Risk Management in Five Easy Pieces
Colorado Springs, Colorado May 8th , 2008




               Risk management is essential for any significant project. and is useful for any project where an 
            unfavorable outcome is undesirable. Certain information about key project cost, performance, and 
            unfavorable outcome is undesirable Certain information about key project cost performance and
            schedule attributes are often unknown until the project is underway. The emerging risks that can 
            be identified early in the project that impact the project later, are often termed “known 
            unknowns.” These risks can be mitigated with a good risk management process. For risks that are 
            beyond the vision of the project team a properly implemented risk management process can also 
            rapidly quantify the risks impact and provide sound plans for mitigating its affect.
               Risk management is concerned with the outcome of future events, whose exact outcome is 
            unknown, and with how to deal with these uncertainties. Outcomes are categorized as favorable or 
            unfavorable, and risk management is the art and science of planning, assessing, handling, and 
            monitoring future events to ensure favorable outcomes. A good risk management process is 
            proactive and fundamentally different than issue management or problem solving, which is 
            reactive. 
               This presentation describes the fundamental of Risk Management in 5 easy steps – using Jack 
            Nicholson’s “Five Easy Pieces” 1970’s movie as a backdrop. The Five Pieces are:
              1. Hope is not a strategy
              2. All point estimates are wrong
              3. Without integrating Cost, Schedule and Technical Performance you’re driving in the rearview 
                  mirror
              4. Without a model for risk management, you’re driving in the dark with the headlights turn off
              5. Risk Communication is everything
               Risk management is an important skill that can be applied to a wide variety of projects. In an era 
            of downsizing, consolidation, shrinking budgets, increasing technological sophistication, and shorter 
            development times, risk management provides valuable insights to help key project personnel plan 
            for risks, alert them of potential risk issues, analyze these issues, and develop, implement, and 
            monitor plans to address risks  long before they surface as issues and adversely affect project cost, 
            performance, and schedule.




Glen B. Alleman
Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112
www.lewisandfowler.com                                                                                               1
Colorado Springs PMI
Risk Management in Five Easy Pieces
Colorado Springs, Colorado May 8th , 2008




            1. Hoping that something positive will result is not a very good strategy. Preparing for success is the 
               basis of success.
            2. Single point estimates are no better than 50/50 guesses in the absence of knowledge of the 
               standard deviation of the  underlying distribution
            3. Without connecting cost, schedule, and technical performance of the effort to produce the 
               product or service the connection to value cannot be made.
            4. Risk management is not an ad hoc processes that you can make up as you go. A formal 
               foundation for risk management is needed.
               foundation for risk management is needed
            5. Identifying risks without communication them is a waste of time.




Glen B. Alleman
Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112
www.lewisandfowler.com                                                                                                 2
Colorado Springs PMI
Risk Management in Five Easy Pieces
Colorado Springs, Colorado May 8th , 2008




               Project Managers constantly seek ways to eliminate or control risk, variance and uncertainly. 
            This is a hopeless pursuit. 
               Managing “in the presence” of risk, variance and uncertainty is the key to success. Some projects 
            have few uncertainties –only the complexity of tasks and relationships is important – but most 
            projects are characterized by several types of uncertainty. Although each uncertainty type is 
            distinct, a single project may encounter some combination of four types:
            1. Variation – comes from many small influences and yields a range of values on a particular 
               activity. Attempting to control these variances outside their natural boundaries is a waste 
               activity. Attempting to control these variances outside their natural boundaries is a waste
               (Muda)
            2. Foreseen Uncertainty – are uncertainties identifiable and understood influences that the team 
               cannot be sure will occur. There needs to be a mitigation plan for these foreseen uncertainties.
            3. Unforeseen Uncertainty – is uncertainty that can’t be identified during project planning. When 
               these occur, a new plan is needed.
            4. Chaos – appears in the presence of “unknown unknowns”


               “Managing Project Uncertainty: From Variation to Chaos,” Arnoud De Meyer, Christoph H. Loch 
               and Michael T. Pich, MIT Sloan Management Review, Winter 2000.




Glen B. Alleman
Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112
www.lewisandfowler.com                                                                                              3
Colorado Springs PMI
Risk Management in Five Easy Pieces
Colorado Springs, Colorado May 8th , 2008




            Larger variances can be  tolerated in early periods. But tolerances for risk must decrease as the 
            program matures.
            At all times, avoiding unseen risk is mandatory.
            Any unknown risk must be discovered before it becomes and issue.
            The management of variance must first recognize four types of risk, their associated variances and 
            the impact of these risks and variances:
            1. Normal Variation – in activity durations, costs, and technical and business performance level 
               delivered by the project. 
            2. Foreseen Risks – are indentified, but have uncertain influences on the project
            3. Unforeseen Risks – are not formally identified in the planning stage, are not anticipated and a 
               mitigation plan has not been identified.
            4. Chaos – is fundamental uncertainty about the basic structure of the project plan itself.
            The key concept here is that as the project proceeds the risk must be reduced. But also the 
            tolerance for risk must be reduced as well. This means that the variance and the tolerance must be 
            reduced in tandem. They must track each other to the end of the project.




Glen B. Alleman
Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112
www.lewisandfowler.com                                                                                            4
Colorado Springs PMI
Risk Management in Five Easy Pieces
Colorado Springs, Colorado May 8th , 2008




               Project duration and costs are random variables drawn from some underlying probability 
            distribution.
               The use of point estimates for durations and costs is many times the first impulse in an 
            organization low on the project management maturity scale. Understanding cost and durations are 
            actually “random variables,” drawn from an underlying distribution of possible value is the starting 
            point for managing in the presence of uncertainty.
                In probability theory, every random variable is attributed to a probability distribution. The 
            probability distribution associated with a cost or duration describes the variance of these random 
            probability distribution associated with a cost or duration describes the variance of these random
            variables. A common distribution of probabilistic estimates for cost and schedule random variables 
            is the Triangle Distribution. 
               The Triangle Distribution is used as a subjective description of a population for which there is 
            only limited sample data, and especially where the relationship between variables is known but 
            data is scarce. It is based on the knowledge of the minimum and maximum and a “best guess” of 
            the modal value (the Most Likely). 
               Using the Triangle Distribution for the costs and durations, a Monte Carlo simulation of the 
               Ui      h T i l Di ib i f h                     dd      i      M     C l i l i         f h
            network of activities and their costs can be performed. Monte Carlo methods are used to 
            numerically transform and integrate the posterior quantitative risk assessment into a confidence 
            interval. The result is a “confidence” model for the cost and completion times for the project based 
            on the upper and lower bounds of each distribution assigned to each duration and cost.
               This approach to estimating provides insight into the behavior of the plan as well as sensitivity 
            between the individual elements of the plan.




