Railway Engineering
Maintenance
of Railway Track
Textbook
Page 24-1 to 24-25
What is the right time for maintenance ?
Daily (minor defects, manually)
Periodically (every 2-3 years)
Approach to Railway
Track Maintenance
Conventional RT maintenance
Done manually “Labour –based”,
simple tools are used Fully mechanized
Mixed process
(Labour + machines)
Machine-based RT maintenance
(mechanical appliances are used)
Two approaches are basically used for Railway maintenance
When RT Maintenance
Become Necessary?
1. Reduction in strength of track
structure due to
Consequences are:
 Changes to alignment.
 Changes to gauge.
 Changes to surface level of rails. Movement of
high speed trains
Heavy axle loads
High loading
Frequency
(repetition)
2. Deterioration of track structure due to environmental effects,
such as: rain water, wind and sun actions.
Consequences:
 Wear and tear of rails & wear to rolling stock.
3. Rail track exhibits other forms of defects such
as on curves, crossing, and bridge approaches.
No maintenance!
Faster wear
Rough riding quality
Derailment leading
to life loss
What Are The Advantages
of Proper RT Maintenance?
1. Increases the life of both track and rolling stock.
3. Safer and more comfortable transport mode encourages
more people and goods to use the rail transports leading to
better earning, less damage to environment, additional
economical value to goods…etc.
2. Provides smooth riding quality which brings comfort and
safety to passengers and goods.
4. Allow savings in operation costs (e.g. reduction in fuel
consumption due to reduced friction between rails & wheels).
Probably this is true for each and every engineered structure.
Items Checked for Maintenance
1. Surface of Rails
2.Track Alignment
3. Gauge 7. Rolling Stock
5. Track Components
8.Bridges & Tunnels
4. Drainage 6. Points & Crossings
Periodic
Maintenance
1. Surface of Rails Maintenance
At straight sections of RT, the top surface of two rails should
be kept in level (same plane). On curved sections of the RT,
the outer rail should be kept at correct elevation above the
inner rail. This is to maintain the required super-elevation.
Packing
Is the method of forcing the ballast bellow the sleepers.
Deterioration mechanism: Due to heavy loads and vibration caused by
running train, ballast under sleepers get loose and depressions are formed
in plane of rails. Non-uniformity of subgrade would worsen the situation
(remember the importance of consolidation while constructing formation)
Entails the following operations:
Surfacing the Track / Leveling the Track
 Surfacing the track : The whole of the track is brought to a condition of
vertical evenness. Rails and track are kept in uniform level. Equal elevation
in the transverse direction is called leveling.
Cont. Surface of
Rails Maintenance
Boxing and Dressing the Track
 This is the process of filling the ballast between sleepers and beyond
ends of sleepers to required shape.
Lifting of the track
 Lifting the depressed track to required height
If lifting is done under traffic, then it should be done in the direction
opposite to traffic .
If both rails needs lifting, then they should be lifted simultaneously.
Spot Packing and Track lifting
 Consists of correcting the defects at a particular point and involves
lifting of 5 to 7 sleepers.
This task is one of the essentials of daily maintenance.
Required when defect extends over considerable length.
Cont. Surface of
Rails Maintenance
Surface Defects and Remedies
 Defects manifest due to lack of maintenance. RT defects may include:
High joint or riding joint: Top level of the joint is higher than rail level
why occurs? Due to over-packing of sleepers at joints OR sinking of
sleepers between joints.
Blowing Joints: A blow joint is caused when joint is rested on loose and
dusty ballast.
Mechanism? When wheel load passes over the sleepers resting on dusty
ballast, the sleeper sinks and when the wheel loads are relieved, the
sleeper rises with sucking up dust.
Causes? Thin layer of ballast, week sleepers, dusty ballast, worn out rail
ends, and wide expansion gap.
Remedial action? (1) Clean dirty ballast and repack joints with ballast.
(2) Improvement rail ends (dehogging of rails).
(3) Reduction of expansion gap.
Cont. Surface of
Rails Maintenance
Surface Defects and Remedies
Pumping joints: In rainy weather, blowing joint is affected by water and
gets converted into what is termed as “pumping joint”. The joint splashes
water as loads move on.
Causes? Same causes for blowing joints + bad drainage (dirt ballast does
not allow good and quick drainage.
Remedial action? (1) Cleansing of ballast.
(2) Provision of proper drainage.
(3) Remedies listed for blowing joints.
Hogged rails: Due to worn out of rail ends due to load repetition, the rail
gets bent down at its ends, creating what is termed as “hogged rails”.
Consequence ? Rough riding, more vibration leading to more defects.
Causes? loose packing under joints and loose fish plate.
Remedial action? (1) Replace joint, (2) Welding joint, (3) Dehogging,
(4) Cropping {Refer to handout}
Cont. Surface of
Rails Maintenance
Surface Defects and Remedies
Buckling of Track: The track, especially in hot weather, goes out of
alignment on both tangents and curves.
Causes? Insufficient gaps at joints, tightened fish plate, welded track with
