. Besides, it is portable and can it be deployed anywhere.
This traffic light is the best solution to replace the flagman in
order to control the flow of traffic during the road construction.
REFERENCES
[1]. V. R. Ganapathy, S. K. Subramaniam, A. B. M. Diah, M.
K. Suaidi, A. H. Hamidon, “ Flagman and Risk Involved in
Road Construction Road Site”, International HJournal of
Sustainable Construction Engineering and Technology, Vol 1,
No 1, 2010.
[2]. V.R Gannapathy, S.K Subramaniam, A.B Mohamad Diah,
M.K Suaidi,A.H Hamidon, “ Risk Factors in a Road
Construction Site”, World Academy Science, Engineering and
Technology 46, August 2008.
[3]. T. Augustynowicz,"ZigBee IEEE 802.15.4”, 1999.
[4]. J.Lonn, J.Olsson, “ ZigBee for wireless networking”, 15th
March 2005.
[5]. “PIC Microcontroller And Its Architecture”, September
6,2013.
[6]. M. Jain, R. Jain, Hamilton Electronic, “PIR Motion Sensor”
[7]. C. Mathas, Electronic Product, “Sensing Motion With
Passive Infrared (PIR) Sensor”, 28 Jun 2012.
[8]. http://www.osha.gov/doc/highway_workzones/
mutcd/figures.html
[9]. Mustafa M.N, „overview of Current Road Safety Situation
in Malaysia”, Highway Planning Unit, Road Safety Section,
Ministry of Works,2005.

Weitere Àhnliche Inhalte

Was ist angesagt?

Automatic fire prevteing system in train and buses
Automatic fire prevteing system in train and busesAutomatic fire prevteing system in train and buses
Automatic fire prevteing system in train and busesVasu Manikandan
 
Automatic Broken Rail Crack Detection Scheme
Automatic Broken Rail Crack Detection SchemeAutomatic Broken Rail Crack Detection Scheme
Automatic Broken Rail Crack Detection SchemeIJERA Editor
 
IRJET- Automated Automobile Headlighting System
IRJET- Automated Automobile Headlighting SystemIRJET- Automated Automobile Headlighting System
IRJET- Automated Automobile Headlighting SystemIRJET Journal
 
Project report on IR based vehicle with automatic braking and driver awakenin...
Project report on IR based vehicle with automatic braking and driver awakenin...Project report on IR based vehicle with automatic braking and driver awakenin...
Project report on IR based vehicle with automatic braking and driver awakenin...Neeraj Khatri
 
IJSRED-V2I2P22
IJSRED-V2I2P22IJSRED-V2I2P22
IJSRED-V2I2P22IJSRED
 
IRJET- Automatic Movable Railway Bridge & Energy Generation from Piezoelectri...
IRJET- Automatic Movable Railway Bridge & Energy Generation from Piezoelectri...IRJET- Automatic Movable Railway Bridge & Energy Generation from Piezoelectri...
IRJET- Automatic Movable Railway Bridge & Energy Generation from Piezoelectri...IRJET Journal
 
Iintelligence braking system
Iintelligence braking system Iintelligence braking system
Iintelligence braking system paras gupta
 
intelligent braking system ppt
intelligent braking system pptintelligent braking system ppt
intelligent braking system pptSumit Kumar
 
Automatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismAutomatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismecwayerode
 
IRJET - Traffic Signal Automation using Spike Road Block
IRJET - Traffic Signal Automation using Spike Road BlockIRJET - Traffic Signal Automation using Spike Road Block
IRJET - Traffic Signal Automation using Spike Road BlockIRJET Journal
 
IRJET- Smart Helmet an Intelligent Bike System
IRJET- 	  Smart Helmet an Intelligent Bike SystemIRJET- 	  Smart Helmet an Intelligent Bike System
IRJET- Smart Helmet an Intelligent Bike SystemIRJET Journal
 
Automatic Braking System, Final review ppt presentation6 (1).pptx
Automatic Braking System, Final review ppt presentation6 (1).pptxAutomatic Braking System, Final review ppt presentation6 (1).pptx
Automatic Braking System, Final review ppt presentation6 (1).pptxSyedmuhammed Hussainabbas
 
Wireless Sensor Networking in Railways
Wireless Sensor Networking in RailwaysWireless Sensor Networking in Railways
Wireless Sensor Networking in RailwaysHari Wiz
 
Designof auto brakingsystemforaccidentpreventionandaccidentdetectionsystemusi...
Designof auto brakingsystemforaccidentpreventionandaccidentdetectionsystemusi...Designof auto brakingsystemforaccidentpreventionandaccidentdetectionsystemusi...
Designof auto brakingsystemforaccidentpreventionandaccidentdetectionsystemusi...Premkumar K
 
IRJET- Intelligent Braking System for Automobiles
IRJET- Intelligent Braking System for AutomobilesIRJET- Intelligent Braking System for Automobiles
IRJET- Intelligent Braking System for AutomobilesIRJET Journal
 
IRJET- Automatic Vehicle Speed Controller System in Restricted Areas
IRJET- Automatic Vehicle Speed Controller System in Restricted AreasIRJET- Automatic Vehicle Speed Controller System in Restricted Areas
IRJET- Automatic Vehicle Speed Controller System in Restricted AreasIRJET Journal
 
automatic braking system and brake actuation before collison
automatic braking system and brake actuation before collisonautomatic braking system and brake actuation before collison
automatic braking system and brake actuation before collisonashutosh singh
 

Was ist angesagt? (19)

Automatic fire prevteing system in train and buses
Automatic fire prevteing system in train and busesAutomatic fire prevteing system in train and buses
Automatic fire prevteing system in train and buses
 
Smart Car
Smart CarSmart Car
Smart Car
 
Automatic Broken Rail Crack Detection Scheme
Automatic Broken Rail Crack Detection SchemeAutomatic Broken Rail Crack Detection Scheme
Automatic Broken Rail Crack Detection Scheme
 
IRJET- Automated Automobile Headlighting System
IRJET- Automated Automobile Headlighting SystemIRJET- Automated Automobile Headlighting System
IRJET- Automated Automobile Headlighting System
 
Project report on IR based vehicle with automatic braking and driver awakenin...
Project report on IR based vehicle with automatic braking and driver awakenin...Project report on IR based vehicle with automatic braking and driver awakenin...
Project report on IR based vehicle with automatic braking and driver awakenin...
 
