OBJECTIVE
To explain about the list of utilities on worksite
and safety procedures during disconnecting
utilities.
Explaining the safety measures during
preparatory work and locate catch platform.
To explain safe method of disposing debris and
safety measures taken during site clearing.
UTILITIES ON WORKSITE
•
•
•
•
•

Electric
Gas
Water
Steam
Sewer
LOCKOUT / TAGOUT

1
If the machine or equipment is operating, shut it
2 down by the normal stopping procedure.

Notify all affected employees that a lockout or
tagout system is going to be utilized and the Reason.

Operate the switch, valve, or other energy isolating
device(s) so that the equipment is isolated from its
energy source(s).

3
4 Lockout/tagout device application.
SAFETY PROCEDURES DURING DISCONNECTING
UTILITIES

LOCKOUT / TAGOUT
in a
5 Locks shall be affixedsafe manner that will hold the energy
isolating devices in a
or off position.

6

All potentially hazardous stored or residual energy shall be
relieved, disconnected, restrained or otherwise rendered safe.
What is demolition works?
• ‘Demolition work’ means to demolish or dismantle a
structure or part of a structure that is load-bearing or
otherwise related to the physical integrity of the structure
Before the demolition operations begin:
• Adequate inspection should be made by designated person.
• If necessary to prevent danger, unstable parts of structure should be
made secure
• All utilities should be effectively disconnected or shut off at or outside
the property line.
• The danger zone around of the structure should be
adequately fenced off or warning sign posted.

• Before the demolition work, the structure should be free
from any toxic or hazardous substances.
• Where applicable metal scaffold enclosed with peripheral
nettings should be erected around the building or structure
to be demolished.
Before demolition work is carried out, ensure that these
materials are removed:
• Glass in doors, windows, etc.
• Loose objects
• Projecting parts
• Explosive inflammable, toxic and harmful substances.
The American National Standards Institute (ANSI) in its
ANSI A10.6-1983– states:

"No employee shall be permitted in any area that can be adversely affected
when demolition operations are being performed. Only those employees
necessary for the performance of the operations shall be permitted in
these areas."
CATCH PLATFORM FOR DEMOLITION
OPERATIONS
• Such catch platform shall be maintained not more than 6
metres below from which the exterior walls are being
removed.

• Catch platform shall not be used for storage
of materials or be used as working
platforms or walkways.
• During the demolition of the exterior walls of a structure
originally more than 12.2 metres high, catch platforms shall
be provided along the exterior, faces of such wall, where
necessary, to prevent injury to the public.

• Such platform shall be designed by a Professional Engineer
and certified for safety prior to erection and use.
Use of explosives
Use of explosives
• In the controlled demolition industry, building implosion is the
strategic placing of explosive material and timing of its
detonation so that a structure collapses on itself in a matter of
seconds, minimizing the physical damage to its immediate

surroundings.
• Building implosion (which reduces to seconds a process which
could take months or years to achieve by other methods)
typically occurs in urban areas and often involves large landmark
structures.
DEMOLITION OF GLENCAIRN
TOWER
VIDEO
SAFE METHOD OF DISPOSING DEBRIBS
 Debris shall be handled and disposed off by a
method, which will not endanger workers and public
safety and health. (Reg. 22(1), Building Operations
And Works Of Engineering Construction (Safety)
Regulations, 1986)
 Debris shall not be allowed to accumulate so as to
constitute a hazard. (Reg. 22(2), Building Operations
And Works Of Engineering Construction (Safety)
Regulations, 1986)
 Debris shall be kept sufficiently moist to lay the dust.
(Reg. 22(3), Building Operations And Works Of
Engineering Construction (Safety) Regulations, 1986)
SAFETY MEASURES TAKEN DURING
SITE CLEARING
• Felling of trees should be done by trained personnel
to safeguard public safety and to prevent damage to
public property.
 Where the site is located in the immediate vicinity of
a build-up area, hoarding should be erected with
proper and adequate signs to prevent unauthorized
entry.
 Arrangement should be made to prevent
landslides, sinkhole and flooding or other
unstable ground condition. These arrangement
should conform to the requirements of relevant
authorities.
 All access and egress roads at the site should be
maintained in safe condition.
 Every measure should be taken to suppress any dust
generated by the vehicles.
 Care should be taken to protect existing
underground and overhead utilities (if any)
especially electric cables to avoid any undue
accident during site clearing work if relocation of
such services are not possible.
THE END

Weitere ähnliche Inhalte

Was ist angesagt?