Glen B. Alleman
Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112
www.lewisandfowler.com                                                                                              5
Colorado Springs PMI
Risk Management in Five Easy Pieces
Colorado Springs, Colorado May 8th , 2008




            Estimating is a very vague art in the absence of a formal process. One place to start is with the 
            statistical definition of an “estimate.” 
            But even that definition has three (3) different possibilities.
               The Mode is the most likely value. The value that occurs most often when statistical samples are 
               drawn from the underlying population.
               The Median is the “middle” value between the highest and lowest value from the total of all 
               samples drawn from the underlying statistical population.
               The Mean is the “average” of all the samples drawn from the population.
            The most important concept is to understand that the “sum” of all the “estimates” is never one of 
            these three estimates.
            The details of this are beyond the scope of this presentation but it has to do with “summing” 
            probability  distributions is not actually a summation process – it is a convolution process. This 
            means that the probability distribution – represented by an integral equation – is convolved with 
            the other integral equations.
            the other integral equations




Glen B. Alleman
Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112
www.lewisandfowler.com                                                                                             6
Colorado Springs PMI
Risk Management in Five Easy Pieces
Colorado Springs, Colorado May 8th , 2008




            The actual duration or cost are random variables, drawn from a probability distribution.
            The Mean, Mode, Median are statistical terms that characterize probability distributions – not point 
            values.
            When we naively speak about a duration or cost in the absence of a variance, the result is suspect. 
            Ignoring for the moment the Mean, Mode, and Median issues, this missing variance creates odd 
            outcomes.
            The median temperature in Cody Wyoming is very close to the median temperature in Trinidad 
            Tobago . Both are around 78°. In Trinidad the variance is significantly less than in Cody. 
            Tobago Both are around 78° In Trinidad the variance is significantly less than in Cody
            Cody has a temperature range between 10°F and 100°F. The Median is 60°F. Fudge this up  to 78°
            In Trinidad Tobago, the maximum temperature runs around 89°F with minimums running around 
            68°F. Means of 77°F in the winter and 85°F in the summer.
            Answering the variance question is as important or possibly more important than answering the 
            Median question.




Glen B. Alleman
Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112
www.lewisandfowler.com                                                                                              7
Colorado Springs PMI
Risk Management in Five Easy Pieces
Colorado Springs, Colorado May 8th , 2008




            In the project planning business, the use of deterministic and probabilistic  analysis are both useful. 
            The deterministic description is great for “power point” type displays of the scheduled activities and 
            management briefings. This type of information shows a “static” description of the schedule, cost, 
            or technical performance.
            The probabilistic description is useful as the basis for risk analysis. This type of information shows 
            the range of possible values each variable can take one. The analysis derived from these variables 
            shows to impact on the project. This itself is a variance – a variance of impact.
            The difference between Probability and Statistics is important to the notion of “randomness” of 
            The difference between Probability and Statistics is important to the notion of “randomness” of
            durations and cost.
            We need to know things about the underlying statistical behavior of the durations and costs before 
            we can ask question about the probabilistic confidence in the planned completion date and planned 
            completion costs.




Glen B. Alleman
Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112
www.lewisandfowler.com                                                                                                 8
Colorado Springs PMI
Risk Management in Five Easy Pieces
Colorado Springs, Colorado May 8th , 2008




            In many descriptions of project management – cost, schedule, and quality are considered as the 
            “Iron Triangle.” Change one and the other two must change as well. It turns our this is too narrow a 
            view of what's happening  on a project.
            It’s the Technical Performance Measurement that replaces Quality. Quality is one of the Technical 
            Performance measures.
            Cost and Schedule are obvious elements of the project. Technical  Performance Measures describe 
            the status of technical achievement of the project at any point in time. 
            The Planned technical achievement is part of the Performance Measurement Baseline (PMB) in the 
            The Planned technical achievement is part of the Performance Measurement Baseline (PMB) in the
            same way the Planned Value (BCWS) is part of the PMB.
            The Technical Performance Measurement System (TPMS) uses the techniques of risk analysis and 
            probability to give program managers the early warning needed to avoid unplanned costs and 
            slippage in schedule. Systems engineering uses technical performance measurements to balance 
            cost, schedule, and performance throughout the life cycle.  
            Technical performance measurements compare actual versus planned technical development and 
            design.  They also report the degree to which system requirements are met in terms of 
            performance, cost, schedule, and progress in implementing risk handling.  Performance metrics are 
            traceable to user‐defined capabilities.




Glen B. Alleman
Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112
www.lewisandfowler.com                                                                                              9
Colorado Springs PMI
Risk Management in Five Easy Pieces
Colorado Springs, Colorado May 8th , 2008




            Measures of Effectiveness, Measures Performance, and Measures of Quality are typical Technical 
            Performance Measures.
            The Cost and Schedule “measures” are straightforward in most cases. 
            The measures of Technical Performance involve Effectiveness, Performance, Technical Performance
            Measures of Effectiveness (MOE) define the operational mission success factor as defined by the 
            customer. These are:
            1. Stated from the customer point of view;
            2.   Focused on the most critical mission performance needs; 
            3. Independent of any particular solution; 
            4. Actual measures at the end of development. 
            Measures of Performance (MOP) characterize physical or functional attribute relating to the system 
            operation: 
            1. Supplier’s point of view
               Supplier s point of view
            2. Measured under specified testing or operational conditions
            3. Assesses delivered solution performance against critical system level specified requirements
            4. Risk indicators that are monitored progressively.




Glen B. Alleman
Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112
www.lewisandfowler.com                                                                                            10
Colorado Springs PMI
Risk Management in Five Easy Pieces
Colorado Springs, Colorado May 8th , 2008




            Risk Management is a full time effort. Even if it is a part‐time job.
            Someone needs to “own” the risks and the process around risk management.
            Someone or a collection of “someone's” needs to have risk management in their mind(s) at 
            all times
            Risk Management is not something you can do once and them forget. The risks don’t just 
            go away. They are forever there, even if they are mitigated, retired or bought down.




Glen B. Alleman
Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112
www.lewisandfowler.com                                                                                  11
Colorado Springs PMI
Risk Management in Five Easy Pieces
Colorado Springs, Colorado May 8th , 2008




              Risk Management means using a proven risk management process, adapting this to the project 
            environment, and using this process for everyday decision making.
                Technical performance is a concept absent from the traditional approaches to risk management.  
            Yet it is the primary driver of risk in many technology intensive projects. Cost growth and schedule 
            slippage often occur when unrealistically high levels of performance are required and little 
            flexibility is provided to degrade performance during the course of the program. Quality is often a 
            cause rather than an impact to the program and can generally be broken down into Cost, 
            Performance, and Schedule components.
            The framework shown here provides:
               Risk management policy
               Risk management structure
               Risk Management Process Model
               Organizational and behavioral considerations for implementing risk management
               The performance dimension of consequence of occurrence
               Th     f        di    i    f              f
               The performance dimension of Monte Carlo simulation modeling
               A structured approach for developing a risk handling strategy




Glen B. Alleman
Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112
www.lewisandfowler.com                                                                                              12
Colorado Springs PMI
Risk Management in Five Easy Pieces
Colorado Springs, Colorado May 8th , 2008




            The traditional three variables the “iron triangle” are inappropriate in today’s integrated software, 
            hardware and operational world and there are two other “triangles.”
            One includes Risk, Customer Satisfaction, and Quality
            The other includes CMMI, Six Sigma, and Lean.
            The three collections of three attributes form a “system” to assess risk, address these risks and 
            manage the project in the presence of this risk.
            Putting these 3 sets of 3 together results in a view of 
               Product risk – the risk that the product will not performance as specified or perform to the needs 
               of the customer
               Programmatic risk – the risk that the project will be over budget or behind schedule in producing 
               the product
               Process risk – the risk that the processes used to build the product or management the project 
               will fail in their desired outcomes.