insufficient strength.
Consequences? Derailment which can lead to fatalities or damage to goods
Remedial action? (1) Tighten & lubricate fish plate to proper joint function.
(2) Use of steel sleepers.
(3) Proper anchoring for welded rails.
Centre bound Track: Under rolling load, settlement of ballast under rail
seat is more than under the centre of sleepers (sleepers deflects more at
the ends), This deflection is named as “centre bound track”.
Remedial action? (1) Loosen ballast under the centre of sleepers and pack
under the ends.
(2) Open a drain under the centre of sleepers.
Cont. Surface of
Rails Maintenance
Surface Defects and Remedies
Corrugated or Roaring rails: The heads of rails corrugate (fine depressions
on the surface of rails). Causes roaring sounds when wheels pass over it.
Causes? Found at places where trains brakes or starts its journey, other
reasons such as: composition of steel used to manufacture rails.
Consequences? (1) Unpleasant roaring sound which cause discomfort to
passengers and residents along side the rail track
(2) Vibration causes further deterioration to other track
elements.
Remedial action? (1) Replace rail if corrugation is severe and the defect is
limited to small number of rails
(2) Grind top surface of rail, a grinding train moving at
3 km per hour can be used (as in Germany).
2. Track Alignment
Maintenance
What makes the track to go out of alignment?
Increase hammering action of
wheels on one of the pair rails while
less or no hammering on the other.
Why hammering differs ?
Variation in cross levels.
Inadequate super-elevation.
Non-uniformity of gauge.
Improver packing of ballast.
Poor subgrade.Formation of kinks.
Kink in Rails: Adjoining rails slightly move out of position.
Causes? Loose packing at joints, Defects in gauge and alignment,
Defects in cross levels at joints, closing of rail joints, and Uneven wear
for rail heads.
Consequences? Unpleasant jerk for train, further kink at places other
than joints will form, risk in turning operation for kinks formed at curves.
Remedial action? (1) Periodic maintenance for cross level, gauge..etc.
(2) Correcting alignment at joints and curved sections.
3. Gauge Maintenance
Uniformity of the gauge should be properly maintained all-over
the track. Failure to achieve gauge uniformity will negatively
influence the riding quality.
Loosening of track & sleeper fittings
What causes gauge variation?
Tight gauge and slack (relaxed) gauge: tight gauge is
always better since it prevents lateral play of wheels.
4. Restoration of Proper
Drainage Proper drainage ensures smooth
riding quality and longer track life.
Tasks involved in
restoring drainage
cleaning of ballast
dust and weeds
allows water to
stay for long time
in ballast and may
percolate to
formation causing
defects to track.
surface drainage
clean and slope-
maintained side
drain (ditches) to
provide good
surface drainage
Subsurface drain
Under ground
drain.
Inverted filter
blanket
cleaning of cess
To prevent
collection of
water. Cess to
clean from
grass and be
sloped outward.
5. Track Components
Maintenance
Worn out rails: When replacing worn out rail, one has to take
care of the final table. The new rail become higher than other
adjoining rails, resulting in damage to rail ends. If it is done as
part of daily maintenance, then used rail has to be fitted.
Broken or cracked rails: A sleeper is to be placed under the
fractured rail until rail is replaced.
Maintenance and Renewal of Rails
Corrosion of rails: If inner rail on curve is
corroded then it has to be replaced immediately.
Cont. Track Components
Maintenance
Spot Renewal
The defective sleeper and the
fitting of sleeper are renewed
Remove ballast below old sleeper.
Take broken sleeper out.
New sleeper is fitted and packed.
Through Renewal
Rails are removed and sleeper are
taken out and replaced and rails
are put back.
Maintenance and Renewal of Sleepers
Maintenance and Renewal of Fittings
Fish-plate and fish bolt are the most important fittings for jointed rails
Cont. Track Components
Maintenance
Graphiting of Fish Plate
Apply lubricant containing graphite.
To protect fish-plate against corrosion
To allow free expansion.
To increase the life of fish plate and bolts.
Track imprest A stock of all usual materials, such as rails, sleepers,
fish-plate, bolts and other fittings, is permanently maintained at selected
place for immediate replacement. These materials are known as track-
imprest. They are to be used only in emergency. Items must be replaced
as soon as possible.
6. Points and Crossing
Maintenance
Switches are regarded to be the weakest points of the track
and receives most of derailments incidents. Thus it should be
watched constantly.
Inspection of switches should be done under moving train
loads. Because some of their defects can be picked up only
when train load moves on.
Causes for switch defects
Wear of fittings and pins.
Creep of track.
Poor maintenance.
Signalling During
Maintenance Work
It is necessary to warn the train drivers
when maintenance work is in progress.
Short duration maintenance
work ( less than three days).
Then temporary flags would
be satisfactory
Long duration maintenance
work ( more than three days).
Then temporary fixed signals are
required (discuss next sessions)

