Introduction - 1
• Cost management has always been a major focus for all business unit. There is always demand by investors for business
to deliver expected profit . The singular strategy to achieve this is to emphasize strong focus on cost management.
• Cost management is the act of planning and controlling the established budget of any business. When you are unable to
measure and track your budget continuously, then maintaining or controlling the budget within a reasonable limit of the
established budget becomes an arduous task.
• The major cost classification related to physical asset management that comes quickly to mind in a process plant are:
 Plant Maintenance Cost
 Non-Plant Maintenance Cost
• Plant Maintenance cost consist of all cost incurred to maintain, restore or ensure that a physical asset maintains its
design reliability and maintainability. These costs include:
 Cost of activities to find, discover and evaluate (inspect) conditions of physical assets proactively, before a failure
occurs. This technically involves identification of the failed or degraded object part or parts, the degradation
mechanism or mechanisms and deduction of the degradation remediation tasks.
 Cost of maintaining or delaying effect of the degradation of the target condition (Maintenance) of a physical asset.
Most Inspection if properly implemented will generates properly planned and scheduled Maintenance activities.
 Cost of activities for restoring a physical object to its operational state
 Cost of improving the reliability and maintainability of a physical asset without necessarily changing its original
intended function.
Introduction - 2
• Non-Plant Maintenance cost consist of all other physical asset management costs excluding the Plant Maintenance costs.
These costs are:
 Cost of Initial Procurement, installation, commissioning and Startup
 Cost of operation
 Cost of replacement and reinstallation (When asset completes its useful lifecycle and is not replaced due to
reliability issues)
 Cost of disposal, Mothballing etc., when stoppage of the use of the physical asset was not due to a reliability issue.
 Cost of plant upgrade due to non reliability or maintainability related issues.
 Manufacturing or production overhead costs
• From our earlier listings, It is clear that the Maintenance cost is a recurring and variable cost throughout the life cycle of
the asset. Comparing the maintenance cost to the non-maintenance cost, it is safe to conclude that the non-maintenance
cost are fixed costs and mostly one-time costs.
• In a manufacturing plant with a life span of 24 years, the initial first four years ( which involves the design,
procurement, construction, commissioning and startup) are mostly associated with the non- maintenance cost, while
the remaining 20 years are mostly associated with the maintenance cost.
• Therefore Our physical asset cost management tip will be primarily focused on Maintenance cost due to our inference
above (bullet #3).
Summary of Mtce Cost Components - 1
S/N Cost Description Cost Source S/N Cost Description Capture Source
1 Material Cost for Urgent &
Emergency Repair work
EAMS – Work Order 8. External Service Cost for
PPM Mtce. work.
EAMS – Work Order
2. External Service Cost for Urgent
& Emergency Repair work
EAMS – Work Order 9. Internal Labor Cost for PPM
Mtce. work.
EAMS – Work Order
3. Internal Labor Cost for Urgent
& Emergency Repair work
EAMS – Work Order 10. Material Cost for Mtce.
Project work.
EAMS – Work Order
4. Material Cost for Proactive
repair Work.
EAMS – Work Order 11. External Service Cost for
Mtce. Project work.
EAMS – Work Order
5. External Service cost for
Proactive Repair Work.
EAMS – Work Order 12. Internal Labor Cost for PPM
Mtce. Project work.
EAMS – Work Order
6. Internal Labor Cost for
Proactive Repair Work.
EAMS – Work Order 13. Rental Equipment Cost for
Mtce. Project work.
EAMS – Work Order
7. Material Cost for PPM Mtce.
work.
EAMS – Work Order 14. Rental Equipment Cost for
PPM Mtce. work.
EAMS – Work Order
Summary of Mtce Cost Components - 2
S/N Cost Description Cost Source S/N Cost Description Capture Source
15. Rental Equipment Cost for Non-
PPM Proactive Mtce. Work.
EAMS – Work Order 22. Cost of Total Productive
Maintenance (TPM)
EAMS-Work Order
16. Rental Equipment Cost for
Urgent & Emergency work.
EAMS – Work Order 23. Cost of Maintenance Induced
Failure
EAMS – Work Order
17. Prod. Resource Tool Cost for
Urgent & Emergency work.
EAMS – Work Order 24. Cost of Operational Induced
Failure
EAMS – Work Order
18. Prod. Resource Tool Cost for
Non-PPM Proactive Mtce.
Work.
EAMS – Work Order
19. Prod. Resource Tool Cost for
PPM Mtce. Work.
EAMS – Work Order
20. Prod. Resource Tool Cost for
Mtce. Project work.
EAMS – Work Order
21. Cost of PPM Optimization. EAMS – Work Order
S/N S/N
1 All Services Cost Not Pre-Planned in the WO 13 Lack of or Poor Failure Reporting and
Corrective Action System (FRACAS)2 Rental Service Cost Not tracked against Plan
3 Rework costs not tracked to eliminate rework 14 Ware house stock material cost not determined
using Economic Order Quantity model4 Mtce. Process destabilization and capability not monitored
5 Lack of or Ineffective Preventive & Predictive Mtce. (PPM) 15 Plants designed and built without considering
design for Maintainability (DFM) variables.6 Lack of or poor use of work order types in Mtce. Process.
7 Lack of or poor work order scheduling 16 Plants designed and built without considering
design for Reliability (DFR) variables.8 Lack of or Inefficient Preventive & Predictive Mtce.
9 Lack of implementation of follow-up action from PPM 17 Lack of or poor Equipment criticality rating
10 Lack of or ineffective Mtce. Planning and Scheduling 18 Lack of or poor implementation of RCFA
11 Poor Contract Engrg./Management/Admin. Practices 19 Not considering or poor use of LCCA variables
in equipment repair or maintenance decisions12 Lack of or poor work order priority assignment
Causes of Maintenance Cost Bad Actor
Contact Us
• If your plant is struggling with Maintenance cost optimization, contact us for help.
• Our contact:
 Email: info@fogaecelectrophysics.com
 Phone: (832) 496-1455