Glen B. Alleman
Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112
www.lewisandfowler.com                                                                                               13
Colorado Springs PMI
Risk Management in Five Easy Pieces
Colorado Springs, Colorado May 8th , 2008




            It does no good to manage risks if the results are not communicated to all the participants.
            Only the participants can define the needed mitigations
            Risk communication is the basis of risk mitigation. It serves no purpose to have a risk plan and the 
            defined mitigations in the absence of a risk communication plan.
            This plan needs to address the following:
               Executive summary – a simple summary of the program and the risks associated with the 
               activities of the program. Each risk needs an ordinal rank, a planned mitigation is the risk is active 
               (a risk approved by the Risk Board), and the mitigations shown in the schedule with associated 
               costs.
               Program description – a detailed description of the program and the risk associated with each of 
               the deliverables. This description should be “operational” in nature, with the consequences 
               description in “operational” terms as well.
               Risk reduction activities by phase – using some formal risk management process that connects 
               risk, mitigation and the IMS. The efforts for mitigation need to be in the schedule.
               risk mitigation and the IMS The efforts for mitigation need to be in the schedule
               Risk management methodology – using the DoD Risk Management process is a good start. This 
               approach has proven and approved by high risk, high reward programs. The steps in the 
               processes are not optional and should be executed for ALL risk processes.




Glen B. Alleman
Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112
www.lewisandfowler.com                                                                                                   14
Colorado Springs PMI
Risk Management in Five Easy Pieces
Colorado Springs, Colorado May 8th , 2008




            This list comes from guidance in the defense program management business. While some 
            of the statement may not be appropriate for the commercial world, every statement has 
            some applicability to every project – not matter what the domain. Whether formal or 
            informal the programmatic risk assessment of a project needs to ask or answer these 
            statements.
            The actions needed to close any gaps from these statements are outside the scope of this 
            presentation. 
            But the next step is to have the project management team start to answer these questions.




Glen B. Alleman
Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112
www.lewisandfowler.com                                                                                  15
Colorado Springs PMI
Risk Management in Five Easy Pieces
Colorado Springs, Colorado May 8th , 2008




            Many speak about risk management as part of the project management process.
            But do they do risk management as part of the project management process? 
            Test yourself and anyone who claims to be doing risk management  




Glen B. Alleman
Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112
www.lewisandfowler.com                                                                    16
Colorado Springs PMI
Risk Management in Five Easy Pieces
Colorado Springs, Colorado May 8th , 2008




            The first set of questions should be:
               How do we earn back the investment in risk management? 
               How can be measure the benefits of risk management?
               Who gets to say what the value of risk management is?
            These is monetized questions are risk. So the answers have to be monetized as well. 
            attaching money to risk is the starting point. attaching money to the mitigation activities is 
            the next. The risks and their mitigations need to be represented in the schedule and cost 
            the next The risks and their mitigations need to be represented in the schedule and cost
            baseline. Otherwise risk management is not Project Management.




Glen B. Alleman
Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112
www.lewisandfowler.com                                                                                        17

Más contenido relacionado

Was ist angesagt?

Programmatic risk management workshop (handbook)
Programmatic risk management workshop (handbook)Programmatic risk management workshop (handbook)
Programmatic risk management workshop (handbook)Glen Alleman
 
Risk assesment template
Risk assesment templateRisk assesment template
Risk assesment templateGlen Alleman
 
Risk management of the performance measurement baseline
Risk management of the performance measurement baselineRisk management of the performance measurement baseline
Risk management of the performance measurement baselineGlen Alleman
 
Programmatic risk management
Programmatic risk managementProgrammatic risk management
Programmatic risk managementGlen Alleman
 
Agile project management and normative
Agile project management and normativeAgile project management and normative
Agile project management and normativeGlen Alleman
 
Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planningGlen Alleman
 
Managing in the presence of uncertainty
Managing in the presence of uncertaintyManaging in the presence of uncertainty
Managing in the presence of uncertaintyGlen Alleman
 
Risk Management Basics for Globalization Projects
Risk Management Basics for Globalization ProjectsRisk Management Basics for Globalization Projects
Risk Management Basics for Globalization Projectsvanessa_wilburn
 
Options based decisions processes
Options based decisions processesOptions based decisions processes
Options based decisions processesGlen Alleman
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project SuccessGlen Alleman
 
Bertrand's Individual Essay
Bertrand's Individual EssayBertrand's Individual Essay
Bertrand's Individual EssayPrince Bertrand
 
12.0 risk management agile+evm (v10.2)
12.0 risk management agile+evm (v10.2)12.0 risk management agile+evm (v10.2)
12.0 risk management agile+evm (v10.2)Glen Alleman
 
Technical Risk Management
Technical Risk ManagementTechnical Risk Management
Technical Risk ManagementGlen Alleman
 
Iwsm2014 defining technical risk in software development (vard antinyan)
Iwsm2014   defining technical risk in software development (vard antinyan)Iwsm2014   defining technical risk in software development (vard antinyan)
Iwsm2014 defining technical risk in software development (vard antinyan)Nesma
 
Software Engineering Risk Management Software Application
Software Engineering Risk Management   Software ApplicationSoftware Engineering Risk Management   Software Application
Software Engineering Risk Management Software Applicationguestfea9c55
 
Notional cam interview questions (update)
Notional cam interview questions (update)Notional cam interview questions (update)
Notional cam interview questions (update)Glen Alleman
 
Continuous Risk Management
Continuous Risk ManagementContinuous Risk Management
Continuous Risk ManagementGlen Alleman
 

Was ist angesagt? (20)

Programmatic risk management workshop (handbook)
Programmatic risk management workshop (handbook)Programmatic risk management workshop (handbook)
Programmatic risk management workshop (handbook)
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Risk assesment template
Risk assesment templateRisk assesment template
Risk assesment template
 
Risk management of the performance measurement baseline
Risk management of the performance measurement baselineRisk management of the performance measurement baseline
Risk management of the performance measurement baseline
 
Programmatic risk management
Programmatic risk managementProgrammatic risk management
Programmatic risk management
 
Agile project management and normative
Agile project management and normativeAgile project management and normative
Agile project management and normative
 
Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planning
 
Root causes
Root causesRoot causes
Root causes
 
Managing in the presence of uncertainty
Managing in the presence of uncertaintyManaging in the presence of uncertainty
Managing in the presence of uncertainty
 
