March 30, 2013



                “Taking the Bite out of
                   Power Outages”

READING ELECTRIC, in conjunction with Mail Shark, provides this
information as an educational service to the Region’s Industrial and
Commercial Businesses.

Mail Shark (www.themailshark.com) is a recognized leader providing
nationwide printing and mailing services, specializing in specific industry
marketing plans. Mail Shark’s clients rely on constant weekly delivery of
direct mail advertising to ensure their business growth. Mail Shark’s portfolio
includes but is not limited to direct mail campaigns, printing of menus,
brochures, postcards, magnets, and a variety of other promotional pieces.


Critical Power Problem Identification
Satisfying the marketing and promotional needs of a nationwide customer
base that relies on the design, printing and mailing of their marketing
programs without interruption on 24/7/365 basis requires excellence in
project planning, implementation and operation. This level of customer
commitment requires reliable electric utility service for Mail Shark to provide
100% certainty of their production schedules.


Located in the middle of the Nolde Forest in Mohnton Pennsylvania, Mail
Shark is faced with high vulnerability to power outages. It was critical that
Mail Shark had a quality back-up electrical service plan.


As the seasonal storms seemed to increase in strength, the frequency and
duration of power outages became untenable for Mail Shark. The cost of
losing production for a one (1) week period equates to about $50,000 in
immediate losses. The greater impact of customer dissatisfaction, while hard
to calculate, is very real. Short term power outages of just a couple of hours
were very disruptive to manufacturing operations and greatly impacted
profitability due to overtime, waste and expediting charges.


If Mail Shark lost power for one week twice a year, the profit losses over 10
years would equate to 1 million dollars. More importantly, millions of dollars
would be at risk due to unsatisfied customers seeking business from
competitors. Mail Shark President, Brian Johnson, decided to implement a
plan to eliminate the negative impacts of power outages


The decision was made to investigate upgrading the emergency standby
generator system to carry the current full loads of manufacturing operations,
IT Support Systems, and planned future expansions.



Page 1 of 4
Critical Power Problem Solution
A six (6) month investigation and analysis provided the Mail Shark Team with
sufficient information to embark upon the project phase of budget analysis,
appropriation approval, and ordering of an emergency standby power
system. In October 2012, the Contract was signed. This project installation
phase required two (2) months for completion which included equipment
delivery.

Initially, a study was completed to determine if
placing small individual backup generators to
serve specific equipment would be viable. In the
final analysis it was deemed a more reliable and
cost effective solution to design and install a full
service generator into the main utility feed.

The solution that evolved over this period
resulted in a Standby Power System that
consisted of: 250 Kw diesel powered generator
with a sub-base fuel tank for 48 hours of
runtime, new 800 amp Service Entrance rated
transfer switch, and a remote annunciator panel
which mimics the generator control panel
alarms. This equipment was to be installed
outdoors and would provide the entire 800 amp
service meeting the current requirements. This
solution would provide Mail Shark with four ‘9s’
capability.

The ROI is expected to be less than one (1)
year. The Standby Power System would pay for
itself after only ten (10) days of lost production
avoidance The System is currently sized for
65% loading. It was also decided to purchase
the System from a local Company (Reading
Electric) to avoid response time issues.

Implementation and Associated Issues:
As with any complex Solution, there were
dozens of details that needed to have special
focus to ensure success of the Program in terms
of performance and schedule. These details
were:
        1) Project Management Team consisting
           of decision makers at Mail Shark,
           George H. Longenecker & Sons, and
           Reading Electric.

        2) Real-time status meetings with virtual
           Electronic Meetings / communications
           as required.

        3) Advance review and pre-approval from
           Local Municipality for Permits.

        4) Offsite Equipment Testing before
           shipment & installation at the Mail
           Shark Facility to avoid potential start-up
           problems.
Page 2 of 4
Implementation and Associated Issues (continued):
        5) Detailed installation and test schedules.
           George H. Longenecker & Sons was
           selected for the on-site installer of the
           equipment.

           a. Site Preparation
           b. Equipment Placement
           c. Mechanical
           d. Electric
           e. System Testing

        6) Detailed plan and schedule for
           commissioning and tie-in to the Facility
           systems.