Weitere ähnliche Inhalte

Was ist angesagt?

Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
Akanksha Gupta
 
What is forward and backward scheduling
What is forward and backward schedulingWhat is forward and backward scheduling
What is forward and backward scheduling
Naresh Gupta
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
sai precious
 
Perdue Farms Experience
Perdue Farms ExperiencePerdue Farms Experience
Perdue Farms Experience
Clarence Bell
 

Was ist angesagt? (20)

Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
Basic Maintenance
Basic MaintenanceBasic Maintenance
Basic Maintenance
 
Work Center Scheduling
Work Center Scheduling Work Center Scheduling
Work Center Scheduling
 
What is forward and backward scheduling
What is forward and backward schedulingWhat is forward and backward scheduling
What is forward and backward scheduling
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
 PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)  PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
 
Scheduling ppt @ DOMS
Scheduling ppt @ DOMSScheduling ppt @ DOMS
Scheduling ppt @ DOMS
 
Types of loading, production & operations management
Types of loading, production & operations managementTypes of loading, production & operations management
Types of loading, production & operations management
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Operation engine ii session iv operations scheduling
Operation engine  ii session iv  operations schedulingOperation engine  ii session iv  operations scheduling
Operation engine ii session iv operations scheduling
 
PRODUCTION PLANNING AND CONTROL-Unit 4
PRODUCTION PLANNING AND CONTROL-Unit 4PRODUCTION PLANNING AND CONTROL-Unit 4
PRODUCTION PLANNING AND CONTROL-Unit 4
 
Unit 2
Unit 2Unit 2
Unit 2
 
Perdue Farms Experience
Perdue Farms ExperiencePerdue Farms Experience
Perdue Farms Experience
 
Unit 4
Unit 4Unit 4
Unit 4
 
Electrical System
Electrical SystemElectrical System
Electrical System
 
Unit 4
Unit 4Unit 4
Unit 4
 
Reliability Centered Maintenance
Reliability Centered MaintenanceReliability Centered Maintenance
Reliability Centered Maintenance
 
Production capacity – planning and control
Production capacity – planning and controlProduction capacity – planning and control
Production capacity – planning and control
 
Computer integrated production planning
Computer integrated production planningComputer integrated production planning
Computer integrated production planning
 

Ähnlich wie Tips on Cost optimization For Process Plants.

