IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163
__________________________________________________________________________________________
Volume: 02 Issue: 05 | May-2013, Available @ http://www.ijret.org 750
SOFTWARE TESTING EFFORT ESTIMATION WITH COBB-DOUGLAS
FUNCTION: A PRACTICAL APPLICATION
Shaik Nafeez Umar
Lead-industry consultant, Test Management Consultant, AppLabs – a CSC Company, Hyderabad, India
nshaik5@csc.com, nafishaik123@gmail.com
Abstract
Effort estimation is one of the critical challenges in Software Testing Life Cycle (STLC). It is the basis for the project’s effort
estimation, planning, scheduling and budget planning. This paper illustrates model with an objective to depict the accuracy and bias
variation of an organization’s estimates of software testing effort through Cobb-Douglas function (CDF). Data variables selected for
building the model were believed to be vital and have significant impact on the accuracy of estimates. Data gathered for the
completed projects in the organization for about 13 releases.
Statistically, all variables in this model were statistically significant at p<0.05 and p<0.01 levels. The Cobb-Douglas function was
selected and used for the software testing effort estimation. The results achieved with CDF were compared with the estimates provided
by the area expert. The model’s estimation figures are more accurate than the expert judgment. CDF has one of the appropriate
techniques for estimating effort for software testing. CDF model accuracy is 93.42%.
Index Terms: Effort estimation, software testing, Cobb-Douglas function, STLC and SDLC
-----------------------------------------------------------------------***------------------------------------------------------------------
1. INTRODUCTION
Effort estimation in software industry is highly based on human
judgment, Most of the IT organizations fail to deliver the
projects on time. Most of the IT organizations use traditional and
composite techniques effort estimation. There are different
models available in market that is discussed below in brief.
Singh, Bhatia et al. [1] gave a more detailed classification of
effort estimation empirical techniques, model/theory, expertise
techniques, regression techniques, composite techniques and
machine learning languages.
 Empirical techniques correspond to the analogy-based
techniques which estimations are based on the practice and
previous experience.
 Model/Theory based techniques are the algorithm based
techniques that include Function Point Analysis, SLIM,
Checkpoints and COCOMO model.
 Expertise techniques are equivalent to the expert judgment
when a person carries out estimation based on non-explicit
and non-recoverable reasoning [1];
 Regression based models are used to infer how the Y-
variables are related to X-variable(s), requiring data from
previous projects;
 Composite techniques combine both approaches - expert
judgment and project data - in a consistent way in order to
obtain the effort estimation [2, 3].
In the Software engineering literature there are many of the
traditional models used to estimate the effort. Typically, the
most common effort model used in testing field is COCOMO
basic model [4, 5], SEL model, Walston –Felix model [6, 5],
Bailey-Basil model [7], Halstead model [8], Doty model. From
the existing effort prediction models no one indentify the right
model to use in test effort estimation. These are all just about
prediction models.
Advantages
 Help to effort prediction for each release
 Help to plan for preventive actions for effort estimation
 Improves the overall quality of the software product
 Streamlining the SDLC/STLC
 Insure users next to the costs of field defect occurrence
 Determine the reliability
2. OBJECTIVES AND METHODOLOGY
The main objective of this paper is to predict test effort in
different test phases like Requirements Analysis, Test case
design, Test execution, Test Automation, Test Governance and
Project management. The proposed Cobb-Douglas model was
implemented in excel sheet. The foremost step is to identify
independent parameters of the testing effort model. These
parameters should have impact or any relationship between
effort and their corresponding independent parameters.
IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163
__________________________________________________________________________________________
Volume: 02 Issue: 05 | May-2013, Available @ http://www.ijret.org 751
Before deployment of CMMI practices, organizations estimates
were based on the judgment of only one expert. But, this is not
considered to be a valid method and also not validated
statistically. Two possible solutions were identified to meet the
requirements of CMMI. One of the methods was Delphi method
[9] with participation of at least three algorithmic models for the
testing effort prediction. The other solution was implementation
of algorithm model for the effort estimation based on the
historical data of organization [9].
Model specifications includes input parameters like number of
requirements, number of test cases, complexity of the release,
number of resources, domain experience, requirements, test case
design, test execution, test automation, test governance and
project management. It predicts individual effort of testing
phases and total effort. This model has analyzed the data of 14
software releases with parameters that are derived from the
project dataset. The next step is to normalize the data. Next,
check the correlation between the parameters and multi-
collinerity crisis within the independent parameters. Then
transform the data into logarithmic using the method of least
squares to find coefficient values. Eventually, multiple linear
regressions is used. The Cobb-Douglas function is given by
Y= β0+X1β1+ X2 β2+ X3 β3+ …………+ Xn βn
Where Y=Effort, β0=Constant, β1, β2, β3…… βn are coefficient
values and X1, X2, X3…, Xn are independent parameters.
Accuracy of the model
In statistical modeling, accuracy is the one of the important
criteria for measuring the performance of the model. After
building the model, performance and precision of the model is
evaluated. In this model, we used Theil’s statistics to find out
model performance. The Theil’s statistical values lies between 0
and 1, the accuracy of the model is determined based on how
close the value is to 1.
3. RESULTS AND DISCUSSION
Due to organization security and policy names of the projects are
not disclosed. The Table#1 shows the distribution of release
wise test data of different testing phases collected for 13
releases. The test data is depicted for both dependent and
independent parameters.
The most significant R-squares (Table#2) of the dependent
parameters of the model are Requirements (0.66), Test case
design (0.75), Automated testing (0.68), Test governance (0.75)
and Project management (0.85) which is highly statistically
