COMPARATIVE ANALYSIS OF FORMWORK IN MULTISTORY BUILDING Sandip.P.Pawar1, P.M.Atterde2 1P.G. Student Deptt of civil Engineering SSGBCOET Bhusawal Maharashtra 2Guide, Deptt of civil Engineering SSGBCOET Bhusawal Maharashtra Abstract One of the most important factors in determing the success of a construction project in terms of speed, quality cost and safety of work is the formwork used in the project as it accounts about 40% of the total project cost of the structure. When considering a construction project both the client and contractor want to finish the job early as the client wants to use the building for the intended purpose as soon as possible. The contractor wants to finish the construction as soon as possible to gain a higher profit. The most efficient way to speed up the work in high-rise building construction is by achieving a very short floor cycle. The floor cycle of a building mainly depend on the formwork type as it is the main time factor of a building project. The aim of this paper is to present about the existing formwork types in Maharashtra and to show each one will affect the project duration, project cost and the quality of the work. For that a research has been carried out and the results will present in this paper. Keywords: Formwork,Duration,cost,quality 
---------------------------------------------------------------------***--------------------------------------------------------------------- 1.INTRODUCTION Formwork is defined as temporary structure whos purpose is to provide support and containment for fresh concrete until it can support itself. It moulds the concrete to the desired shape and size and controls its position and alignment. The development of formworks is parallel with the growth of concrete construction throughout the 20th century. The advancement of technology, increase of population and the space limitation lead the way to construct high-rise buildings. But the task was not very easy at the beginning but now the man made the task easy by inventing new machinery and new techniques. The most important factor in terms of cost, quality and speed in a high-rise building construction project is the type of the formwork used in the project. The first formwork type to be used is the conventional type formwork where the timber planks were supported on timber columns. With the advancement of technology it developed gradually and people used ply wood sheets instead of timber planks and steel pipes with jacks were used to support the ply wood. Then people invented small units of formworks and connect the repeating units in the construction. The larger units were invented like formworks for slab panels, formworks for columns, beams…etc. when the same elements are repeating. Then finally the whole system of formwork is made and initially the material used to it was steel and it was very heavy. Then the aim was to reduce the weight of the system and the materials for formwork have extended to aluminium, plastic, fiber glass…etc. 
contractors are in a belief that the system formwork is suitable only for super tall buildings as the initial cost of the system formwork is a bit high. Though the initial cost of the system formwork is a bit high it reduces the project duration and hence the total project cost. When considering the overall construction of a high-rise building the system formwork is much more economical that to all the other primary formwork types as it reduces the project duration, gives a smooth concrete surface and the repetitive use of the system. This is suitable for even for a two or three storey housing scheme of several houses. 2. TYPES OF FORMWORKS Conventional Formwork: This is the oldest type of formwork used in the construction industry. This type uses timber, bamboo, masonry and carpentry in the construction. This type is very much suitable for small houses with two to three storeys and still they are in use for such constructions. But this is not suitable for the big projects or high-rise buildings. Low initial cost, low experience factor, low weight are some of the advantages of this type and poor finish, high labor requirement, skilled labor. requirement and consume lot of time are some of the disadvantages. 
Modern Conventional Formwork: This type is very much closer to the conventional formwork and in simple words this is one step advanced than the conventional type. The same technique has used in the both types and the only difference is the materials use for the formworks. In modern conventional formwork more advanced materials are used and they can reuse for several times. The differences of both types are that steel props and various types of jacks (U jacks, T jacks) are used as supports in the formwork instead of timber supports and ply wood sheets are used instead of timber planks on slab decks, beams and columns. Low initial cost, low skilled labor requirement, can even use in small places and when there are lot of deviations in the structure are some of the advantages while poor finish of the
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Special Issue: 09 | NCETCE-2014 | June-2014, Available @ http://www.ijret.org 23 
concrete surface, high labor requirement and the higher floor cycle are the disadvantages This type is much more advanced than the modern conventional type. In this type there are pre-fabricated formwork items such as pre-fabricated formworks for slab panels and supports and ply wood should be used additionally for slab deck, beams and columns for the surface. There are other forms of semi system formwork such as table forms, flying forms…etc. DOCA is the most famous brand for this type of formwork and some people know about this type only as “DOCA formwork”. System Formwork: System formwork has prefabricated modular components with casting panels. The system formwork is fabricated as it suits the required shape. The biggest advantage of this type is the speedy and quality construction. But the high initial cost is the main disadvantage and hence it is not economical to use in low – rise buildings. But this is the most economical form of formwork type to be used in high-rise building construction when it is having few typical storeys. 