IJSRED-V2I2P22
IJSRED-V2I2P22IJSRED-V2I2P22
IJSRED-V2I2P22
 
IRJET- Automatic Movable Railway Bridge & Energy Generation from Piezoelectri...
IRJET- Automatic Movable Railway Bridge & Energy Generation from Piezoelectri...IRJET- Automatic Movable Railway Bridge & Energy Generation from Piezoelectri...
IRJET- Automatic Movable Railway Bridge & Energy Generation from Piezoelectri...
 
Iintelligence braking system
Iintelligence braking system Iintelligence braking system
Iintelligence braking system
 
intelligent braking system ppt
intelligent braking system pptintelligent braking system ppt
intelligent braking system ppt
 
Automatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismAutomatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanism
 
IRJET - Traffic Signal Automation using Spike Road Block
IRJET - Traffic Signal Automation using Spike Road BlockIRJET - Traffic Signal Automation using Spike Road Block
IRJET - Traffic Signal Automation using Spike Road Block
 
IRJET- Smart Helmet an Intelligent Bike System
IRJET- 	  Smart Helmet an Intelligent Bike SystemIRJET- 	  Smart Helmet an Intelligent Bike System
IRJET- Smart Helmet an Intelligent Bike System
 
C44091316
C44091316C44091316
C44091316
 
Automatic Braking System, Final review ppt presentation6 (1).pptx
Automatic Braking System, Final review ppt presentation6 (1).pptxAutomatic Braking System, Final review ppt presentation6 (1).pptx
Automatic Braking System, Final review ppt presentation6 (1).pptx
 
Wireless Sensor Networking in Railways
Wireless Sensor Networking in RailwaysWireless Sensor Networking in Railways
Wireless Sensor Networking in Railways
 
Designof auto brakingsystemforaccidentpreventionandaccidentdetectionsystemusi...
Designof auto brakingsystemforaccidentpreventionandaccidentdetectionsystemusi...Designof auto brakingsystemforaccidentpreventionandaccidentdetectionsystemusi...
Designof auto brakingsystemforaccidentpreventionandaccidentdetectionsystemusi...
 
IRJET- Intelligent Braking System for Automobiles
IRJET- Intelligent Braking System for AutomobilesIRJET- Intelligent Braking System for Automobiles
IRJET- Intelligent Braking System for Automobiles
 
IRJET- Automatic Vehicle Speed Controller System in Restricted Areas
IRJET- Automatic Vehicle Speed Controller System in Restricted AreasIRJET- Automatic Vehicle Speed Controller System in Restricted Areas
IRJET- Automatic Vehicle Speed Controller System in Restricted Areas
 
automatic braking system and brake actuation before collison
automatic braking system and brake actuation before collisonautomatic braking system and brake actuation before collison
automatic braking system and brake actuation before collison
 

Andere mochten auch

Parallel k nn on gpu architecture using opencl
Parallel k nn on gpu architecture using openclParallel k nn on gpu architecture using opencl
Parallel k nn on gpu architecture using opencleSAT Publishing House
 
A comparative study of secure search protocols in pay as-you-go clouds
A comparative study of secure search protocols in pay as-you-go cloudsA comparative study of secure search protocols in pay as-you-go clouds
A comparative study of secure search protocols in pay as-you-go cloudseSAT Publishing House
 
Noise reduction in speech processing using improved active noise control (anc...
Noise reduction in speech processing using improved active noise control (anc...Noise reduction in speech processing using improved active noise control (anc...
Noise reduction in speech processing using improved active noise control (anc...eSAT Publishing House
 
Crowd control system using ir transmitter and receiver
Crowd control system using ir transmitter and receiverCrowd control system using ir transmitter and receiver
Crowd control system using ir transmitter and receivereSAT Publishing House
 
Searching and tracking of neighboring base stations
Searching and tracking of neighboring base stationsSearching and tracking of neighboring base stations
Searching and tracking of neighboring base stationseSAT Publishing House
 
Comparative analysis of c99 and topictiling text
Comparative analysis of c99 and topictiling textComparative analysis of c99 and topictiling text
Comparative analysis of c99 and topictiling texteSAT Publishing House
 
Effect of concentration on structural and optical
Effect of concentration on structural and opticalEffect of concentration on structural and optical
Effect of concentration on structural and opticaleSAT Publishing House
 
Analysis of proximity coupled equilateral triangular
Analysis of proximity coupled equilateral triangularAnalysis of proximity coupled equilateral triangular
Analysis of proximity coupled equilateral triangulareSAT Publishing House
 
Beam steering in smart antennas by using low complex
Beam steering in smart antennas by using low complexBeam steering in smart antennas by using low complex
Beam steering in smart antennas by using low complexeSAT Publishing House
 
Product aspect ranking using domain dependent and domain independent review
Product aspect ranking using domain dependent and domain independent reviewProduct aspect ranking using domain dependent and domain independent review
Product aspect ranking using domain dependent and domain independent revieweSAT Publishing House
 