252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
DusanJankovic8
 
SCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingSCAFFOLDING Safety Training
SCAFFOLDING Safety Training
William York
 
Working at Height - Falling Objects
Working at Height - Falling ObjectsWorking at Height - Falling Objects
Working at Height - Falling Objects
Rudi Nieuwoudt
 

Was ist angesagt? (20)

252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
 
Construction Safety Training
Construction Safety TrainingConstruction Safety Training
Construction Safety Training
 
SCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingSCAFFOLDING Safety Training
SCAFFOLDING Safety Training
 
working at hight
working at  hightworking at  hight
working at hight
 
Working at Height - Falling Objects
Working at Height - Falling ObjectsWorking at Height - Falling Objects
Working at Height - Falling Objects
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Hot Work Permits Training by ELCOSH
Hot Work Permits Training by ELCOSHHot Work Permits Training by ELCOSH
Hot Work Permits Training by ELCOSH
 
Barricading construction site and excavation
Barricading construction site and excavation Barricading construction site and excavation
Barricading construction site and excavation
 
Scaffolds Training by Pennsylvania L&I
Scaffolds Training by Pennsylvania L&IScaffolds Training by Pennsylvania L&I
Scaffolds Training by Pennsylvania L&I
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
OSHA regulations Fall protection
OSHA regulations Fall protection OSHA regulations Fall protection
OSHA regulations Fall protection
 
Scaffolding training-presentation
Scaffolding training-presentationScaffolding training-presentation
Scaffolding training-presentation
 
Fall Protection by Osha
Fall Protection by Osha Fall Protection by Osha
Fall Protection by Osha
 
Working Safely around Plant and Equipment
Working Safely around Plant and EquipmentWorking Safely around Plant and Equipment
Working Safely around Plant and Equipment
 
Eta Scaffold Training
Eta Scaffold TrainingEta Scaffold Training
Eta Scaffold Training
 
Working at heights
Working at heightsWorking at heights
Working at heights
 
TOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsTOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operations
 
OSHA Trenching and Excavation Requirements
OSHA Trenching and Excavation Requirements OSHA Trenching and Excavation Requirements
OSHA Trenching and Excavation Requirements
 
Flagman-Training.ppt
Flagman-Training.pptFlagman-Training.ppt
Flagman-Training.ppt
 
Safety man and machine presentation
Safety man and machine presentation Safety man and machine presentation
Safety man and machine presentation
 

Andere mochten auch

Demolition methods and its sequence
Demolition methods and its sequenceDemolition methods and its sequence
Demolition methods and its sequence
Ranjith Kumar
 
Challenges and opportunities in the paperless NHS & beyond - A data protectio...
Challenges and opportunities in the paperless NHS & beyond - A data protectio...Challenges and opportunities in the paperless NHS & beyond - A data protectio...
Challenges and opportunities in the paperless NHS & beyond - A data protectio...
Osborne Clarke
 
Basic helicopter ground handling
Basic helicopter ground handling Basic helicopter ground handling
Basic helicopter ground handling
Bai Haqi
 
DEMOLITION OF STRUCTURE BY ABHINAV RAWAT
DEMOLITION OF STRUCTURE BY ABHINAV RAWATDEMOLITION OF STRUCTURE BY ABHINAV RAWAT
DEMOLITION OF STRUCTURE BY ABHINAV RAWAT
Abhinav Rawat
 

Andere mochten auch (20)

Demolition of building
Demolition of building Demolition of building
Demolition of building
 
Demolition methods and its sequence
Demolition methods and its sequenceDemolition methods and its sequence
Demolition methods and its sequence
 
Presentation-Demolition-Yıkım
Presentation-Demolition-YıkımPresentation-Demolition-Yıkım
Presentation-Demolition-Yıkım
 
Demolition
 Demolition Demolition
Demolition
 
Demolition of Structures.
Demolition of Structures.Demolition of Structures.
Demolition of Structures.
 