Weitere ähnliche Inhalte

Was ist angesagt?

Creep of Rails.pdf
Creep of Rails.pdfCreep of Rails.pdf
Creep of Rails.pdfTVijayaGowri
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenanceMohd Bakhsh
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railwaysVipul Naidu
 
Railway Engineering Introduction
Railway Engineering IntroductionRailway Engineering Introduction
Railway Engineering IntroductionT.Naga Anusha
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossingssrinivas2036
 
Railway and Airport Engineering
Railway and Airport EngineeringRailway and Airport Engineering
Railway and Airport EngineeringEmaan Sharma
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the trackT.Naga Anusha
 
Sleepers and Ballast
Sleepers and Ballast Sleepers and Ballast
Sleepers and Ballast T.Naga Anusha
 
1.railway intro and rails
1.railway intro and rails1.railway intro and rails
1.railway intro and railsDeven Diran
 
Fittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfFittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfTVijayaGowri
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)RAMPRASAD KUMAWAT
 
Construction of a New Railway Track
Construction of a New  Railway TrackConstruction of a New  Railway Track
Construction of a New Railway TrackArbaz Kazi
 
Sleepers and Their types
Sleepers and Their typesSleepers and Their types
Sleepers and Their types17CE67
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railwayRAMPRASAD KUMAWAT
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackKHUSHBU SHAH
 
railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its typeYash Patel
 
Civil engineering in indian railways spce
Civil engineering in indian railways spceCivil engineering in indian railways spce
Civil engineering in indian railways spceirkportal
 

Was ist angesagt? (20)

Creep of Rails.pdf
Creep of Rails.pdfCreep of Rails.pdf
Creep of Rails.pdf
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenance
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railways
 
Railway Gauge
Railway GaugeRailway Gauge
Railway Gauge
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Railway Engineering Introduction
Railway Engineering IntroductionRailway Engineering Introduction
Railway Engineering Introduction
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Railway and Airport Engineering
Railway and Airport EngineeringRailway and Airport Engineering
Railway and Airport Engineering
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the track
 