Automatic power generation control structure for smart electrical power grids
Automatic power generation control structure for smart electrical power gridsAutomatic power generation control structure for smart electrical power grids
Automatic power generation control structure for smart electrical power gridseSAT Publishing House
 
Efficient distributed detection of node replication attacks in mobile sensor ...
Efficient distributed detection of node replication attacks in mobile sensor ...Efficient distributed detection of node replication attacks in mobile sensor ...
Efficient distributed detection of node replication attacks in mobile sensor ...eSAT Publishing House
 
Dry sliding wear behaviour of sand cast cu 11 ni-6sn alloy
Dry sliding wear behaviour of sand cast cu 11 ni-6sn alloyDry sliding wear behaviour of sand cast cu 11 ni-6sn alloy
Dry sliding wear behaviour of sand cast cu 11 ni-6sn alloyeSAT Publishing House
 
Optimization of cultural conditions for lactic acid
Optimization of cultural conditions for lactic acidOptimization of cultural conditions for lactic acid
Optimization of cultural conditions for lactic acideSAT Publishing House
 
A novel methodology for test scenario generation based on control flow analys...
A novel methodology for test scenario generation based on control flow analys...A novel methodology for test scenario generation based on control flow analys...
A novel methodology for test scenario generation based on control flow analys...eSAT Publishing House
 
An innovative way for computerized smith chart generation and transmission li...
An innovative way for computerized smith chart generation and transmission li...An innovative way for computerized smith chart generation and transmission li...
An innovative way for computerized smith chart generation and transmission li...eSAT Publishing House
 
Critical comparison of ground motion attenuation formulae for recent earthqua...
Critical comparison of ground motion attenuation formulae for recent earthqua...Critical comparison of ground motion attenuation formulae for recent earthqua...
Critical comparison of ground motion attenuation formulae for recent earthqua...eSAT Publishing House
 
Evolution of social developer network in oss survey
Evolution of social developer network in oss surveyEvolution of social developer network in oss survey
Evolution of social developer network in oss surveyeSAT Publishing House
 
Secured data hiding by using extended visual
Secured data hiding by using extended visualSecured data hiding by using extended visual
Secured data hiding by using extended visualeSAT Publishing House
 

Andere mochten auch (20)

Parallel k nn on gpu architecture using opencl
Parallel k nn on gpu architecture using openclParallel k nn on gpu architecture using opencl
Parallel k nn on gpu architecture using opencl
 
A comparative study of secure search protocols in pay as-you-go clouds
A comparative study of secure search protocols in pay as-you-go cloudsA comparative study of secure search protocols in pay as-you-go clouds
A comparative study of secure search protocols in pay as-you-go clouds
 
Noise reduction in speech processing using improved active noise control (anc...
Noise reduction in speech processing using improved active noise control (anc...Noise reduction in speech processing using improved active noise control (anc...
Noise reduction in speech processing using improved active noise control (anc...
 
Crowd control system using ir transmitter and receiver
Crowd control system using ir transmitter and receiverCrowd control system using ir transmitter and receiver
Crowd control system using ir transmitter and receiver
 
Searching and tracking of neighboring base stations
Searching and tracking of neighboring base stationsSearching and tracking of neighboring base stations
Searching and tracking of neighboring base stations
 
Comparative analysis of c99 and topictiling text
Comparative analysis of c99 and topictiling textComparative analysis of c99 and topictiling text
Comparative analysis of c99 and topictiling text
 
Effect of concentration on structural and optical
Effect of concentration on structural and opticalEffect of concentration on structural and optical
Effect of concentration on structural and optical
 
Analysis of proximity coupled equilateral triangular
Analysis of proximity coupled equilateral triangularAnalysis of proximity coupled equilateral triangular
Analysis of proximity coupled equilateral triangular
 
Beam steering in smart antennas by using low complex
Beam steering in smart antennas by using low complexBeam steering in smart antennas by using low complex
Beam steering in smart antennas by using low complex
 
Product aspect ranking using domain dependent and domain independent review
Product aspect ranking using domain dependent and domain independent reviewProduct aspect ranking using domain dependent and domain independent review
Product aspect ranking using domain dependent and domain independent review
 
Automatic power generation control structure for smart electrical power grids
Automatic power generation control structure for smart electrical power gridsAutomatic power generation control structure for smart electrical power grids
Automatic power generation control structure for smart electrical power grids
 
Efficient distributed detection of node replication attacks in mobile sensor ...
Efficient distributed detection of node replication attacks in mobile sensor ...Efficient distributed detection of node replication attacks in mobile sensor ...
Efficient distributed detection of node replication attacks in mobile sensor ...
 
Music analyzer and plagiarism
Music analyzer and plagiarismMusic analyzer and plagiarism
Music analyzer and plagiarism
 
Dry sliding wear behaviour of sand cast cu 11 ni-6sn alloy
Dry sliding wear behaviour of sand cast cu 11 ni-6sn alloyDry sliding wear behaviour of sand cast cu 11 ni-6sn alloy
Dry sliding wear behaviour of sand cast cu 11 ni-6sn alloy
 
Optimization of cultural conditions for lactic acid
Optimization of cultural conditions for lactic acidOptimization of cultural conditions for lactic acid
Optimization of cultural conditions for lactic acid
 
A novel methodology for test scenario generation based on control flow analys...
A novel methodology for test scenario generation based on control flow analys...A novel methodology for test scenario generation based on control flow analys...
A novel methodology for test scenario generation based on control flow analys...
 
An innovative way for computerized smith chart generation and transmission li...
An innovative way for computerized smith chart generation and transmission li...An innovative way for computerized smith chart generation and transmission li...
An innovative way for computerized smith chart generation and transmission li...
 
Critical comparison of ground motion attenuation formulae for recent earthqua...
Critical comparison of ground motion attenuation formulae for recent earthqua...Critical comparison of ground motion attenuation formulae for recent earthqua...
Critical comparison of ground motion attenuation formulae for recent earthqua...
 