The Program time line was:
       Equipment Delivery -             5 weeks
       Installation -                   2 weeks
       Planned Commissioning & Tie-in – 4 hours

Careful coordination among Mail Shark, George
H. Longenecker & Sons and Reading Electric
Personnel resulted in a Tie-In that did not impact
printing   operations.    Commissioning       and
Acceptance Testing were scheduled in advance,
safeguarding     Mail     Shark’s      operations.
Commissioning took place in December 2012
and this commissioning included operational
testing where “loss of utility” conditions were
simulated.

Emergency System testing
Since commissioning, the Emergency
Power Standby system has not been
tested as yet by nature, but Mail Shark
has put in place a bi-weekly test of the
system. These tests do not fully transfer
all loads to the Emergency System. A
full load test will be conducted twice
annually.

The Emergency System carries a two
year/ 1000 hour warranty on the
generator, one year on the transfer
switch and is under an annual service
contract for service and testing.

Critical Power Lessons Learned
Several lessons were learned through
the implementation and execution of the
Mail Shark Standby Generator Program.

1) Management monitoring of corporate
   growth and demands on the
   Emergency Power Standby Systems
   is critical for maintaining business
   integrity.
Page 3 of 4
Critical Power Lessons Learned (continued)

2) A complete engineering analysis of
   the current and future electrical loads
  is required for correct System sizing
  and design.

3) Attention paid to the implementation
  and commissioning schedule pays
  large benefits during the ‘tie-in’ to the
  facility.


Critical Power Information Resources
For additional information on Standby
Power Systems, contact Russ Yerger,
Critical Power Systems Manager,
Reading Electric Phone: 610-929-5777;
email: ryerger@readingelectric.com

READING ELECTRIC is a leading
supplier       of     electro-mechanical
equipment & services for Industrial and
Commercial Customers, specializing in
providing Total Solution Packages for
Critical Power Requirements to
safeguard the Industry’s profitability
from electrical power outages.
Website: www.readingelectric.com




                                              File: CP#033013




Page 4 of 4

Weitere ähnliche Inhalte

Was ist angesagt?

John Hopwood Resume
John Hopwood ResumeJohn Hopwood Resume
John Hopwood Resume
John Hopwood
 
Net_Alliant_Technologies
Net_Alliant_TechnologiesNet_Alliant_Technologies
Net_Alliant_Technologies
Cris Beagle
 
electrical maintenace (2)
electrical maintenace  (2)electrical maintenace  (2)
electrical maintenace (2)
Bharjendu vimal
 
Factors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE TransactionsFactors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE Transactions
Jim White
 
Preparing for Distributed Energy Resources
Preparing for Distributed Energy ResourcesPreparing for Distributed Energy Resources
Preparing for Distributed Energy Resources
Schneider Electric
 

Was ist angesagt? (20)

Collecting Economic Data in Power Quality Survey
Collecting Economic Data in Power Quality SurveyCollecting Economic Data in Power Quality Survey
Collecting Economic Data in Power Quality Survey
 
John Hopwood Resume
John Hopwood ResumeJohn Hopwood Resume
John Hopwood Resume
 
Net_Alliant_Technologies
Net_Alliant_TechnologiesNet_Alliant_Technologies
Net_Alliant_Technologies
 
The metals and mining industry
The metals and mining industryThe metals and mining industry
The metals and mining industry
 
8.2_IEEE 1547 and Microgrids_Key_EPRI/SNL Microgrid Symposium
8.2_IEEE 1547 and Microgrids_Key_EPRI/SNL Microgrid Symposium8.2_IEEE 1547 and Microgrids_Key_EPRI/SNL Microgrid Symposium
8.2_IEEE 1547 and Microgrids_Key_EPRI/SNL Microgrid Symposium
 
