Ben Worthington, Senior Associate | 02 November 2015
ben.worthington@olswang.com | +44 20 7067 3541 | @disputes_lawyer
Construction Law Masterclass 2015
Managing the Risks of Delay
|
Delay risks
constructiveblog.comManaging the Risks of Delay2
• Common causes:
• Contractor performance
• Design change or error
• Inclement weather
• Availability of labour/materials/equipment
• Employer interference
• Delay almost always causes increased cost:
• Lost income
• Alternative accommodation
• Overheads
• Delay damages
|
Date for completion of the works
constructiveblog.comManaging the Risks of Delay3
• Specific date almost always agreed in advance – if no completion date, contractor
must complete within a reasonable time
• Contractor usually obliged to provide a programme showing how the completion
date can be achieved
• Programme not normally a binding contract document
• No implied term that contractor must progress works in accordance with the
programme
• Contractor can claim more time for:
• Delays caused by the Employer
• Delays which are not the contractor’s responsibility
• But unless the contract provides that a specific risk is a relevant event, it will
generally be at the contractor’s risk
|
Extending time – the importance of notice provisions
constructiveblog.comManaging the Risks of Delay4
• Notice provisions = allow client team to assess and manage delay risk
• Key points:
• For the contractor - be aware of the procedural requirements as to form and time
• For the Employer - consider making the notice a condition precedent to
entitlement to more time
• For both parties - Be clear so that there is no dispute as to what is required and
the consequences of any failure to comply
• Employers / CAs need to be aware of waiver: City Inn v Shepherd Construction
|
Extending time – insisting on contractual notices
constructiveblog.comManaging the Risks of Delay5
• Contract will determine whether notice is a condition precedent to an EoT
• “If and whenever it becomes reasonably apparent that the progress of the Works or
any Section is being or is likely to be delayed the Contractor shall forthwith give
notice to the Architect/ Contract Administrator of the material circumstances,
including the cause or causes of the delay, and shall identify in the notice any event
which in his opinion is a Relevant Event.” (JCT SBC 2011, 2.27.1)
• “If… on receiving a notice and particulars…” the CA considers the notified event is
i) a relevant event and ii) is likely to delay completion beyond the completion date
under clause 2.27, then it must award an EoT (JCT SBC 2011, 2.28.1)
• Contract must use very clear words to impose a condition precedent to an
extension of time: WW Gear Construction Ltd v McGee Group Ltd (2010)
|
Employer remedies for delay – liquidated damages
constructiveblog.comManaging the Risks of Delay6
• In the event contractor fails to complete by specified date, employer is entitled to
damages at a fixed rate for every week or month until the work is complete
• Actual loss is irrelevant – contrast with claim for unliquidated damages
• Why use them?
• Complexity of construction claims
• Saves time and cost
• Avoids the need for dispute procedures
• Certainty: (i) cost of delay (ii) risk of delay easier to price (iii) limits liability (see
Temloc v Errill (1987))
|
Challenging the employer’s entitlement to liquidated damages
constructiveblog.comManaging the Risks of Delay7
• Penalty clauses not enforceable… normally
• See: Alfred McAlpine Capital Projects v Tilebox Ltd (2005) – is the liquidated
sum extravagant or unconscionable by comparison with the greatest loss that
might be suffered?
• Unaoil (2014) - $55m contract sum / $40m LDs payable for breach – liquidated
sum was not a genuine pre-estimate of loss
• Cavendish Square Holdings v Makdessi (2013) – even an extravagant liquidated
sum may not penal where there was a commercial justification
• Contractor entitled to an EoT
|
Employer remedies for delay - termination
constructiveblog.comManaging the Risks of Delay8
• JCT - employer can terminate where contractor:
• Wholly or substantially suspends the work
• Fails to proceed regularly and diligently with the work
• Strict notice requirements
• Serious consequences of unlawful termination
• What is a failure to proceed regularly and diligently? West Faulkner Associates v London
Borough of Newham (1994) – the contractor must proceed:
• “continuously, industriously and efficiently with appropriate physical resources so
as to progress the work steadily towards completion substantially in accordance
with the contractual requirements as to time, sequence and quality of work”.
|
Employer remedies for delay – termination (2)
constructiveblog.comManaging the Risks of Delay9
• contractor entitled to plan the works as he sees fit
• delay is not by itself proof of a lack of due diligence
• a failure to provide an adequate programme is not by itself proof of a lack of due
diligence
• delay due to a failure to deploy labour/resources will normally be evidence of a lack
of due diligence
• but poor management of labour and inadquate supervision not sufficient
• the existence of defects is not by itself evidence of a lack of due diligence
|
Employer remedies for delay – the power to omit work or
instruct acceleration
constructiveblog.comManaging the Risks of Delay10
• The power to omit works - Abbey Developments Ltd v PP Brickwork Limited (2003)
– “It is implicit in most contracts that an owner who exercises a power to omit work
must genuinely require the work not to be done at all, and cannot exercise such a
power with a view to having the work carried out by someone else.”
• clear words required to overturn this assumption
• Acceleration:
• CA may have power to instruct the contractor to make up for lost time
• Usually employer will need to pay overtime, the costs of unproductive work as a
result of rescheduling, wasted materials, supervision, site management, plant
hire etc
• Reduced payment periods, payment in advance
• Resolution of any outstanding EoT claims
|
Contractor remedies for delay
constructiveblog.comManaging the Risks of Delay11
• Contractor entitled to more time where employer risk event occurs which causes
critical delay
• But occurrence of employer risk event and delay does not necessarily mean that
the contractor may claim damages e.g. adverse weather may be a relevant event
(time), but not a relevant matter (money)
• Contractor must show the relevant event has caused a critical delay to the works:
Cleveland Bridge UK Ltd v Severfield–Rowen Structures Ltd (2012):
“it is necessary to show that the claiming party was actually delayed by the
factors of which it complains; it simply does not follow as a matter of
logic, let alone practice, on a construction or fabrication project, that, simply
because a variation is issued or that information is provided later than
programmed or that free issue materials are issued later in the programme
than envisaged originally, the claimant is delayed.”
|
The importance of project records to delay claims
constructiveblog.comManaging the Risks of Delay12
• To establish entitlement as a result of a delay will require:
• Documents
• Witnesses of fact
• Delay analysis
|
The importance of project records to delay claims (2)
constructiveblog.comManaging the Risks of Delay13
• Standard form contracts do not give detailed requirements
• JCT 2011 SBC XQ - contractor must:
• give notice of actual or likely delay
• give particulars of the expected effects of any delay
• “shall… supply such further information as the Architect/Contract
Administrator may at any time reasonably require.“
|
The importance of project records to delay claims (3)
constructiveblog.comManaging the Risks of Delay14
• Claims must be based on reality
• Tribunals are essentially concerned with practical issues, not theoretical arguments
about delay analysis
• Common problems:
• Project documentation often turns out to be insufficient, inaccurate or unreliable
• Failure to identify actual man hours and costs associated with discreet items of
additional work or additional time
• Failure to record productivity by activity
• Failure to record day to day reporting of what is happening on the site, through
progress reports, diaries etc
|
For more information please contact
Olswang:
Changing Business.
www.olswang.com
Ben Worthington
Construction
+44 20 7067 3541
ben.worthington@olswang.com
Brussels
+32 2 647 4772
London
+44 20 7067 3000
Madrid
+34 91 187 1920
Munich
+49 89 206 028 400
Singapore
+65 6720 8278
Paris
+33 17 091 8720
Thames Valley
+44 20 7071 7300