Evolution of social developer network in oss survey
Evolution of social developer network in oss surveyEvolution of social developer network in oss survey
Evolution of social developer network in oss survey
 
Secured data hiding by using extended visual
Secured data hiding by using extended visualSecured data hiding by using extended visual
Secured data hiding by using extended visual
 

Ähnlich wie Portable wireless traffic light system (pwtls)

Design of intelligent traffic light controller using gsm & embedded system
Design of intelligent traffic light controller using gsm & embedded systemDesign of intelligent traffic light controller using gsm & embedded system
Design of intelligent traffic light controller using gsm & embedded systemYakkali Kiran
 
Tensile and Wear Property Analysis of Friction Stir processed Metal Matrix Co...
Tensile and Wear Property Analysis of Friction Stir processed Metal Matrix Co...Tensile and Wear Property Analysis of Friction Stir processed Metal Matrix Co...
Tensile and Wear Property Analysis of Friction Stir processed Metal Matrix Co...IRJET Journal
 
IOT based Fully Automated Speed Bumps and Road Blockers for Smart Cities
IOT based Fully Automated Speed Bumps and Road Blockers for Smart CitiesIOT based Fully Automated Speed Bumps and Road Blockers for Smart Cities
IOT based Fully Automated Speed Bumps and Road Blockers for Smart CitiesIRJET Journal
 
IRJET- A Review on Accident Prevention Methods at Railway Line Crossings
IRJET-  	  A Review on Accident Prevention Methods at Railway Line CrossingsIRJET-  	  A Review on Accident Prevention Methods at Railway Line Crossings
IRJET- A Review on Accident Prevention Methods at Railway Line CrossingsIRJET Journal
 
Wireless Smart Traffic Control System based on Vehicle density in Traffic Lan...
Wireless Smart Traffic Control System based on Vehicle density in Traffic Lan...Wireless Smart Traffic Control System based on Vehicle density in Traffic Lan...
Wireless Smart Traffic Control System based on Vehicle density in Traffic Lan...IRJET Journal
 
Project report for railway security monotorin system
Project report for railway security monotorin systemProject report for railway security monotorin system
Project report for railway security monotorin systemASWATHY VG
 
IRJET- Smart Traffic Monitoring System using Ir Sensors based on Microcon...
IRJET-  	  Smart Traffic Monitoring System using Ir Sensors based on Microcon...IRJET-  	  Smart Traffic Monitoring System using Ir Sensors based on Microcon...
IRJET- Smart Traffic Monitoring System using Ir Sensors based on Microcon...IRJET Journal
 
Inginious Trafalgar Contrivition System
Inginious Trafalgar Contrivition SystemInginious Trafalgar Contrivition System
Inginious Trafalgar Contrivition SystemIJSRED
 
Iaetsd literature review on traffic signal control system based on
Iaetsd literature review on traffic signal control system based onIaetsd literature review on traffic signal control system based on
Iaetsd literature review on traffic signal control system based onIaetsd Iaetsd
 
IRJET - A Real-Time Pothole Detection Approach for a Safety Transportation Sy...
IRJET - A Real-Time Pothole Detection Approach for a Safety Transportation Sy...IRJET - A Real-Time Pothole Detection Approach for a Safety Transportation Sy...
IRJET - A Real-Time Pothole Detection Approach for a Safety Transportation Sy...IRJET Journal
 
Dynamic vehicle traffic management system
Dynamic vehicle traffic management systemDynamic vehicle traffic management system
Dynamic vehicle traffic management systemeSAT Journals
 
IRJET-Railway Track Security System
IRJET-Railway Track Security SystemIRJET-Railway Track Security System
IRJET-Railway Track Security SystemIRJET Journal
 
A PROPOSED MODEL FOR TRAFFIC SIGNAL PREEMPTION USING GLOBAL POSITIONING SYSTE...
A PROPOSED MODEL FOR TRAFFIC SIGNAL PREEMPTION USING GLOBAL POSITIONING SYSTE...A PROPOSED MODEL FOR TRAFFIC SIGNAL PREEMPTION USING GLOBAL POSITIONING SYSTE...
A PROPOSED MODEL FOR TRAFFIC SIGNAL PREEMPTION USING GLOBAL POSITIONING SYSTE...csandit
 
A PROPOSED MODEL FOR TRAFFIC SIGNAL PREEMPTION USING GLOBAL POSITIONING SYSTE...
A PROPOSED MODEL FOR TRAFFIC SIGNAL PREEMPTION USING GLOBAL POSITIONING SYSTE...A PROPOSED MODEL FOR TRAFFIC SIGNAL PREEMPTION USING GLOBAL POSITIONING SYSTE...
A PROPOSED MODEL FOR TRAFFIC SIGNAL PREEMPTION USING GLOBAL POSITIONING SYSTE...cscpconf
 
A proposed model for traffic signal preemption using global positioning syste...
A proposed model for traffic signal preemption using global positioning syste...A proposed model for traffic signal preemption using global positioning syste...
A proposed model for traffic signal preemption using global positioning syste...csandit
 
SMART CONTROL OF TRAFFIC LIGHT USING ARTIFICIAL INTELLIGENCE
SMART CONTROL OF TRAFFIC LIGHT USING ARTIFICIAL INTELLIGENCESMART CONTROL OF TRAFFIC LIGHT USING ARTIFICIAL INTELLIGENCE
SMART CONTROL OF TRAFFIC LIGHT USING ARTIFICIAL INTELLIGENCEIRJET Journal
 
IRJET-Smart Roads using IoT Devices.
IRJET-Smart Roads using IoT Devices.IRJET-Smart Roads using IoT Devices.
IRJET-Smart Roads using IoT Devices.IRJET Journal
 