Risk Management Basics for Globalization Projects
Risk Management Basics for Globalization ProjectsRisk Management Basics for Globalization Projects
Risk Management Basics for Globalization Projects
 
Options based decisions processes
Options based decisions processesOptions based decisions processes
Options based decisions processes
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project Success
 
Bertrand's Individual Essay
Bertrand's Individual EssayBertrand's Individual Essay
Bertrand's Individual Essay
 
12.0 risk management agile+evm (v10.2)
12.0 risk management agile+evm (v10.2)12.0 risk management agile+evm (v10.2)
12.0 risk management agile+evm (v10.2)
 
Technical Risk Management
Technical Risk ManagementTechnical Risk Management
Technical Risk Management
 
Risk ppt1672
Risk ppt1672Risk ppt1672
Risk ppt1672
 
Iwsm2014 defining technical risk in software development (vard antinyan)
Iwsm2014   defining technical risk in software development (vard antinyan)Iwsm2014   defining technical risk in software development (vard antinyan)
Iwsm2014 defining technical risk in software development (vard antinyan)
 
Software Engineering Risk Management Software Application
Software Engineering Risk Management   Software ApplicationSoftware Engineering Risk Management   Software Application
Software Engineering Risk Management Software Application
 
Notional cam interview questions (update)
Notional cam interview questions (update)Notional cam interview questions (update)
Notional cam interview questions (update)
 
Continuous Risk Management
Continuous Risk ManagementContinuous Risk Management
Continuous Risk Management
 

Ähnlich wie Risk Management in Five Easy Pieces

Risk management (final review)
Risk management (final review)Risk management (final review)
Risk management (final review)Glen Alleman
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Managementcgautam
 
Quantification of Risks in Project Management
Quantification of Risks in Project ManagementQuantification of Risks in Project Management
Quantification of Risks in Project ManagementVenkatesh Ganapathy
 
Managing risk as Opportunity
Managing risk as OpportunityManaging risk as Opportunity
Managing risk as OpportunityGlen Alleman
 
5 Project Risk Managementadrian825iStockThinkstockLe.docx
5 Project Risk Managementadrian825iStockThinkstockLe.docx5 Project Risk Managementadrian825iStockThinkstockLe.docx
5 Project Risk Managementadrian825iStockThinkstockLe.docxgilbertkpeters11344
 
11. Project Risk Management.pptx
11. Project Risk Management.pptx11. Project Risk Management.pptx
11. Project Risk Management.pptxKamranKhan353531
 
Building Risk Tolerance into the Program Plan and Schedule
Building Risk Tolerance into the Program Plan and ScheduleBuilding Risk Tolerance into the Program Plan and Schedule
Building Risk Tolerance into the Program Plan and ScheduleGlen Alleman
 
IT Risk managment combined
IT Risk managment combinedIT Risk managment combined
IT Risk managment combinedGlen Alleman
 
How Traditional Risk Reporting Has Let Us Down
How Traditional Risk Reporting Has Let Us DownHow Traditional Risk Reporting Has Let Us Down
How Traditional Risk Reporting Has Let Us DownAcumen
 
Risky Business
Risky BusinessRisky Business
Risky Business3gamma
 
UCISA Toolkit - Effective Risk Management for Business Change and IT Projects
UCISA Toolkit - Effective Risk Management for Business Change and IT Projects UCISA Toolkit - Effective Risk Management for Business Change and IT Projects
UCISA Toolkit - Effective Risk Management for Business Change and IT Projects Mark Ritchie
 
Information Technology Risk Management
Information Technology Risk ManagementInformation Technology Risk Management
Information Technology Risk ManagementGlen Alleman
 
2.11 risk management 1
2.11 risk management 12.11 risk management 1
2.11 risk management 1reddvise
 
Paper on risk management by Samuel Obino Mokaya
Paper on risk management by Samuel Obino MokayaPaper on risk management by Samuel Obino Mokaya
Paper on risk management by Samuel Obino MokayaDiscover JKUAT
 
Event and Non-Event Risk - PMP/CAPM from PMI
Event and Non-Event Risk  - PMP/CAPM from PMIEvent and Non-Event Risk  - PMP/CAPM from PMI
Event and Non-Event Risk - PMP/CAPM from PMIMudassir Iqbal
 
Risk management Phase 1-5 Individual Project.docx
Risk management Phase 1-5 Individual Project.docxRisk management Phase 1-5 Individual Project.docx
Risk management Phase 1-5 Individual Project.docxjoellemurphey
 
Project Risk Management
Project  Risk ManagementProject  Risk Management
Project Risk ManagementKelvin Fredson
 

Ähnlich wie Risk Management in Five Easy Pieces (20)

Risk management (final review)
Risk management (final review)Risk management (final review)
Risk management (final review)
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Quantification of Risks in Project Management
Quantification of Risks in Project ManagementQuantification of Risks in Project Management
Quantification of Risks in Project Management
 
Managing risk as Opportunity
Managing risk as OpportunityManaging risk as Opportunity
Managing risk as Opportunity
 
5 Project Risk Managementadrian825iStockThinkstockLe.docx
5 Project Risk Managementadrian825iStockThinkstockLe.docx5 Project Risk Managementadrian825iStockThinkstockLe.docx
5 Project Risk Managementadrian825iStockThinkstockLe.docx
 
11. Project Risk Management.pptx
11. Project Risk Management.pptx11. Project Risk Management.pptx
11. Project Risk Management.pptx
 
Building Risk Tolerance into the Program Plan and Schedule
Building Risk Tolerance into the Program Plan and ScheduleBuilding Risk Tolerance into the Program Plan and Schedule
Building Risk Tolerance into the Program Plan and Schedule
 
IT Risk managment combined
IT Risk managment combinedIT Risk managment combined
IT Risk managment combined
 
How Traditional Risk Reporting Has Let Us Down
How Traditional Risk Reporting Has Let Us DownHow Traditional Risk Reporting Has Let Us Down
How Traditional Risk Reporting Has Let Us Down
 
8. project risk management
8. project risk management8. project risk management
8. project risk management
 
Risky Business
Risky BusinessRisky Business
Risky Business
 
UCISA Toolkit - Effective Risk Management for Business Change and IT Projects
UCISA Toolkit - Effective Risk Management for Business Change and IT Projects UCISA Toolkit - Effective Risk Management for Business Change and IT Projects
UCISA Toolkit - Effective Risk Management for Business Change and IT Projects
 
Project Risk
Project RiskProject Risk
Project Risk
 
Project mngmnt risks3.2
Project mngmnt risks3.2Project mngmnt risks3.2
Project mngmnt risks3.2
 
Information Technology Risk Management
Information Technology Risk ManagementInformation Technology Risk Management
Information Technology Risk Management
 
2.11 risk management 1
2.11 risk management 12.11 risk management 1
2.11 risk management 1
 
Paper on risk management by Samuel Obino Mokaya
Paper on risk management by Samuel Obino MokayaPaper on risk management by Samuel Obino Mokaya
Paper on risk management by Samuel Obino Mokaya
 