Weitere ähnliche Inhalte

Was ist angesagt?

Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variationVj NiroSh
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In ConstructionAB MAKASANA
 
Construction project management
Construction project managementConstruction project management
Construction project managementSenthil Kannan
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.Abhishek kumar maurya
 
Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Jamal Nelson, CCM
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Managementsrinivas2036
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction ManagementShahin MB
 
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISIONPROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISIONDAVIDSON ECHIDIKE
 
Contract Management
Contract Management Contract Management
Contract Management Dr K M SONI
 
Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Mohd. Ikhwan
 
“Construction Risk Management”
“Construction Risk Management”“Construction Risk Management”
“Construction Risk Management”Ary Jamil
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in WorksDr K M SONI
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of RatesRaj Shah
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.NAVNEET KUMAR JHA
 
Chapter 2 construction project planning and scheduling
Chapter 2 construction project planning and schedulingChapter 2 construction project planning and scheduling
Chapter 2 construction project planning and schedulingSubash Bhattarai
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Processarpantripathi2
 
Site visit report
Site visit reportSite visit report
Site visit reportJıa Yıı
 

Was ist angesagt? (20)

Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.
 
Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Management
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISIONPROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
 
Contract Management
Contract Management Contract Management
Contract Management
 
Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)
 
“Construction Risk Management”
“Construction Risk Management”“Construction Risk Management”
“Construction Risk Management”
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in Works
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of Rates
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
Chapter 2 construction project planning and scheduling
Chapter 2 construction project planning and schedulingChapter 2 construction project planning and scheduling
Chapter 2 construction project planning and scheduling
 
Fidic law1
Fidic law1Fidic law1
Fidic law1
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 

Andere mochten auch

Statistical Methods for Construction Delay Analysis
Statistical Methods for Construction Delay Analysis Statistical Methods for Construction Delay Analysis
Statistical Methods for Construction Delay Analysis IOSR Journals
 
More weapons, more power
More weapons, more powerMore weapons, more power
More weapons, more powertaobao.com
 
E ardhmja e Unionit Evropian
E ardhmja e Unionit EvropianE ardhmja e Unionit Evropian
E ardhmja e Unionit EvropianMenaxherat
 
Results For Questionaire New Onee[1]
Results For Questionaire New Onee[1]Results For Questionaire New Onee[1]
Results For Questionaire New Onee[1]guest969fd6
 
