Outline
• Background
• Draft Preferred Concept Design
• Corridor-wide Improvements
• Streetscape, Art, and Green Infrastructure
• Improvements by Segment
• Multimodal Operations Analysis
• Preliminary Cost Estimate
• Next Steps
Outline
2
Outline
• General Plan and subsequent plans call for project
• Options were reviewed in fall of 2018
• Council directed staff to prepare design for 40th Street
from Adeline to IKEA entry
• Two-way separated bikeway on north side of street
• Bus-only lanes (one by converting westbound mixed-flow
lane to bus-only lane west of San Pablo Avenue)
• Elimination of parking and bus stops at Harlan Street
• Bicycle-pedestrian intersection improvements
• Bus stop improvements with passenger loading areas
• Streetscaping with green infrastructure and art
opportunities
• Transit agencies and Caltrans reviewed draft design
Background
3
Draft Preferred Concept Design
4
Outline
• Multimodal Treatments
• Two-way Separated (Class IV) Bikeway
Corridor-wide Improvements
Example of treatment at Shellmound/Christie intersection
5
Outline
• Multimodal Treatments
• East- and West-bound Bus-only Lanes
Corridor-wide Improvements
Bus-Only Lanes in San Francisco
Source: SFMTASource: NACTO
Concept Diagram
6
Outline
• Multimodal Treatments
• Multimodal Intersection Improvements
Corridor-wide Improvements
Diagram of Protected Intersection
Source: globaldesigningcities.org
7
Outline
• Bus Stops along Bikeway
Corridor-wide Improvements
Source: AC Transit Multimodal Corridor GuidelinesExample of Treatment on Shellmound
8
Outline
• Bus Stops West of San Pablo Avenue – North Side
Corridor-wide Improvements
9
Outline
• Bus Stops West of San Pablo Avenue – South Side
Corridor-wide Improvements
10
Outline
• Green Infrastructure
• Biofiltraton or Bioretention Planters
• Permeable Asphalt Bikeway
• Tree Wells
• Rain Gardens
Corridor-wide Improvements
11
Outline
• Streetscape Improvement at curb
reconfigurations
• Seating
• Bus Shelter
• Lighting
Corridor-wide Improvements
12
Outline
• Streetscape Improvement at curb
reconfigurations
• Bike Parking
• Public Art
• Wayfinding Signage
Corridor-wide Improvements
Source: belson.com 13
Segment-by-Segment Improvements
14
Outline
• 40th Street Bus Hub between Adeline and San Pablo
40th Street Bus Hub
15
Outline
• Adeline
Street
Intersection
• Protected
corner
• Signal
changes
• Visible
crosswalks
40th Street Bus Hub
16
Outline
• 40th Street Bus Hub Area – streetscape
40th Street Bus Hub
17
Outline
• 40th Street Bus Hub Area – near Adeline Street
40th Street Bus Hub
Section A: 40th Street bus stops at Adeline Street (looking west)
18
Outline
• 40th Street Bus Hub Area – Mid-Block
40th Street Bus Hub
Section B: 40th Street bus stops between Adeline and San Pablo Avenue (looking west)
19
Outline
• 40th Street Bus Hub Area – near San Pablo Avenue
40th Street Bus Hub
Section C: 40th Street at San Pablo Avenue (looking west)
20
Outline
• San Pablo
Avenue
Intersection
40th Street Bus Hub
21
Outline
• San Pablo Avenue to Emery Street
San Pablo Avenue to West of Emery Street
22
Outline
• San Pablo Avenue to Emery Street
San Pablo Avenue to West of Emery Street
Section D: 40th Street between San Pablo Avenue and Emery Street (looking west)
23
Outline
• Bus Stops at Emery Street
West of Emery Street to West of Holden Street
Section E: 40th Street Bus Stops at Emery Street (looking west)
24
• Watts Street to Holden Street
West of Emery Street to West of Holden Street
25
Outline
• Watts Street to Holden Street
Section F: 40th Street Typical mid-block Condition (looking west)
West of Emery Street to West of Holden Street
26
Outline
• Watts Street to Holden Street
Section G: 40th Street Typical Condition with Turn Lane at Intersections (looking west)
West of Emery Street to West of Holden Street
27
Outline
• Holden Street to Hubbard Street
West of Holden Street to West of Hubbard Street
28
Outline
• Holden Street to Hubbard Street
West of Holden Street to West of Hubbard Street
Section H: 40th Street at Eastbound Bus Stops at Horton Street (looking west)
29
Outline
• Hubbard Street to Halleck Street
West of Hubbard Street to IKEA Entry
30
Outline
• Hubbard Street to IKEA Entry
West of Hubbard Street to IKEA Entry
31
Outline
Section I: Shellmound Street Bridge (looking west)
• Hubbard Street to IKEA Entry – Shellmound Street Bridge
West of Hubbard Street to IKEA Entry
32
Outline
• Hubbard Street to IKEA Entry – IKEA Entry
Section J: Shellmound Street at IKEA Entry (looking west)
West of Hubbard Street to IKEA Entry
33
Multimodal Operations Analysis
34
Outline
• Change in travel time between Yerba Buena Avenue
east of Adeline Street and IKEA entrance
End-to End Travel Time
Change in End-to-End Travel Time with Project (minutes)
Morning
Eastbound
Morning
Westbound
Evening
Eastbound
Evening
Westbound
Bus -0.2 -0.2 -1.5 -0.3
Car +0.5 +1.0 +0.3 +1.2
35
Outline
• Travel time between Yerba Buena Avenue east of
Adeline Street and IKEA entrance
End-to End Travel Time
Buses Cars and Trucks
Existing 7.1 minutes 3.8 minutes
With Project 5.6 minutes 4.1 minutes
Eastbound Travel Time during Evening Rush Hour
36
Outline
LOS C:
• Stable flow
• Comfortable
• Efficiently close to capacity
• Posted speed maintained
• Common goal for highways
Vehicular Level of Service (LOS)
LOS D:
• Approaching unstable flow
• Less comfortable
• Approaching but not at
capacity
• Speeds decrease slightly as
volumes increase
• Common goal for urban
streets during peak hours
37
OutlineVehicular Level of Service (LOS)
Level of Service with Project
• No intersection exceeds LOS D
• LOS changes from C to D at
• Adeline/40th – morning rush hour
• Hollis/40th – evening rush hour
• Emery/40th – evening rush hour
38
OutlinePreliminary Cost Estimate
Construction $12,500,000
Design, Engineering, Land, Art $ 3,000,000
______________________________________
Total Project Cost $15,500,000
39
OutlineNext Steps
• Review
• Planning Commission – May 23
• Bicycle/Pedestrian Advisory Committee – June 3
• Public Art Committee – June 13
• Transportation Committee – June 20
• City Council – July 9
• Implementation
• Final Memorandum and Plans
• Final Operations Analysis and Cost Estimate
• Draft and Final Funding Strategy
• Grant Applications
40
Questions? Comments?
41