Traffic Signal Control Using Programmable Logic Controller (PLC)
Traffic Signal Control Using Programmable Logic Controller (PLC)Traffic Signal Control Using Programmable Logic Controller (PLC)
Traffic Signal Control Using Programmable Logic Controller (PLC)IJSRED
 
Fpga implementation of mass public transit facility for smart security system
Fpga implementation of mass public transit facility for smart security systemFpga implementation of mass public transit facility for smart security system
Fpga implementation of mass public transit facility for smart security systemeSAT Journals
 

Ähnlich wie Portable wireless traffic light system (pwtls) (20)

D0362026029
D0362026029D0362026029
D0362026029
 
Design of intelligent traffic light controller using gsm & embedded system
Design of intelligent traffic light controller using gsm & embedded systemDesign of intelligent traffic light controller using gsm & embedded system
Design of intelligent traffic light controller using gsm & embedded system
 
Tensile and Wear Property Analysis of Friction Stir processed Metal Matrix Co...
Tensile and Wear Property Analysis of Friction Stir processed Metal Matrix Co...Tensile and Wear Property Analysis of Friction Stir processed Metal Matrix Co...
Tensile and Wear Property Analysis of Friction Stir processed Metal Matrix Co...
 
IOT based Fully Automated Speed Bumps and Road Blockers for Smart Cities
IOT based Fully Automated Speed Bumps and Road Blockers for Smart CitiesIOT based Fully Automated Speed Bumps and Road Blockers for Smart Cities
IOT based Fully Automated Speed Bumps and Road Blockers for Smart Cities
 
IRJET- A Review on Accident Prevention Methods at Railway Line Crossings
IRJET-  	  A Review on Accident Prevention Methods at Railway Line CrossingsIRJET-  	  A Review on Accident Prevention Methods at Railway Line Crossings
IRJET- A Review on Accident Prevention Methods at Railway Line Crossings
 
Wireless Smart Traffic Control System based on Vehicle density in Traffic Lan...
Wireless Smart Traffic Control System based on Vehicle density in Traffic Lan...Wireless Smart Traffic Control System based on Vehicle density in Traffic Lan...
Wireless Smart Traffic Control System based on Vehicle density in Traffic Lan...
 
Project report for railway security monotorin system
Project report for railway security monotorin systemProject report for railway security monotorin system
Project report for railway security monotorin system
 
IRJET- Smart Traffic Monitoring System using Ir Sensors based on Microcon...
IRJET-  	  Smart Traffic Monitoring System using Ir Sensors based on Microcon...IRJET-  	  Smart Traffic Monitoring System using Ir Sensors based on Microcon...
IRJET- Smart Traffic Monitoring System using Ir Sensors based on Microcon...
 
Inginious Trafalgar Contrivition System
Inginious Trafalgar Contrivition SystemInginious Trafalgar Contrivition System
Inginious Trafalgar Contrivition System
 
Iaetsd literature review on traffic signal control system based on
Iaetsd literature review on traffic signal control system based onIaetsd literature review on traffic signal control system based on
Iaetsd literature review on traffic signal control system based on
 
IRJET - A Real-Time Pothole Detection Approach for a Safety Transportation Sy...
IRJET - A Real-Time Pothole Detection Approach for a Safety Transportation Sy...IRJET - A Real-Time Pothole Detection Approach for a Safety Transportation Sy...
IRJET - A Real-Time Pothole Detection Approach for a Safety Transportation Sy...
 
Dynamic vehicle traffic management system
Dynamic vehicle traffic management systemDynamic vehicle traffic management system
Dynamic vehicle traffic management system
 
IRJET-Railway Track Security System
IRJET-Railway Track Security SystemIRJET-Railway Track Security System
IRJET-Railway Track Security System
 
A PROPOSED MODEL FOR TRAFFIC SIGNAL PREEMPTION USING GLOBAL POSITIONING SYSTE...
A PROPOSED MODEL FOR TRAFFIC SIGNAL PREEMPTION USING GLOBAL POSITIONING SYSTE...A PROPOSED MODEL FOR TRAFFIC SIGNAL PREEMPTION USING GLOBAL POSITIONING SYSTE...
A PROPOSED MODEL FOR TRAFFIC SIGNAL PREEMPTION USING GLOBAL POSITIONING SYSTE...
 
A PROPOSED MODEL FOR TRAFFIC SIGNAL PREEMPTION USING GLOBAL POSITIONING SYSTE...
A PROPOSED MODEL FOR TRAFFIC SIGNAL PREEMPTION USING GLOBAL POSITIONING SYSTE...A PROPOSED MODEL FOR TRAFFIC SIGNAL PREEMPTION USING GLOBAL POSITIONING SYSTE...
A PROPOSED MODEL FOR TRAFFIC SIGNAL PREEMPTION USING GLOBAL POSITIONING SYSTE...
 
A proposed model for traffic signal preemption using global positioning syste...
A proposed model for traffic signal preemption using global positioning syste...A proposed model for traffic signal preemption using global positioning syste...
A proposed model for traffic signal preemption using global positioning syste...
 
SMART CONTROL OF TRAFFIC LIGHT USING ARTIFICIAL INTELLIGENCE
SMART CONTROL OF TRAFFIC LIGHT USING ARTIFICIAL INTELLIGENCESMART CONTROL OF TRAFFIC LIGHT USING ARTIFICIAL INTELLIGENCE
SMART CONTROL OF TRAFFIC LIGHT USING ARTIFICIAL INTELLIGENCE
 
IRJET-Smart Roads using IoT Devices.
IRJET-Smart Roads using IoT Devices.IRJET-Smart Roads using IoT Devices.
IRJET-Smart Roads using IoT Devices.
 