Analytical Evaluation of the Edinburgh 2010 Conference
Analytical Evaluation of the Edinburgh 2010 ConferenceAnalytical Evaluation of the Edinburgh 2010 Conference
Analytical Evaluation of the Edinburgh 2010 Conferencemarkoxbrow
 
Conference Organisation
Conference OrganisationConference Organisation
Conference OrganisationGlobus Eventi
 
ACA-ACE Framework Alliance Contract - 25 February 2016
ACA-ACE Framework Alliance Contract - 25 February 2016ACA-ACE Framework Alliance Contract - 25 February 2016
ACA-ACE Framework Alliance Contract - 25 February 2016Francis Ho
 
Ad Creative London 09
Ad Creative London 09Ad Creative London 09
Ad Creative London 09guest5c931a0
 
Apex Prd 2009 Masterplan
Apex Prd 2009 MasterplanApex Prd 2009 Masterplan
Apex Prd 2009 MasterplanVoIPSpecialist
 
Y O G A, M A N A G E M E N T A N D N A M A S M A R A N D R
Y O G A,  M A N A G E M E N T  A N D  N A M A S M A R A N  D RY O G A,  M A N A G E M E N T  A N D  N A M A S M A R A N  D R
Y O G A, M A N A G E M E N T A N D N A M A S M A R A N D Rshriniwaskashalikar
 
Master key system part 08
Master key system   part 08Master key system   part 08
Master key system part 08canei2day
 
Validating MSI Updates and Patches
Validating MSI Updates and PatchesValidating MSI Updates and Patches
Validating MSI Updates and PatchesFlexera
 
Competencias Basicas
Competencias BasicasCompetencias Basicas
Competencias Basicasguestd5b40b
 
Google исследования 1
Google исследования 1Google исследования 1
Google исследования 1guest9e7f496
 
好山好水 好危險
好山好水 好危險好山好水 好危險
好山好水 好危險Josephine C
 
Web 2.0思维与NGO2.0案例
Web 2.0思维与NGO2.0案例Web 2.0思维与NGO2.0案例
Web 2.0思维与NGO2.0案例jinwang8882000
 

Andere mochten auch (20)

Statistical Methods for Construction Delay Analysis
Statistical Methods for Construction Delay Analysis Statistical Methods for Construction Delay Analysis
Statistical Methods for Construction Delay Analysis
 
W H Y P R A Y E R D R
W H Y  P R A Y E R  D RW H Y  P R A Y E R  D R
W H Y P R A Y E R D R
 
More weapons, more power
More weapons, more powerMore weapons, more power
More weapons, more power
 
E ardhmja e Unionit Evropian
E ardhmja e Unionit EvropianE ardhmja e Unionit Evropian
E ardhmja e Unionit Evropian
 
Results For Questionaire New Onee[1]
Results For Questionaire New Onee[1]Results For Questionaire New Onee[1]
Results For Questionaire New Onee[1]
 
Analytical Evaluation of the Edinburgh 2010 Conference
Analytical Evaluation of the Edinburgh 2010 ConferenceAnalytical Evaluation of the Edinburgh 2010 Conference
Analytical Evaluation of the Edinburgh 2010 Conference
 
Conference Organisation
Conference OrganisationConference Organisation
Conference Organisation
 
ACA-ACE Framework Alliance Contract - 25 February 2016
ACA-ACE Framework Alliance Contract - 25 February 2016ACA-ACE Framework Alliance Contract - 25 February 2016
ACA-ACE Framework Alliance Contract - 25 February 2016
 
Ad Creative London 09
Ad Creative London 09Ad Creative London 09
Ad Creative London 09
 
Apex Prd 2009 Masterplan
Apex Prd 2009 MasterplanApex Prd 2009 Masterplan
Apex Prd 2009 Masterplan
 
Dedicate time
Dedicate timeDedicate time
Dedicate time
 
王瑾 Listen 20
王瑾 Listen 20王瑾 Listen 20
王瑾 Listen 20
 
Y O G A, M A N A G E M E N T A N D N A M A S M A R A N D R
Y O G A,  M A N A G E M E N T  A N D  N A M A S M A R A N  D RY O G A,  M A N A G E M E N T  A N D  N A M A S M A R A N  D R
Y O G A, M A N A G E M E N T A N D N A M A S M A R A N D R
 
Master key system part 08
Master key system   part 08Master key system   part 08
Master key system part 08
 
Validating MSI Updates and Patches
Validating MSI Updates and PatchesValidating MSI Updates and Patches
Validating MSI Updates and Patches
 
Competencias Basicas
Competencias BasicasCompetencias Basicas
Competencias Basicas
 
Google исследования 1
Google исследования 1Google исследования 1
Google исследования 1
 
Splinternetmarketing Ranking Report Internet Marketing
Splinternetmarketing Ranking Report Internet MarketingSplinternetmarketing Ranking Report Internet Marketing
Splinternetmarketing Ranking Report Internet Marketing
 