Event and Non-Event Risk - PMP/CAPM from PMI
Event and Non-Event Risk  - PMP/CAPM from PMIEvent and Non-Event Risk  - PMP/CAPM from PMI
Event and Non-Event Risk - PMP/CAPM from PMI
 
Risk management Phase 1-5 Individual Project.docx
Risk management Phase 1-5 Individual Project.docxRisk management Phase 1-5 Individual Project.docx
Risk management Phase 1-5 Individual Project.docx
 
Project Risk Management
Project  Risk ManagementProject  Risk Management
Project Risk Management
 

Mehr von Glen Alleman

A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSGlen Alleman
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMGlen Alleman
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk managementGlen Alleman
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk ManagementGlen Alleman
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Glen Alleman
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringGlen Alleman
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideGlen Alleman
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineGlen Alleman
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Glen Alleman
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by StepGlen Alleman
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)Glen Alleman
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possibleGlen Alleman
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic AbundanceGlen Alleman
 
Capabilities based planning
Capabilities based planningCapabilities based planning
Capabilities based planningGlen Alleman
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for AgileGlen Alleman
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement BaselineGlen Alleman
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaGlen Alleman
 
Policy and Procedure Rollout
Policy and Procedure RolloutPolicy and Procedure Rollout
Policy and Procedure RolloutGlen Alleman
 
Integrated Master Plan Development
Integrated Master Plan DevelopmentIntegrated Master Plan Development
Integrated Master Plan DevelopmentGlen Alleman
 
Project Management Theory
Project Management TheoryProject Management Theory
Project Management TheoryGlen Alleman
 

Mehr von Glen Alleman (20)

A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMS
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPM
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk management
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk Management
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems Engineering
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guide
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement Baseline
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by Step
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possible
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic Abundance
 
Capabilities based planning
Capabilities based planningCapabilities based planning
Capabilities based planning
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for Agile
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement Baseline
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six Sigma
 
Policy and Procedure Rollout
Policy and Procedure RolloutPolicy and Procedure Rollout
Policy and Procedure Rollout
 
Integrated Master Plan Development
Integrated Master Plan DevelopmentIntegrated Master Plan Development
Integrated Master Plan Development
 
Project Management Theory
Project Management TheoryProject Management Theory
Project Management Theory
 

Último

14 march 2024-capital-markets-update eni.pdf
14 march 2024-capital-markets-update eni.pdf14 march 2024-capital-markets-update eni.pdf
14 march 2024-capital-markets-update eni.pdfEni
 
We are inviting you on board, to move forward together in the Right Direction
We are inviting you on board, to move forward together in the Right DirectionWe are inviting you on board, to move forward together in the Right Direction
We are inviting you on board, to move forward together in the Right DirectionRight Direction Aero
 
Bus Eth ch3 ppt.ppt business ethics and corporate social responsibilities ppt
Bus Eth ch3 ppt.ppt business ethics and corporate social responsibilities pptBus Eth ch3 ppt.ppt business ethics and corporate social responsibilities ppt
Bus Eth ch3 ppt.ppt business ethics and corporate social responsibilities pptendeworku
 
NewBase 14 March 2024 Energy News issue - 1707 by Khaled Al Awadi_compress...
NewBase  14 March  2024  Energy News issue - 1707 by Khaled Al Awadi_compress...NewBase  14 March  2024  Energy News issue - 1707 by Khaled Al Awadi_compress...
NewBase 14 March 2024 Energy News issue - 1707 by Khaled Al Awadi_compress...Khaled Al Awadi
 
How The Hustle Milestone Referral Program Got 300K Subscribers
How The Hustle Milestone Referral Program Got 300K SubscribersHow The Hustle Milestone Referral Program Got 300K Subscribers
How The Hustle Milestone Referral Program Got 300K SubscribersFlyyx Tech
 
Mist Cooling & Fogging System Company in Egypt
Mist Cooling & Fogging System Company in EgyptMist Cooling & Fogging System Company in Egypt
Mist Cooling & Fogging System Company in Egyptopstechsanjanasingh
 
Project Work on Consumer Behavior in Fast Food Restaurants. Their behavior to...
Project Work on Consumer Behavior in Fast Food Restaurants. Their behavior to...Project Work on Consumer Behavior in Fast Food Restaurants. Their behavior to...
Project Work on Consumer Behavior in Fast Food Restaurants. Their behavior to...BilalAhmed717
 
3BBE: THE FUTURE OF ECOMMERCE PRESENTATION - LOUIS MALAYBALAY
3BBE: THE FUTURE OF ECOMMERCE PRESENTATION - LOUIS MALAYBALAY3BBE: THE FUTURE OF ECOMMERCE PRESENTATION - LOUIS MALAYBALAY
3BBE: THE FUTURE OF ECOMMERCE PRESENTATION - LOUIS MALAYBALAYLouis Malaybalay
 
Meet Raj Shamani: A Trailblazing Entrepreneur
Meet Raj Shamani: A Trailblazing EntrepreneurMeet Raj Shamani: A Trailblazing Entrepreneur
Meet Raj Shamani: A Trailblazing Entrepreneurramya202104
 
pitchdeck ORPC 2019 data info turine.pdf
pitchdeck ORPC 2019 data info turine.pdfpitchdeck ORPC 2019 data info turine.pdf
pitchdeck ORPC 2019 data info turine.pdflebob12
 
Unleashing the Power of Fandom: A Short Guide to Fan Business
Unleashing the Power of Fandom: A Short Guide to Fan BusinessUnleashing the Power of Fandom: A Short Guide to Fan Business
Unleashing the Power of Fandom: A Short Guide to Fan Businesstompeter3736
 
CORPORATE SOCIAL RESPONSIBILITY - FINAL REQUIREMENT.pdf
CORPORATE SOCIAL RESPONSIBILITY - FINAL REQUIREMENT.pdfCORPORATE SOCIAL RESPONSIBILITY - FINAL REQUIREMENT.pdf
CORPORATE SOCIAL RESPONSIBILITY - FINAL REQUIREMENT.pdfLouis Malaybalay
 
Strategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateStrategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateAdnet Communications
 
The 10 Most Influential Women Making Difference In 2024.pdf
The 10 Most Influential Women Making Difference In 2024.pdfThe 10 Most Influential Women Making Difference In 2024.pdf
The 10 Most Influential Women Making Difference In 2024.pdfInsightsSuccess4
 
Reframing Requirements: A Strategic Approach to Requirement Definition, with ...
Reframing Requirements: A Strategic Approach to Requirement Definition, with ...Reframing Requirements: A Strategic Approach to Requirement Definition, with ...
Reframing Requirements: A Strategic Approach to Requirement Definition, with ...Jake Truemper
 
Optimize Your CRM Customization and Beyond
Optimize Your CRM Customization and BeyondOptimize Your CRM Customization and Beyond
Optimize Your CRM Customization and BeyondBoundify
 
