SlideShare ist ein Scribd-Unternehmen logo
1 von 16
FY 2013 RTC Appropriation
    Allocation Process




Iowa Telecommunications and Technology Commission Meeting
                      May 17, 2012


                   Approved by ITTC on 5/17/2012
Background
• RTC function and inclusion in the bill that
  created ITTC

• Role of IPTV and transfer of functions to ICN

• RTC current support functions



                   Approved by ITTC on 5/17/2012
Long-Term Goals
• Effective and sustainable support
• Accountability and transparency of allocated
  funds
• Initiatives to increase video and broadband usage
  to optimize distance learning
• Technology migration incentives
• Educational technology requirements and long-
  term planning
• Phased-in approach

                   Approved by ITTC on 5/17/2012
The Phased-In Transition Process
Created with lots of help and input
• RTC Support Staff
• ETC Chair
• ITTC members
• Community College Association
• ICN Staff Specialists



                  Approved by ITTC on 5/17/2012
Changes for FY 2013
• Implementing tracking for ALL three functions to show
  extensiveness of RTC support
• Transparency and Accountability Focus
• Expanded Guidelines
• Allocation provided in two parts
• Sign off by CFOs for both Plans and Reports
• Monthly RTC tracking submission to ICN
• Shorter report completion time frames
• Des Moines School District
• Allocations not released until documents/tracking received
• Random spot reviews for RTCs

                       Approved by ITTC on 5/17/2012
Subcommittee
• 5 members
  – 1 - ITTC member
  – 2 - ETC members
  – 1 - Community college member
  – 1 - ICN staff member
• Estimated four meetings during FY 13
  – Review RTC plans (Two meetings in late summer)
  – Review of tracking (February/March)
  – Review of reports (August/September)

                  Approved by ITTC on 5/17/2012
FY 2013 Allocation Process
• Appropriation amount is the same as FY 2012
• Formula
• Two allocation steps
  – 1st half of requested budget when plan is
    approved by subcommittee & ITTC
  – 2nd half of requested budget when 1st half of fiscal
    year’s tracking is approved by subcommittee &
    ITTC
• Des Moines School District

                    Approved by ITTC on 5/17/2012
Proposed Allocation Amounts




         Approved by ITTC on 5/17/2012
Tentative Timeline




    Approved by ITTC on 5/17/2012
Why Tracking?
                    Inconsistency Between Sources

Current Classroom Support Information
FY 11 RTC Reports




                          Approved by ITTC on 5/17/2012
Why Tracking?
        Specific Type of Support Not Tied to Amount of Support

Current LAN/WAN Internet Information
FY 11 RTC Reports

 3. Installation and maintenance: Train and assist local school employees with skills needed to install hardware and
 software, and to perform preventive maintenance on networks.
 Number of Calls/Requests from Schools: 31 (Enter the number of calls/requests from schools for installation and maintenance.)




 Comments: Typical installation questions as in past years including significant increases to school bandwidth through the
 ICN.




                                                 Approved by ITTC on 5/17/2012
Why Tracking?
                    Inconsistency Between Regions

Current Scheduling Information
FY 11 RTC Reports
• Include regional count of session and hours by audience
RTC A                           RTC B




                          Approved by ITTC on 5/17/2012
Tracking Examples
• Technicians – Use current Service Desk system
  with additional fields
• Schedulers – New Excel spreadsheet tracking
• LAN/WAN – New Excel form tracking




                 Approved by ITTC on 5/17/2012
Commission’s Role
• Total of 15 RTCs throughout Iowa
  – Approve RTC Plans
     • Disperses 1st half of requested budget
  – Acknowledge/Approval of RTC Tracking
    Component
     • Tracking for July – December
     • Disperses 2nd half of the
       allocation
  – Approve RTC Reports
     • End of the Fiscal Year

                      Approved by ITTC on 5/17/2012
Next Steps
• Present process to ETC, June 7
• Training and tracking processes for each RTC
  function
• Receipt and evaluation of Regional Support
  Services Plans
• Begin tracking on July 2; and submit monthly
  tracking documentation to ICN
• Receive documentation that CFO’s are aware
  of new guidelines for random spot reviews