Maintenance and material handling methods (1)
Maintenance and material handling methods (1)Maintenance and material handling methods (1)
Maintenance and material handling methods (1)
Harpreet Singh Grover
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptx
Margi Shah
 

Ähnlich wie Tips on Cost optimization For Process Plants. (20)

Report for COOP PUPR without fusion
Report for COOP PUPR without fusionReport for COOP PUPR without fusion
Report for COOP PUPR without fusion
 
Kpi familiarization
Kpi familiarizationKpi familiarization
Kpi familiarization
 
Asset Managment
Asset ManagmentAsset Managment
Asset Managment
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
KPI.ppt
KPI.pptKPI.ppt
KPI.ppt
 
Tpm (group 8)
Tpm (group 8)Tpm (group 8)
Tpm (group 8)
 
Maintenance_KPI.pdf
Maintenance_KPI.pdfMaintenance_KPI.pdf
Maintenance_KPI.pdf
 
Boost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceBoost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive Maintenance
 
Chap 8 Organization of Maintenance Resources.ppt
Chap 8 Organization of Maintenance Resources.pptChap 8 Organization of Maintenance Resources.ppt
Chap 8 Organization of Maintenance Resources.ppt
 
Maintenance and material handling methods (1)
Maintenance and material handling methods (1)Maintenance and material handling methods (1)
Maintenance and material handling methods (1)
 
Reliability and Maintenance in production Management
Reliability and Maintenance in production ManagementReliability and Maintenance in production Management
Reliability and Maintenance in production Management
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
CV
CVCV
CV
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptx
 
Maintenace management and TPM
Maintenace management and TPMMaintenace management and TPM
Maintenace management and TPM
 
MAINTENANCE , advanced management
MAINTENANCE , advanced managementMAINTENANCE , advanced management
MAINTENANCE , advanced management
 
Unit 1 mpa
Unit 1 mpaUnit 1 mpa
Unit 1 mpa
 

Kürzlich hochgeladen

+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 

Kürzlich hochgeladen (20)

COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 

Tips on Cost optimization For Process Plants.