好山好水 好危險
好山好水 好危險好山好水 好危險
好山好水 好危險
 
Web 2.0思维与NGO2.0案例
Web 2.0思维与NGO2.0案例Web 2.0思维与NGO2.0案例
Web 2.0思维与NGO2.0案例
 

Ähnlich wie Managing the Risks of Delay in Construction Projects

Olswang Construction Law Masterclass - October 2014 - Liqudated Damages and P...
Olswang Construction Law Masterclass - October 2014 - Liqudated Damages and P...Olswang Construction Law Masterclass - October 2014 - Liqudated Damages and P...
Olswang Construction Law Masterclass - October 2014 - Liqudated Damages and P...Francis Ho
 
Disputes and Claims in Engineering Contracts - 18.07.07.ppt
Disputes and Claims in Engineering Contracts - 18.07.07.pptDisputes and Claims in Engineering Contracts - 18.07.07.ppt
Disputes and Claims in Engineering Contracts - 18.07.07.pptNesrElhandasa1
 
20091118 Construction Life cycle completion
20091118 Construction Life cycle completion20091118 Construction Life cycle completion
20091118 Construction Life cycle completionraymond_wan2005
 
GCC2015 Course_Day2
GCC2015 Course_Day2GCC2015 Course_Day2
GCC2015 Course_Day2JB Nartey
 
GCC2015 Course_Day2
GCC2015 Course_Day2GCC2015 Course_Day2
GCC2015 Course_Day2JB Nartey
 
Claims & disputes management
Claims & disputes managementClaims & disputes management
Claims & disputes managementMohammed Tanbouz
 
Terminating a Construction Contract: Getting it Right
Terminating a Construction Contract: Getting it RightTerminating a Construction Contract: Getting it Right
Terminating a Construction Contract: Getting it RightFrancis Ho
 
Adjudication: Tips, Traps and Tactics
Adjudication: Tips, Traps and TacticsAdjudication: Tips, Traps and Tactics
Adjudication: Tips, Traps and TacticsFrancis Ho
 
Drafting Construction Contracts
Drafting Construction ContractsDrafting Construction Contracts
Drafting Construction ContractsMelissa Brumback
 
PECDisputeResolution25102018.pptx
PECDisputeResolution25102018.pptxPECDisputeResolution25102018.pptx
PECDisputeResolution25102018.pptxIrfanAwan25
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2ahmong4
 
Delay Analysis from a Technical and Legal Perspective presentation slides.pdf
Delay Analysis from a Technical and Legal Perspective presentation slides.pdfDelay Analysis from a Technical and Legal Perspective presentation slides.pdf
Delay Analysis from a Technical and Legal Perspective presentation slides.pdfAssociation for Project Management
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014SHKLaw
 
PP Seminar Tutorial 7
PP Seminar Tutorial 7PP Seminar Tutorial 7
PP Seminar Tutorial 7Farah Sham
 
Design & Build contracts - key points for a main contractor with technology a...
Design & Build contracts - key points for a main contractor with technology a...Design & Build contracts - key points for a main contractor with technology a...
Design & Build contracts - key points for a main contractor with technology a...Bhalindra Bath - projects & M&A law
 

Ähnlich wie Managing the Risks of Delay in Construction Projects (20)

Olswang Construction Law Masterclass - October 2014 - Liqudated Damages and P...
Olswang Construction Law Masterclass - October 2014 - Liqudated Damages and P...Olswang Construction Law Masterclass - October 2014 - Liqudated Damages and P...
Olswang Construction Law Masterclass - October 2014 - Liqudated Damages and P...
 
Ceca Caselaw
Ceca Caselaw Ceca Caselaw
Ceca Caselaw
 
Disputes and Claims in Engineering Contracts - 18.07.07.ppt
Disputes and Claims in Engineering Contracts - 18.07.07.pptDisputes and Claims in Engineering Contracts - 18.07.07.ppt
Disputes and Claims in Engineering Contracts - 18.07.07.ppt
 
20091118 Construction Life cycle completion
20091118 Construction Life cycle completion20091118 Construction Life cycle completion
20091118 Construction Life cycle completion
 
GCC2015 Course_Day2
GCC2015 Course_Day2GCC2015 Course_Day2
GCC2015 Course_Day2
 
GCC2015 Course_Day2
GCC2015 Course_Day2GCC2015 Course_Day2
GCC2015 Course_Day2
 
Claims & disputes management
Claims & disputes managementClaims & disputes management
Claims & disputes management
 
Claims and insolvencies (1)
Claims and insolvencies (1)Claims and insolvencies (1)
Claims and insolvencies (1)
 
Terminating a Construction Contract: Getting it Right
Terminating a Construction Contract: Getting it RightTerminating a Construction Contract: Getting it Right
Terminating a Construction Contract: Getting it Right
 
Prolongation and HOOH Costs
Prolongation and HOOH CostsProlongation and HOOH Costs
Prolongation and HOOH Costs
 