                  Approved by ITTC on 5/17/2012
Questions




Approved by ITTC on 5/17/2012

Weitere ähnliche Inhalte

Andere mochten auch

AGRICULTURE PROJECTS-EMBEDDED SYSTEM BASED GSM COMMUNICATION FOR AUTOMATIC IR...
AGRICULTURE PROJECTS-EMBEDDED SYSTEM BASED GSM COMMUNICATION FOR AUTOMATIC IR...AGRICULTURE PROJECTS-EMBEDDED SYSTEM BASED GSM COMMUNICATION FOR AUTOMATIC IR...
AGRICULTURE PROJECTS-EMBEDDED SYSTEM BASED GSM COMMUNICATION FOR AUTOMATIC IR...ASHOKKUMAR RAMAR
 
RTC Interfacing and Programming
RTC Interfacing and ProgrammingRTC Interfacing and Programming
RTC Interfacing and ProgrammingDevashish Raval
 
Audio devices and applications
Audio devices and applicationsAudio devices and applications
Audio devices and applicationsDevashish Raval
 
Ppt on automatic street light control using ir sensors
Ppt on automatic street light control using ir sensorsPpt on automatic street light control using ir sensors
Ppt on automatic street light control using ir sensorsVikram Emmidi
 

Andere mochten auch (6)

AGRICULTURE PROJECTS-EMBEDDED SYSTEM BASED GSM COMMUNICATION FOR AUTOMATIC IR...
AGRICULTURE PROJECTS-EMBEDDED SYSTEM BASED GSM COMMUNICATION FOR AUTOMATIC IR...AGRICULTURE PROJECTS-EMBEDDED SYSTEM BASED GSM COMMUNICATION FOR AUTOMATIC IR...
AGRICULTURE PROJECTS-EMBEDDED SYSTEM BASED GSM COMMUNICATION FOR AUTOMATIC IR...
 
RTC Interfacing and Programming
RTC Interfacing and ProgrammingRTC Interfacing and Programming
RTC Interfacing and Programming
 
Audio devices and applications
Audio devices and applicationsAudio devices and applications
Audio devices and applications
 
ppt on Smart Grid
ppt on Smart Gridppt on Smart Grid
ppt on Smart Grid
 
Ppt on automatic street light control using ir sensors
Ppt on automatic street light control using ir sensorsPpt on automatic street light control using ir sensors
Ppt on automatic street light control using ir sensors
 
Smart grid ppt
Smart grid pptSmart grid ppt
Smart grid ppt
 

Ähnlich wie Fiscal year 2013 RTC Presentation

Butler county commissioners office and fiber 10 a1 management improvements in...
Butler county commissioners office and fiber 10 a1 management improvements in...Butler county commissioners office and fiber 10 a1 management improvements in...
Butler county commissioners office and fiber 10 a1 management improvements in...SBC LLC
 
HB264 significant changes
HB264 significant changesHB264 significant changes
HB264 significant changesdrieker
 
CIL: Project planning and infrastructure with notes
CIL: Project planning and infrastructure with notesCIL: Project planning and infrastructure with notes
CIL: Project planning and infrastructure with notesPAS_Team
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report647435
 
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...India Water Portal
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report647435
 
7 board pri update 2-23-15 3 pm
7 board pri update 2-23-15   3 pm7 board pri update 2-23-15   3 pm
7 board pri update 2-23-15 3 pmRon Garrison
 
Q1 review strategic projects (1)
Q1 review   strategic projects (1)Q1 review   strategic projects (1)
Q1 review strategic projects (1)647435
 
Q1 review strategic projects (1)
Q1 review   strategic projects (1)Q1 review   strategic projects (1)
Q1 review strategic projects (1)647435
 