Weitere ähnliche Inhalte

Was ist angesagt? (7)

Tantallon crossroads briefing
Tantallon crossroads briefingTantallon crossroads briefing
Tantallon crossroads briefing
 
The Highline
 The Highline The Highline
The Highline
 
Construction of the highline
Construction of the highlineConstruction of the highline
Construction of the highline
 
Design Review Panel Presentation - December 2014
Design Review Panel Presentation - December 2014Design Review Panel Presentation - December 2014
Design Review Panel Presentation - December 2014
 
Carrollton's revised strategies for revitalization
Carrollton's revised strategies for revitalizationCarrollton's revised strategies for revitalization
Carrollton's revised strategies for revitalization
 
January 28, 2022 Greening Lower Grand Avenue Update
January 28, 2022 Greening Lower Grand Avenue UpdateJanuary 28, 2022 Greening Lower Grand Avenue Update
January 28, 2022 Greening Lower Grand Avenue Update
 
Jan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public MeetingJan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public Meeting
 

Ähnlich wie Emeryville 40th and San Pablo Avenue Bus Hub Conceptual Design

My thesis final presentation
My thesis final presentationMy thesis final presentation
My thesis final presentation
Shusei Kakimoto
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
GardinerEast
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
Crosstown TO
 
Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank Station
Crosstown TO
 
Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017
Crosstown TO
 
Rethinking Urban Highways
Rethinking Urban HighwaysRethinking Urban Highways
Rethinking Urban Highways
sneapa
 

Ähnlich wie Emeryville 40th and San Pablo Avenue Bus Hub Conceptual Design (20)