Sleepers and Ballast
Sleepers and Ballast Sleepers and Ballast
Sleepers and Ballast
 
1.railway intro and rails
1.railway intro and rails1.railway intro and rails
1.railway intro and rails
 
Fittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfFittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdf
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Construction of a New Railway Track
Construction of a New  Railway TrackConstruction of a New  Railway Track
Construction of a New Railway Track
 
Sleepers and Their types
Sleepers and Their typesSleepers and Their types
Sleepers and Their types
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railway
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway track
 
railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its type
 
Civil engineering in indian railways spce
Civil engineering in indian railways spceCivil engineering in indian railways spce
Civil engineering in indian railways spce
 

Ähnlich wie 08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. Elsaigh)

Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionBathla Tuition Centre
 
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...Hossam Shafiq I
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Railssrinivas2036
 
Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineeringDnyaneshwar More
 
Crane Tracking problems
Crane Tracking problemsCrane Tracking problems
Crane Tracking problemsAmin Paniwala
 
Corrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in railsCorrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in railsSagar Kaptan
 
Defects in a Railway Track & their maintenance.pptx
Defects in a Railway Track & their maintenance.pptxDefects in a Railway Track & their maintenance.pptx
Defects in a Railway Track & their maintenance.pptxSuhasR37
 
Railway Planning - Unit 1
Railway Planning - Unit 1Railway Planning - Unit 1
Railway Planning - Unit 1Arun G
 
lecturenote_1888016911chapter-3 track.pdf
lecturenote_1888016911chapter-3 track.pdflecturenote_1888016911chapter-3 track.pdf
lecturenote_1888016911chapter-3 track.pdfssuser75acc8
 
1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptxMayuriPatel90
 
RAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERINGRAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERINGbhavin_pindoriya
 
Railway Construction and Maintenance RHTA Module 2
Railway Construction and Maintenance RHTA Module 2Railway Construction and Maintenance RHTA Module 2
Railway Construction and Maintenance RHTA Module 2AJEETH B
 
Defects in rails. Railway Engineering
Defects in rails. Railway EngineeringDefects in rails. Railway Engineering
Defects in rails. Railway EngineeringIrfan Nasir
 
01-Rail span correction compressor house
01-Rail span correction compressor house01-Rail span correction compressor house
01-Rail span correction compressor houseDeepak kumar sahoo
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railwayKHUSHBU SHAH
 
chapter-3 Track Stracture.pptx
chapter-3  Track Stracture.pptxchapter-3  Track Stracture.pptx
chapter-3 Track Stracture.pptxMamushLeta
 
Ch4 Bridge Floors (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally ...
Ch4 Bridge Floors (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally ...Ch4 Bridge Floors (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally ...
Ch4 Bridge Floors (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally ...Hossam Shafiq II
 

Ähnlich wie 08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. Elsaigh) (20)

Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
 
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
 
Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineering
 
3rd unit
3rd unit3rd unit
3rd unit
 
Railway track
Railway trackRailway track
Railway track
 
Crane Tracking problems
Crane Tracking problemsCrane Tracking problems
Crane Tracking problems
 
Corrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in railsCorrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in rails
 
Defects in a Railway Track & their maintenance.pptx
Defects in a Railway Track & their maintenance.pptxDefects in a Railway Track & their maintenance.pptx
Defects in a Railway Track & their maintenance.pptx
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Railway Planning - Unit 1
Railway Planning - Unit 1Railway Planning - Unit 1
Railway Planning - Unit 1
 
lecturenote_1888016911chapter-3 track.pdf
lecturenote_1888016911chapter-3 track.pdflecturenote_1888016911chapter-3 track.pdf
lecturenote_1888016911chapter-3 track.pdf
 
1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx
 
RAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERINGRAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERING
 