3. RESEARCH STUDY The expectation of this study is to find the most economical formwork type to be used in a high-rise building project. When considering a construction project there are many cost components contributing to the total cost of the project. Preliminary cost is a key cost component when comparing the total cost of a project, and the duration of the project is the governing factor for the preliminary running cost. Total Project Cost = Materials and labour + Preliminary cost + Machinery & equipment t+ Waste material handling + Safety + Finishes + … Preliminary Cost = Salaries + work establishment charge + Security … When a building construction project is considered the material requirement is unique as it depends on the design. But the labor requirement and the duration of the project are directly affected by the technologies and the construction methods used in the project. The speed of the project is directly affected by the formwork type used in the project. This is the most critical in high-rise building construction. When using latest technologies, the labor requirement and the time duration can beminimized in the project, mainly for the super structure. In high-rise building projects time controlling factor is the formwork as it directly affect the floor cycle and hence it will reduce the time taken to construct the main structure and because of that the total duration of the project will go down drastically. In this research cost comparisons of total project cost has done for several projects when all the two types of formwork types are used in the same project. 
4. THE RESULTS 
4.1 The Results Obtained 
Data is collected from M/s Sai Construction Ahmednagar .Name of Construction work on Residetial Building of KARAN RHEA Wing A,Wing B,&Wing C at Wadegaon Sheri, Pune projects and calculations are done for the total project cost of the selected projects when using different types of formworks in the construction. In the calculations all the parameters are kept same and only the formwork type is changed. At the same time all the factors affect due to the formwork type is considered. The results can be shown in a table as follows. Table .1 
Project 
No.of Floor 
Area of each floor (sqm) 
Total cost of Project 
Wing A 
10 
418 
11,24,42,000 
Wing B 
15 
510 
13,71,90,000 
Wing C 
20 
600 
16,14,40,000 
Table .2 
Analysis of the Aluminium formwork for Typical Floor 
Wing A aA1 11 
Wing B 2 
Wing C 3 
Form work cost in Laks 
9.82 
11.98 
14.1 
Waist disposal cost in Laks 
0 
0 
0 
Machinary cost in Laks 
0.9 
1.12 
1.98 
For Aluminium form work Table 3 
. Analysis of the conventional formwork for Typical Floor 
Wing A aA1 11 
Wing B 2 
Wing C 3 
Form work cost in Laks 
6.27 
7.65 
9.0 
Waist disposal cost in Laks 
0.31 
0.38 
0.45 
0 
5 
10 
15 
Tower 1 
Tower 2 
Tower 3 
Form work cost in Laks 
Waist disposal cost in Laks
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Special Issue: 09 | NCETCE-2014 | June-2014, Available @ http://www.ijret.org 24 
Machinary cost in Laks 
0.5 
0.85 
1.25 
For Conventional Form work 
5. CONCLUSIONS From the results obtained we can come to a conclusion that when the system formwork is used in the construction project, the total project cost and the duration of the project is lesser than the other formwork types. The main important thing is that the aluminium panel system formwork is the most expensive formwork type from those three types. At the same time the highest total project cost is obtained when modern conventional type of formwork is used in the building construction project which is the least expensive formwork type. So it is clearly seen that that not the cost of formwork directly affected to the total project cost but the type of formwork. The floor cycle will be 6-10 days when the system formwork is in use and hence the total project duration will be reduced. At the same time a smooth concrete surface can be obtained as the system can be assembled without any discontinuities in the surface and hence less finishing work will be there and hence the cost for finishes will be reduced. There will be less waste disposal and less machinery usage. Not only the direct benefits, there are many indirect benefits of using aluminium panel system formwork in the high-rise building construction projects. For example the system can be sold after using, it can be used in other slabs doing slight variations (there is no need to buy materials again). REFERENCES 
[1] Hurd, M.K. 1989. Formwork for Concrete, 6th ed. American Concrete Institute, Detroit, MI. 
[2] Nolan, É. Innovation in concrete frame construction 1995–2015. IHS BRE Press, Garston. BR 483. 44pp 
[3] Moore, C.E. 1977. Concrete Form Construction. Van Nostrand Reinhold, New York. 
[4] Ratay, R.T. 1984. Handbook of Temporary Structures in Construction. McGraw-Hill, New York 
[5] Peurifoy, P.E. 1976. Formwork for Concrete Structures. McGraw-Hill, New York. Plasticizer” International Scholarly Research Network ISRN Civil Engineering Volume 2012, Article ID 469272, 5 pages doi:10.5402/2012/469272 2005. 
[6] Ketan Shah, " Modular formwork for faster, economical and quality construction", Indian Concrete Journal, July 2005, Volume 79,Pg.6-23. 
[7] “Formwork & Scaffolding”, CE & CR, September 1992, Vol. 05, No. 9, Pg. 46-57. 
[8] Ashok Mandal, "Scaffolding & Formwork- Maintenance & Safety",CE & CR, August 2006, Vol. 19, No. 8, Pg. 46-50. 
[9] "Emerging Trends In Formwork And Scaffolding", CE & CR, Sep 92,Pg.46-49. 
[10] "ConstructionEquipment",CE&CR,Mayl992,Pg.50- 52. 
[11] IS14687(Falsework For Concrete Structures- Guidelines) 
BIOGRAPHIES 
Sandip P.Pawar Completed B.E. in civil Engineering 2009 and M.E appear in Construction Technology & Management in North Maharashtra University Jalgaon (MS). 
P.M.Atterde (Department of civil engineering SSGBCOET Bhusawal) 
0 
2 
4 
6 
8 
10 
Tower 1 
Tower 2 
Tower 3 
Form work cost in Laks 
Waist disposal cost in Laks