  • 1. Tips on Cost optimization For Process Plants. Fortunatus Udegbue (MBA. M.Sc. CMRP. ASQ-CRE. PMP) Tag Line: “Costs do not exist to be calculated, Costs exist to be reduced” (Taiichi 0hno)
  • 2. Introduction - 1 • Cost management has always been a major focus for all business unit. There is always demand by investors for business to deliver expected profit . The singular strategy to achieve this is to emphasize strong focus on cost management. • Cost management is the act of planning and controlling the established budget of any business. When you are unable to measure and track your budget continuously, then maintaining or controlling the budget within a reasonable limit of the established budget becomes an arduous task. • The major cost classification related to physical asset management that comes quickly to mind in a process plant are:  Plant Maintenance Cost  Non-Plant Maintenance Cost • Plant Maintenance cost consist of all cost incurred to maintain, restore or ensure that a physical asset maintains its design reliability and maintainability. These costs include:  Cost of activities to find, discover and evaluate (inspect) conditions of physical assets proactively, before a failure occurs. This technically involves identification of the failed or degraded object part or parts, the degradation mechanism or mechanisms and deduction of the degradation remediation tasks.  Cost of maintaining or delaying effect of the degradation of the target condition (Maintenance) of a physical asset. Most Inspection if properly implemented will generates properly planned and scheduled Maintenance activities.  Cost of activities for restoring a physical object to its operational state  Cost of improving the reliability and maintainability of a physical asset without necessarily changing its original intended function.
  • 3. Introduction - 2 • Non-Plant Maintenance cost consist of all other physical asset management costs excluding the Plant Maintenance costs. These costs are:  Cost of Initial Procurement, installation, commissioning and Startup  Cost of operation  Cost of replacement and reinstallation (When asset completes its useful lifecycle and is not replaced due to reliability issues)  Cost of disposal, Mothballing etc., when stoppage of the use of the physical asset was not due to a reliability issue.  Cost of plant upgrade due to non reliability or maintainability related issues.  Manufacturing or production overhead costs • From our earlier listings, It is clear that the Maintenance cost is a recurring and variable cost throughout the life cycle of the asset. Comparing the maintenance cost to the non-maintenance cost, it is safe to conclude that the non-maintenance cost are fixed costs and mostly one-time costs. • In a manufacturing plant with a life span of 24 years, the initial first four years ( which involves the design, procurement, construction, commissioning and startup) are mostly associated with the non- maintenance cost, while the remaining 20 years are mostly associated with the maintenance cost. • Therefore Our physical asset cost management tip will be primarily focused on Maintenance cost due to our inference above (bullet #3).
  • 4. Summary of Mtce Cost Components - 1 S/N Cost Description Cost Source S/N Cost Description Capture Source 1 Material Cost for Urgent & Emergency Repair work EAMS – Work Order 8. External Service Cost for PPM Mtce. work. EAMS – Work Order 2. External Service Cost for Urgent & Emergency Repair work EAMS – Work Order 9. Internal Labor Cost for PPM Mtce. work. EAMS – Work Order 3. Internal Labor Cost for Urgent & Emergency Repair work EAMS – Work Order 10. Material Cost for Mtce. Project work. EAMS – Work Order 4. Material Cost for Proactive repair Work. EAMS – Work Order 11. External Service Cost for Mtce. Project work. EAMS – Work Order 5. External Service cost for Proactive Repair Work. EAMS – Work Order 12. Internal Labor Cost for PPM Mtce. Project work. EAMS – Work Order 6. Internal Labor Cost for Proactive Repair Work. EAMS – Work Order 13. Rental Equipment Cost for Mtce. Project work. EAMS – Work Order 7. Material Cost for PPM Mtce. work. EAMS – Work Order 14. Rental Equipment Cost for PPM Mtce. work. EAMS – Work Order
  • 5. Summary of Mtce Cost Components - 2 S/N Cost Description Cost Source S/N Cost Description Capture Source 15. Rental Equipment Cost for Non- PPM Proactive Mtce. Work. EAMS – Work Order 22. Cost of Total Productive Maintenance (TPM) EAMS-Work Order 16. Rental Equipment Cost for Urgent & Emergency work. EAMS – Work Order 23. Cost of Maintenance Induced Failure EAMS – Work Order 17. Prod. Resource Tool Cost for Urgent & Emergency work. EAMS – Work Order 24. Cost of Operational Induced Failure EAMS – Work Order 18. Prod. Resource Tool Cost for Non-PPM Proactive Mtce. Work. EAMS – Work Order 19. Prod. Resource Tool Cost for PPM Mtce. Work. EAMS – Work Order 20. Prod. Resource Tool Cost for Mtce. Project work. EAMS – Work Order 21. Cost of PPM Optimization. EAMS – Work Order
  • 6. S/N S/N 1 All Services Cost Not Pre-Planned in the WO 13 Lack of or Poor Failure Reporting and Corrective Action System (FRACAS)2 Rental Service Cost Not tracked against Plan 3 Rework costs not tracked to eliminate rework 14 Ware house stock material cost not determined using Economic Order Quantity model4 Mtce. Process destabilization and capability not monitored 5 Lack of or Ineffective Preventive & Predictive Mtce. (PPM) 15 Plants designed and built without considering design for Maintainability (DFM) variables.6 Lack of or poor use of work order types in Mtce. Process. 7 Lack of or poor work order scheduling 16 Plants designed and built without considering design for Reliability (DFR) variables.8 Lack of or Inefficient Preventive & Predictive Mtce. 9 Lack of implementation of follow-up action from PPM 17 Lack of or poor Equipment criticality rating 10 Lack of or ineffective Mtce. Planning and Scheduling 18 Lack of or poor implementation of RCFA 11 Poor Contract Engrg./Management/Admin. Practices 19 Not considering or poor use of LCCA variables in equipment repair or maintenance decisions12 Lack of or poor work order priority assignment Causes of Maintenance Cost Bad Actor
  • 7. Contact Us • If your plant is struggling with Maintenance cost optimization, contact us for help. • Our contact:  Email: info@fogaecelectrophysics.com  Phone: (832) 496-1455