Streamlining Approval Procedure for Real Estate Projects (SAPREP) - 19 sept '14
Streamlining Approval Procedure for Real Estate Projects (SAPREP) -  19 sept '14Streamlining Approval Procedure for Real Estate Projects (SAPREP) -  19 sept '14
Streamlining Approval Procedure for Real Estate Projects (SAPREP) - 19 sept '14Competition Advisory Services (India) LLP
 
Enhancement Projects: Improving Successful Implementation in Minnesota
Enhancement Projects: Improving Successful Implementation in MinnesotaEnhancement Projects: Improving Successful Implementation in Minnesota
Enhancement Projects: Improving Successful Implementation in MinnesotaRPO America
 
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Karnataka -...
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Karnataka -...Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Karnataka -...
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Karnataka -...India Water Portal
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxAbdulrahmanAfabafal
 
Enhancing the implementation of SBM (Gramin) - Arghyam and FourthLion Technol...
Enhancing the implementation of SBM (Gramin) - Arghyam and FourthLion Technol...Enhancing the implementation of SBM (Gramin) - Arghyam and FourthLion Technol...
Enhancing the implementation of SBM (Gramin) - Arghyam and FourthLion Technol...India Water Portal
 

Ähnlich wie Fiscal year 2013 RTC Presentation (20)

Butler county commissioners office and fiber 10 a1 management improvements in...
Butler county commissioners office and fiber 10 a1 management improvements in...Butler county commissioners office and fiber 10 a1 management improvements in...
Butler county commissioners office and fiber 10 a1 management improvements in...
 
HB264 significant changes
HB264 significant changesHB264 significant changes
HB264 significant changes
 
CIL: Project planning and infrastructure with notes
CIL: Project planning and infrastructure with notesCIL: Project planning and infrastructure with notes
CIL: Project planning and infrastructure with notes
 
The Commercial Energy Codes Support Program
The Commercial Energy Codes Support ProgramThe Commercial Energy Codes Support Program
The Commercial Energy Codes Support Program
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report
 
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report
 
The construction programme - assurance and controls
The construction programme - assurance and controlsThe construction programme - assurance and controls
The construction programme - assurance and controls
 
7 board pri update 2-23-15 3 pm
7 board pri update 2-23-15   3 pm7 board pri update 2-23-15   3 pm
7 board pri update 2-23-15 3 pm
 
Q1 review strategic projects (1)
Q1 review   strategic projects (1)Q1 review   strategic projects (1)
Q1 review strategic projects (1)
 
Q1 review strategic projects (1)
Q1 review   strategic projects (1)Q1 review   strategic projects (1)
Q1 review strategic projects (1)
 
Streamlining Approval Procedure for Real Estate Projects (SAPREP) - 19 sept '14
Streamlining Approval Procedure for Real Estate Projects (SAPREP) -  19 sept '14Streamlining Approval Procedure for Real Estate Projects (SAPREP) -  19 sept '14
Streamlining Approval Procedure for Real Estate Projects (SAPREP) - 19 sept '14
 
Enhancement Projects: Improving Successful Implementation in Minnesota
Enhancement Projects: Improving Successful Implementation in MinnesotaEnhancement Projects: Improving Successful Implementation in Minnesota
Enhancement Projects: Improving Successful Implementation in Minnesota
 
TTC Services
TTC ServicesTTC Services
TTC Services
 
Developer's Forum - RSTF Update Final Report
Developer's Forum - RSTF Update Final ReportDeveloper's Forum - RSTF Update Final Report
Developer's Forum - RSTF Update Final Report
 
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Karnataka -...
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Karnataka -...Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Karnataka -...
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Karnataka -...
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
 
Pkrmmp phase 2 ntb workshop draft 3 ty-session 0
Pkrmmp phase 2 ntb workshop draft 3 ty-session 0Pkrmmp phase 2 ntb workshop draft 3 ty-session 0
Pkrmmp phase 2 ntb workshop draft 3 ty-session 0
 
ppt watertech-1
ppt watertech-1ppt watertech-1
ppt watertech-1
 
Enhancing the implementation of SBM (Gramin) - Arghyam and FourthLion Technol...
Enhancing the implementation of SBM (Gramin) - Arghyam and FourthLion Technol...Enhancing the implementation of SBM (Gramin) - Arghyam and FourthLion Technol...
Enhancing the implementation of SBM (Gramin) - Arghyam and FourthLion Technol...
 