Adjudication: Tips, Traps and Tactics
Adjudication: Tips, Traps and TacticsAdjudication: Tips, Traps and Tactics
Adjudication: Tips, Traps and Tactics
 
Drafting Construction Contracts
Drafting Construction ContractsDrafting Construction Contracts
Drafting Construction Contracts
 
Cl presentation
Cl presentationCl presentation
Cl presentation
 
PECDisputeResolution25102018.pptx
PECDisputeResolution25102018.pptxPECDisputeResolution25102018.pptx
PECDisputeResolution25102018.pptx
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
Delay Analysis from a Technical and Legal Perspective presentation slides.pdf
Delay Analysis from a Technical and Legal Perspective presentation slides.pdfDelay Analysis from a Technical and Legal Perspective presentation slides.pdf
Delay Analysis from a Technical and Legal Perspective presentation slides.pdf
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014
 
PP Seminar Tutorial 7
PP Seminar Tutorial 7PP Seminar Tutorial 7
PP Seminar Tutorial 7
 
Design & Build contracts - key points for a main contractor with technology a...
Design & Build contracts - key points for a main contractor with technology a...Design & Build contracts - key points for a main contractor with technology a...
Design & Build contracts - key points for a main contractor with technology a...
 
The pathway to documenting successful contract claims..
The pathway to documenting successful contract claims..The pathway to documenting successful contract claims..
The pathway to documenting successful contract claims..
 

Mehr von Francis Ho

COP26: Eating for the Planet
COP26: Eating for the PlanetCOP26: Eating for the Planet
COP26: Eating for the PlanetFrancis Ho
 
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...Francis Ho
 
City of London Law Society - Construction Law Committee - Response to Retenti...
City of London Law Society - Construction Law Committee - Response to Retenti...City of London Law Society - Construction Law Committee - Response to Retenti...
City of London Law Society - Construction Law Committee - Response to Retenti...Francis Ho
 
How will Brexit impact on Construction?
How will Brexit impact on Construction?How will Brexit impact on Construction?
How will Brexit impact on Construction?Francis Ho
 
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...Francis Ho
 
Construction Insolvency
Construction InsolvencyConstruction Insolvency
Construction InsolvencyFrancis Ho
 
The Management of Complex Contracts
The Management of Complex ContractsThe Management of Complex Contracts
The Management of Complex ContractsFrancis Ho
 
Key Developments in Emerging Markets
Key Developments in Emerging MarketsKey Developments in Emerging Markets
Key Developments in Emerging MarketsFrancis Ho
 
Using Two-Stage Tendering Effectively
Using Two-Stage Tendering EffectivelyUsing Two-Stage Tendering Effectively
Using Two-Stage Tendering EffectivelyFrancis Ho
 
It Pays to Be Right: Payment in Construction Contracts
It Pays to Be Right: Payment in Construction ContractsIt Pays to Be Right: Payment in Construction Contracts
It Pays to Be Right: Payment in Construction ContractsFrancis Ho
 
Contractual Options for Procuring Major Projects in the UK
Contractual Options for Procuring Major Projects in the UKContractual Options for Procuring Major Projects in the UK
Contractual Options for Procuring Major Projects in the UKFrancis Ho
 
Introductory Note on International Construction Contracts
Introductory Note on International Construction ContractsIntroductory Note on International Construction Contracts
Introductory Note on International Construction ContractsFrancis Ho
 
Works Insurance and Latent Defects Insurance
Works Insurance and Latent Defects InsuranceWorks Insurance and Latent Defects Insurance
Works Insurance and Latent Defects InsuranceFrancis Ho
 
Third Party Rights and Why They Matter
Third Party Rights and Why They MatterThird Party Rights and Why They Matter
Third Party Rights and Why They MatterFrancis Ho
 
A Practical Guide to the Construction (Design and Management) Regulations 2015
A Practical Guide to the Construction (Design and Management) Regulations 2015A Practical Guide to the Construction (Design and Management) Regulations 2015
A Practical Guide to the Construction (Design and Management) Regulations 2015Francis Ho
 
Construction Dispute Resolution and Avoidance in a Boom Market
Construction Dispute Resolution and Avoidance in a Boom MarketConstruction Dispute Resolution and Avoidance in a Boom Market
Construction Dispute Resolution and Avoidance in a Boom MarketFrancis Ho
 
Letters of Intent
Letters of IntentLetters of Intent
Letters of IntentFrancis Ho
 
Collateral Warranties and Third Party Rights
Collateral Warranties and Third Party RightsCollateral Warranties and Third Party Rights
Collateral Warranties and Third Party RightsFrancis Ho
 
Early Dispute Resolution in the Construction Industry
Early Dispute Resolution in the Construction IndustryEarly Dispute Resolution in the Construction Industry
Early Dispute Resolution in the Construction IndustryFrancis Ho
 
Olswang 2nd Annual Construction Law Conference
Olswang 2nd Annual Construction Law ConferenceOlswang 2nd Annual Construction Law Conference
Olswang 2nd Annual Construction Law ConferenceFrancis Ho
 

Mehr von Francis Ho (20)

COP26: Eating for the Planet
COP26: Eating for the PlanetCOP26: Eating for the Planet
COP26: Eating for the Planet
 
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...
 