Chicago lakeside developent lm 032414
Chicago lakeside developent lm 032414Chicago lakeside developent lm 032414
Chicago lakeside developent lm 032414
 
West loop Parking Plan Community Meeting Presentation
West loop Parking Plan Community Meeting PresentationWest loop Parking Plan Community Meeting Presentation
West loop Parking Plan Community Meeting Presentation
 
RV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
RV 2014: Can We Get There from Here? First and Last Miles by Dan GallagherRV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
RV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
 
State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015
 
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
 
My thesis final presentation
My thesis final presentationMy thesis final presentation
My thesis final presentation
 
Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016
 
CMAX Cleveland Avenue BRT Public Meeting
CMAX Cleveland Avenue BRT Public MeetingCMAX Cleveland Avenue BRT Public Meeting
CMAX Cleveland Avenue BRT Public Meeting
 
Mobility and City Streets: From Roads for Cars to Streets for People
Mobility and City Streets: From Roads for Cars to Streets for PeopleMobility and City Streets: From Roads for Cars to Streets for People
Mobility and City Streets: From Roads for Cars to Streets for People
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
 
September Proposed Changes Comment Meetings
September Proposed Changes Comment MeetingsSeptember Proposed Changes Comment Meetings
September Proposed Changes Comment Meetings
 
Final public meeting presentation
Final public meeting presentationFinal public meeting presentation
Final public meeting presentation
 
Transit BRT In LA County
Transit BRT In LA CountyTransit BRT In LA County
Transit BRT In LA County
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 
Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank Station
 
Ottawa fall construction season 2016
Ottawa fall construction season 2016Ottawa fall construction season 2016
Ottawa fall construction season 2016
 
Urban Design Quality. Church Fields, Boston Spa, a case study.
Urban Design Quality. Church Fields, Boston Spa, a case study.Urban Design Quality. Church Fields, Boston Spa, a case study.
Urban Design Quality. Church Fields, Boston Spa, a case study.
 
Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017
 
Rethinking Urban Highways
Rethinking Urban HighwaysRethinking Urban Highways
Rethinking Urban Highways
 
Marmion Way Corridor, Metro Gold LIne Light Rail
Marmion Way Corridor, Metro Gold LIne Light RailMarmion Way Corridor, Metro Gold LIne Light Rail
Marmion Way Corridor, Metro Gold LIne Light Rail
 

Mehr von E'ville Eye

City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]
E'ville Eye
 

Mehr von E'ville Eye (20)

legal-Complaint-emery-unified-assault.pdf
legal-Complaint-emery-unified-assault.pdflegal-Complaint-emery-unified-assault.pdf
legal-Complaint-emery-unified-assault.pdf
 
EUSD Superintendent Goals 2021-2023.pdf
EUSD Superintendent Goals 2021-2023.pdfEUSD Superintendent Goals 2021-2023.pdf
EUSD Superintendent Goals 2021-2023.pdf
 
SeaWallsMap-UPDATE.pdf
SeaWallsMap-UPDATE.pdfSeaWallsMap-UPDATE.pdf
SeaWallsMap-UPDATE.pdf
 
EGR-WOAK_BART_Preso_1024.pdf
EGR-WOAK_BART_Preso_1024.pdfEGR-WOAK_BART_Preso_1024.pdf
EGR-WOAK_BART_Preso_1024.pdf
 
City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]
 
Wood Street Engagement Sessions FAQ.pdf
Wood Street Engagement Sessions FAQ.pdfWood Street Engagement Sessions FAQ.pdf
Wood Street Engagement Sessions FAQ.pdf
 
Item 9.2 bay street emeryville grocery store staff report
Item 9.2 bay street emeryville grocery store staff reportItem 9.2 bay street emeryville grocery store staff report
Item 9.2 bay street emeryville grocery store staff report
 
2021 Emeryville Special Election Petition
2021 Emeryville Special Election Petition2021 Emeryville Special Election Petition
2021 Emeryville Special Election Petition
 
Wdwg press packet
Wdwg press packetWdwg press packet
Wdwg press packet
 
8 6 updated_reopeningschoolsdata_0
8 6 updated_reopeningschoolsdata_08 6 updated_reopeningschoolsdata_0
8 6 updated_reopeningschoolsdata_0
 