Kürzlich hochgeladen

Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 

Kürzlich hochgeladen (20)

Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 

Fiscal year 2013 RTC Presentation

  • 1. FY 2013 RTC Appropriation Allocation Process Iowa Telecommunications and Technology Commission Meeting May 17, 2012 Approved by ITTC on 5/17/2012
  • 2. Background • RTC function and inclusion in the bill that created ITTC • Role of IPTV and transfer of functions to ICN • RTC current support functions Approved by ITTC on 5/17/2012
  • 3. Long-Term Goals • Effective and sustainable support • Accountability and transparency of allocated funds • Initiatives to increase video and broadband usage to optimize distance learning • Technology migration incentives • Educational technology requirements and long- term planning • Phased-in approach Approved by ITTC on 5/17/2012
  • 4. The Phased-In Transition Process Created with lots of help and input • RTC Support Staff • ETC Chair • ITTC members • Community College Association • ICN Staff Specialists Approved by ITTC on 5/17/2012
  • 5. Changes for FY 2013 • Implementing tracking for ALL three functions to show extensiveness of RTC support • Transparency and Accountability Focus • Expanded Guidelines • Allocation provided in two parts • Sign off by CFOs for both Plans and Reports • Monthly RTC tracking submission to ICN • Shorter report completion time frames • Des Moines School District • Allocations not released until documents/tracking received • Random spot reviews for RTCs Approved by ITTC on 5/17/2012
  • 6. Subcommittee • 5 members – 1 - ITTC member – 2 - ETC members – 1 - Community college member – 1 - ICN staff member • Estimated four meetings during FY 13 – Review RTC plans (Two meetings in late summer) – Review of tracking (February/March) – Review of reports (August/September) Approved by ITTC on 5/17/2012
  • 7. FY 2013 Allocation Process • Appropriation amount is the same as FY 2012 • Formula • Two allocation steps – 1st half of requested budget when plan is approved by subcommittee & ITTC – 2nd half of requested budget when 1st half of fiscal year’s tracking is approved by subcommittee & ITTC • Des Moines School District Approved by ITTC on 5/17/2012
  • 8. Proposed Allocation Amounts Approved by ITTC on 5/17/2012
  • 9. Tentative Timeline Approved by ITTC on 5/17/2012
  • 10. Why Tracking? Inconsistency Between Sources Current Classroom Support Information FY 11 RTC Reports Approved by ITTC on 5/17/2012
  • 11. Why Tracking? Specific Type of Support Not Tied to Amount of Support Current LAN/WAN Internet Information FY 11 RTC Reports 3. Installation and maintenance: Train and assist local school employees with skills needed to install hardware and software, and to perform preventive maintenance on networks. Number of Calls/Requests from Schools: 31 (Enter the number of calls/requests from schools for installation and maintenance.) Comments: Typical installation questions as in past years including significant increases to school bandwidth through the ICN. Approved by ITTC on 5/17/2012
  • 12. Why Tracking? Inconsistency Between Regions Current Scheduling Information FY 11 RTC Reports • Include regional count of session and hours by audience RTC A RTC B Approved by ITTC on 5/17/2012
  • 13. Tracking Examples • Technicians – Use current Service Desk system with additional fields • Schedulers – New Excel spreadsheet tracking • LAN/WAN – New Excel form tracking Approved by ITTC on 5/17/2012
  • 14. Commission’s Role • Total of 15 RTCs throughout Iowa – Approve RTC Plans • Disperses 1st half of requested budget – Acknowledge/Approval of RTC Tracking Component • Tracking for July – December • Disperses 2nd half of the allocation – Approve RTC Reports • End of the Fiscal Year Approved by ITTC on 5/17/2012
  • 15. Next Steps • Present process to ETC, June 7 • Training and tracking processes for each RTC function • Receipt and evaluation of Regional Support Services Plans • Begin tracking on July 2; and submit monthly tracking documentation to ICN • Receive documentation that CFO’s are aware of new guidelines for random spot reviews Approved by ITTC on 5/17/2012