DEMOLITION OF BUILDING
DEMOLITION OF BUILDINGDEMOLITION OF BUILDING
DEMOLITION OF BUILDING
 
Excavations ppt
Excavations pptExcavations ppt
Excavations ppt
 
AeroDocs Aviation Document Control Software
AeroDocs Aviation Document Control SoftwareAeroDocs Aviation Document Control Software
AeroDocs Aviation Document Control Software
 
Challenges and opportunities in the paperless NHS & beyond - A data protectio...
Challenges and opportunities in the paperless NHS & beyond - A data protectio...Challenges and opportunities in the paperless NHS & beyond - A data protectio...
Challenges and opportunities in the paperless NHS & beyond - A data protectio...
 
Past Bridges Middle East Presentation from Ministry of Public Works and Housi...
Past Bridges Middle East Presentation from Ministry of Public Works and Housi...Past Bridges Middle East Presentation from Ministry of Public Works and Housi...
Past Bridges Middle East Presentation from Ministry of Public Works and Housi...
 
Duke Energy Brand Standards Manual
Duke Energy Brand Standards ManualDuke Energy Brand Standards Manual
Duke Energy Brand Standards Manual
 
Fully Demolition
Fully Demolition Fully Demolition
Fully Demolition
 
Excavation and-trenching safety 03
Excavation and-trenching safety 03Excavation and-trenching safety 03
Excavation and-trenching safety 03
 
Ila's ppt on demolition
Ila's ppt on demolitionIla's ppt on demolition
Ila's ppt on demolition
 
Mobilizing the utility workforce: How mobile technology and analytics will tr...
Mobilizing the utility workforce: How mobile technology and analytics will tr...Mobilizing the utility workforce: How mobile technology and analytics will tr...
Mobilizing the utility workforce: How mobile technology and analytics will tr...
 
Demolition Equipment/Technique Available
Demolition Equipment/Technique Available Demolition Equipment/Technique Available
Demolition Equipment/Technique Available
 
Basic helicopter ground handling
Basic helicopter ground handling Basic helicopter ground handling
Basic helicopter ground handling
 
DEMOLITION OF STRUCTURE BY ABHINAV RAWAT
DEMOLITION OF STRUCTURE BY ABHINAV RAWATDEMOLITION OF STRUCTURE BY ABHINAV RAWAT
DEMOLITION OF STRUCTURE BY ABHINAV RAWAT
 
Fire safety first aid
Fire safety first aidFire safety first aid
Fire safety first aid
 
Excavation & Trenching Safety
Excavation & Trenching Safety Excavation & Trenching Safety
Excavation & Trenching Safety
 

Ähnlich wie OSHA demolition

Demolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS codeDemolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS code
jaimin1702
 
Construction safety pocket guide osha3252
Construction safety pocket guide osha3252Construction safety pocket guide osha3252
Construction safety pocket guide osha3252
zul husni
 
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...
LisayahManobangs
 

Ähnlich wie OSHA demolition (20)

Dempolition notes Part 1.pdf
Dempolition notes Part 1.pdfDempolition notes Part 1.pdf
Dempolition notes Part 1.pdf
 
Demolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS codeDemolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS code
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
osha3252.pdf
osha3252.pdfosha3252.pdf
osha3252.pdf
 
Construction safety pocket guide osha3252
Construction safety pocket guide osha3252Construction safety pocket guide osha3252
Construction safety pocket guide osha3252
 
BUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORTBUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORT
 
12 trenching and excavation safety
12 trenching and excavation safety12 trenching and excavation safety
12 trenching and excavation safety
 
s1
s1s1
s1
 
Construction safety session 1 (new)
Construction safety session 1 (new)Construction safety session 1 (new)
Construction safety session 1 (new)
 
NIOSH - Preventing Worker Deaths from Trench Cave-ins
NIOSH - Preventing Worker Deaths from Trench Cave-ins NIOSH - Preventing Worker Deaths from Trench Cave-ins
NIOSH - Preventing Worker Deaths from Trench Cave-ins
 