Weitere ähnliche Inhalte

Was ist angesagt?

Off site fabrication
Off site fabricationOff site fabrication
Off site fabricationSunny Mahajan
 
IRJET- Planning, Analyzing and Design of High Rise Building using Etabs
IRJET- Planning, Analyzing and Design of High Rise Building using EtabsIRJET- Planning, Analyzing and Design of High Rise Building using Etabs
IRJET- Planning, Analyzing and Design of High Rise Building using EtabsIRJET Journal
 
Modular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of HousingModular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of HousingLoay Ghazaleh MBA, BSc Civil Eng.
 
IRJET- Performance of High Rise Building under Seismic and Wind Excitation fo...
IRJET- Performance of High Rise Building under Seismic and Wind Excitation fo...IRJET- Performance of High Rise Building under Seismic and Wind Excitation fo...
IRJET- Performance of High Rise Building under Seismic and Wind Excitation fo...IRJET Journal
 
Modular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The MasterclassModular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The MasterclassGPTraining
 
Earth quake response of different shapes of mivan wall tall buildings
Earth quake response of different shapes of mivan wall tall buildingsEarth quake response of different shapes of mivan wall tall buildings
Earth quake response of different shapes of mivan wall tall buildingseSAT Journals
 
The Time Is Now For Modular Construction
The Time Is Now For Modular ConstructionThe Time Is Now For Modular Construction
The Time Is Now For Modular ConstructionRob Coyle CDCP
 
The Articulation of the High-Rise Residential Building Envelope: A Review fro...
The Articulation of the High-Rise Residential Building Envelope: A Review fro...The Articulation of the High-Rise Residential Building Envelope: A Review fro...
The Articulation of the High-Rise Residential Building Envelope: A Review fro...IJRESJOURNAL
 
SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2Darshiini Vig
 
3D Monolithic Modular- Defence seminar on new construction technologies and m...
3D Monolithic Modular- Defence seminar on new construction technologies and m...3D Monolithic Modular- Defence seminar on new construction technologies and m...
3D Monolithic Modular- Defence seminar on new construction technologies and m...SJVijay
 
Overview of Modular Construction
Overview of Modular ConstructionOverview of Modular Construction
Overview of Modular ConstructionRusty Williams
 

Was ist angesagt? (17)

Off site fabrication
Off site fabricationOff site fabrication
Off site fabrication
 
IRJET- Planning, Analyzing and Design of High Rise Building using Etabs
IRJET- Planning, Analyzing and Design of High Rise Building using EtabsIRJET- Planning, Analyzing and Design of High Rise Building using Etabs
IRJET- Planning, Analyzing and Design of High Rise Building using Etabs
 
ace cover pg 2829
ace cover pg  2829ace cover pg  2829
ace cover pg 2829
 
Modular building institute improving construction efficiency & productivity...
Modular building institute   improving construction efficiency & productivity...Modular building institute   improving construction efficiency & productivity...
Modular building institute improving construction efficiency & productivity...
 
Modular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of HousingModular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of Housing
 
IRJET- Performance of High Rise Building under Seismic and Wind Excitation fo...
IRJET- Performance of High Rise Building under Seismic and Wind Excitation fo...IRJET- Performance of High Rise Building under Seismic and Wind Excitation fo...
IRJET- Performance of High Rise Building under Seismic and Wind Excitation fo...
 
Modular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The MasterclassModular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The Masterclass
 
Earth quake response of different shapes of mivan wall tall buildings
Earth quake response of different shapes of mivan wall tall buildingsEarth quake response of different shapes of mivan wall tall buildings
Earth quake response of different shapes of mivan wall tall buildings
 
The Time Is Now For Modular Construction
The Time Is Now For Modular ConstructionThe Time Is Now For Modular Construction
The Time Is Now For Modular Construction
 
076 Modular Construction
076 Modular Construction076 Modular Construction
076 Modular Construction
 
The Articulation of the High-Rise Residential Building Envelope: A Review fro...
The Articulation of the High-Rise Residential Building Envelope: A Review fro...The Articulation of the High-Rise Residential Building Envelope: A Review fro...
The Articulation of the High-Rise Residential Building Envelope: A Review fro...
 
SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2
 
3D Monolithic Modular- Defence seminar on new construction technologies and m...
3D Monolithic Modular- Defence seminar on new construction technologies and m...3D Monolithic Modular- Defence seminar on new construction technologies and m...
3D Monolithic Modular- Defence seminar on new construction technologies and m...
 