Traffic Signal Control Using Programmable Logic Controller (PLC)
Traffic Signal Control Using Programmable Logic Controller (PLC)Traffic Signal Control Using Programmable Logic Controller (PLC)
Traffic Signal Control Using Programmable Logic Controller (PLC)
 
Fpga implementation of mass public transit facility for smart security system
Fpga implementation of mass public transit facility for smart security systemFpga implementation of mass public transit facility for smart security system
Fpga implementation of mass public transit facility for smart security system
 

Mehr von eSAT Publishing House

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnameSAT Publishing House
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...eSAT Publishing House
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnameSAT Publishing House
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...eSAT Publishing House
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaeSAT Publishing House
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingeSAT Publishing House
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...eSAT Publishing House
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...eSAT Publishing House
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...eSAT Publishing House
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a revieweSAT Publishing House
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...eSAT Publishing House
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard managementeSAT Publishing House
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallseSAT Publishing House
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...eSAT Publishing House
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...eSAT Publishing House
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaeSAT Publishing House
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structureseSAT Publishing House
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingseSAT Publishing House
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...eSAT Publishing House
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...eSAT Publishing House
 

Mehr von eSAT Publishing House (20)

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
 

KĂŒrzlich hochgeladen

Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 

KĂŒrzlich hochgeladen (20)

Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 

Portable wireless traffic light system (pwtls)