Dashboards y paneles - CP Home - Area de Operaciones
Dashboards y paneles - CP Home - Area de OperacionesDashboards y paneles - CP Home - Area de Operaciones
Dashboards y paneles - CP Home - Area de OperacionesLPI ONG
 
Olympus 38DL Plus Ultrasonic Thickness Gauge
Olympus 38DL Plus Ultrasonic Thickness GaugeOlympus 38DL Plus Ultrasonic Thickness Gauge
Olympus 38DL Plus Ultrasonic Thickness GaugeStephenKim86
 
Presented by Sabri international .......
Presented by Sabri international .......Presented by Sabri international .......
Presented by Sabri international .......SABRI INTERNATIONAL
 
PHX Corporate Presentation March 2024 Final
PHX Corporate Presentation March 2024 FinalPHX Corporate Presentation March 2024 Final
PHX Corporate Presentation March 2024 FinalPanhandleOilandGas
 

Último (20)

14 march 2024-capital-markets-update eni.pdf
14 march 2024-capital-markets-update eni.pdf14 march 2024-capital-markets-update eni.pdf
14 march 2024-capital-markets-update eni.pdf
 
We are inviting you on board, to move forward together in the Right Direction
We are inviting you on board, to move forward together in the Right DirectionWe are inviting you on board, to move forward together in the Right Direction
We are inviting you on board, to move forward together in the Right Direction
 
Bus Eth ch3 ppt.ppt business ethics and corporate social responsibilities ppt
Bus Eth ch3 ppt.ppt business ethics and corporate social responsibilities pptBus Eth ch3 ppt.ppt business ethics and corporate social responsibilities ppt
Bus Eth ch3 ppt.ppt business ethics and corporate social responsibilities ppt
 
NewBase 14 March 2024 Energy News issue - 1707 by Khaled Al Awadi_compress...
NewBase  14 March  2024  Energy News issue - 1707 by Khaled Al Awadi_compress...NewBase  14 March  2024  Energy News issue - 1707 by Khaled Al Awadi_compress...
NewBase 14 March 2024 Energy News issue - 1707 by Khaled Al Awadi_compress...
 
How The Hustle Milestone Referral Program Got 300K Subscribers
How The Hustle Milestone Referral Program Got 300K SubscribersHow The Hustle Milestone Referral Program Got 300K Subscribers
How The Hustle Milestone Referral Program Got 300K Subscribers
 
Mist Cooling & Fogging System Company in Egypt
Mist Cooling & Fogging System Company in EgyptMist Cooling & Fogging System Company in Egypt
Mist Cooling & Fogging System Company in Egypt
 
Project Work on Consumer Behavior in Fast Food Restaurants. Their behavior to...
Project Work on Consumer Behavior in Fast Food Restaurants. Their behavior to...Project Work on Consumer Behavior in Fast Food Restaurants. Their behavior to...
Project Work on Consumer Behavior in Fast Food Restaurants. Their behavior to...
 
3BBE: THE FUTURE OF ECOMMERCE PRESENTATION - LOUIS MALAYBALAY
3BBE: THE FUTURE OF ECOMMERCE PRESENTATION - LOUIS MALAYBALAY3BBE: THE FUTURE OF ECOMMERCE PRESENTATION - LOUIS MALAYBALAY
3BBE: THE FUTURE OF ECOMMERCE PRESENTATION - LOUIS MALAYBALAY
 
Meet Raj Shamani: A Trailblazing Entrepreneur
Meet Raj Shamani: A Trailblazing EntrepreneurMeet Raj Shamani: A Trailblazing Entrepreneur
Meet Raj Shamani: A Trailblazing Entrepreneur
 
pitchdeck ORPC 2019 data info turine.pdf
pitchdeck ORPC 2019 data info turine.pdfpitchdeck ORPC 2019 data info turine.pdf
pitchdeck ORPC 2019 data info turine.pdf
 
Unleashing the Power of Fandom: A Short Guide to Fan Business
Unleashing the Power of Fandom: A Short Guide to Fan BusinessUnleashing the Power of Fandom: A Short Guide to Fan Business
Unleashing the Power of Fandom: A Short Guide to Fan Business
 
CORPORATE SOCIAL RESPONSIBILITY - FINAL REQUIREMENT.pdf
CORPORATE SOCIAL RESPONSIBILITY - FINAL REQUIREMENT.pdfCORPORATE SOCIAL RESPONSIBILITY - FINAL REQUIREMENT.pdf
CORPORATE SOCIAL RESPONSIBILITY - FINAL REQUIREMENT.pdf
 
Strategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateStrategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 Update
 
The 10 Most Influential Women Making Difference In 2024.pdf
The 10 Most Influential Women Making Difference In 2024.pdfThe 10 Most Influential Women Making Difference In 2024.pdf
The 10 Most Influential Women Making Difference In 2024.pdf
 
Reframing Requirements: A Strategic Approach to Requirement Definition, with ...
Reframing Requirements: A Strategic Approach to Requirement Definition, with ...Reframing Requirements: A Strategic Approach to Requirement Definition, with ...
Reframing Requirements: A Strategic Approach to Requirement Definition, with ...
 
Optimize Your CRM Customization and Beyond
Optimize Your CRM Customization and BeyondOptimize Your CRM Customization and Beyond
Optimize Your CRM Customization and Beyond
 
Dashboards y paneles - CP Home - Area de Operaciones
Dashboards y paneles - CP Home - Area de OperacionesDashboards y paneles - CP Home - Area de Operaciones
Dashboards y paneles - CP Home - Area de Operaciones
 
Olympus 38DL Plus Ultrasonic Thickness Gauge
Olympus 38DL Plus Ultrasonic Thickness GaugeOlympus 38DL Plus Ultrasonic Thickness Gauge
Olympus 38DL Plus Ultrasonic Thickness Gauge
 
Presented by Sabri international .......
Presented by Sabri international .......Presented by Sabri international .......
Presented by Sabri international .......
 
PHX Corporate Presentation March 2024 Final
PHX Corporate Presentation March 2024 FinalPHX Corporate Presentation March 2024 Final
PHX Corporate Presentation March 2024 Final
 