Prefabricated structure
Prefabricated structurePrefabricated structure
Prefabricated structure
 
01ADNAN Mtech
01ADNAN Mtech01ADNAN Mtech
01ADNAN Mtech
 
Modular housing/building
Modular housing/buildingModular housing/building
Modular housing/building
 
Overview of Modular Construction
Overview of Modular ConstructionOverview of Modular Construction
Overview of Modular Construction
 

Andere mochten auch

Innovative timber buildings – including cross laminated timber and laminated ...
Innovative timber buildings – including cross laminated timber and laminated ...Innovative timber buildings – including cross laminated timber and laminated ...
Innovative timber buildings – including cross laminated timber and laminated ...FWPA
 
Timber frame construction presentation`gr
Timber frame construction presentation`grTimber frame construction presentation`gr
Timber frame construction presentation`grCKMCforstudents
 
Run time dynamic partial reconfiguration using
Run time dynamic partial reconfiguration usingRun time dynamic partial reconfiguration using
Run time dynamic partial reconfiguration usingeSAT Publishing House
 
Online review mining for forecasting sales
Online review mining for forecasting salesOnline review mining for forecasting sales
Online review mining for forecasting saleseSAT Publishing House
 
An understanding of graphical perception
An understanding of graphical perceptionAn understanding of graphical perception
An understanding of graphical perceptioneSAT Publishing House
 
Comparative analysis of c99 and topictiling text
Comparative analysis of c99 and topictiling textComparative analysis of c99 and topictiling text
Comparative analysis of c99 and topictiling texteSAT Publishing House
 
Performance evaluation of path loss parameters for broadcasting applications
Performance evaluation of path loss parameters for broadcasting applicationsPerformance evaluation of path loss parameters for broadcasting applications
Performance evaluation of path loss parameters for broadcasting applicationseSAT Publishing House
 
Study on shear strength characteristics of coir mat reinforced sand
Study on shear strength characteristics of coir mat reinforced sandStudy on shear strength characteristics of coir mat reinforced sand
Study on shear strength characteristics of coir mat reinforced sandeSAT Publishing House
 
Compressive strength variability of brown coal fly ash geopolymer concrete
Compressive strength variability of brown coal fly ash geopolymer concreteCompressive strength variability of brown coal fly ash geopolymer concrete
Compressive strength variability of brown coal fly ash geopolymer concreteeSAT Publishing House
 
A survey on ontology based web personalization
A survey on ontology based web personalizationA survey on ontology based web personalization
A survey on ontology based web personalizationeSAT Publishing House
 
Searching and tracking of neighboring base stations
Searching and tracking of neighboring base stationsSearching and tracking of neighboring base stations
Searching and tracking of neighboring base stationseSAT Publishing House
 
Critical comparison of ground motion attenuation formulae for recent earthqua...
Critical comparison of ground motion attenuation formulae for recent earthqua...Critical comparison of ground motion attenuation formulae for recent earthqua...
Critical comparison of ground motion attenuation formulae for recent earthqua...eSAT Publishing House
 
Comparison of physical and rheological properties of
Comparison of physical and rheological properties ofComparison of physical and rheological properties of
Comparison of physical and rheological properties ofeSAT Publishing House
 
Swarm robotics for intelligent warehousing an
Swarm robotics for intelligent warehousing anSwarm robotics for intelligent warehousing an
Swarm robotics for intelligent warehousing aneSAT Publishing House
 
Effect of concentration on structural and optical
Effect of concentration on structural and opticalEffect of concentration on structural and optical
Effect of concentration on structural and opticaleSAT Publishing House
 
The use of polynomial shape function in the buckling
The use of polynomial shape function in the bucklingThe use of polynomial shape function in the buckling
The use of polynomial shape function in the bucklingeSAT Publishing House
 
Seismic evaluation of rc framed buildings with
Seismic evaluation of rc framed buildings withSeismic evaluation of rc framed buildings with
Seismic evaluation of rc framed buildings witheSAT Publishing House
 
Scheduling for interference mitigation using enhanced intercell interference ...
Scheduling for interference mitigation using enhanced intercell interference ...Scheduling for interference mitigation using enhanced intercell interference ...
Scheduling for interference mitigation using enhanced intercell interference ...eSAT Publishing House
 
Open channel flow velocity profiles for different
Open channel flow velocity profiles for differentOpen channel flow velocity profiles for different
Open channel flow velocity profiles for differenteSAT Publishing House
 

Andere mochten auch (20)

Innovative timber buildings – including cross laminated timber and laminated ...
Innovative timber buildings – including cross laminated timber and laminated ...Innovative timber buildings – including cross laminated timber and laminated ...
Innovative timber buildings – including cross laminated timber and laminated ...
 
Timber frame construction presentation`gr
Timber frame construction presentation`grTimber frame construction presentation`gr
Timber frame construction presentation`gr
 
Run time dynamic partial reconfiguration using
Run time dynamic partial reconfiguration usingRun time dynamic partial reconfiguration using
Run time dynamic partial reconfiguration using
 
Online review mining for forecasting sales
Online review mining for forecasting salesOnline review mining for forecasting sales
Online review mining for forecasting sales
 
An understanding of graphical perception
An understanding of graphical perceptionAn understanding of graphical perception
An understanding of graphical perception
 
Comparative analysis of c99 and topictiling text
Comparative analysis of c99 and topictiling textComparative analysis of c99 and topictiling text
Comparative analysis of c99 and topictiling text
 