significant at 0.01 levels. This shows the selected dependent
parameters selected for this model has significant impact on
estimating the effort for software testing.
The standard error is comparatively less for requirement
(6.58%), test case design (7.2%) and automated testing (5.69%).
This shows statistically error of the model is very less for these
variables when compared to other parameters. This indicates that
these parameters are reliable and has significant impact in
estimating the effort for software testing. In software testing
organization most of the parameters are not associated with the
effort due to frequent changes in the business requirements.
Apparently, test execution is not statistically significant in
model, it may be poorly correlated with effort and also its
standard error is 11.52%, which is high in the model. The
proposed Cobb-Douglas model gave 93.42% of accuracy of the
actual and predicted values.
The variation between actual and predicted values using this
model is significantly very low. When comparison of each every
independent Cobb-Douglas model for testing phase it was good
prediction actual vs predicted values. It was shows (Table#4)
predicted values close to actual values. Finally in Cobb-Douglas
model putting the actual independent parameters we will get
predicted effort values.
IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163
__________________________________________________________________________________________
Volume: 02 Issue: 05 | May-2013, Available @ http://www.ijret.org 752
Table1: Distribution of release wise data of different testing phases
Independent parameters Actual effort (Hrs)-Dependent parameters
Release
Numberofrequirements(#)
Numberoftestcases(#)
Complexityoftherelease(Scale)
Numberofresources(#)
Domainexperience(#)
Requirements
Testcasedesign
Testexecution
Automatedtesting
Testgovernance
Projectmanagement
Totaleffort
1 15 420 3 3 2 16 32 13 48 46 21 176
2 62 1240 2 5 2 15 43 14 52 56 20 200
3 65 1560 1 4 3 21 38 16 45 47 26 193
4 26 728 2 3 4 21 39 14 50 45 20 189
5 45 810 3 2 2 19 39 21 42 33 23 177
6 14 210 2 2 2 23 31 16 47 30 34 181
7 15 525 1 1 5 16 23 18 43 28 29 157
8 65 2600 2 8 6 23 25 16 37 28 24 153
9 48 1344 3 8 4 16 18 15 38 25 35 147
10 52 520 1 2 3 15 16 10 39 28 20 128
11(Assumed) 100 1800 3 4 5
12(Assumed) 75 2400 4 6 4
13(Assumed) 50 1250 2 4 3
Table2: Descriptive statistics and R-square values of the testing parameters
Testing phases Mean Standard deviation R-square Standard error (%)
Requirements (Hrs) 18.50 3.27 0.66 (p<0.01) 6.58
Test case design (Hrs) 30.40 9.50 0.75 (p<0.01) 7.2
Test execution (Hrs) 15.30 2.95 0.48 (p>0.05) 11.52
Automated testing (Hrs) 44.10 5.17 0.68 (p<0.05) 5.69
Test governance (Hrs) 36.60 10.83 0.75 (p<0.01) 14.59
Project management
(Hrs) 25.20 5.71 0.85 (p<0.01) 12.59
IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163
__________________________________________________________________________________________
Volume: 02 Issue: 05 | May-2013, Available @ http://www.ijret.org 753
Table3: Predicted Effort (Hrs) of testing phases-using Cobb-Douglass function
CONCLUSIONS
Based on the objective of the study Cobb-Douglas testing effort
estimation model proposed is statistically and scientifically
significant. Using the model the accuracy of effort estimation
calculated is93.42%.It clearly states Cobb-Douglas model is
more robust than other models as the model is blend of using
historical data and scientific approach. With this level of
accuracy, this model brings in huge relief for the software
industry by helping them in estimating the testing efforts
required for executing the project and thereby increasing the
accuracy levels of the overall project effort estimates..
ACKNOWLEDGEMENTS
I want to thank Narendra singh Rajput, Lead Associate Manager,
for his valuable feedback and guidance and Prof Balasiddamuni,
Department of Statistics, S V University, Tirupati and Raghav
Beeram, Global Head - Test Management Consulting,
Independent Testing Services, CSC, Hyderabad for guiding me
and supporting me in my research paper.
I would like to express my love affection to my mother Smt.
Shaik Zaibunnisa, My Father Sri. Late S. Mahaboob Basha,
Brothers and Sisters, My spouse Ballary Ameen, Children’s
Shaik Mohammed Wafeeq, Shaik Waneeya, my Niece Samreen
Aaleia for enthusing me throughout the work
REFERENCES
[1]. Y. Singh, P.K. Bhatia, A. Kaur, and O. Sangwan, A Review
of Studies on Effort Estimation Techniques of Software
Development, in Proc. Conference Mathematical Techniques:
Emerging Paradigms for Electronics and IT Industries, New
Delhi, 2008, pp. 188-196.
[2]. B. Boehm, C. Abts and S. Chulani, Software development
cost estimation approaches - A survey, Annal of Software
Engineering, vol. 10, pp. 177-205, 2000.
[3]. L.C. Briand and I. Wieczorek, Resource Estimation in
Software Engineering, Encyclopedia of Software Eng., J.J.
Marcinak, ed., pp. 1160-1196, John Wiley & Sons, 2002.
[4]. M.V. Deshpande and S.G. Bhirud, “Analysis of Combining
Software Estimation Techniques,” International
Journal of Computer Applications (0975 – 8887) Volume 5 –
No.3.
[5]. Y. Singh, K.K.Aggarwal. Software Engineering Third
edition, New Age International Publisher Limited New Delhi.
[6]. Pressman. Software Engineering - a Practitioner’s
Approach. 6th Eddition Mc Graw Hill international Edition,
Pearson education, ISBN 007 - 124083 – 7.
Predicted effort (Hrs)-Testing phases
Release
Requirements
Testcasedesign
Testexecution
Automatedtesting
Testgovernance
Product/Project
management
Totaleffort
1 19 40 16 51 45 51 221
2 18 41 15 47 50 47 218
3 18 36 14 47 50 47 212
4 19 25 15 42 30 42 172
5 17 38 19 43 36 43 196
6 18 26 13 48 34 48 187
7 18 27 18 44 31 44 182
8 20 24 15 39 30 39 166
9 19 23 14 40 29 40 166
10 17 19 12 40 27 40 154
11(Assumed) 18 17 17 32 18 32 134
12(Assumed) 18 29 19 38 28 38 170
13(Assumed) 18 33 16 44 38 44 192
IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163
__________________________________________________________________________________________
Volume: 02 Issue: 05 | May-2013, Available @ http://www.ijret.org 754
[7]. S. Devnani-Chulani, "Bayesian Analysis of Software Cost
and Quality Models”. Faculty of the Graduate School,
University Of Southern California May 1999.
[8]. O. Benediktsson and D. Dalcher, “Effort Estimation in
incremental Software Development,” IEEE Proc. Software, Vol.
150, no. 6, December 2003, pp. 351-
[9] H. Leung and Z. Fan, Software Cost Estimation, in
Handbook of Software Engineering and Knowledge
Engineering, Hong Kong Polytechnic University, 2002
BIOGRAPHIES
Working as Lead Industry Consultant in Test
Management Consulting group, AppLabs – a
Computer Science Corporation Company,
Hyderabad, India. He has 9 years in IT
experience as Statistician and Statistical
modeler. He has published 14 papers in
National/International journals. He is expert
in Statistical and Econometric modeling