Hannover High End Utility Metering
Hannover High End Utility MeteringHannover High End Utility Metering
Hannover High End Utility Metering
 
[Infographic] 2013 U.S. Utility Grid Automation Survey (Part 2)
[Infographic] 2013 U.S. Utility Grid Automation Survey (Part 2)[Infographic] 2013 U.S. Utility Grid Automation Survey (Part 2)
[Infographic] 2013 U.S. Utility Grid Automation Survey (Part 2)
 
Dtech 2015 the distribution management system network model
Dtech 2015  the distribution management system network modelDtech 2015  the distribution management system network model
Dtech 2015 the distribution management system network model
 
[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT Convergence[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT Convergence
 
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...[Case study] Dakota Electric Association: Solutions to streamline GIS, design...
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...
 
electrical maintenace (2)
electrical maintenace  (2)electrical maintenace  (2)
electrical maintenace (2)
 
Restoring jamaica’s power after a natural disaster
Restoring jamaica’s power after a natural disasterRestoring jamaica’s power after a natural disaster
Restoring jamaica’s power after a natural disaster
 
Sankar_ Vaid
Sankar_ VaidSankar_ Vaid
Sankar_ Vaid
 
SEI Smart City Offers Catalogue
SEI Smart City Offers CatalogueSEI Smart City Offers Catalogue
SEI Smart City Offers Catalogue
 
An improved architecture for high efficiency, high-density data centers
An improved architecture for high efficiency, high-density data centersAn improved architecture for high efficiency, high-density data centers
An improved architecture for high efficiency, high-density data centers
 
IRJET- Sanctioned Load Monitoring & Controlling by using PLC
IRJET- Sanctioned Load Monitoring & Controlling by using PLCIRJET- Sanctioned Load Monitoring & Controlling by using PLC
IRJET- Sanctioned Load Monitoring & Controlling by using PLC
 
Virtual Power Plant - Becky Harrison, Progress Energy
Virtual Power Plant - Becky Harrison, Progress EnergyVirtual Power Plant - Becky Harrison, Progress Energy
Virtual Power Plant - Becky Harrison, Progress Energy
 
Schneider Electric Services_Modernization and Upgrade Solutions.pptx
Schneider Electric Services_Modernization and Upgrade Solutions.pptxSchneider Electric Services_Modernization and Upgrade Solutions.pptx
Schneider Electric Services_Modernization and Upgrade Solutions.pptx
 
Factors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE TransactionsFactors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE Transactions
 
Preparing for Distributed Energy Resources
Preparing for Distributed Energy ResourcesPreparing for Distributed Energy Resources
Preparing for Distributed Energy Resources
 

Ähnlich wie Mail shark case study

John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resume
John Snyder
 
Wind Exchange 2015 Report
Wind Exchange 2015 ReportWind Exchange 2015 Report
Wind Exchange 2015 Report
Joshua Chokera
 
Professional Resume sep 2016
Professional Resume sep 2016Professional Resume sep 2016
Professional Resume sep 2016
Yodani Quezada
 
Circuit Break Connect Monitoring to 5G Mobile Application
Circuit Break Connect Monitoring to 5G Mobile ApplicationCircuit Break Connect Monitoring to 5G Mobile Application
Circuit Break Connect Monitoring to 5G Mobile Application
AIRCC Publishing Corporation
 
CIRCUIT BREAK CONNECT MONITORING TO 5G MOBILE APPLICATION
CIRCUIT BREAK CONNECT MONITORING TO 5G MOBILE APPLICATIONCIRCUIT BREAK CONNECT MONITORING TO 5G MOBILE APPLICATION
CIRCUIT BREAK CONNECT MONITORING TO 5G MOBILE APPLICATION
ijcsit
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
Sher Chuhan
 
KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability Statement
Ray Salmons
 

Ähnlich wie Mail shark case study (20)

Resume_sdy-4-1
Resume_sdy-4-1Resume_sdy-4-1
Resume_sdy-4-1
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resume
 