Risk Management in Five Easy Pieces

  • 1. Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8th , 2008 Risk management is essential for any significant project. and is useful for any project where an  unfavorable outcome is undesirable. Certain information about key project cost, performance, and  unfavorable outcome is undesirable Certain information about key project cost performance and schedule attributes are often unknown until the project is underway. The emerging risks that can  be identified early in the project that impact the project later, are often termed “known  unknowns.” These risks can be mitigated with a good risk management process. For risks that are  beyond the vision of the project team a properly implemented risk management process can also  rapidly quantify the risks impact and provide sound plans for mitigating its affect. Risk management is concerned with the outcome of future events, whose exact outcome is  unknown, and with how to deal with these uncertainties. Outcomes are categorized as favorable or  unfavorable, and risk management is the art and science of planning, assessing, handling, and  monitoring future events to ensure favorable outcomes. A good risk management process is  proactive and fundamentally different than issue management or problem solving, which is  reactive.  This presentation describes the fundamental of Risk Management in 5 easy steps – using Jack  Nicholson’s “Five Easy Pieces” 1970’s movie as a backdrop. The Five Pieces are: 1. Hope is not a strategy 2. All point estimates are wrong 3. Without integrating Cost, Schedule and Technical Performance you’re driving in the rearview  mirror 4. Without a model for risk management, you’re driving in the dark with the headlights turn off 5. Risk Communication is everything Risk management is an important skill that can be applied to a wide variety of projects. In an era  of downsizing, consolidation, shrinking budgets, increasing technological sophistication, and shorter  development times, risk management provides valuable insights to help key project personnel plan  for risks, alert them of potential risk issues, analyze these issues, and develop, implement, and  monitor plans to address risks  long before they surface as issues and adversely affect project cost,  performance, and schedule. Glen B. Alleman Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112 www.lewisandfowler.com  1
  • 2. Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8th , 2008 1. Hoping that something positive will result is not a very good strategy. Preparing for success is the  basis of success. 2. Single point estimates are no better than 50/50 guesses in the absence of knowledge of the  standard deviation of the  underlying distribution 3. Without connecting cost, schedule, and technical performance of the effort to produce the  product or service the connection to value cannot be made. 4. Risk management is not an ad hoc processes that you can make up as you go. A formal  foundation for risk management is needed. foundation for risk management is needed 5. Identifying risks without communication them is a waste of time. Glen B. Alleman Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112 www.lewisandfowler.com  2
  • 3. Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8th , 2008 Project Managers constantly seek ways to eliminate or control risk, variance and uncertainly.  This is a hopeless pursuit.  Managing “in the presence” of risk, variance and uncertainty is the key to success. Some projects  have few uncertainties –only the complexity of tasks and relationships is important – but most  projects are characterized by several types of uncertainty. Although each uncertainty type is  distinct, a single project may encounter some combination of four types: 1. Variation – comes from many small influences and yields a range of values on a particular  activity. Attempting to control these variances outside their natural boundaries is a waste  activity. Attempting to control these variances outside their natural boundaries is a waste (Muda) 2. Foreseen Uncertainty – are uncertainties identifiable and understood influences that the team  cannot be sure will occur. There needs to be a mitigation plan for these foreseen uncertainties. 3. Unforeseen Uncertainty – is uncertainty that can’t be identified during project planning. When  these occur, a new plan is needed. 4. Chaos – appears in the presence of “unknown unknowns” “Managing Project Uncertainty: From Variation to Chaos,” Arnoud De Meyer, Christoph H. Loch  and Michael T. Pich, MIT Sloan Management Review, Winter 2000. Glen B. Alleman Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112 www.lewisandfowler.com  3
  • 4. Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8th , 2008 Larger variances can be  tolerated in early periods. But tolerances for risk must decrease as the  program matures. At all times, avoiding unseen risk is mandatory. Any unknown risk must be discovered before it becomes and issue. The management of variance must first recognize four types of risk, their associated variances and  the impact of these risks and variances: 1. Normal Variation – in activity durations, costs, and technical and business performance level  delivered by the project.  2. Foreseen Risks – are indentified, but have uncertain influences on the project 3. Unforeseen Risks – are not formally identified in the planning stage, are not anticipated and a  mitigation plan has not been identified. 4. Chaos – is fundamental uncertainty about the basic structure of the project plan itself. The key concept here is that as the project proceeds the risk must be reduced. But also the  tolerance for risk must be reduced as well. This means that the variance and the tolerance must be  reduced in tandem. They must track each other to the end of the project. Glen B. Alleman Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112 www.lewisandfowler.com  4
  • 5. Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8th , 2008 Project duration and costs are random variables drawn from some underlying probability  distribution. The use of point estimates for durations and costs is many times the first impulse in an  organization low on the project management maturity scale. Understanding cost and durations are  actually “random variables,” drawn from an underlying distribution of possible value is the starting  point for managing in the presence of uncertainty. In probability theory, every random variable is attributed to a probability distribution. The  probability distribution associated with a cost or duration describes the variance of these random  probability distribution associated with a cost or duration describes the variance of these random variables. A common distribution of probabilistic estimates for cost and schedule random variables  is the Triangle Distribution.  The Triangle Distribution is used as a subjective description of a population for which there is  only limited sample data, and especially where the relationship between variables is known but  data is scarce. It is based on the knowledge of the minimum and maximum and a “best guess” of  the modal value (the Most Likely).  Using the Triangle Distribution for the costs and durations, a Monte Carlo simulation of the  Ui h T i l Di ib i f h dd i M C l i l i f h network of activities and their costs can be performed. Monte Carlo methods are used to  numerically transform and integrate the posterior quantitative risk assessment into a confidence  interval. The result is a “confidence” model for the cost and completion times for the project based  on the upper and lower bounds of each distribution assigned to each duration and cost. This approach to estimating provides insight into the behavior of the plan as well as sensitivity  between the individual elements of the plan. Glen B. Alleman Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112 www.lewisandfowler.com  5
  • 6. Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8th , 2008 Estimating is a very vague art in the absence of a formal process. One place to start is with the  statistical definition of an “estimate.”  But even that definition has three (3) different possibilities. The Mode is the most likely value. The value that occurs most often when statistical samples are  drawn from the underlying population. The Median is the “middle” value between the highest and lowest value from the total of all  samples drawn from the underlying statistical population. The Mean is the “average” of all the samples drawn from the population. The most important concept is to understand that the “sum” of all the “estimates” is never one of  these three estimates. The details of this are beyond the scope of this presentation but it has to do with “summing”  probability  distributions is not actually a summation process – it is a convolution process. This  means that the probability distribution – represented by an integral equation – is convolved with  the other integral equations. the other integral equations Glen B. Alleman Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112 www.lewisandfowler.com  6
  • 7. Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8th , 2008 The actual duration or cost are random variables, drawn from a probability distribution. The Mean, Mode, Median are statistical terms that characterize probability distributions – not point  values. When we naively speak about a duration or cost in the absence of a variance, the result is suspect.  Ignoring for the moment the Mean, Mode, and Median issues, this missing variance creates odd  outcomes. The median temperature in Cody Wyoming is very close to the median temperature in Trinidad  Tobago . Both are around 78°. In Trinidad the variance is significantly less than in Cody.  Tobago Both are around 78° In Trinidad the variance is significantly less than in Cody Cody has a temperature range between 10°F and 100°F. The Median is 60°F. Fudge this up  to 78° In Trinidad Tobago, the maximum temperature runs around 89°F with minimums running around  68°F. Means of 77°F in the winter and 85°F in the summer. Answering the variance question is as important or possibly more important than answering the  Median question. Glen B. Alleman Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112 www.lewisandfowler.com  7