Weitere ähnliche Inhalte

Was ist angesagt?

Automated parameter optimization should be included in future 
defect predict...
Automated parameter optimization should be included in future 
defect predict...Automated parameter optimization should be included in future 
defect predict...
Automated parameter optimization should be included in future 
defect predict...Chakkrit (Kla) Tantithamthavorn
 
Software testing defect prediction model a practical approach
Software testing defect prediction model   a practical approachSoftware testing defect prediction model   a practical approach
Software testing defect prediction model a practical approacheSAT Journals
 
Towards a Better Understanding of the Impact of Experimental Components on De...
Towards a Better Understanding of the Impact of Experimental Components on De...Towards a Better Understanding of the Impact of Experimental Components on De...
Towards a Better Understanding of the Impact of Experimental Components on De...Chakkrit (Kla) Tantithamthavorn
 
H047054064
H047054064H047054064
H047054064inventy
 
Software Testing Outline Performances and Measurements
Software Testing Outline Performances and MeasurementsSoftware Testing Outline Performances and Measurements
Software Testing Outline Performances and Measurementsijtsrd
 
EXTRACTING THE MINIMIZED TEST SUITE FOR REVISED SIMULINK/STATEFLOW MODEL
EXTRACTING THE MINIMIZED TEST SUITE FOR REVISED SIMULINK/STATEFLOW MODELEXTRACTING THE MINIMIZED TEST SUITE FOR REVISED SIMULINK/STATEFLOW MODEL
EXTRACTING THE MINIMIZED TEST SUITE FOR REVISED SIMULINK/STATEFLOW MODELijaia
 
Introduction to specification based test design techniques
Introduction to specification based test design techniquesIntroduction to specification based test design techniques
Introduction to specification based test design techniquesYogindernath Gupta
 
Effectiveness of test case
Effectiveness of test caseEffectiveness of test case
Effectiveness of test caseijseajournal
 
Prioritizing Test Cases for Regression Testing A Model Based Approach
Prioritizing Test Cases for Regression Testing A Model Based ApproachPrioritizing Test Cases for Regression Testing A Model Based Approach
Prioritizing Test Cases for Regression Testing A Model Based ApproachIJTET Journal
 
Decision Support Analyss for Software Effort Estimation by Analogy
Decision Support Analyss for Software Effort Estimation by AnalogyDecision Support Analyss for Software Effort Estimation by Analogy
Decision Support Analyss for Software Effort Estimation by AnalogyTim Menzies
 
Applicability of Hooke’s and Jeeves Direct Search Solution Method to Metal c...
 Applicability of Hooke’s and Jeeves Direct Search Solution Method to Metal c... Applicability of Hooke’s and Jeeves Direct Search Solution Method to Metal c...
Applicability of Hooke’s and Jeeves Direct Search Solution Method to Metal c...ijiert bestjournal
 
Itab innovative assessments
Itab innovative assessmentsItab innovative assessments
Itab innovative assessmentsMartin J Ippel
 

Was ist angesagt? (18)

Team 16_Report
Team 16_ReportTeam 16_Report
Team 16_Report
 
Automated parameter optimization should be included in future 
defect predict...
Automated parameter optimization should be included in future 
defect predict...Automated parameter optimization should be included in future 
defect predict...
Automated parameter optimization should be included in future 
defect predict...
 