Railway Construction and Maintenance RHTA Module 2
Railway Construction and Maintenance RHTA Module 2Railway Construction and Maintenance RHTA Module 2
Railway Construction and Maintenance RHTA Module 2
 
Defects in rails. Railway Engineering
Defects in rails. Railway EngineeringDefects in rails. Railway Engineering
Defects in rails. Railway Engineering
 
01-Rail span correction compressor house
01-Rail span correction compressor house01-Rail span correction compressor house
01-Rail span correction compressor house
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railway
 
chapter-3 Track Stracture.pptx
chapter-3  Track Stracture.pptxchapter-3  Track Stracture.pptx
chapter-3 Track Stracture.pptx
 
Ch4 Bridge Floors (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally ...
Ch4 Bridge Floors (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally ...Ch4 Bridge Floors (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally ...
Ch4 Bridge Floors (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally ...
 

Mehr von Hossam Shafiq I

14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...Hossam Shafiq I
 
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...Hossam Shafiq I
 
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...Hossam Shafiq I
 
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...Hossam Shafiq I
 
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...Hossam Shafiq I
 
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...Hossam Shafiq I
 
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...Hossam Shafiq I
 
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...Hossam Shafiq I
 
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...Hossam Shafiq I
 
05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...Hossam Shafiq I
 
05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...
05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...
05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...Hossam Shafiq I
 
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....Hossam Shafiq I
 
04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...
04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...
04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...Hossam Shafiq I
 
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...Hossam Shafiq I
 
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...Hossam Shafiq I
 
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...Hossam Shafiq I
 
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...Hossam Shafiq I
 
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...Hossam Shafiq I
 
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...Hossam Shafiq I
 
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...Hossam Shafiq I
 

Mehr von Hossam Shafiq I (20)

14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
 
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
 
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
 
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
 
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
 
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
 
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
 
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
 
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
 
05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
 
05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...
05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...
05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...
 
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
 
04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...
04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...
04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...
 
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
 
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
 
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
 
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
 
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
 
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...
 
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...
 

Kürzlich hochgeladen

(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 

Kürzlich hochgeladen (20)

(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 

08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. Elsaigh)