History and Innovation in Emeryville
History and Innovation in EmeryvilleHistory and Innovation in Emeryville
History and Innovation in Emeryville
 
Onni deemed withdrawn letter 07 22-20
Onni deemed withdrawn letter 07 22-20Onni deemed withdrawn letter 07 22-20
Onni deemed withdrawn letter 07 22-20
 
Item 7.1 art center study session
Item 7.1   art center study sessionItem 7.1   art center study session
Item 7.1 art center study session
 
Lpas rcs-3600-san-pablo
Lpas rcs-3600-san-pabloLpas rcs-3600-san-pablo
Lpas rcs-3600-san-pablo
 
Tejada retirement notice
Tejada retirement noticeTejada retirement notice
Tejada retirement notice
 
Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020
 
Biomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovationBiomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovation
 
2020.03.19 covid-19 emergency rental assistance program
2020.03.19   covid-19 emergency rental assistance program2020.03.19   covid-19 emergency rental assistance program
2020.03.19 covid-19 emergency rental assistance program
 
Dec 3 2019 cc meeting proposed sales tax measure
Dec 3 2019 cc meeting   proposed sales tax measureDec 3 2019 cc meeting   proposed sales tax measure
Dec 3 2019 cc meeting proposed sales tax measure
 
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
 

Kürzlich hochgeladen

Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
nehasharma67844
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Chandigarh Call girls 9053900678 Call girls in Chandigarh
 

Kürzlich hochgeladen (20)

Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS
 
VIP Model Call Girls Baramati ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Baramati ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Baramati ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Baramati ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
SMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptxSMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptx
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
 
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
 
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakurbest call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
 