Performance evaluation of path loss parameters for broadcasting applications
Performance evaluation of path loss parameters for broadcasting applicationsPerformance evaluation of path loss parameters for broadcasting applications
Performance evaluation of path loss parameters for broadcasting applications
 
Study on shear strength characteristics of coir mat reinforced sand
Study on shear strength characteristics of coir mat reinforced sandStudy on shear strength characteristics of coir mat reinforced sand
Study on shear strength characteristics of coir mat reinforced sand
 
Compressive strength variability of brown coal fly ash geopolymer concrete
Compressive strength variability of brown coal fly ash geopolymer concreteCompressive strength variability of brown coal fly ash geopolymer concrete
Compressive strength variability of brown coal fly ash geopolymer concrete
 
A survey on ontology based web personalization
A survey on ontology based web personalizationA survey on ontology based web personalization
A survey on ontology based web personalization
 
Searching and tracking of neighboring base stations
Searching and tracking of neighboring base stationsSearching and tracking of neighboring base stations
Searching and tracking of neighboring base stations
 
Critical comparison of ground motion attenuation formulae for recent earthqua...
Critical comparison of ground motion attenuation formulae for recent earthqua...Critical comparison of ground motion attenuation formulae for recent earthqua...
Critical comparison of ground motion attenuation formulae for recent earthqua...
 
Comparison of physical and rheological properties of
Comparison of physical and rheological properties ofComparison of physical and rheological properties of
Comparison of physical and rheological properties of
 
.Net compiler using cloud computing
.Net compiler using cloud computing.Net compiler using cloud computing
.Net compiler using cloud computing
 
Swarm robotics for intelligent warehousing an
Swarm robotics for intelligent warehousing anSwarm robotics for intelligent warehousing an
Swarm robotics for intelligent warehousing an
 
Effect of concentration on structural and optical
Effect of concentration on structural and opticalEffect of concentration on structural and optical
Effect of concentration on structural and optical
 
The use of polynomial shape function in the buckling
The use of polynomial shape function in the bucklingThe use of polynomial shape function in the buckling
The use of polynomial shape function in the buckling
 
Seismic evaluation of rc framed buildings with
Seismic evaluation of rc framed buildings withSeismic evaluation of rc framed buildings with
Seismic evaluation of rc framed buildings with
 
Scheduling for interference mitigation using enhanced intercell interference ...
Scheduling for interference mitigation using enhanced intercell interference ...Scheduling for interference mitigation using enhanced intercell interference ...
Scheduling for interference mitigation using enhanced intercell interference ...
 
Open channel flow velocity profiles for different
Open channel flow velocity profiles for differentOpen channel flow velocity profiles for different
Open channel flow velocity profiles for different
 

Ähnlich wie Comparative analysis of formwork in multistory buildin gv

IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...IRJET Journal
 
FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSIS
FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSISFORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSIS
FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSISIRJET Journal
 
SELECTION OF FORMWORKS FOR BUILDING CONSTRUCTION
SELECTION OF FORMWORKS FOR BUILDING CONSTRUCTIONSELECTION OF FORMWORKS FOR BUILDING CONSTRUCTION
SELECTION OF FORMWORKS FOR BUILDING CONSTRUCTIONIRJET Journal
 
Effects of longer span floor system in the constancy of the multistoried stru...
Effects of longer span floor system in the constancy of the multistoried stru...Effects of longer span floor system in the constancy of the multistoried stru...
Effects of longer span floor system in the constancy of the multistoried stru...eSAT Journals
 
Aluminium Formwork Vs Conventional Formwork
Aluminium Formwork Vs  Conventional  FormworkAluminium Formwork Vs  Conventional  Formwork
Aluminium Formwork Vs Conventional Formworkchaitanyakrsk
 
July2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORKJuly2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORKSameer Malvankar
 
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...IRJET Journal
 
Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...IRJET Journal
 
Development OF Low Cost Durable Precast Compound Wall
Development OF Low Cost Durable Precast Compound WallDevelopment OF Low Cost Durable Precast Compound Wall
Development OF Low Cost Durable Precast Compound WallIRJET Journal
 
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...IRJET Journal
 
Planning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed BuildingPlanning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed BuildingIRJET Journal
 
Advanced Tunnel Form Construction Technique, Case Study of Rohan-Abhilasha, ...
Advanced Tunnel Form Construction Technique, Case Study of  Rohan-Abhilasha, ...Advanced Tunnel Form Construction Technique, Case Study of  Rohan-Abhilasha, ...
Advanced Tunnel Form Construction Technique, Case Study of Rohan-Abhilasha, ...Mary Montoya
 
Time, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast BuildingsTime, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast BuildingsIRJET Journal
 
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...IRJET Journal
 
The Study of Measurement of Over-Engineering in Construction Project
The Study of Measurement of Over-Engineering in Construction ProjectThe Study of Measurement of Over-Engineering in Construction Project
The Study of Measurement of Over-Engineering in Construction ProjectIRJET Journal
 
IRJET- Cost Estimation of a Building using Cost Effective Building Materials
IRJET-  	  Cost Estimation of a Building using Cost Effective Building MaterialsIRJET-  	  Cost Estimation of a Building using Cost Effective Building Materials
IRJET- Cost Estimation of a Building using Cost Effective Building MaterialsIRJET Journal
 