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
 
IRJET - Hazard Identification and Risk Assessment in Fettling Process
IRJET - Hazard Identification and Risk Assessment in Fettling ProcessIRJET - Hazard Identification and Risk Assessment in Fettling Process
IRJET - Hazard Identification and Risk Assessment in Fettling Process
 
International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER) International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER)
 
apm-et13e-chapter-21-woodworking-machinery.ppt
apm-et13e-chapter-21-woodworking-machinery.pptapm-et13e-chapter-21-woodworking-machinery.ppt
apm-et13e-chapter-21-woodworking-machinery.ppt
 
BCT Mod 4 demolition of structure (Updated)
BCT Mod 4 demolition of structure (Updated)BCT Mod 4 demolition of structure (Updated)
BCT Mod 4 demolition of structure (Updated)
 
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdfUNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
 
Building construction 1 group report
Building construction 1 group reportBuilding construction 1 group report
Building construction 1 group report
 
CS S3
CS S3CS S3
CS S3
 
Study of Safety in Demolition of Buildings
Study of Safety in Demolition of BuildingsStudy of Safety in Demolition of Buildings
Study of Safety in Demolition of Buildings
 
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

Top Rated Hyderabad Call Girls Erragadda ⟟ 9332606886 ⟟ Call Me For Genuine ...
Top Rated  Hyderabad Call Girls Erragadda ⟟ 9332606886 ⟟ Call Me For Genuine ...Top Rated  Hyderabad Call Girls Erragadda ⟟ 9332606886 ⟟ Call Me For Genuine ...
Top Rated Hyderabad Call Girls Erragadda ⟟ 9332606886 ⟟ Call Me For Genuine ...
 
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
 
Russian Call Girls Service Jaipur {8445551418} ❤️PALLAVI VIP Jaipur Call Gir...
Russian Call Girls Service  Jaipur {8445551418} ❤️PALLAVI VIP Jaipur Call Gir...Russian Call Girls Service  Jaipur {8445551418} ❤️PALLAVI VIP Jaipur Call Gir...
Russian Call Girls Service Jaipur {8445551418} ❤️PALLAVI VIP Jaipur Call Gir...
 
O898O367676 Call Girls In Ahmedabad Escort Service Available 24×7 In Ahmedabad
O898O367676 Call Girls In Ahmedabad Escort Service Available 24×7 In AhmedabadO898O367676 Call Girls In Ahmedabad Escort Service Available 24×7 In Ahmedabad
O898O367676 Call Girls In Ahmedabad Escort Service Available 24×7 In Ahmedabad
 
Top Rated Bangalore Call Girls Ramamurthy Nagar ⟟ 9332606886 ⟟ Call Me For G...
Top Rated Bangalore Call Girls Ramamurthy Nagar ⟟  9332606886 ⟟ Call Me For G...Top Rated Bangalore Call Girls Ramamurthy Nagar ⟟  9332606886 ⟟ Call Me For G...
Top Rated Bangalore Call Girls Ramamurthy Nagar ⟟ 9332606886 ⟟ Call Me For G...
 
Book Paid Powai Call Girls Mumbai 𖠋 9930245274 𖠋Low Budget Full Independent H...
Book Paid Powai Call Girls Mumbai 𖠋 9930245274 𖠋Low Budget Full Independent H...Book Paid Powai Call Girls Mumbai 𖠋 9930245274 𖠋Low Budget Full Independent H...
Book Paid Powai Call Girls Mumbai 𖠋 9930245274 𖠋Low Budget Full Independent H...
 
Pondicherry Call Girls Book Now 9630942363 Top Class Pondicherry Escort Servi...
Pondicherry Call Girls Book Now 9630942363 Top Class Pondicherry Escort Servi...Pondicherry Call Girls Book Now 9630942363 Top Class Pondicherry Escort Servi...
Pondicherry Call Girls Book Now 9630942363 Top Class Pondicherry Escort Servi...
 