Software testing defect prediction model a practical approach
Software testing defect prediction model   a practical approachSoftware testing defect prediction model   a practical approach
Software testing defect prediction model a practical approach
 
Towards a Better Understanding of the Impact of Experimental Components on De...
Towards a Better Understanding of the Impact of Experimental Components on De...Towards a Better Understanding of the Impact of Experimental Components on De...
Towards a Better Understanding of the Impact of Experimental Components on De...
 
Ijciet 10 02_011
Ijciet 10 02_011Ijciet 10 02_011
Ijciet 10 02_011
 
H047054064
H047054064H047054064
H047054064
 
Q44098893
Q44098893Q44098893
Q44098893
 
Software Testing Outline Performances and Measurements
Software Testing Outline Performances and MeasurementsSoftware Testing Outline Performances and Measurements
Software Testing Outline Performances and Measurements
 
Dc35579583
Dc35579583Dc35579583
Dc35579583
 
EXTRACTING THE MINIMIZED TEST SUITE FOR REVISED SIMULINK/STATEFLOW MODEL
EXTRACTING THE MINIMIZED TEST SUITE FOR REVISED SIMULINK/STATEFLOW MODELEXTRACTING THE MINIMIZED TEST SUITE FOR REVISED SIMULINK/STATEFLOW MODEL
EXTRACTING THE MINIMIZED TEST SUITE FOR REVISED SIMULINK/STATEFLOW MODEL
 
Sta unit 5(abimanyu)
Sta unit 5(abimanyu)Sta unit 5(abimanyu)
Sta unit 5(abimanyu)
 
Introduction to specification based test design techniques
Introduction to specification based test design techniquesIntroduction to specification based test design techniques
Introduction to specification based test design techniques
 
Effectiveness of test case
Effectiveness of test caseEffectiveness of test case
Effectiveness of test case
 
Bd36334337
Bd36334337Bd36334337
Bd36334337
 
Prioritizing Test Cases for Regression Testing A Model Based Approach
Prioritizing Test Cases for Regression Testing A Model Based ApproachPrioritizing Test Cases for Regression Testing A Model Based Approach
Prioritizing Test Cases for Regression Testing A Model Based Approach
 
Decision Support Analyss for Software Effort Estimation by Analogy
Decision Support Analyss for Software Effort Estimation by AnalogyDecision Support Analyss for Software Effort Estimation by Analogy
Decision Support Analyss for Software Effort Estimation by Analogy
 
Applicability of Hooke’s and Jeeves Direct Search Solution Method to Metal c...
 Applicability of Hooke’s and Jeeves Direct Search Solution Method to Metal c... Applicability of Hooke’s and Jeeves Direct Search Solution Method to Metal c...
Applicability of Hooke’s and Jeeves Direct Search Solution Method to Metal c...
 
Itab innovative assessments
Itab innovative assessmentsItab innovative assessments
Itab innovative assessments
 

Ähnlich wie Software testing effort estimation with cobb douglas function- a practical application

Configuration Navigation Analysis Model for Regression Test Case Prioritization
Configuration Navigation Analysis Model for Regression Test Case PrioritizationConfiguration Navigation Analysis Model for Regression Test Case Prioritization
Configuration Navigation Analysis Model for Regression Test Case Prioritizationijsrd.com
 
A Novel Approach to Derive the Average-Case Behavior of Distributed Embedded ...
A Novel Approach to Derive the Average-Case Behavior of Distributed Embedded ...A Novel Approach to Derive the Average-Case Behavior of Distributed Embedded ...
A Novel Approach to Derive the Average-Case Behavior of Distributed Embedded ...ijccmsjournal
 
Test case-point-analysis (whitepaper)
Test case-point-analysis (whitepaper)Test case-point-analysis (whitepaper)
Test case-point-analysis (whitepaper)KMS Technology
 
A value added predictive defect type distribution model
A value added predictive defect type distribution modelA value added predictive defect type distribution model
A value added predictive defect type distribution modelUmeshchandraYadav5
 
IRJET- Analysis of Software Cost Estimation Techniques
IRJET- Analysis of Software Cost Estimation TechniquesIRJET- Analysis of Software Cost Estimation Techniques
IRJET- Analysis of Software Cost Estimation TechniquesIRJET Journal
 
IRJET- Development Operations for Continuous Delivery
IRJET- Development Operations for Continuous DeliveryIRJET- Development Operations for Continuous Delivery
IRJET- Development Operations for Continuous DeliveryIRJET Journal
 
Proceedings of the 2015 Industrial and Systems Engineering Res.docx
Proceedings of the 2015 Industrial and Systems Engineering Res.docxProceedings of the 2015 Industrial and Systems Engineering Res.docx
Proceedings of the 2015 Industrial and Systems Engineering Res.docxwkyra78
 
Determination of Optimum Parameters Affecting the Properties of O Rings
Determination of Optimum Parameters Affecting the Properties of O RingsDetermination of Optimum Parameters Affecting the Properties of O Rings
Determination of Optimum Parameters Affecting the Properties of O RingsIRJET Journal
 