ANALYSIS OF G+2 MONO-COLUMN BUILDING FOR DIFFERENT PLAN CONFIGURATIONS WITH T...
ANALYSIS OF G+2 MONO-COLUMN BUILDING FOR DIFFERENT PLAN CONFIGURATIONS WITH T...ANALYSIS OF G+2 MONO-COLUMN BUILDING FOR DIFFERENT PLAN CONFIGURATIONS WITH T...
ANALYSIS OF G+2 MONO-COLUMN BUILDING FOR DIFFERENT PLAN CONFIGURATIONS WITH T...IRJET Journal
 
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...IRJET Journal
 
MIVAN FRAMEWORK
MIVAN FRAMEWORKMIVAN FRAMEWORK
MIVAN FRAMEWORKQadir Raza
 

Ähnlich wie Comparative analysis of formwork in multistory buildin gv (20)

IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
IRJET- Comparative Analysis for High Rise Building of Tunnel Formwork System ...
 
FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSIS
FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSISFORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSIS
FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSIS
 
SELECTION OF FORMWORKS FOR BUILDING CONSTRUCTION
SELECTION OF FORMWORKS FOR BUILDING CONSTRUCTIONSELECTION OF FORMWORKS FOR BUILDING CONSTRUCTION
SELECTION OF FORMWORKS FOR BUILDING CONSTRUCTION
 
Effects of longer span floor system in the constancy of the multistoried stru...
Effects of longer span floor system in the constancy of the multistoried stru...Effects of longer span floor system in the constancy of the multistoried stru...
Effects of longer span floor system in the constancy of the multistoried stru...
 
Aluminium Formwork Vs Conventional Formwork
Aluminium Formwork Vs  Conventional  FormworkAluminium Formwork Vs  Conventional  Formwork
Aluminium Formwork Vs Conventional Formwork
 
July2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORKJuly2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORK
 
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
 
Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...
 
Development OF Low Cost Durable Precast Compound Wall
Development OF Low Cost Durable Precast Compound WallDevelopment OF Low Cost Durable Precast Compound Wall
Development OF Low Cost Durable Precast Compound Wall
 
A PRESENTATION ON PREFABRICATED STRUCTURES
A PRESENTATION ON PREFABRICATED STRUCTURES A PRESENTATION ON PREFABRICATED STRUCTURES
A PRESENTATION ON PREFABRICATED STRUCTURES
 
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
 
Planning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed BuildingPlanning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed Building
 
Advanced Tunnel Form Construction Technique, Case Study of Rohan-Abhilasha, ...
Advanced Tunnel Form Construction Technique, Case Study of  Rohan-Abhilasha, ...Advanced Tunnel Form Construction Technique, Case Study of  Rohan-Abhilasha, ...
Advanced Tunnel Form Construction Technique, Case Study of Rohan-Abhilasha, ...
 
Time, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast BuildingsTime, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast Buildings
 
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
 
The Study of Measurement of Over-Engineering in Construction Project
The Study of Measurement of Over-Engineering in Construction ProjectThe Study of Measurement of Over-Engineering in Construction Project
The Study of Measurement of Over-Engineering in Construction Project
 
IRJET- Cost Estimation of a Building using Cost Effective Building Materials
IRJET-  	  Cost Estimation of a Building using Cost Effective Building MaterialsIRJET-  	  Cost Estimation of a Building using Cost Effective Building Materials
IRJET- Cost Estimation of a Building using Cost Effective Building Materials
 
ANALYSIS OF G+2 MONO-COLUMN BUILDING FOR DIFFERENT PLAN CONFIGURATIONS WITH T...
ANALYSIS OF G+2 MONO-COLUMN BUILDING FOR DIFFERENT PLAN CONFIGURATIONS WITH T...ANALYSIS OF G+2 MONO-COLUMN BUILDING FOR DIFFERENT PLAN CONFIGURATIONS WITH T...
ANALYSIS OF G+2 MONO-COLUMN BUILDING FOR DIFFERENT PLAN CONFIGURATIONS WITH T...
 
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
 
MIVAN FRAMEWORK
MIVAN FRAMEWORKMIVAN FRAMEWORK
MIVAN FRAMEWORK
 

Mehr von eSAT Publishing House

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnameSAT Publishing House
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...eSAT Publishing House
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnameSAT Publishing House
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...eSAT Publishing House
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaeSAT Publishing House
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingeSAT Publishing House
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...eSAT Publishing House
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...eSAT Publishing House
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...eSAT Publishing House
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a revieweSAT Publishing House
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...eSAT Publishing House
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard managementeSAT Publishing House
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallseSAT Publishing House
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...eSAT Publishing House
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...eSAT Publishing House
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaeSAT Publishing House
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structureseSAT Publishing House
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingseSAT Publishing House
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...eSAT Publishing House
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...eSAT Publishing House
 

Mehr von eSAT Publishing House (20)