Emeryville 40th and San Pablo Avenue Bus Hub Conceptual Design

  • 2. Outline • Background • Draft Preferred Concept Design • Corridor-wide Improvements • Streetscape, Art, and Green Infrastructure • Improvements by Segment • Multimodal Operations Analysis • Preliminary Cost Estimate • Next Steps Outline 2
  • 3. Outline • General Plan and subsequent plans call for project • Options were reviewed in fall of 2018 • Council directed staff to prepare design for 40th Street from Adeline to IKEA entry • Two-way separated bikeway on north side of street • Bus-only lanes (one by converting westbound mixed-flow lane to bus-only lane west of San Pablo Avenue) • Elimination of parking and bus stops at Harlan Street • Bicycle-pedestrian intersection improvements • Bus stop improvements with passenger loading areas • Streetscaping with green infrastructure and art opportunities • Transit agencies and Caltrans reviewed draft design Background 3
  • 5. Outline • Multimodal Treatments • Two-way Separated (Class IV) Bikeway Corridor-wide Improvements Example of treatment at Shellmound/Christie intersection 5
  • 6. Outline • Multimodal Treatments • East- and West-bound Bus-only Lanes Corridor-wide Improvements Bus-Only Lanes in San Francisco Source: SFMTASource: NACTO Concept Diagram 6
  • 7. Outline • Multimodal Treatments • Multimodal Intersection Improvements Corridor-wide Improvements Diagram of Protected Intersection Source: globaldesigningcities.org 7
  • 8. Outline • Bus Stops along Bikeway Corridor-wide Improvements Source: AC Transit Multimodal Corridor GuidelinesExample of Treatment on Shellmound 8
  • 9. Outline • Bus Stops West of San Pablo Avenue – North Side Corridor-wide Improvements 9
  • 10. Outline • Bus Stops West of San Pablo Avenue – South Side Corridor-wide Improvements 10
  • 11. Outline • Green Infrastructure • Biofiltraton or Bioretention Planters • Permeable Asphalt Bikeway • Tree Wells • Rain Gardens Corridor-wide Improvements 11
  • 12. Outline • Streetscape Improvement at curb reconfigurations • Seating • Bus Shelter • Lighting Corridor-wide Improvements 12
  • 13. Outline • Streetscape Improvement at curb reconfigurations • Bike Parking • Public Art • Wayfinding Signage Corridor-wide Improvements Source: belson.com 13
  • 15. Outline • 40th Street Bus Hub between Adeline and San Pablo 40th Street Bus Hub 15
  • 16. Outline • Adeline Street Intersection • Protected corner • Signal changes • Visible crosswalks 40th Street Bus Hub 16
  • 17. Outline • 40th Street Bus Hub Area – streetscape 40th Street Bus Hub 17
  • 18. Outline • 40th Street Bus Hub Area – near Adeline Street 40th Street Bus Hub Section A: 40th Street bus stops at Adeline Street (looking west) 18
  • 19. Outline • 40th Street Bus Hub Area – Mid-Block 40th Street Bus Hub Section B: 40th Street bus stops between Adeline and San Pablo Avenue (looking west) 19
  • 20. Outline • 40th Street Bus Hub Area – near San Pablo Avenue 40th Street Bus Hub Section C: 40th Street at San Pablo Avenue (looking west) 20
  • 22. Outline • San Pablo Avenue to Emery Street San Pablo Avenue to West of Emery Street 22
  • 23. Outline • San Pablo Avenue to Emery Street San Pablo Avenue to West of Emery Street Section D: 40th Street between San Pablo Avenue and Emery Street (looking west) 23
  • 24. Outline • Bus Stops at Emery Street West of Emery Street to West of Holden Street Section E: 40th Street Bus Stops at Emery Street (looking west) 24
  • 25. • Watts Street to Holden Street West of Emery Street to West of Holden Street 25
  • 26. Outline • Watts Street to Holden Street Section F: 40th Street Typical mid-block Condition (looking west) West of Emery Street to West of Holden Street 26
  • 27. Outline • Watts Street to Holden Street Section G: 40th Street Typical Condition with Turn Lane at Intersections (looking west) West of Emery Street to West of Holden Street 27
  • 28. Outline • Holden Street to Hubbard Street West of Holden Street to West of Hubbard Street 28
  • 29. Outline • Holden Street to Hubbard Street West of Holden Street to West of Hubbard Street Section H: 40th Street at Eastbound Bus Stops at Horton Street (looking west) 29
  • 30. Outline • Hubbard Street to Halleck Street West of Hubbard Street to IKEA Entry 30
  • 31. Outline • Hubbard Street to IKEA Entry West of Hubbard Street to IKEA Entry 31
  • 32. Outline Section I: Shellmound Street Bridge (looking west) • Hubbard Street to IKEA Entry – Shellmound Street Bridge West of Hubbard Street to IKEA Entry 32
  • 33. Outline • Hubbard Street to IKEA Entry – IKEA Entry Section J: Shellmound Street at IKEA Entry (looking west) West of Hubbard Street to IKEA Entry 33
  • 35. Outline • Change in travel time between Yerba Buena Avenue east of Adeline Street and IKEA entrance End-to End Travel Time Change in End-to-End Travel Time with Project (minutes) Morning Eastbound Morning Westbound Evening Eastbound Evening Westbound Bus -0.2 -0.2 -1.5 -0.3 Car +0.5 +1.0 +0.3 +1.2 35
  • 36. Outline • Travel time between Yerba Buena Avenue east of Adeline Street and IKEA entrance End-to End Travel Time Buses Cars and Trucks Existing 7.1 minutes 3.8 minutes With Project 5.6 minutes 4.1 minutes Eastbound Travel Time during Evening Rush Hour 36
  • 37. Outline LOS C: • Stable flow • Comfortable • Efficiently close to capacity • Posted speed maintained • Common goal for highways Vehicular Level of Service (LOS) LOS D: • Approaching unstable flow • Less comfortable • Approaching but not at capacity • Speeds decrease slightly as volumes increase • Common goal for urban streets during peak hours 37
  • 38. OutlineVehicular Level of Service (LOS) Level of Service with Project • No intersection exceeds LOS D • LOS changes from C to D at • Adeline/40th – morning rush hour • Hollis/40th – evening rush hour • Emery/40th – evening rush hour 38
  • 39. OutlinePreliminary Cost Estimate Construction $12,500,000 Design, Engineering, Land, Art $ 3,000,000 ______________________________________ Total Project Cost $15,500,000 39
  • 40. OutlineNext Steps • Review • Planning Commission – May 23 • Bicycle/Pedestrian Advisory Committee – June 3 • Public Art Committee – June 13 • Transportation Committee – June 20 • City Council – July 9 • Implementation • Final Memorandum and Plans • Final Operations Analysis and Cost Estimate • Draft and Final Funding Strategy • Grant Applications 40