A Review on Software Fault Detection and Prevention Mechanism in Software Dev...
A Review on Software Fault Detection and Prevention Mechanism in Software Dev...A Review on Software Fault Detection and Prevention Mechanism in Software Dev...
A Review on Software Fault Detection and Prevention Mechanism in Software Dev...iosrjce
 
A Complexity Based Regression Test Selection Strategy
A Complexity Based Regression Test Selection StrategyA Complexity Based Regression Test Selection Strategy
A Complexity Based Regression Test Selection StrategyCSEIJJournal
 
A lean model based outlook on cost & quality optimization in software projects
A lean model based outlook on cost & quality optimization in software projectsA lean model based outlook on cost & quality optimization in software projects
A lean model based outlook on cost & quality optimization in software projectsSonata Software
 
International Journal of Soft Computing and Engineering (IJS
International Journal of Soft Computing and Engineering (IJSInternational Journal of Soft Computing and Engineering (IJS
International Journal of Soft Computing and Engineering (IJShildredzr1di
 
MIT521 software testing (2012) v2
MIT521   software testing  (2012) v2MIT521   software testing  (2012) v2
MIT521 software testing (2012) v2Yudep Apoi
 
Gaining Insights into Patient Satisfaction through Interpretable Machine Lear...
Gaining Insights into Patient Satisfaction through Interpretable Machine Lear...Gaining Insights into Patient Satisfaction through Interpretable Machine Lear...
Gaining Insights into Patient Satisfaction through Interpretable Machine Lear...IRJET Journal
 
Role+Of+Testing+In+Sdlc
Role+Of+Testing+In+SdlcRole+Of+Testing+In+Sdlc
Role+Of+Testing+In+Sdlcmahendra singh
 
Threshold benchmarking for feature ranking techniques
Threshold benchmarking for feature ranking techniquesThreshold benchmarking for feature ranking techniques
Threshold benchmarking for feature ranking techniquesjournalBEEI
 

Ähnlich wie Software testing effort estimation with cobb douglas function- a practical application (20)

Configuration Navigation Analysis Model for Regression Test Case Prioritization
Configuration Navigation Analysis Model for Regression Test Case PrioritizationConfiguration Navigation Analysis Model for Regression Test Case Prioritization
Configuration Navigation Analysis Model for Regression Test Case Prioritization
 
A Novel Approach to Derive the Average-Case Behavior of Distributed Embedded ...
A Novel Approach to Derive the Average-Case Behavior of Distributed Embedded ...A Novel Approach to Derive the Average-Case Behavior of Distributed Embedded ...
A Novel Approach to Derive the Average-Case Behavior of Distributed Embedded ...
 
Test case-point-analysis (whitepaper)
Test case-point-analysis (whitepaper)Test case-point-analysis (whitepaper)
Test case-point-analysis (whitepaper)
 
A value added predictive defect type distribution model
A value added predictive defect type distribution modelA value added predictive defect type distribution model
A value added predictive defect type distribution model
 
IRJET- Analysis of Software Cost Estimation Techniques
IRJET- Analysis of Software Cost Estimation TechniquesIRJET- Analysis of Software Cost Estimation Techniques
IRJET- Analysis of Software Cost Estimation Techniques
 
IRJET- Development Operations for Continuous Delivery
IRJET- Development Operations for Continuous DeliveryIRJET- Development Operations for Continuous Delivery
IRJET- Development Operations for Continuous Delivery
 
Proceedings of the 2015 Industrial and Systems Engineering Res.docx
Proceedings of the 2015 Industrial and Systems Engineering Res.docxProceedings of the 2015 Industrial and Systems Engineering Res.docx
Proceedings of the 2015 Industrial and Systems Engineering Res.docx
 
Comparison of available Methods to Estimate Effort, Performance and Cost with...
Comparison of available Methods to Estimate Effort, Performance and Cost with...Comparison of available Methods to Estimate Effort, Performance and Cost with...
Comparison of available Methods to Estimate Effort, Performance and Cost with...
 
Determination of Optimum Parameters Affecting the Properties of O Rings
Determination of Optimum Parameters Affecting the Properties of O RingsDetermination of Optimum Parameters Affecting the Properties of O Rings
Determination of Optimum Parameters Affecting the Properties of O Rings
 
Hh3512801283
Hh3512801283Hh3512801283
Hh3512801283
 
A Review on Software Fault Detection and Prevention Mechanism in Software Dev...
A Review on Software Fault Detection and Prevention Mechanism in Software Dev...A Review on Software Fault Detection and Prevention Mechanism in Software Dev...
A Review on Software Fault Detection and Prevention Mechanism in Software Dev...
 
F017652530
F017652530F017652530
F017652530
 
A Complexity Based Regression Test Selection Strategy
A Complexity Based Regression Test Selection StrategyA Complexity Based Regression Test Selection Strategy
A Complexity Based Regression Test Selection Strategy
 
Ijcatr04051006
Ijcatr04051006Ijcatr04051006
Ijcatr04051006
 
A lean model based outlook on cost & quality optimization in software projects
A lean model based outlook on cost & quality optimization in software projectsA lean model based outlook on cost & quality optimization in software projects
A lean model based outlook on cost & quality optimization in software projects
 
International Journal of Soft Computing and Engineering (IJS
International Journal of Soft Computing and Engineering (IJSInternational Journal of Soft Computing and Engineering (IJS
International Journal of Soft Computing and Engineering (IJS
 
MIT521 software testing (2012) v2
MIT521   software testing  (2012) v2MIT521   software testing  (2012) v2
MIT521 software testing (2012) v2
 
Gaining Insights into Patient Satisfaction through Interpretable Machine Lear...
Gaining Insights into Patient Satisfaction through Interpretable Machine Lear...Gaining Insights into Patient Satisfaction through Interpretable Machine Lear...
Gaining Insights into Patient Satisfaction through Interpretable Machine Lear...
 