  • 1. Dr. Walied A. Elsaigh welsaigh@ksu.edu.sa Asst. Prof. of Civil Engineering Jumada’-I 1437H CE 435 Railway Engineering Maintenance of Railway Track
  • 3. What is the right time for maintenance ? Daily (minor defects, manually) Periodically (every 2-3 years) Approach to Railway Track Maintenance Conventional RT maintenance Done manually “Labour –based”, simple tools are used Fully mechanized Mixed process (Labour + machines) Machine-based RT maintenance (mechanical appliances are used) Two approaches are basically used for Railway maintenance
  • 4. When RT Maintenance Become Necessary? 1. Reduction in strength of track structure due to Consequences are:  Changes to alignment.  Changes to gauge.  Changes to surface level of rails. Movement of high speed trains Heavy axle loads High loading Frequency (repetition) 2. Deterioration of track structure due to environmental effects, such as: rain water, wind and sun actions. Consequences:  Wear and tear of rails & wear to rolling stock. 3. Rail track exhibits other forms of defects such as on curves, crossing, and bridge approaches. No maintenance! Faster wear Rough riding quality Derailment leading to life loss
  • 5. What Are The Advantages of Proper RT Maintenance? 1. Increases the life of both track and rolling stock. 3. Safer and more comfortable transport mode encourages more people and goods to use the rail transports leading to better earning, less damage to environment, additional economical value to goods…etc. 2. Provides smooth riding quality which brings comfort and safety to passengers and goods. 4. Allow savings in operation costs (e.g. reduction in fuel consumption due to reduced friction between rails & wheels). Probably this is true for each and every engineered structure.
  • 6. Items Checked for Maintenance 1. Surface of Rails 2.Track Alignment 3. Gauge 7. Rolling Stock 5. Track Components 8.Bridges & Tunnels 4. Drainage 6. Points & Crossings Periodic Maintenance
  • 7. 1. Surface of Rails Maintenance At straight sections of RT, the top surface of two rails should be kept in level (same plane). On curved sections of the RT, the outer rail should be kept at correct elevation above the inner rail. This is to maintain the required super-elevation. Packing Is the method of forcing the ballast bellow the sleepers. Deterioration mechanism: Due to heavy loads and vibration caused by running train, ballast under sleepers get loose and depressions are formed in plane of rails. Non-uniformity of subgrade would worsen the situation (remember the importance of consolidation while constructing formation) Entails the following operations: Surfacing the Track / Leveling the Track  Surfacing the track : The whole of the track is brought to a condition of vertical evenness. Rails and track are kept in uniform level. Equal elevation in the transverse direction is called leveling.
  • 8. Cont. Surface of Rails Maintenance Boxing and Dressing the Track  This is the process of filling the ballast between sleepers and beyond ends of sleepers to required shape. Lifting of the track  Lifting the depressed track to required height If lifting is done under traffic, then it should be done in the direction opposite to traffic . If both rails needs lifting, then they should be lifted simultaneously. Spot Packing and Track lifting  Consists of correcting the defects at a particular point and involves lifting of 5 to 7 sleepers. This task is one of the essentials of daily maintenance. Required when defect extends over considerable length.
  • 9. Cont. Surface of Rails Maintenance Surface Defects and Remedies  Defects manifest due to lack of maintenance. RT defects may include: High joint or riding joint: Top level of the joint is higher than rail level why occurs? Due to over-packing of sleepers at joints OR sinking of sleepers between joints. Blowing Joints: A blow joint is caused when joint is rested on loose and dusty ballast. Mechanism? When wheel load passes over the sleepers resting on dusty ballast, the sleeper sinks and when the wheel loads are relieved, the sleeper rises with sucking up dust. Causes? Thin layer of ballast, week sleepers, dusty ballast, worn out rail ends, and wide expansion gap. Remedial action? (1) Clean dirty ballast and repack joints with ballast. (2) Improvement rail ends (dehogging of rails). (3) Reduction of expansion gap.
  • 10. Cont. Surface of Rails Maintenance Surface Defects and Remedies Pumping joints: In rainy weather, blowing joint is affected by water and gets converted into what is termed as “pumping joint”. The joint splashes water as loads move on. Causes? Same causes for blowing joints + bad drainage (dirt ballast does not allow good and quick drainage. Remedial action? (1) Cleansing of ballast. (2) Provision of proper drainage. (3) Remedies listed for blowing joints. Hogged rails: Due to worn out of rail ends due to load repetition, the rail gets bent down at its ends, creating what is termed as “hogged rails”. Consequence ? Rough riding, more vibration leading to more defects. Causes? loose packing under joints and loose fish plate. Remedial action? (1) Replace joint, (2) Welding joint, (3) Dehogging, (4) Cropping {Refer to handout}