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 242 PORTABLE WIRELESS TRAFFIC LIGHT SYSTEM (PWTLS) Ida S.Md Isa1 , N.Latif A.Shaari2 , A.T.I Fayeez3 , N.Azlin4 1, 3, 4 Faculty of Electronics and Computer Engineering,Universiti Teknikal Malaysia Melaka (UTeM) 2 Faculty of Electrical Engineering,Universiti Teknikal Malaysia Melaka (UTeM) Abstract A Portable Wireless Traffic Light System using a microcontroller and wireless ZigBee is the best system to control the traffic flow during the road construction or maintenance. This traffic light is designed to solve the various type of hazard which may happen to the worker, flagman and also road users during the road construction. The communication between these two traffic lights is via wireless. Due to this it can be deployed anywhere because no wire is used. This system is equipped with the safety purpose where it is equipped with motion and infrared sensor to detect and count the number of vehicles to avoid any collision. This automated system can be used 24-hours in various weather conditions. This eliminate the limited working hours when using the flagman. This system is a low cost system where it uses microcontroller to control the system. Keywords—Portable Wireless Traffic Light, PIC Microcontroller, flagman. ----------------------------------------------------------------------***----------------------------------------------------------------------- 1. INTRODUCTION The process of developing the safety and comfort road for user involved a road construction. Currently, the flagman who acts as a traffic controller is a must to ensure the traffic went smooth during the road construction besides optimized the safety. Road construction might happen everywhere either at highway, two-way road, and hilly road. Due to this the traffic need to be monitored and controlled. This flagman is used to control and monitored the flow of traffic. The cost needed for man power utilization is high. Because of this, most of the flagman hired is not well trained due to the high cost of training session. Various type of hazard can happen to the flagman, workers and also road users during the construction road. Besides, the possibilities of flagman, workers and also road users involve in an accident are high during the road construction. Road construction may happen for overnight or sometime 24- hours in different weather condition. So, it is not applicable to use flagman especially at night or on rainy day. This portable traffic light system is more effective to be used for two way road where one way is under construction or maintenance and the other ways is use for vehicles traffic. Fig 1: One person was injured when a pickup truck collide a sweeper in a construction zone Fig 2: Road user not follow the flagman instruction and accident occur during road construction
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 243 2. CURRENT SYSTEM DURING ROAD CONSTRCUTION Until now, during road construction the flagman is used to monitor and control the flow of traffic until the session of construction or maintenance is finished. Usually the flagman is highly visible in their bright orange vests, as they stood up with their “Stop” and “Go” signs. Sometimes they will use flag red and green color. As an alternative, some contractors practice the usage of flaggers with a custom flags to alerts and direct the drivers when bypass the road to a single line [1]. Fig 3: Flagman with sign and flag when control the traffic. There are some regulations contained of legal requirement created by The Department of Occupational Safety and Health (DOSH), which needed to be followed by the contractor in order to ensure the safety of the workers at work zone. During the road construction there should be a minimum of 10 safety alert sign boards which must be placed on specific locations at the construction area. In most cases the contractors may overlook the safety regulations and rules appointed by Ministry of Works. This irresponsible attitude may also causes problem to numerous parties. Also, the flagman who is appointed by the contractors might not be well trained by their employment. These untrained flagmen could be harmful for the road users and themselves. At times the flagman‟s concentration on controlling the traffic flow also can result in various miseries not only to his life but also to the public. For an example, when the flagman works under the hot sun, they get tired easily and lose their concentration on work [2]. Fig 4: Several safety alert sign that will use during road construction During the road construction, the driver must follow the instruction given by flagman to avoid an accident involved of flagman, worker and also road user [2]. However, some drivers do not follow the instructions from the flagman and drive with reckless and this may cause an accidents. Fig 5: Flagman controlled the traffic during road construction 3. PWTLs SYSTEM Portable Wireless Traffic Light System (PWTLs) is design to develop a smart system that can be used during the road construction in order to reduce the amount of flagman use and also to smooth the flow of traffic. The system proposed used two traffic lights. The communication between these two traffic lights is via wireless. Due to this, the traffic light is portable since there is no wire used. Besides, this may eliminate the limit usage of the traffic light and it can be deployed anywhere. The system of the traffic lights is fully automated and will operate without human control at all times. Usually, the flow of traffic especially on a two-way road is difficult to be monitored and controlled during a rainy day and also extremely hot weather. So, with this proposed system, the traffic problem can be solved. Besides,
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 244 the system is designed to help in the effort to control the traffic and decrease the number of accident without having a flagman during the road construction. PWTLs consist of hardware and software part. For hardware part, the PIC (Programmable Interface Controllers) microcontroller, IEEE 802.15.4 device, light emitting diode (LED), infrared sensor and motion sensor are used. PIC microcontrollers can be programmed to be timers or to control a production line and much more. Most of the traffic light which has been proposed is using the PLC (Programmable Logic Circuit) instead of microcontroller. In this project the PIC Microcontrollers is used since it is cheaper compare to the PLC and also can be as pre-built circuits. The entire program has been created and downloads to the PIC microcontroller circuit. The advantage of the PIC is its fast performance since it uses RISC architecture and the power conception is also less compare to other microcontroller [6]. Besides, the PIC microcontroller is used in this project to reduce the cost of traffic light. It also uses low power which is only at 5 volts. Due to this, the PIC may use the battery to function. Figure 6 shows an overview of PIC microcontroller. Fig 6: Pic microcontroller The IEEE 802.15.4 device, Zigbee is used in this project for communication purpose. Zigbee is a communications standard that provides a short range cost effective networking capability. It has been developed with the emphasis on low-cost battery powered applications. X-bee is also under the Zigbee wireless network [6]. This Zigbee defines mesh, star and cluster tree network topologies with data security features and interoperable application profiles [3]. It requires longer battery life, lower data rates and less complexity than those from existing standards. The Zigbee network node is designed for battery powered or high energy savings, searches for available networks, transfers data from its application as necessary, determines whether data is pending, requests data from the network coordinator, can sleep for extended periods [4]. Besides, this type of device is used in this project because it has a wide range of radio communication where the outdoor range can be up to 750m. The Zigbee is controlled by the PIC microcontroller. Most of the implementation of wireless traffic light use RF module where the radio range is only 100m. However, is not applicable to be used at a road construction. This is because the maximum range according to the United Stated Department Of Labor (Occupational Safety & Health Administration) the maximum length for the road construction for one-way road is 400 feet or around 122 m [10]. Due to this, the Zigbee module is used in this project since the maximum radio range is up to 750m as mentioned before. Figure 7 shows the overview of the Zigbee device. Fig 7: Zigbee (Xbee) Infrared sensor is used in PWTLs system. This sensor is implementing at both traffic lights and is control by the PIC microcontroller. This sensor is used to detect vehicles that passed thought each of the traffic light. When this sensor detects vehicles, it will be count by the PIC microcontroller. The number of vehicles passed at the first traffic light will be transmitted to the second traffic light and it will be compared with the number of vehicles passed at the second traffic light. If the number of vehicles are equal at both traffic lights, then only the second traffic light turn green and vice versa. This is to ensure the safety and to avoid any collision especially at hilly road. The motion sensor is used in this system for the safety purpose. This sensor will be put at a maximum height of the traffic light. This sensor is also implementing at both traffic light. This sensor is used to sense the vehicles along the single lane used. The sensor will sense the vehicles when both of the traffic lights are red. Even if the numbers of vehicles are equal at both side, but there are still vehicles detection on that single lane road, the system will not let any of the traffic light turns green. Figure 8 shows an overview of motion sensor used in this system. Fig 8: Motion Sensor