All Time Service Available Call Girls Marine Drive 📳 9820252231 For 18+ VIP C...
All Time Service Available Call Girls Marine Drive 📳 9820252231 For 18+ VIP C...All Time Service Available Call Girls Marine Drive 📳 9820252231 For 18+ VIP C...
All Time Service Available Call Girls Marine Drive 📳 9820252231 For 18+ VIP C...
 
Best Rate (Patna ) Call Girls Patna ⟟ 8617370543 ⟟ High Class Call Girl In 5 ...
Best Rate (Patna ) Call Girls Patna ⟟ 8617370543 ⟟ High Class Call Girl In 5 ...Best Rate (Patna ) Call Girls Patna ⟟ 8617370543 ⟟ High Class Call Girl In 5 ...
Best Rate (Patna ) Call Girls Patna ⟟ 8617370543 ⟟ High Class Call Girl In 5 ...
 
Call Girls Haridwar Just Call 8250077686 Top Class Call Girl Service Available
Call Girls Haridwar Just Call 8250077686 Top Class Call Girl Service AvailableCall Girls Haridwar Just Call 8250077686 Top Class Call Girl Service Available
Call Girls Haridwar Just Call 8250077686 Top Class Call Girl Service Available
 
Call Girls Jabalpur Just Call 8250077686 Top Class Call Girl Service Available
Call Girls Jabalpur Just Call 8250077686 Top Class Call Girl Service AvailableCall Girls Jabalpur Just Call 8250077686 Top Class Call Girl Service Available
Call Girls Jabalpur Just Call 8250077686 Top Class Call Girl Service Available
 
Call Girls Agra Just Call 8250077686 Top Class Call Girl Service Available
Call Girls Agra Just Call 8250077686 Top Class Call Girl Service AvailableCall Girls Agra Just Call 8250077686 Top Class Call Girl Service Available
Call Girls Agra Just Call 8250077686 Top Class Call Girl Service Available
 
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Faridabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls Varanasi Just Call 8250077686 Top Class Call Girl Service Available
Call Girls Varanasi Just Call 8250077686 Top Class Call Girl Service AvailableCall Girls Varanasi Just Call 8250077686 Top Class Call Girl Service Available
Call Girls Varanasi Just Call 8250077686 Top Class Call Girl Service Available
 
Call Girls Bareilly Just Call 8250077686 Top Class Call Girl Service Available
Call Girls Bareilly Just Call 8250077686 Top Class Call Girl Service AvailableCall Girls Bareilly Just Call 8250077686 Top Class Call Girl Service Available
Call Girls Bareilly Just Call 8250077686 Top Class Call Girl Service Available
 
Call Girls Coimbatore Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Coimbatore Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Coimbatore Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Coimbatore Just Call 9907093804 Top Class Call Girl Service Available
 
Best Rate (Guwahati ) Call Girls Guwahati ⟟ 8617370543 ⟟ High Class Call Girl...
Best Rate (Guwahati ) Call Girls Guwahati ⟟ 8617370543 ⟟ High Class Call Girl...Best Rate (Guwahati ) Call Girls Guwahati ⟟ 8617370543 ⟟ High Class Call Girl...
Best Rate (Guwahati ) Call Girls Guwahati ⟟ 8617370543 ⟟ High Class Call Girl...
 
Premium Bangalore Call Girls Jigani Dail 6378878445 Escort Service For Hot Ma...
Premium Bangalore Call Girls Jigani Dail 6378878445 Escort Service For Hot Ma...Premium Bangalore Call Girls Jigani Dail 6378878445 Escort Service For Hot Ma...
Premium Bangalore Call Girls Jigani Dail 6378878445 Escort Service For Hot Ma...
 
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...
 