  • 11. Cont. Surface of Rails Maintenance Surface Defects and Remedies Buckling of Track: The track, especially in hot weather, goes out of alignment on both tangents and curves. Causes? Insufficient gaps at joints, tightened fish plate, welded track with insufficient strength. Consequences? Derailment which can lead to fatalities or damage to goods Remedial action? (1) Tighten & lubricate fish plate to proper joint function. (2) Use of steel sleepers. (3) Proper anchoring for welded rails. Centre bound Track: Under rolling load, settlement of ballast under rail seat is more than under the centre of sleepers (sleepers deflects more at the ends), This deflection is named as “centre bound track”. Remedial action? (1) Loosen ballast under the centre of sleepers and pack under the ends. (2) Open a drain under the centre of sleepers.
  • 12. Cont. Surface of Rails Maintenance Surface Defects and Remedies Corrugated or Roaring rails: The heads of rails corrugate (fine depressions on the surface of rails). Causes roaring sounds when wheels pass over it. Causes? Found at places where trains brakes or starts its journey, other reasons such as: composition of steel used to manufacture rails. Consequences? (1) Unpleasant roaring sound which cause discomfort to passengers and residents along side the rail track (2) Vibration causes further deterioration to other track elements. Remedial action? (1) Replace rail if corrugation is severe and the defect is limited to small number of rails (2) Grind top surface of rail, a grinding train moving at 3 km per hour can be used (as in Germany).
  • 13. 2. Track Alignment Maintenance What makes the track to go out of alignment? Increase hammering action of wheels on one of the pair rails while less or no hammering on the other. Why hammering differs ? Variation in cross levels. Inadequate super-elevation. Non-uniformity of gauge. Improver packing of ballast. Poor subgrade.Formation of kinks. Kink in Rails: Adjoining rails slightly move out of position. Causes? Loose packing at joints, Defects in gauge and alignment, Defects in cross levels at joints, closing of rail joints, and Uneven wear for rail heads. Consequences? Unpleasant jerk for train, further kink at places other than joints will form, risk in turning operation for kinks formed at curves. Remedial action? (1) Periodic maintenance for cross level, gauge..etc. (2) Correcting alignment at joints and curved sections.
  • 14. 3. Gauge Maintenance Uniformity of the gauge should be properly maintained all-over the track. Failure to achieve gauge uniformity will negatively influence the riding quality. Loosening of track & sleeper fittings What causes gauge variation? Tight gauge and slack (relaxed) gauge: tight gauge is always better since it prevents lateral play of wheels.
  • 15. 4. Restoration of Proper Drainage Proper drainage ensures smooth riding quality and longer track life. Tasks involved in restoring drainage cleaning of ballast dust and weeds allows water to stay for long time in ballast and may percolate to formation causing defects to track. surface drainage clean and slope- maintained side drain (ditches) to provide good surface drainage Subsurface drain Under ground drain. Inverted filter blanket cleaning of cess To prevent collection of water. Cess to clean from grass and be sloped outward.
  • 16. 5. Track Components Maintenance Worn out rails: When replacing worn out rail, one has to take care of the final table. The new rail become higher than other adjoining rails, resulting in damage to rail ends. If it is done as part of daily maintenance, then used rail has to be fitted. Broken or cracked rails: A sleeper is to be placed under the fractured rail until rail is replaced. Maintenance and Renewal of Rails Corrosion of rails: If inner rail on curve is corroded then it has to be replaced immediately.
  • 17. Cont. Track Components Maintenance Spot Renewal The defective sleeper and the fitting of sleeper are renewed Remove ballast below old sleeper. Take broken sleeper out. New sleeper is fitted and packed. Through Renewal Rails are removed and sleeper are taken out and replaced and rails are put back. Maintenance and Renewal of Sleepers
  • 18. Maintenance and Renewal of Fittings Fish-plate and fish bolt are the most important fittings for jointed rails Cont. Track Components Maintenance Graphiting of Fish Plate Apply lubricant containing graphite. To protect fish-plate against corrosion To allow free expansion. To increase the life of fish plate and bolts. Track imprest A stock of all usual materials, such as rails, sleepers, fish-plate, bolts and other fittings, is permanently maintained at selected place for immediate replacement. These materials are known as track- imprest. They are to be used only in emergency. Items must be replaced as soon as possible.
  • 19. 6. Points and Crossing Maintenance Switches are regarded to be the weakest points of the track and receives most of derailments incidents. Thus it should be watched constantly. Inspection of switches should be done under moving train loads. Because some of their defects can be picked up only when train load moves on. Causes for switch defects Wear of fittings and pins. Creep of track. Poor maintenance.
  • 20. Signalling During Maintenance Work It is necessary to warn the train drivers when maintenance work is in progress. Short duration maintenance work ( less than three days). Then temporary flags would be satisfactory Long duration maintenance work ( more than three days). Then temporary fixed signals are required (discuss next sessions)