  • 8. Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8th , 2008 In the project planning business, the use of deterministic and probabilistic  analysis are both useful.  The deterministic description is great for “power point” type displays of the scheduled activities and  management briefings. This type of information shows a “static” description of the schedule, cost,  or technical performance. The probabilistic description is useful as the basis for risk analysis. This type of information shows  the range of possible values each variable can take one. The analysis derived from these variables  shows to impact on the project. This itself is a variance – a variance of impact. The difference between Probability and Statistics is important to the notion of “randomness” of  The difference between Probability and Statistics is important to the notion of “randomness” of durations and cost. We need to know things about the underlying statistical behavior of the durations and costs before  we can ask question about the probabilistic confidence in the planned completion date and planned  completion costs. Glen B. Alleman Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112 www.lewisandfowler.com  8
  • 9. Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8th , 2008 In many descriptions of project management – cost, schedule, and quality are considered as the  “Iron Triangle.” Change one and the other two must change as well. It turns our this is too narrow a  view of what's happening  on a project. It’s the Technical Performance Measurement that replaces Quality. Quality is one of the Technical  Performance measures. Cost and Schedule are obvious elements of the project. Technical  Performance Measures describe  the status of technical achievement of the project at any point in time.  The Planned technical achievement is part of the Performance Measurement Baseline (PMB) in the  The Planned technical achievement is part of the Performance Measurement Baseline (PMB) in the same way the Planned Value (BCWS) is part of the PMB. The Technical Performance Measurement System (TPMS) uses the techniques of risk analysis and  probability to give program managers the early warning needed to avoid unplanned costs and  slippage in schedule. Systems engineering uses technical performance measurements to balance  cost, schedule, and performance throughout the life cycle.   Technical performance measurements compare actual versus planned technical development and  design.  They also report the degree to which system requirements are met in terms of  performance, cost, schedule, and progress in implementing risk handling.  Performance metrics are  traceable to user‐defined capabilities. Glen B. Alleman Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112 www.lewisandfowler.com  9
  • 10. Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8th , 2008 Measures of Effectiveness, Measures Performance, and Measures of Quality are typical Technical  Performance Measures. The Cost and Schedule “measures” are straightforward in most cases.  The measures of Technical Performance involve Effectiveness, Performance, Technical Performance Measures of Effectiveness (MOE) define the operational mission success factor as defined by the  customer. These are: 1. Stated from the customer point of view; 2. Focused on the most critical mission performance needs;  3. Independent of any particular solution;  4. Actual measures at the end of development.  Measures of Performance (MOP) characterize physical or functional attribute relating to the system  operation:  1. Supplier’s point of view Supplier s point of view 2. Measured under specified testing or operational conditions 3. Assesses delivered solution performance against critical system level specified requirements 4. Risk indicators that are monitored progressively. Glen B. Alleman Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112 www.lewisandfowler.com  10
  • 11. Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8th , 2008 Risk Management is a full time effort. Even if it is a part‐time job. Someone needs to “own” the risks and the process around risk management. Someone or a collection of “someone's” needs to have risk management in their mind(s) at  all times Risk Management is not something you can do once and them forget. The risks don’t just  go away. They are forever there, even if they are mitigated, retired or bought down. Glen B. Alleman Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112 www.lewisandfowler.com  11
  • 12. Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8th , 2008 Risk Management means using a proven risk management process, adapting this to the project  environment, and using this process for everyday decision making. Technical performance is a concept absent from the traditional approaches to risk management.   Yet it is the primary driver of risk in many technology intensive projects. Cost growth and schedule  slippage often occur when unrealistically high levels of performance are required and little  flexibility is provided to degrade performance during the course of the program. Quality is often a  cause rather than an impact to the program and can generally be broken down into Cost,  Performance, and Schedule components. The framework shown here provides: Risk management policy Risk management structure Risk Management Process Model Organizational and behavioral considerations for implementing risk management The performance dimension of consequence of occurrence Th f di i f f The performance dimension of Monte Carlo simulation modeling A structured approach for developing a risk handling strategy Glen B. Alleman Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112 www.lewisandfowler.com  12
  • 13. Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8th , 2008 The traditional three variables the “iron triangle” are inappropriate in today’s integrated software,  hardware and operational world and there are two other “triangles.” One includes Risk, Customer Satisfaction, and Quality The other includes CMMI, Six Sigma, and Lean. The three collections of three attributes form a “system” to assess risk, address these risks and  manage the project in the presence of this risk. Putting these 3 sets of 3 together results in a view of  Product risk – the risk that the product will not performance as specified or perform to the needs  of the customer Programmatic risk – the risk that the project will be over budget or behind schedule in producing  the product Process risk – the risk that the processes used to build the product or management the project  will fail in their desired outcomes. Glen B. Alleman Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112 www.lewisandfowler.com  13
  • 14. Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8th , 2008 It does no good to manage risks if the results are not communicated to all the participants. Only the participants can define the needed mitigations Risk communication is the basis of risk mitigation. It serves no purpose to have a risk plan and the  defined mitigations in the absence of a risk communication plan. This plan needs to address the following: Executive summary – a simple summary of the program and the risks associated with the  activities of the program. Each risk needs an ordinal rank, a planned mitigation is the risk is active  (a risk approved by the Risk Board), and the mitigations shown in the schedule with associated  costs. Program description – a detailed description of the program and the risk associated with each of  the deliverables. This description should be “operational” in nature, with the consequences  description in “operational” terms as well. Risk reduction activities by phase – using some formal risk management process that connects  risk, mitigation and the IMS. The efforts for mitigation need to be in the schedule. risk mitigation and the IMS The efforts for mitigation need to be in the schedule Risk management methodology – using the DoD Risk Management process is a good start. This  approach has proven and approved by high risk, high reward programs. The steps in the  processes are not optional and should be executed for ALL risk processes. Glen B. Alleman Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112 www.lewisandfowler.com  14
  • 15. Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8th , 2008 This list comes from guidance in the defense program management business. While some  of the statement may not be appropriate for the commercial world, every statement has  some applicability to every project – not matter what the domain. Whether formal or  informal the programmatic risk assessment of a project needs to ask or answer these  statements. The actions needed to close any gaps from these statements are outside the scope of this  presentation.  But the next step is to have the project management team start to answer these questions. Glen B. Alleman Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112 www.lewisandfowler.com  15
  • 16. Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8th , 2008 Many speak about risk management as part of the project management process. But do they do risk management as part of the project management process?  Test yourself and anyone who claims to be doing risk management   Glen B. Alleman Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112 www.lewisandfowler.com  16
  • 17. Colorado Springs PMI Risk Management in Five Easy Pieces Colorado Springs, Colorado May 8th , 2008 The first set of questions should be: How do we earn back the investment in risk management?  How can be measure the benefits of risk management? Who gets to say what the value of risk management is? These is monetized questions are risk. So the answers have to be monetized as well.  attaching money to risk is the starting point. attaching money to the mitigation activities is  the next. The risks and their mitigations need to be represented in the schedule and cost  the next The risks and their mitigations need to be represented in the schedule and cost baseline. Otherwise risk management is not Project Management. Glen B. Alleman Lewis & Fowler, 8310 South Valley Highway, Englewood CO80112 www.lewisandfowler.com  17