City of London Law Society - Construction Law Committee - Response to Retenti...
City of London Law Society - Construction Law Committee - Response to Retenti...City of London Law Society - Construction Law Committee - Response to Retenti...
City of London Law Society - Construction Law Committee - Response to Retenti...
 
How will Brexit impact on Construction?
How will Brexit impact on Construction?How will Brexit impact on Construction?
How will Brexit impact on Construction?
 
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
 
Construction Insolvency
Construction InsolvencyConstruction Insolvency
Construction Insolvency
 
The Management of Complex Contracts
The Management of Complex ContractsThe Management of Complex Contracts
The Management of Complex Contracts
 
Key Developments in Emerging Markets
Key Developments in Emerging MarketsKey Developments in Emerging Markets
Key Developments in Emerging Markets
 
Using Two-Stage Tendering Effectively
Using Two-Stage Tendering EffectivelyUsing Two-Stage Tendering Effectively
Using Two-Stage Tendering Effectively
 
It Pays to Be Right: Payment in Construction Contracts
It Pays to Be Right: Payment in Construction ContractsIt Pays to Be Right: Payment in Construction Contracts
It Pays to Be Right: Payment in Construction Contracts
 
Contractual Options for Procuring Major Projects in the UK
Contractual Options for Procuring Major Projects in the UKContractual Options for Procuring Major Projects in the UK
Contractual Options for Procuring Major Projects in the UK
 
Introductory Note on International Construction Contracts
Introductory Note on International Construction ContractsIntroductory Note on International Construction Contracts
Introductory Note on International Construction Contracts
 
Works Insurance and Latent Defects Insurance
Works Insurance and Latent Defects InsuranceWorks Insurance and Latent Defects Insurance
Works Insurance and Latent Defects Insurance
 
Third Party Rights and Why They Matter
Third Party Rights and Why They MatterThird Party Rights and Why They Matter
Third Party Rights and Why They Matter
 
A Practical Guide to the Construction (Design and Management) Regulations 2015
A Practical Guide to the Construction (Design and Management) Regulations 2015A Practical Guide to the Construction (Design and Management) Regulations 2015
A Practical Guide to the Construction (Design and Management) Regulations 2015
 
Construction Dispute Resolution and Avoidance in a Boom Market
Construction Dispute Resolution and Avoidance in a Boom MarketConstruction Dispute Resolution and Avoidance in a Boom Market
Construction Dispute Resolution and Avoidance in a Boom Market
 
Letters of Intent
Letters of IntentLetters of Intent
Letters of Intent
 
Collateral Warranties and Third Party Rights
Collateral Warranties and Third Party RightsCollateral Warranties and Third Party Rights
Collateral Warranties and Third Party Rights
 
Early Dispute Resolution in the Construction Industry
Early Dispute Resolution in the Construction IndustryEarly Dispute Resolution in the Construction Industry
Early Dispute Resolution in the Construction Industry
 
Olswang 2nd Annual Construction Law Conference
Olswang 2nd Annual Construction Law ConferenceOlswang 2nd Annual Construction Law Conference
Olswang 2nd Annual Construction Law Conference
 

Kürzlich hochgeladen

Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...asmaqueen5
 
Call Girls in shastri nagar Delhi 8264348440 ✅ call girls ❤️
Call Girls in shastri nagar Delhi 8264348440 ✅ call girls ❤️Call Girls in shastri nagar Delhi 8264348440 ✅ call girls ❤️
Call Girls in shastri nagar Delhi 8264348440 ✅ call girls ❤️soniya singh
 
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCRGirls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCRasmaqueen5
 
2k Shot Call girls Aiims Delhi 9205541914
2k Shot Call girls Aiims Delhi 92055419142k Shot Call girls Aiims Delhi 9205541914
2k Shot Call girls Aiims Delhi 9205541914Delhi Call girls
 
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In DelhiCall Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhiasmaqueen5
 
Call girls in new Ashok NagarDelhi꧁ 8447779280꧂ Escort Service Women Seeking ...
Call girls in new Ashok NagarDelhi꧁ 8447779280꧂ Escort Service Women Seeking ...Call girls in new Ashok NagarDelhi꧁ 8447779280꧂ Escort Service Women Seeking ...
Call girls in new Ashok NagarDelhi꧁ 8447779280꧂ Escort Service Women Seeking ...asmaqueen5
 
3D Architectural Rendering Company by Panoram CGI
3D Architectural Rendering Company by Panoram CGI3D Architectural Rendering Company by Panoram CGI
3D Architectural Rendering Company by Panoram CGIPanoram CGI
 
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports WorkTENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports WorkTurbo Tenant
 
M3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial VenturesM3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial Venturessheltercareglobal
 