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 245 For the software part, C programming using the MPLAB software is developed for the system of the traffic light. The software is then embedded in the PIC Microcontroller. This PIC microcontroller will control the system as programmed. Figure 9 shows the system design of the PWTLs which consists of PIC microcontroller, Zigbee module, infrared and motion sensor. Fig 9: System Design of PWTLs 3.1 Advantages of PWTLs The advantages of this system are it can be one of the effective practices in road construction traffic control systems. The main factor of developing this system is to reduce the amount of accident which mostly involved the flagman. So, this system is suitable to be used at the road construction where the risk and limitation of a flagman can be reduced. Moreover, it can be used overnight or 24-hours operation at any environmental and weather factors since it uses low power to operate. Besides, by using this system the working hours are unlimited compared to flagman. The system in PWTLs is equipped with a safety purpose where the green light at both side will only turn on when the road is clear. This is by having the IR sensor which can be used for counting purpose and motion sensor which is used for vehicles detection along the single lane road. Most of the traffic lights are using the programmable logic circuit which is much more expensive compared to PIC microcontroller. So, this system is not only good in term of safety but also low in cost. Besides, these systems also use low power and this makes the system operate by only using batteries instead of having generator. 3.2 Operation of PWTLs during road construction The PWTLs system is proposed to be used at a two-way road which is on construction. Figure 10 and Figure 11 shows the critical zone in a two-way road at a construction site. Fig 10: A straight two-way road Fig 11: A curve two-way road Figure 10 shows the overview of a straight two-way road where the road construction is held and block one of the roads. In this situation, only one road is available for both ways. As mentioned before, usually the road will be control by a flagman. But this can be replaced by having the traffic light to control the traffic. One traffic light will acts as the master and the other traffic light will acts as a slave. Figure 11 shows an overview of a curve or hilly two-way road. The road construction is held on one of the road. So, as explained in Figure 10, only one of the roads can be used for both ways. In this situation, the traffic is hard to be controlled. Usually at this situation, at least two flagman need to be place at each of the side. The communication between the flagman must be strong so that there will be no collision to avoid accidents to happen. This situation can be replaced with the portable wireless traffic light system. Since the communication range for the Zigbee is up to 750m, then the signal transmit and receive at both side will faced no problem. Since the system is made as portable, there will be no usage of wire. So the workers can place the traffic light at anywhere with range limited to 750m. The system is supplied with a power voltage of 12 Volt. Once the system is on, the master traffic light will be turning green while the slave traffic light will turn red. There will be three type of condition that is considered in this design which is normal condition, unequal condition and equal condition after time limited. These conditions are different in terms of time delay in turning the light sequence. There will be two types of signal which will be sending and received at both side of traffic lights. The first signal is used to inform the other traffic light that it has turned red. This is also to give the other traffic light permission to turn into green. The second signal is the number of vehicles passed through it. These two signals are important in order to let the other traffic light to turn into green. The delay time is set in programming and is controlled by the PIC Microcontroller. The delay time is important for safety purpose in controlling the turning of green signal at both sides. A motion sensor is also added at both traffic lights to sense if there are any vehicles still using the single lane road.
  • 5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 246 Fig 12: Normal Condition Fig 13: Normal Condition 2 Figure 12 and Figure 13 shows the overview of normal condition of the system. In this system, the time for each sequence of light is setting at 5 seconds. This condition is where the number of vehicles passed at both traffic lights is equal. When the first traffic light is green and yellow, the number of vehicles passed thought it will be counted using infrared sensor. When it turn red, the microcontroller will stop counting and send a signal to the second traffic light to inform that the first traffic light has turn red. Then it will also send the second signal to inform the number of vehicle counted. At second traffic light, before receiving the signal it will also count the number of vehicle passed through it. When it received the first signal, it will wait for the second signal. At the same time, it will still count the number of vehicles passed through it. Once received the number of vehicles from the first traffic light, it will compared with the number of vehicles passed through it. At the same time the motion sensor will also sense the vehicles on the single road. When the number is equal and there is no vehicles using that single road, it will automatically turn into green. This is continuous for the first and second traffic light in sending signal, receiving signal also change the state of light color. This is also happened when there is no vehicle passed through both traffic lights. Fig 14: Unequal Condition Figure 14 show the condition where the number vehicles passed through both traffic lights is not equal. At this condition, there are still two types of signal will be send and received. For example, there are 10 vehicles passed through the first traffic light before it turns into red. At the second traffic light, there are only 8 vehicles passed through it until it received the second signal which contain the number of vehicles at the first traffic light. In this situation, the second traffic light will not automatically turn into green but there will be delayed. In this system, the maximum delay is set to 15 second. After 15 seconds and there is no vehicle detection on that road, then only the second traffic light will turns green even the number of vehicles is not equal. This is for the safety purpose. Fig 15: Equal Condition Figure 15 shows the condition where the numbers of vehicles passed at both traffic lights are equal after both traffic lights are turning into red. As mentioned before, the second traffic lights will still counting the number of vehicles passed through it even it received the second signal from the first traffic light. This is also vice versa. For example, if there are 10 vehicles passed through the first traffic light before it turns red, the first traffic light will send the second signal with the number of vehicles is 10 to the second traffic light. When the second traffic light
  • 6. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 247 received the signal, it will then compare with the number of vehicles passed through it. If it is not equal, then it will wait for another 15 seconds and still counting. In between 15 second if the number of vehicles is equal and there is no vehicle detection on that road, then it will automatically turn into green. The system of the second traffic light will not wait until the maximum delay. 4. CONCLUSIONS Road construction process will happen every day on hilly road, straight road or highway. These processes are needed in order to repair the damaged or upgrading the existing road or highway. Road construction process will involve many people, including road users, workers and the flagman. Individuals involved are often faced with the risk of an accident while they were working especially flagman. During the process of road construction, the traffic will be controlled by a flagman manually by using the flag (red and green) or signals (stop and go). They will control traffic throughout the day regardless of time and weather to avoid traffic congestion. Many ways is use to prevent the occurrence of safety accidents. The safety features are done by wearing protective clothing to facilitate the road users to see the flagman and putting the warning signs before the construction of roads and so on. However, accidents are still occurs during the road construction. The usage of flagman is important and until now, Malaysia still uses the flagman to control the flow of traffic during road construction. Nowadays technologies have become more and more advanced and sophisticated. With the skills and knowledge available, various methods are created to facilitate many type of work. With the existing technologies, a Portable Wireless Traffic Light System was created. This system was implemented to replace the work done by a flagman. This system was created based on the safety and it is use to minimize the number of accident happen which involved flagman, worker and also the road user. Moreover, this is a low cost system compares to the others traffic since it use microcontroller to controlled the system. Besides, it is portable and can it be deployed anywhere. This traffic light is the best solution to replace the flagman in order to control the flow of traffic during the road construction. REFERENCES [1]. V. R. Ganapathy, S. K. Subramaniam, A. B. M. Diah, M. K. Suaidi, A. H. Hamidon, “ Flagman and Risk Involved in Road Construction Road Site”, International HJournal of Sustainable Construction Engineering and Technology, Vol 1, No 1, 2010. [2]. V.R Gannapathy, S.K Subramaniam, A.B Mohamad Diah, M.K Suaidi,A.H Hamidon, “ Risk Factors in a Road Construction Site”, World Academy Science, Engineering and Technology 46, August 2008. [3]. T. Augustynowicz,"ZigBee IEEE 802.15.4”, 1999. [4]. J.Lonn, J.Olsson, “ ZigBee for wireless networking”, 15th March 2005. [5]. “PIC Microcontroller And Its Architecture”, September 6,2013. [6]. M. Jain, R. Jain, Hamilton Electronic, “PIR Motion Sensor” [7]. C. Mathas, Electronic Product, “Sensing Motion With Passive Infrared (PIR) Sensor”, 28 Jun 2012. [8]. http://www.osha.gov/doc/highway_workzones/ mutcd/figures.html [9]. Mustafa M.N, „overview of Current Road Safety Situation in Malaysia”, Highway Planning Unit, Road Safety Section, Ministry of Works,2005.