Business Continuity and Recovery Planning for Power Outages
Business Continuity and Recovery Planning for Power OutagesBusiness Continuity and Recovery Planning for Power Outages
Business Continuity and Recovery Planning for Power Outages
 
RMJElectrical 2015 JB Brochure
RMJElectrical 2015 JB BrochureRMJElectrical 2015 JB Brochure
RMJElectrical 2015 JB Brochure
 
RMJElectrical 2015 Brochure
RMJElectrical 2015 BrochureRMJElectrical 2015 Brochure
RMJElectrical 2015 Brochure
 
Wind Exchange 2015 Report
Wind Exchange 2015 ReportWind Exchange 2015 Report
Wind Exchange 2015 Report
 
Shweta Rajouria(0048_59)-KPMG_LG.pptx
Shweta Rajouria(0048_59)-KPMG_LG.pptxShweta Rajouria(0048_59)-KPMG_LG.pptx
Shweta Rajouria(0048_59)-KPMG_LG.pptx
 
Professional Resume sep 2016
Professional Resume sep 2016Professional Resume sep 2016
Professional Resume sep 2016
 
CV
CVCV
CV
 
Falkonry overview deck
Falkonry overview deckFalkonry overview deck
Falkonry overview deck
 
Energy in emerging telecoms telecommunications
Energy in emerging telecoms telecommunicationsEnergy in emerging telecoms telecommunications
Energy in emerging telecoms telecommunications
 
Resume-Chandramouli
Resume-ChandramouliResume-Chandramouli
Resume-Chandramouli
 
Circuit Break Connect Monitoring to 5G Mobile Application
Circuit Break Connect Monitoring to 5G Mobile ApplicationCircuit Break Connect Monitoring to 5G Mobile Application
Circuit Break Connect Monitoring to 5G Mobile Application
 
CIRCUIT BREAK CONNECT MONITORING TO 5G MOBILE APPLICATION
CIRCUIT BREAK CONNECT MONITORING TO 5G MOBILE APPLICATIONCIRCUIT BREAK CONNECT MONITORING TO 5G MOBILE APPLICATION
CIRCUIT BREAK CONNECT MONITORING TO 5G MOBILE APPLICATION
 
1.1_Power Systems Engineering R&D_Ton_EPRI/SNL Symposium
1.1_Power Systems Engineering R&D_Ton_EPRI/SNL Symposium1.1_Power Systems Engineering R&D_Ton_EPRI/SNL Symposium
1.1_Power Systems Engineering R&D_Ton_EPRI/SNL Symposium
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
Importance of O&M
Importance of O&MImportance of O&M
Importance of O&M
 
Power Plant Software - Get Insights!.
Power Plant Software - Get Insights!.Power Plant Software - Get Insights!.
Power Plant Software - Get Insights!.
 
KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability Statement
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
 

Kürzlich hochgeladen

Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
baharayali
 
Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
baharayali
 
Amil baba, Black magic expert in Sialkot and Kala ilam expert in Faisalabad a...
Amil baba, Black magic expert in Sialkot and Kala ilam expert in Faisalabad a...Amil baba, Black magic expert in Sialkot and Kala ilam expert in Faisalabad a...
Amil baba, Black magic expert in Sialkot and Kala ilam expert in Faisalabad a...
baharayali
 
-Developing-the-10-Paramis-in-a-Vipassana-Meditation.ppt
-Developing-the-10-Paramis-in-a-Vipassana-Meditation.ppt-Developing-the-10-Paramis-in-a-Vipassana-Meditation.ppt
-Developing-the-10-Paramis-in-a-Vipassana-Meditation.ppt
BonnieDuran1
 
Top 10 Amil baba list Famous Amil baba In Pakistan Amil baba Kala jadu in Raw...
Top 10 Amil baba list Famous Amil baba In Pakistan Amil baba Kala jadu in Raw...Top 10 Amil baba list Famous Amil baba In Pakistan Amil baba Kala jadu in Raw...
Top 10 Amil baba list Famous Amil baba In Pakistan Amil baba Kala jadu in Raw...
Amil Baba Naveed Bangali
 