Kolte Patil Kharadi Pune E Brochure.pdf
Kolte Patil Kharadi Pune E  Brochure.pdfKolte Patil Kharadi Pune E  Brochure.pdf
Kolte Patil Kharadi Pune E Brochure.pdfabbu831446
 
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)Delhi Call girls
 
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|AkshayJoshi575980
 
Premium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road BengaluruPremium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road BengaluruShivaSeo3
 
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In DelhiLow Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhiasmaqueen5
 
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhidelhimodel235
 
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCRCall Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCRasmaqueen5
 
9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhidelhimodel235
 
Majestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdfMajestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdfBabyrudram
 
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhidelhimodel235
 

Kürzlich hochgeladen (20)

Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
 
Call Girls in shastri nagar Delhi 8264348440 ✅ call girls ❤️
Call Girls in shastri nagar Delhi 8264348440 ✅ call girls ❤️Call Girls in shastri nagar Delhi 8264348440 ✅ call girls ❤️
Call Girls in shastri nagar Delhi 8264348440 ✅ call girls ❤️
 
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCRGirls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
 
2k Shot Call girls Aiims Delhi 9205541914
2k Shot Call girls Aiims Delhi 92055419142k Shot Call girls Aiims Delhi 9205541914
2k Shot Call girls Aiims Delhi 9205541914
 
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In DelhiCall Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
 
Call girls in new Ashok NagarDelhi꧁ 8447779280꧂ Escort Service Women Seeking ...
Call girls in new Ashok NagarDelhi꧁ 8447779280꧂ Escort Service Women Seeking ...Call girls in new Ashok NagarDelhi꧁ 8447779280꧂ Escort Service Women Seeking ...
Call girls in new Ashok NagarDelhi꧁ 8447779280꧂ Escort Service Women Seeking ...
 
3D Architectural Rendering Company by Panoram CGI
3D Architectural Rendering Company by Panoram CGI3D Architectural Rendering Company by Panoram CGI
3D Architectural Rendering Company by Panoram CGI
 
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports WorkTENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
 
M3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial VenturesM3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
 
Kolte Patil Kharadi Pune E Brochure.pdf
Kolte Patil Kharadi Pune E  Brochure.pdfKolte Patil Kharadi Pune E  Brochure.pdf
Kolte Patil Kharadi Pune E Brochure.pdf
 
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)
 
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
 
Premium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road BengaluruPremium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road Bengaluru
 
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
 
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In DelhiLow Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
 
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
 
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCRCall Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
 
9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi
 
Majestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdfMajestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdf
 