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
 

Kürzlich hochgeladen

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 

Kürzlich hochgeladen (20)

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 

Comparative analysis of formwork in multistory buildin gv

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 09 | NCETCE-2014 | June-2014, Available @ http://www.ijret.org 22 COMPARATIVE ANALYSIS OF FORMWORK IN MULTISTORY BUILDING Sandip.P.Pawar1, P.M.Atterde2 1P.G. Student Deptt of civil Engineering SSGBCOET Bhusawal Maharashtra 2Guide, Deptt of civil Engineering SSGBCOET Bhusawal Maharashtra Abstract One of the most important factors in determing the success of a construction project in terms of speed, quality cost and safety of work is the formwork used in the project as it accounts about 40% of the total project cost of the structure. When considering a construction project both the client and contractor want to finish the job early as the client wants to use the building for the intended purpose as soon as possible. The contractor wants to finish the construction as soon as possible to gain a higher profit. The most efficient way to speed up the work in high-rise building construction is by achieving a very short floor cycle. The floor cycle of a building mainly depend on the formwork type as it is the main time factor of a building project. The aim of this paper is to present about the existing formwork types in Maharashtra and to show each one will affect the project duration, project cost and the quality of the work. For that a research has been carried out and the results will present in this paper. Keywords: Formwork,Duration,cost,quality ---------------------------------------------------------------------***--------------------------------------------------------------------- 1.INTRODUCTION Formwork is defined as temporary structure whos purpose is to provide support and containment for fresh concrete until it can support itself. It moulds the concrete to the desired shape and size and controls its position and alignment. The development of formworks is parallel with the growth of concrete construction throughout the 20th century. The advancement of technology, increase of population and the space limitation lead the way to construct high-rise buildings. But the task was not very easy at the beginning but now the man made the task easy by inventing new machinery and new techniques. The most important factor in terms of cost, quality and speed in a high-rise building construction project is the type of the formwork used in the project. The first formwork type to be used is the conventional type formwork where the timber planks were supported on timber columns. With the advancement of technology it developed gradually and people used ply wood sheets instead of timber planks and steel pipes with jacks were used to support the ply wood. Then people invented small units of formworks and connect the repeating units in the construction. The larger units were invented like formworks for slab panels, formworks for columns, beams…etc. when the same elements are repeating. Then finally the whole system of formwork is made and initially the material used to it was steel and it was very heavy. Then the aim was to reduce the weight of the system and the materials for formwork have extended to aluminium, plastic, fiber glass…etc. contractors are in a belief that the system formwork is suitable only for super tall buildings as the initial cost of the system formwork is a bit high. Though the initial cost of the system formwork is a bit high it reduces the project duration and hence the total project cost. When considering the overall construction of a high-rise building the system formwork is much more economical that to all the other primary formwork types as it reduces the project duration, gives a smooth concrete surface and the repetitive use of the system. This is suitable for even for a two or three storey housing scheme of several houses. 2. TYPES OF FORMWORKS Conventional Formwork: This is the oldest type of formwork used in the construction industry. This type uses timber, bamboo, masonry and carpentry in the construction. This type is very much suitable for small houses with two to three storeys and still they are in use for such constructions. But this is not suitable for the big projects or high-rise buildings. Low initial cost, low experience factor, low weight are some of the advantages of this type and poor finish, high labor requirement, skilled labor. requirement and consume lot of time are some of the disadvantages. Modern Conventional Formwork: This type is very much closer to the conventional formwork and in simple words this is one step advanced than the conventional type. The same technique has used in the both types and the only difference is the materials use for the formworks. In modern conventional formwork more advanced materials are used and they can reuse for several times. The differences of both types are that steel props and various types of jacks (U jacks, T jacks) are used as supports in the formwork instead of timber supports and ply wood sheets are used instead of timber planks on slab decks, beams and columns. Low initial cost, low skilled labor requirement, can even use in small places and when there are lot of deviations in the structure are some of the advantages while poor finish of the