Role+Of+Testing+In+Sdlc
Role+Of+Testing+In+SdlcRole+Of+Testing+In+Sdlc
Role+Of+Testing+In+Sdlc
 
Threshold benchmarking for feature ranking techniques
Threshold benchmarking for feature ranking techniquesThreshold benchmarking for feature ranking techniques
Threshold benchmarking for feature ranking techniques
 

Mehr von eSAT Journals

Mechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementsMechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementseSAT Journals
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case studyeSAT Journals
 
Managing drought short term strategies in semi arid regions a case study
Managing drought    short term strategies in semi arid regions  a case studyManaging drought    short term strategies in semi arid regions  a case study
Managing drought short term strategies in semi arid regions a case studyeSAT Journals
 
Life cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangaloreLife cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangaloreeSAT Journals
 
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialsLaboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialseSAT Journals
 
Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...eSAT Journals
 
Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...eSAT Journals
 
Influence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizerInfluence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizereSAT Journals
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementeSAT Journals
 
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...eSAT Journals
 
Factors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteFactors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteeSAT Journals
 
Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...eSAT Journals
 
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...eSAT Journals
 
Evaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabsEvaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabseSAT Journals
 
Evaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaEvaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaeSAT Journals
 
Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...eSAT Journals
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodeSAT Journals
 
Estimation of morphometric parameters and runoff using rs &amp; gis techniques
Estimation of morphometric parameters and runoff using rs &amp; gis techniquesEstimation of morphometric parameters and runoff using rs &amp; gis techniques
Estimation of morphometric parameters and runoff using rs &amp; gis techniqueseSAT Journals
 
Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...eSAT Journals
 
Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...eSAT Journals
 

Mehr von eSAT Journals (20)

Mechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementsMechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavements
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case study
 
Managing drought short term strategies in semi arid regions a case study
Managing drought    short term strategies in semi arid regions  a case studyManaging drought    short term strategies in semi arid regions  a case study
Managing drought short term strategies in semi arid regions a case study
 
Life cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangaloreLife cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangalore
 
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialsLaboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
 
Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...
 
Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...
 
Influence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizerInfluence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizer
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources management
 
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
 
Factors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteFactors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concrete
 
Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...
 
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
 
Evaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabsEvaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabs
 
Evaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaEvaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in india
 
Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn method
 
Estimation of morphometric parameters and runoff using rs &amp; gis techniques
Estimation of morphometric parameters and runoff using rs &amp; gis techniquesEstimation of morphometric parameters and runoff using rs &amp; gis techniques
Estimation of morphometric parameters and runoff using rs &amp; gis techniques
 
Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...
 
Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...
 

Kürzlich hochgeladen

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 

Kürzlich hochgeladen (20)

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 

Software testing effort estimation with cobb douglas function- a practical application