Authentic Black magic, Kala ilam expert in UAE and Kala ilam specialist in S...
Authentic Black magic, Kala ilam expert in UAE  and Kala ilam specialist in S...Authentic Black magic, Kala ilam expert in UAE  and Kala ilam specialist in S...
Authentic Black magic, Kala ilam expert in UAE and Kala ilam specialist in S...
baharayali
 
Verified Amil baba in Pakistan Amil baba in Islamabad Famous Amil baba in Ger...
Verified Amil baba in Pakistan Amil baba in Islamabad Famous Amil baba in Ger...Verified Amil baba in Pakistan Amil baba in Islamabad Famous Amil baba in Ger...
Verified Amil baba in Pakistan Amil baba in Islamabad Famous Amil baba in Ger...
Amil Baba Naveed Bangali
 

Kürzlich hochgeladen (20)

St. Louise de Marillac and Care of the Sick Poor
St. Louise de Marillac and Care of the Sick PoorSt. Louise de Marillac and Care of the Sick Poor
St. Louise de Marillac and Care of the Sick Poor
 
Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
 
May 2024 Calendar of Events for Hope Lutheran Church
May 2024 Calendar of Events for Hope Lutheran ChurchMay 2024 Calendar of Events for Hope Lutheran Church
May 2024 Calendar of Events for Hope Lutheran Church
 
St. Louise de Marillac and Galley Prisoners
St. Louise de Marillac and Galley PrisonersSt. Louise de Marillac and Galley Prisoners
St. Louise de Marillac and Galley Prisoners
 
Deerfoot Church of Christ Bulletin 4 28 24
Deerfoot Church of Christ Bulletin 4 28 24Deerfoot Church of Christ Bulletin 4 28 24
Deerfoot Church of Christ Bulletin 4 28 24
 
Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
 
Amil baba, Black magic expert in Sialkot and Kala ilam expert in Faisalabad a...
Amil baba, Black magic expert in Sialkot and Kala ilam expert in Faisalabad a...Amil baba, Black magic expert in Sialkot and Kala ilam expert in Faisalabad a...
Amil baba, Black magic expert in Sialkot and Kala ilam expert in Faisalabad a...
 
-Developing-the-10-Paramis-in-a-Vipassana-Meditation.ppt
-Developing-the-10-Paramis-in-a-Vipassana-Meditation.ppt-Developing-the-10-Paramis-in-a-Vipassana-Meditation.ppt
-Developing-the-10-Paramis-in-a-Vipassana-Meditation.ppt
 
Top 10 Amil baba list Famous Amil baba In Pakistan Amil baba Kala jadu in Raw...
Top 10 Amil baba list Famous Amil baba In Pakistan Amil baba Kala jadu in Raw...Top 10 Amil baba list Famous Amil baba In Pakistan Amil baba Kala jadu in Raw...
Top 10 Amil baba list Famous Amil baba In Pakistan Amil baba Kala jadu in Raw...
 
Authentic Black magic, Kala ilam expert in UAE and Kala ilam specialist in S...
Authentic Black magic, Kala ilam expert in UAE  and Kala ilam specialist in S...Authentic Black magic, Kala ilam expert in UAE  and Kala ilam specialist in S...
Authentic Black magic, Kala ilam expert in UAE and Kala ilam specialist in S...
 
+92343-7800299 No.1 Amil baba in Pakistan amil baba in Lahore amil baba in Ka...
+92343-7800299 No.1 Amil baba in Pakistan amil baba in Lahore amil baba in Ka...+92343-7800299 No.1 Amil baba in Pakistan amil baba in Lahore amil baba in Ka...
+92343-7800299 No.1 Amil baba in Pakistan amil baba in Lahore amil baba in Ka...
 