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any TimeTop Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
 

OSHA demolition

  • 1. OCCUPATIONAL SAFETY AND HEALTH LECTURER NORNAWAR LAILI BT NORDIN HANI AMIERA ABD HALIM 06DSB11F2044 SITI AMIRAH BT ABDUL RAZAK 06DSB11F2036 NURUL AIN BINTI ABDUL RAHIM 06DSB11F2047
  • 2. OBJECTIVE To explain about the list of utilities on worksite and safety procedures during disconnecting utilities. Explaining the safety measures during preparatory work and locate catch platform. To explain safe method of disposing debris and safety measures taken during site clearing.
  • 4. LOCKOUT / TAGOUT 1 If the machine or equipment is operating, shut it 2 down by the normal stopping procedure. Notify all affected employees that a lockout or tagout system is going to be utilized and the Reason. Operate the switch, valve, or other energy isolating device(s) so that the equipment is isolated from its energy source(s). 3 4 Lockout/tagout device application.
  • 5. SAFETY PROCEDURES DURING DISCONNECTING UTILITIES LOCKOUT / TAGOUT in a 5 Locks shall be affixedsafe manner that will hold the energy isolating devices in a or off position. 6 All potentially hazardous stored or residual energy shall be relieved, disconnected, restrained or otherwise rendered safe.
  • 6. What is demolition works? • ‘Demolition work’ means to demolish or dismantle a structure or part of a structure that is load-bearing or otherwise related to the physical integrity of the structure
  • 7. Before the demolition operations begin: • Adequate inspection should be made by designated person. • If necessary to prevent danger, unstable parts of structure should be made secure • All utilities should be effectively disconnected or shut off at or outside the property line.
  • 8. • The danger zone around of the structure should be adequately fenced off or warning sign posted. • Before the demolition work, the structure should be free from any toxic or hazardous substances.
  • 9. • Where applicable metal scaffold enclosed with peripheral nettings should be erected around the building or structure to be demolished.
  • 10. Before demolition work is carried out, ensure that these materials are removed: • Glass in doors, windows, etc. • Loose objects • Projecting parts • Explosive inflammable, toxic and harmful substances.
  • 11. The American National Standards Institute (ANSI) in its ANSI A10.6-1983– states: "No employee shall be permitted in any area that can be adversely affected when demolition operations are being performed. Only those employees necessary for the performance of the operations shall be permitted in these areas."
  • 12. CATCH PLATFORM FOR DEMOLITION OPERATIONS
  • 13. • Such catch platform shall be maintained not more than 6 metres below from which the exterior walls are being removed. • Catch platform shall not be used for storage of materials or be used as working platforms or walkways.
  • 14. • During the demolition of the exterior walls of a structure originally more than 12.2 metres high, catch platforms shall be provided along the exterior, faces of such wall, where necessary, to prevent injury to the public. • Such platform shall be designed by a Professional Engineer and certified for safety prior to erection and use.
  • 16. Use of explosives • In the controlled demolition industry, building implosion is the strategic placing of explosive material and timing of its detonation so that a structure collapses on itself in a matter of seconds, minimizing the physical damage to its immediate surroundings. • Building implosion (which reduces to seconds a process which could take months or years to achieve by other methods) typically occurs in urban areas and often involves large landmark structures.
  • 17.
  • 19.
  • 20.
  • 21.
  • 22. VIDEO
  • 23. SAFE METHOD OF DISPOSING DEBRIBS  Debris shall be handled and disposed off by a method, which will not endanger workers and public safety and health. (Reg. 22(1), Building Operations And Works Of Engineering Construction (Safety) Regulations, 1986)
  • 24.  Debris shall not be allowed to accumulate so as to constitute a hazard. (Reg. 22(2), Building Operations And Works Of Engineering Construction (Safety) Regulations, 1986)
  • 25.  Debris shall be kept sufficiently moist to lay the dust. (Reg. 22(3), Building Operations And Works Of Engineering Construction (Safety) Regulations, 1986)
  • 26. SAFETY MEASURES TAKEN DURING SITE CLEARING • Felling of trees should be done by trained personnel to safeguard public safety and to prevent damage to public property.
  • 27.  Where the site is located in the immediate vicinity of a build-up area, hoarding should be erected with proper and adequate signs to prevent unauthorized entry.
  • 28.  Arrangement should be made to prevent landslides, sinkhole and flooding or other unstable ground condition. These arrangement should conform to the requirements of relevant authorities.
  • 29.  All access and egress roads at the site should be maintained in safe condition.
  • 30.  Every measure should be taken to suppress any dust generated by the vehicles.
  • 31.  Care should be taken to protect existing underground and overhead utilities (if any) especially electric cables to avoid any undue accident during site clearing work if relocation of such services are not possible.