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
 

Managing the Risks of Delay in Construction Projects

  • 1. Ben Worthington, Senior Associate | 02 November 2015 ben.worthington@olswang.com | +44 20 7067 3541 | @disputes_lawyer Construction Law Masterclass 2015 Managing the Risks of Delay
  • 2. | Delay risks constructiveblog.comManaging the Risks of Delay2 • Common causes: • Contractor performance • Design change or error • Inclement weather • Availability of labour/materials/equipment • Employer interference • Delay almost always causes increased cost: • Lost income • Alternative accommodation • Overheads • Delay damages
  • 3. | Date for completion of the works constructiveblog.comManaging the Risks of Delay3 • Specific date almost always agreed in advance – if no completion date, contractor must complete within a reasonable time • Contractor usually obliged to provide a programme showing how the completion date can be achieved • Programme not normally a binding contract document • No implied term that contractor must progress works in accordance with the programme • Contractor can claim more time for: • Delays caused by the Employer • Delays which are not the contractor’s responsibility • But unless the contract provides that a specific risk is a relevant event, it will generally be at the contractor’s risk
  • 4. | Extending time – the importance of notice provisions constructiveblog.comManaging the Risks of Delay4 • Notice provisions = allow client team to assess and manage delay risk • Key points: • For the contractor - be aware of the procedural requirements as to form and time • For the Employer - consider making the notice a condition precedent to entitlement to more time • For both parties - Be clear so that there is no dispute as to what is required and the consequences of any failure to comply • Employers / CAs need to be aware of waiver: City Inn v Shepherd Construction
  • 5. | Extending time – insisting on contractual notices constructiveblog.comManaging the Risks of Delay5 • Contract will determine whether notice is a condition precedent to an EoT • “If and whenever it becomes reasonably apparent that the progress of the Works or any Section is being or is likely to be delayed the Contractor shall forthwith give notice to the Architect/ Contract Administrator of the material circumstances, including the cause or causes of the delay, and shall identify in the notice any event which in his opinion is a Relevant Event.” (JCT SBC 2011, 2.27.1) • “If… on receiving a notice and particulars…” the CA considers the notified event is i) a relevant event and ii) is likely to delay completion beyond the completion date under clause 2.27, then it must award an EoT (JCT SBC 2011, 2.28.1) • Contract must use very clear words to impose a condition precedent to an extension of time: WW Gear Construction Ltd v McGee Group Ltd (2010)
  • 6. | Employer remedies for delay – liquidated damages constructiveblog.comManaging the Risks of Delay6 • In the event contractor fails to complete by specified date, employer is entitled to damages at a fixed rate for every week or month until the work is complete • Actual loss is irrelevant – contrast with claim for unliquidated damages • Why use them? • Complexity of construction claims • Saves time and cost • Avoids the need for dispute procedures • Certainty: (i) cost of delay (ii) risk of delay easier to price (iii) limits liability (see Temloc v Errill (1987))
  • 7. | Challenging the employer’s entitlement to liquidated damages constructiveblog.comManaging the Risks of Delay7 • Penalty clauses not enforceable… normally • See: Alfred McAlpine Capital Projects v Tilebox Ltd (2005) – is the liquidated sum extravagant or unconscionable by comparison with the greatest loss that might be suffered? • Unaoil (2014) - $55m contract sum / $40m LDs payable for breach – liquidated sum was not a genuine pre-estimate of loss • Cavendish Square Holdings v Makdessi (2013) – even an extravagant liquidated sum may not penal where there was a commercial justification • Contractor entitled to an EoT
  • 8. | Employer remedies for delay - termination constructiveblog.comManaging the Risks of Delay8 • JCT - employer can terminate where contractor: • Wholly or substantially suspends the work • Fails to proceed regularly and diligently with the work • Strict notice requirements • Serious consequences of unlawful termination • What is a failure to proceed regularly and diligently? West Faulkner Associates v London Borough of Newham (1994) – the contractor must proceed: • “continuously, industriously and efficiently with appropriate physical resources so as to progress the work steadily towards completion substantially in accordance with the contractual requirements as to time, sequence and quality of work”.
  • 9. | Employer remedies for delay – termination (2) constructiveblog.comManaging the Risks of Delay9 • contractor entitled to plan the works as he sees fit • delay is not by itself proof of a lack of due diligence • a failure to provide an adequate programme is not by itself proof of a lack of due diligence • delay due to a failure to deploy labour/resources will normally be evidence of a lack of due diligence • but poor management of labour and inadquate supervision not sufficient • the existence of defects is not by itself evidence of a lack of due diligence
  • 10. | Employer remedies for delay – the power to omit work or instruct acceleration constructiveblog.comManaging the Risks of Delay10 • The power to omit works - Abbey Developments Ltd v PP Brickwork Limited (2003) – “It is implicit in most contracts that an owner who exercises a power to omit work must genuinely require the work not to be done at all, and cannot exercise such a power with a view to having the work carried out by someone else.” • clear words required to overturn this assumption • Acceleration: • CA may have power to instruct the contractor to make up for lost time • Usually employer will need to pay overtime, the costs of unproductive work as a result of rescheduling, wasted materials, supervision, site management, plant hire etc • Reduced payment periods, payment in advance • Resolution of any outstanding EoT claims
  • 11. | Contractor remedies for delay constructiveblog.comManaging the Risks of Delay11 • Contractor entitled to more time where employer risk event occurs which causes critical delay • But occurrence of employer risk event and delay does not necessarily mean that the contractor may claim damages e.g. adverse weather may be a relevant event (time), but not a relevant matter (money) • Contractor must show the relevant event has caused a critical delay to the works: Cleveland Bridge UK Ltd v Severfield–Rowen Structures Ltd (2012): “it is necessary to show that the claiming party was actually delayed by the factors of which it complains; it simply does not follow as a matter of logic, let alone practice, on a construction or fabrication project, that, simply because a variation is issued or that information is provided later than programmed or that free issue materials are issued later in the programme than envisaged originally, the claimant is delayed.”
  • 12. | The importance of project records to delay claims constructiveblog.comManaging the Risks of Delay12 • To establish entitlement as a result of a delay will require: • Documents • Witnesses of fact • Delay analysis
  • 13. | The importance of project records to delay claims (2) constructiveblog.comManaging the Risks of Delay13 • Standard form contracts do not give detailed requirements • JCT 2011 SBC XQ - contractor must: • give notice of actual or likely delay • give particulars of the expected effects of any delay • “shall… supply such further information as the Architect/Contract Administrator may at any time reasonably require.“
  • 14. | The importance of project records to delay claims (3) constructiveblog.comManaging the Risks of Delay14 • Claims must be based on reality • Tribunals are essentially concerned with practical issues, not theoretical arguments about delay analysis • Common problems: • Project documentation often turns out to be insufficient, inaccurate or unreliable • Failure to identify actual man hours and costs associated with discreet items of additional work or additional time • Failure to record productivity by activity • Failure to record day to day reporting of what is happening on the site, through progress reports, diaries etc
  • 15. | For more information please contact Olswang: Changing Business. www.olswang.com Ben Worthington Construction +44 20 7067 3541 ben.worthington@olswang.com Brussels +32 2 647 4772 London +44 20 7067 3000 Madrid +34 91 187 1920 Munich +49 89 206 028 400 Singapore +65 6720 8278 Paris +33 17 091 8720 Thames Valley +44 20 7071 7300