English - The Forgotten Books of Eden.pdf
English - The Forgotten Books of Eden.pdfEnglish - The Forgotten Books of Eden.pdf
English - The Forgotten Books of Eden.pdf
 
The_Chronological_Life_of_Christ_Part_99_Words_and_Works
The_Chronological_Life_of_Christ_Part_99_Words_and_WorksThe_Chronological_Life_of_Christ_Part_99_Words_and_Works
The_Chronological_Life_of_Christ_Part_99_Words_and_Works
 
St. Louise de Marillac and Poor Children
St. Louise de Marillac and Poor ChildrenSt. Louise de Marillac and Poor Children
St. Louise de Marillac and Poor Children
 
NoHo First Good News online newsletter May 2024
NoHo First Good News online newsletter May 2024NoHo First Good News online newsletter May 2024
NoHo First Good News online newsletter May 2024
 
"The Magnificent Surah Rahman: PDF Version"
"The Magnificent Surah Rahman: PDF Version""The Magnificent Surah Rahman: PDF Version"
"The Magnificent Surah Rahman: PDF Version"
 
Verified Amil baba in Pakistan Amil baba in Islamabad Famous Amil baba in Ger...
Verified Amil baba in Pakistan Amil baba in Islamabad Famous Amil baba in Ger...Verified Amil baba in Pakistan Amil baba in Islamabad Famous Amil baba in Ger...
Verified Amil baba in Pakistan Amil baba in Islamabad Famous Amil baba in Ger...
 
St. Louise de Marillac and Abandoned Children
St. Louise de Marillac and Abandoned ChildrenSt. Louise de Marillac and Abandoned Children
St. Louise de Marillac and Abandoned Children
 
Genesis 1:8 || Meditate the Scripture daily verse by verse
Genesis 1:8  ||  Meditate the Scripture daily verse by verseGenesis 1:8  ||  Meditate the Scripture daily verse by verse
Genesis 1:8 || Meditate the Scripture daily verse by verse
 
Genesis 1:10 || Meditate the Scripture daily verse by verse
Genesis 1:10  ||  Meditate the Scripture daily verse by verseGenesis 1:10  ||  Meditate the Scripture daily verse by verse
Genesis 1:10 || Meditate the Scripture daily verse by verse
 