Hinweis der Redaktion

  1. RTC function and inclusion in the bill that created ITTCIn 1994, the Legislature created the Iowa Telecommunications and Technology Commission (ITTC) doing business as the Iowa Communications Network (ICN), an independent state agency. The legislature also created several authorized user advisory groups to advise the ITTC, including the Educational Telecommunications Council (ETC) and the Regional Telecommunications Councils (RTCs). The ETC and RTCs were put into place to ensure that educational users had a voice in the technologies utilized in the Network and to make sure the technologies would meet the needs of education. As it became apparent that the schools would need assistance with classroom maintenance, scheduling, development of technological plans, and purchasing equipment, an appropriation was made for the purpose of allocating funding to support the maintenance of the video sites at the K-12 schools, community colleges, Board of Regents’ universities and Area Education Agencies (AEAs) as well as the technology planning and the scheduling of video sessions via the ICN Network for those connections that are owned or the lease is paid for by the State. In the early days, the appropriation also was used to fund the salaries of five technicians at Iowa Public Television (IPTV) as well as the training for educators and staff. The 15 RTC areas are defined by the Community College areas and supported by the regional community college. Role of IPTV and transfer of functions to ICNPrior to formation of the ICN as an independent agency, IPTV provided many of the support tasks that the ICN currently provides to the video site users. Most of these tasks have migrated from IPTV to ICN, including video scheduling and technical support. The remaining task that IPTV continues to perform for educational users is the allocation of an appropriation to the RTCs for subsidization of classroom maintenance, regional scheduling and LAN/Technology planning support. RTC current support functionsClassroom maintenance and technical supportLAN/WAN/Internet SupportScheduling Support.
  2. November ITTC meeting Joe Cassis and I presented a business model for allocation of the RTC funds that was usage based and incentive driven. Phased in approach – as we are moving forward phasing in to the new model may be a two year process. It may take the first year to make sure that the tracking processes are collecting the information that we need. As ICN adopts the web based Service manager system, we may want to incorporate some of the tracking instruments we are proposing today into that model.
  3. RTC Support Staff Coordinators, Schedulers, Classroom techs, AEA consultantsETC ChairITTC membersCommunity College Association MJ Dolan, Ann WattsICN Staff SpecialistsJulie Johnson, video schedulingManila Bush and Vicki Harris Current Service Desk support systemDeb Evans and Patricia Townsend for auditing aspect Gary Williams, Dave Marley – LAN/WAN knowledge
  4. Implementing tracking for ALL three functions to show extensiveness of RTC supportTransparency and Accountability FocusExpanded Guidelines – Cover the entire process . Allocation provided in two partsSign off by CFOs for both Plans and Reports AEAs and CCsMonthly RTC tracking submission to ICN – The report requirement at the end of the Fiscal year will be shorter and based on region wide observations rather than functional areas since that information has already been gathered using the tracking mechanisms.Shorter report completion time frames – These will be apparent to you when Lori walks you through the timeline.Des Moines School District – Only school district receiving funding. In FY 11 the only site that DMS has up is Orchard Place which was billed for 15 .6 video hours for the FY11. DMACC provides scheduling services for them and received $7,278.Allocations not released until documents/tracking receivedRandom spot reviews for RTCs – Each RTC will receive a review at least once every 5 years.
  5. Formula - Each CC receives $41,850 plus number of sites ($815.10) Three regions 2, 9, and 15 will have an allocation that is slightly less than last year (due to a reduction in the number of video sites that they will need to support)
  6. Inconsistency.From the information received, we don’t know what classrooms need support.
  7. Insufficient information.
  8. Inconsistent information. RTC B provided the information as requested. RTC A did not. If the ITTC moves toward