  • 1. IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163 __________________________________________________________________________________________ Volume: 02 Issue: 05 | May-2013, Available @ http://www.ijret.org 750 SOFTWARE TESTING EFFORT ESTIMATION WITH COBB-DOUGLAS FUNCTION: A PRACTICAL APPLICATION Shaik Nafeez Umar Lead-industry consultant, Test Management Consultant, AppLabs – a CSC Company, Hyderabad, India nshaik5@csc.com, nafishaik123@gmail.com Abstract Effort estimation is one of the critical challenges in Software Testing Life Cycle (STLC). It is the basis for the project’s effort estimation, planning, scheduling and budget planning. This paper illustrates model with an objective to depict the accuracy and bias variation of an organization’s estimates of software testing effort through Cobb-Douglas function (CDF). Data variables selected for building the model were believed to be vital and have significant impact on the accuracy of estimates. Data gathered for the completed projects in the organization for about 13 releases. Statistically, all variables in this model were statistically significant at p<0.05 and p<0.01 levels. The Cobb-Douglas function was selected and used for the software testing effort estimation. The results achieved with CDF were compared with the estimates provided by the area expert. The model’s estimation figures are more accurate than the expert judgment. CDF has one of the appropriate techniques for estimating effort for software testing. CDF model accuracy is 93.42%. Index Terms: Effort estimation, software testing, Cobb-Douglas function, STLC and SDLC -----------------------------------------------------------------------***------------------------------------------------------------------ 1. INTRODUCTION Effort estimation in software industry is highly based on human judgment, Most of the IT organizations fail to deliver the projects on time. Most of the IT organizations use traditional and composite techniques effort estimation. There are different models available in market that is discussed below in brief. Singh, Bhatia et al. [1] gave a more detailed classification of effort estimation empirical techniques, model/theory, expertise techniques, regression techniques, composite techniques and machine learning languages.  Empirical techniques correspond to the analogy-based techniques which estimations are based on the practice and previous experience.  Model/Theory based techniques are the algorithm based techniques that include Function Point Analysis, SLIM, Checkpoints and COCOMO model.  Expertise techniques are equivalent to the expert judgment when a person carries out estimation based on non-explicit and non-recoverable reasoning [1];  Regression based models are used to infer how the Y- variables are related to X-variable(s), requiring data from previous projects;  Composite techniques combine both approaches - expert judgment and project data - in a consistent way in order to obtain the effort estimation [2, 3]. In the Software engineering literature there are many of the traditional models used to estimate the effort. Typically, the most common effort model used in testing field is COCOMO basic model [4, 5], SEL model, Walston –Felix model [6, 5], Bailey-Basil model [7], Halstead model [8], Doty model. From the existing effort prediction models no one indentify the right model to use in test effort estimation. These are all just about prediction models. Advantages  Help to effort prediction for each release  Help to plan for preventive actions for effort estimation  Improves the overall quality of the software product  Streamlining the SDLC/STLC  Insure users next to the costs of field defect occurrence  Determine the reliability 2. OBJECTIVES AND METHODOLOGY The main objective of this paper is to predict test effort in different test phases like Requirements Analysis, Test case design, Test execution, Test Automation, Test Governance and Project management. The proposed Cobb-Douglas model was implemented in excel sheet. The foremost step is to identify independent parameters of the testing effort model. These parameters should have impact or any relationship between effort and their corresponding independent parameters.
  • 2. IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163 __________________________________________________________________________________________ Volume: 02 Issue: 05 | May-2013, Available @ http://www.ijret.org 751 Before deployment of CMMI practices, organizations estimates were based on the judgment of only one expert. But, this is not considered to be a valid method and also not validated statistically. Two possible solutions were identified to meet the requirements of CMMI. One of the methods was Delphi method [9] with participation of at least three algorithmic models for the testing effort prediction. The other solution was implementation of algorithm model for the effort estimation based on the historical data of organization [9]. Model specifications includes input parameters like number of requirements, number of test cases, complexity of the release, number of resources, domain experience, requirements, test case design, test execution, test automation, test governance and project management. It predicts individual effort of testing phases and total effort. This model has analyzed the data of 14 software releases with parameters that are derived from the project dataset. The next step is to normalize the data. Next, check the correlation between the parameters and multi- collinerity crisis within the independent parameters. Then transform the data into logarithmic using the method of least squares to find coefficient values. Eventually, multiple linear regressions is used. The Cobb-Douglas function is given by Y= β0+X1β1+ X2 β2+ X3 β3+ …………+ Xn βn Where Y=Effort, β0=Constant, β1, β2, β3…… βn are coefficient values and X1, X2, X3…, Xn are independent parameters. Accuracy of the model In statistical modeling, accuracy is the one of the important criteria for measuring the performance of the model. After building the model, performance and precision of the model is evaluated. In this model, we used Theil’s statistics to find out model performance. The Theil’s statistical values lies between 0 and 1, the accuracy of the model is determined based on how close the value is to 1. 