Mail shark case study

  • 1. March 30, 2013 “Taking the Bite out of Power Outages” READING ELECTRIC, in conjunction with Mail Shark, provides this information as an educational service to the Region’s Industrial and Commercial Businesses. Mail Shark (www.themailshark.com) is a recognized leader providing nationwide printing and mailing services, specializing in specific industry marketing plans. Mail Shark’s clients rely on constant weekly delivery of direct mail advertising to ensure their business growth. Mail Shark’s portfolio includes but is not limited to direct mail campaigns, printing of menus, brochures, postcards, magnets, and a variety of other promotional pieces. Critical Power Problem Identification Satisfying the marketing and promotional needs of a nationwide customer base that relies on the design, printing and mailing of their marketing programs without interruption on 24/7/365 basis requires excellence in project planning, implementation and operation. This level of customer commitment requires reliable electric utility service for Mail Shark to provide 100% certainty of their production schedules. Located in the middle of the Nolde Forest in Mohnton Pennsylvania, Mail Shark is faced with high vulnerability to power outages. It was critical that Mail Shark had a quality back-up electrical service plan. As the seasonal storms seemed to increase in strength, the frequency and duration of power outages became untenable for Mail Shark. The cost of losing production for a one (1) week period equates to about $50,000 in immediate losses. The greater impact of customer dissatisfaction, while hard to calculate, is very real. Short term power outages of just a couple of hours were very disruptive to manufacturing operations and greatly impacted profitability due to overtime, waste and expediting charges. If Mail Shark lost power for one week twice a year, the profit losses over 10 years would equate to 1 million dollars. More importantly, millions of dollars would be at risk due to unsatisfied customers seeking business from competitors. Mail Shark President, Brian Johnson, decided to implement a plan to eliminate the negative impacts of power outages The decision was made to investigate upgrading the emergency standby generator system to carry the current full loads of manufacturing operations, IT Support Systems, and planned future expansions. Page 1 of 4
  • 2. Critical Power Problem Solution A six (6) month investigation and analysis provided the Mail Shark Team with sufficient information to embark upon the project phase of budget analysis, appropriation approval, and ordering of an emergency standby power system. In October 2012, the Contract was signed. This project installation phase required two (2) months for completion which included equipment delivery. Initially, a study was completed to determine if placing small individual backup generators to serve specific equipment would be viable. In the final analysis it was deemed a more reliable and cost effective solution to design and install a full service generator into the main utility feed. The solution that evolved over this period resulted in a Standby Power System that consisted of: 250 Kw diesel powered generator with a sub-base fuel tank for 48 hours of runtime, new 800 amp Service Entrance rated transfer switch, and a remote annunciator panel which mimics the generator control panel alarms. This equipment was to be installed outdoors and would provide the entire 800 amp service meeting the current requirements. This solution would provide Mail Shark with four ‘9s’ capability. The ROI is expected to be less than one (1) year. The Standby Power System would pay for itself after only ten (10) days of lost production avoidance The System is currently sized for 65% loading. It was also decided to purchase the System from a local Company (Reading Electric) to avoid response time issues. Implementation and Associated Issues: As with any complex Solution, there were dozens of details that needed to have special focus to ensure success of the Program in terms of performance and schedule. These details were: 1) Project Management Team consisting of decision makers at Mail Shark, George H. Longenecker & Sons, and Reading Electric. 2) Real-time status meetings with virtual Electronic Meetings / communications as required. 3) Advance review and pre-approval from Local Municipality for Permits. 4) Offsite Equipment Testing before shipment & installation at the Mail Shark Facility to avoid potential start-up problems. Page 2 of 4
  • 3. Implementation and Associated Issues (continued): 5) Detailed installation and test schedules. George H. Longenecker & Sons was selected for the on-site installer of the equipment. a. Site Preparation b. Equipment Placement c. Mechanical d. Electric e. System Testing 6) Detailed plan and schedule for commissioning and tie-in to the Facility systems. The Program time line was: Equipment Delivery - 5 weeks Installation - 2 weeks Planned Commissioning & Tie-in – 4 hours Careful coordination among Mail Shark, George H. Longenecker & Sons and Reading Electric Personnel resulted in a Tie-In that did not impact printing operations. Commissioning and Acceptance Testing were scheduled in advance, safeguarding Mail Shark’s operations. Commissioning took place in December 2012 and this commissioning included operational testing where “loss of utility” conditions were simulated. Emergency System testing Since commissioning, the Emergency Power Standby system has not been tested as yet by nature, but Mail Shark has put in place a bi-weekly test of the system. These tests do not fully transfer all loads to the Emergency System. A full load test will be conducted twice annually. The Emergency System carries a two year/ 1000 hour warranty on the generator, one year on the transfer switch and is under an annual service contract for service and testing. Critical Power Lessons Learned Several lessons were learned through the implementation and execution of the Mail Shark Standby Generator Program. 1) Management monitoring of corporate growth and demands on the Emergency Power Standby Systems is critical for maintaining business integrity. Page 3 of 4
  • 4. Critical Power Lessons Learned (continued) 2) A complete engineering analysis of the current and future electrical loads is required for correct System sizing and design. 3) Attention paid to the implementation and commissioning schedule pays large benefits during the ‘tie-in’ to the facility. Critical Power Information Resources For additional information on Standby Power Systems, contact Russ Yerger, Critical Power Systems Manager, Reading Electric Phone: 610-929-5777; email: ryerger@readingelectric.com READING ELECTRIC is a leading supplier of electro-mechanical equipment & services for Industrial and Commercial Customers, specializing in providing Total Solution Packages for Critical Power Requirements to safeguard the Industry’s profitability from electrical power outages. Website: www.readingelectric.com File: CP#033013 Page 4 of 4