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 09 | NCETCE-2014 | June-2014, Available @ http://www.ijret.org 23 concrete surface, high labor requirement and the higher floor cycle are the disadvantages This type is much more advanced than the modern conventional type. In this type there are pre-fabricated formwork items such as pre-fabricated formworks for slab panels and supports and ply wood should be used additionally for slab deck, beams and columns for the surface. There are other forms of semi system formwork such as table forms, flying forms…etc. DOCA is the most famous brand for this type of formwork and some people know about this type only as “DOCA formwork”. System Formwork: System formwork has prefabricated modular components with casting panels. The system formwork is fabricated as it suits the required shape. The biggest advantage of this type is the speedy and quality construction. But the high initial cost is the main disadvantage and hence it is not economical to use in low – rise buildings. But this is the most economical form of formwork type to be used in high-rise building construction when it is having few typical storeys. 3. RESEARCH STUDY The expectation of this study is to find the most economical formwork type to be used in a high-rise building project. When considering a construction project there are many cost components contributing to the total cost of the project. Preliminary cost is a key cost component when comparing the total cost of a project, and the duration of the project is the governing factor for the preliminary running cost. Total Project Cost = Materials and labour + Preliminary cost + Machinery & equipment t+ Waste material handling + Safety + Finishes + … Preliminary Cost = Salaries + work establishment charge + Security … When a building construction project is considered the material requirement is unique as it depends on the design. But the labor requirement and the duration of the project are directly affected by the technologies and the construction methods used in the project. The speed of the project is directly affected by the formwork type used in the project. This is the most critical in high-rise building construction. When using latest technologies, the labor requirement and the time duration can beminimized in the project, mainly for the super structure. In high-rise building projects time controlling factor is the formwork as it directly affect the floor cycle and hence it will reduce the time taken to construct the main structure and because of that the total duration of the project will go down drastically. In this research cost comparisons of total project cost has done for several projects when all the two types of formwork types are used in the same project. 4. THE RESULTS 4.1 The Results Obtained Data is collected from M/s Sai Construction Ahmednagar .Name of Construction work on Residetial Building of KARAN RHEA Wing A,Wing B,&Wing C at Wadegaon Sheri, Pune projects and calculations are done for the total project cost of the selected projects when using different types of formworks in the construction. In the calculations all the parameters are kept same and only the formwork type is changed. At the same time all the factors affect due to the formwork type is considered. The results can be shown in a table as follows. Table .1 Project No.of Floor Area of each floor (sqm) Total cost of Project Wing A 10 418 11,24,42,000 Wing B 15 510 13,71,90,000 Wing C 20 600 16,14,40,000 Table .2 Analysis of the Aluminium formwork for Typical Floor Wing A aA1 11 Wing B 2 Wing C 3 Form work cost in Laks 9.82 11.98 14.1 Waist disposal cost in Laks 0 0 0 Machinary cost in Laks 0.9 1.12 1.98 For Aluminium form work Table 3 . Analysis of the conventional formwork for Typical Floor Wing A aA1 11 Wing B 2 Wing C 3 Form work cost in Laks 6.27 7.65 9.0 Waist disposal cost in Laks 0.31 0.38 0.45 0 5 10 15 Tower 1 Tower 2 Tower 3 Form work cost in Laks Waist disposal cost in Laks
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 09 | NCETCE-2014 | June-2014, Available @ http://www.ijret.org 24 Machinary cost in Laks 0.5 0.85 1.25 For Conventional Form work 5. CONCLUSIONS From the results obtained we can come to a conclusion that when the system formwork is used in the construction project, the total project cost and the duration of the project is lesser than the other formwork types. The main important thing is that the aluminium panel system formwork is the most expensive formwork type from those three types. At the same time the highest total project cost is obtained when modern conventional type of formwork is used in the building construction project which is the least expensive formwork type. So it is clearly seen that that not the cost of formwork directly affected to the total project cost but the type of formwork. The floor cycle will be 6-10 days when the system formwork is in use and hence the total project duration will be reduced. At the same time a smooth concrete surface can be obtained as the system can be assembled without any discontinuities in the surface and hence less finishing work will be there and hence the cost for finishes will be reduced. There will be less waste disposal and less machinery usage. Not only the direct benefits, there are many indirect benefits of using aluminium panel system formwork in the high-rise building construction projects. For example the system can be sold after using, it can be used in other slabs doing slight variations (there is no need to buy materials again). REFERENCES [1] Hurd, M.K. 1989. Formwork for Concrete, 6th ed. American Concrete Institute, Detroit, MI. [2] Nolan, É. Innovation in concrete frame construction 1995–2015. IHS BRE Press, Garston. BR 483. 44pp [3] Moore, C.E. 1977. Concrete Form Construction. Van Nostrand Reinhold, New York. [4] Ratay, R.T. 1984. Handbook of Temporary Structures in Construction. McGraw-Hill, New York [5] Peurifoy, P.E. 1976. Formwork for Concrete Structures. McGraw-Hill, New York. Plasticizer” International Scholarly Research Network ISRN Civil Engineering Volume 2012, Article ID 469272, 5 pages doi:10.5402/2012/469272 2005. [6] Ketan Shah, " Modular formwork for faster, economical and quality construction", Indian Concrete Journal, July 2005, Volume 79,Pg.6-23. [7] “Formwork & Scaffolding”, CE & CR, September 1992, Vol. 05, No. 9, Pg. 46-57. [8] Ashok Mandal, "Scaffolding & Formwork- Maintenance & Safety",CE & CR, August 2006, Vol. 19, No. 8, Pg. 46-50. [9] "Emerging Trends In Formwork And Scaffolding", CE & CR, Sep 92,Pg.46-49. [10] "ConstructionEquipment",CE&CR,Mayl992,Pg.50- 52. [11] IS14687(Falsework For Concrete Structures- Guidelines) BIOGRAPHIES Sandip P.Pawar Completed B.E. in civil Engineering 2009 and M.E appear in Construction Technology & Management in North Maharashtra University Jalgaon (MS). P.M.Atterde (Department of civil engineering SSGBCOET Bhusawal) 0 2 4 6 8 10 Tower 1 Tower 2 Tower 3 Form work cost in Laks Waist disposal cost in Laks