3. RESULTS AND DISCUSSION Due to organization security and policy names of the projects are not disclosed. The Table#1 shows the distribution of release wise test data of different testing phases collected for 13 releases. The test data is depicted for both dependent and independent parameters. The most significant R-squares (Table#2) of the dependent parameters of the model are Requirements (0.66), Test case design (0.75), Automated testing (0.68), Test governance (0.75) and Project management (0.85) which is highly statistically significant at 0.01 levels. This shows the selected dependent parameters selected for this model has significant impact on estimating the effort for software testing. The standard error is comparatively less for requirement (6.58%), test case design (7.2%) and automated testing (5.69%). This shows statistically error of the model is very less for these variables when compared to other parameters. This indicates that these parameters are reliable and has significant impact in estimating the effort for software testing. In software testing organization most of the parameters are not associated with the effort due to frequent changes in the business requirements. Apparently, test execution is not statistically significant in model, it may be poorly correlated with effort and also its standard error is 11.52%, which is high in the model. The proposed Cobb-Douglas model gave 93.42% of accuracy of the actual and predicted values. The variation between actual and predicted values using this model is significantly very low. When comparison of each every independent Cobb-Douglas model for testing phase it was good prediction actual vs predicted values. It was shows (Table#4) predicted values close to actual values. Finally in Cobb-Douglas model putting the actual independent parameters we will get predicted effort values.
  • 3. IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163 __________________________________________________________________________________________ Volume: 02 Issue: 05 | May-2013, Available @ http://www.ijret.org 752 Table1: Distribution of release wise data of different testing phases Independent parameters Actual effort (Hrs)-Dependent parameters Release Numberofrequirements(#) Numberoftestcases(#) Complexityoftherelease(Scale) Numberofresources(#) Domainexperience(#) Requirements Testcasedesign Testexecution Automatedtesting Testgovernance Projectmanagement Totaleffort 1 15 420 3 3 2 16 32 13 48 46 21 176 2 62 1240 2 5 2 15 43 14 52 56 20 200 3 65 1560 1 4 3 21 38 16 45 47 26 193 4 26 728 2 3 4 21 39 14 50 45 20 189 5 45 810 3 2 2 19 39 21 42 33 23 177 6 14 210 2 2 2 23 31 16 47 30 34 181 7 15 525 1 1 5 16 23 18 43 28 29 157 8 65 2600 2 8 6 23 25 16 37 28 24 153 9 48 1344 3 8 4 16 18 15 38 25 35 147 10 52 520 1 2 3 15 16 10 39 28 20 128 11(Assumed) 100 1800 3 4 5 12(Assumed) 75 2400 4 6 4 13(Assumed) 50 1250 2 4 3 Table2: Descriptive statistics and R-square values of the testing parameters Testing phases Mean Standard deviation R-square Standard error (%) Requirements (Hrs) 18.50 3.27 0.66 (p<0.01) 6.58 Test case design (Hrs) 30.40 9.50 0.75 (p<0.01) 7.2 Test execution (Hrs) 15.30 2.95 0.48 (p>0.05) 11.52 Automated testing (Hrs) 44.10 5.17 0.68 (p<0.05) 5.69 Test governance (Hrs) 36.60 10.83 0.75 (p<0.01) 14.59 Project management (Hrs) 25.20 5.71 0.85 (p<0.01) 12.59
  • 4. IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163 __________________________________________________________________________________________ Volume: 02 Issue: 05 | May-2013, Available @ http://www.ijret.org 753 Table3: Predicted Effort (Hrs) of testing phases-using Cobb-Douglass function CONCLUSIONS Based on the objective of the study Cobb-Douglas testing effort estimation model proposed is statistically and scientifically significant. Using the model the accuracy of effort estimation calculated is93.42%.It clearly states Cobb-Douglas model is more robust than other models as the model is blend of using historical data and scientific approach. With this level of accuracy, this model brings in huge relief for the software industry by helping them in estimating the testing efforts required for executing the project and thereby increasing the accuracy levels of the overall project effort estimates.. ACKNOWLEDGEMENTS I want to thank Narendra singh Rajput, Lead Associate Manager, for his valuable feedback and guidance and Prof Balasiddamuni, Department of Statistics, S V University, Tirupati and Raghav Beeram, Global Head - Test Management Consulting, Independent Testing Services, CSC, Hyderabad for guiding me and supporting me in my research paper. I would like to express my love affection to my mother Smt. Shaik Zaibunnisa, My Father Sri. Late S. Mahaboob Basha, Brothers and Sisters, My spouse Ballary Ameen, Children’s Shaik Mohammed Wafeeq, Shaik Waneeya, my Niece Samreen Aaleia for enthusing me throughout the work REFERENCES [1]. Y. Singh, P.K. Bhatia, A. Kaur, and O. Sangwan, A Review of Studies on Effort Estimation Techniques of Software Development, in Proc. Conference Mathematical Techniques: Emerging Paradigms for Electronics and IT Industries, New Delhi, 2008, pp. 188-196. [2]. B. Boehm, C. Abts and S. Chulani, Software development cost estimation approaches - A survey, Annal of Software Engineering, vol. 10, pp. 177-205, 2000. [3]. L.C. Briand and I. Wieczorek, Resource Estimation in Software Engineering, Encyclopedia of Software Eng., J.J. Marcinak, ed., pp. 1160-1196, John Wiley & Sons, 2002. [4]. M.V. Deshpande and S.G. Bhirud, “Analysis of Combining Software Estimation Techniques,” International Journal of Computer Applications (0975 – 8887) Volume 5 – No.3. [5]. Y. Singh, K.K.Aggarwal. Software Engineering Third edition, New Age International Publisher Limited New Delhi. [6]. Pressman. Software Engineering - a Practitioner’s Approach. 6th Eddition Mc Graw Hill international Edition, Pearson education, ISBN 007 - 124083 – 7. Predicted effort (Hrs)-Testing phases Release Requirements Testcasedesign Testexecution Automatedtesting Testgovernance Product/Project management Totaleffort 1 19 40 16 51 45 51 221 2 18 41 15 47 50 47 218 3 18 36 14 47 50 47 212 4 19 25 15 42 30 42 172 5 17 38 19 43 36 43 196 6 18 26 13 48 34 48 187 7 18 27 18 44 31 44 182 8 20 24 15 39 30 39 166 9 19 23 14 40 29 40 166 10 17 19 12 40 27 40 154 11(Assumed) 18 17 17 32 18 32 134 12(Assumed) 18 29 19 38 28 38 170 13(Assumed) 18 33 16 44 38 44 192
  • 5. IJRET: International Journal of Research in Engineering and Technology ISSN: 2319-1163 __________________________________________________________________________________________ Volume: 02 Issue: 05 | May-2013, Available @ http://www.ijret.org 754 [7]. S. Devnani-Chulani, "Bayesian Analysis of Software Cost and Quality Models”. Faculty of the Graduate School, University Of Southern California May 1999. [8]. O. Benediktsson and D. Dalcher, “Effort Estimation in incremental Software Development,” IEEE Proc. Software, Vol. 150, no. 6, December 2003, pp. 351- [9] H. Leung and Z. Fan, Software Cost Estimation, in Handbook of Software Engineering and Knowledge Engineering, Hong Kong Polytechnic University, 2002 BIOGRAPHIES Working as Lead Industry Consultant in Test Management Consulting group, AppLabs – a Computer Science Corporation Company, Hyderabad, India. He has 9 years in IT experience as Statistician and Statistical modeler. He has published 14 papers in National/International journals. He is expert in Statistical and Econometric modeling