SCHEDULING
• Scheduling is an important tool
  or manufacturing and engineering, where it can
  have a major impact on the productivity of a
  process.
• Scheduling relates to the timing of each individual
  delivery.
• It mainly deals with handling application.
• It increases efficiency of production.
• Scheduling decreases material handling cost and
  waiting time for work in process.
SCHEDULING
• It co-ordinate man, machine and production
  facility for obtaining higher output.
• It uses graphical data plotted by taking
  readings to identify the errors in process
• Corrective actions are taken and
  manufacturing lead time is minimized
• Scheduling is the study of process and
  organizing them to obtain higher effficiency
Advantages of Scheduling
•   Process change-over reduction
•   Inventory reduction, leveling
•   Reduced scheduling effort
•   Increased production efficiency
•   Labor load leveling
•   Accurate delivery date quotes
•   Real time information
KNOWLEDGE BASED SCHEDULING
• A general knowledge-based system consists of
  three components:

  – a database

  – a knowledge base

  – an inference engine
• The database stores declarative knowledge
  about the goals, the current situation of the
  world, and the semi finished plan.

• The knowledge-base stores the domain-specific
  and procedural knowledge, often represented
  by production rules or operators.

• the inference engine stores control knowledge
  indicating how to select operators and when to
  apply them.
KNOWLEDGE-BASED SCHEDULER CAN
PERFORM THE FOLLOWING TYPES OF
    SCHEDULING FUNCTIONS:
1. Adaptive scheduling: Schedules are
   generated by goal-driven procedures; the
   scheduler can perform dynamic scheduling to
   adapt to changes in the FMS environment.
2. Planning: State-space inference and heuristic
   search are used to derive production
   processes.
3. Optimizing: Simulation and selection of plans
   from alternates are done by evaluating
   performance criteria and heuristics.

4. Learning: Recognition, refinement, encoding,
   and integration of processes are performed
   to enhance the scheduling performance.
COMPUTER HIERARCHY CONTROL
• The term computer hierarchy control is used
  to describe such configuration which consist
  of following components.

  – Multiple process control station located
    throughout the plant to control the individual loop
    and device of the process.
– A certain control room equipped with the
  operator stations where supervisory control of
  plant occurs

– All process and operator stations interact with
  each other by means of communication network.
SUPERVISORY CONTROL
• The term supervisory control is usually associated
  with the process industries, but the concept
  applies equally well to discrete manufacturing
  automation.
• Supervisory control represent a higher level of
  control than DDC, NC & PLCs.
• Supervisory control denotes a control system
  that manage the activities of a number of
  integrated units operations to achieve certain
  economic objectives for the process.
• Supervisory control is not much more than
  regulatory control or feed forward control.

• In other application the supervisory control
  system is designed to implement optimal or
  adaptive control.

• Supervisory control can be defined as the
  control system that directs and co-ordinates
  the activities of several interacting pieces of
  equipment in manufacturing cell or system.
REFFERENCES
• “AUTOMATION IN PRODUCTION SYSTEM” by
  Mikell P. Grover
• “COMPUTER INTEGRATED MANUFACTURING”
  by N. Venkateshwaran
• “Knowledge based Scheduling in FMS” by
  Michael J. Shaw.
• http://production-scheduling.com/
THANK YOU

Weitere ähnliche Inhalte

Was ist angesagt?

Plan It Rev1
Plan It   Rev1Plan It   Rev1
Plan It Rev1
DLearman
 
Assessment of maintenance management system
Assessment of maintenance management systemAssessment of maintenance management system
Assessment of maintenance management system
Sagar Sharma
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
Akanksha Gupta
 

Was ist angesagt? (20)

Unit 3 Manufacturing system design
Unit   3 Manufacturing system designUnit   3 Manufacturing system design
Unit 3 Manufacturing system design
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Production planning
Production planningProduction planning
Production planning
 
Plan It Rev1
Plan It   Rev1Plan It   Rev1
Plan It Rev1
 
Assessment of maintenance management system
Assessment of maintenance management systemAssessment of maintenance management system
Assessment of maintenance management system
 
Routing and scheduling
Routing and schedulingRouting and scheduling
Routing and scheduling
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
Production planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringProduction planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, Monitoring
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
Maintenance 2sp
Maintenance 2spMaintenance 2sp
Maintenance 2sp
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Maintenance module1 ppt number 3
Maintenance module1 ppt number 3Maintenance module1 ppt number 3
Maintenance module1 ppt number 3
 
Production control
Production controlProduction control
Production control
 
Mba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp aMba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp a
 
Organisation policies for smoothing capacity utilisation
Organisation policies for smoothing capacity utilisationOrganisation policies for smoothing capacity utilisation
Organisation policies for smoothing capacity utilisation
 
CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2) CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2)
 
Introduction to Production Planning by Jasmin Dalal
Introduction to Production Planning  by Jasmin DalalIntroduction to Production Planning  by Jasmin Dalal
Introduction to Production Planning by Jasmin Dalal
 
Reliability Centered Maintenance
Reliability Centered MaintenanceReliability Centered Maintenance
Reliability Centered Maintenance
 
Computer – Aided process planning (CAPP)
Computer – Aided process planning (CAPP)Computer – Aided process planning (CAPP)
Computer – Aided process planning (CAPP)
 
Production control
Production controlProduction control
Production control
 

Andere mochten auch (10)

Project management seminar paper
Project management seminar paperProject management seminar paper
Project management seminar paper
 
Project management seminar pmbok5 v17 aug2013
Project management seminar pmbok5 v17 aug2013Project management seminar pmbok5 v17 aug2013
Project management seminar pmbok5 v17 aug2013
 
Construction Administration Seminar
Construction Administration Seminar Construction Administration Seminar
Construction Administration Seminar
 
Material management on construction site
Material management on construction siteMaterial management on construction site
Material management on construction site
 
construction site safety and management
construction site safety and managementconstruction site safety and management
construction site safety and management
 
Advanced Construction Technology Project
Advanced Construction Technology ProjectAdvanced Construction Technology Project
Advanced Construction Technology Project
 
Construction claims management + project documentation seminar
Construction claims management + project documentation seminarConstruction claims management + project documentation seminar
Construction claims management + project documentation seminar
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
Building methods and construction technology 1
Building methods and construction technology 1Building methods and construction technology 1
Building methods and construction technology 1
 
Construction Material Management
Construction Material ManagementConstruction Material Management
Construction Material Management
 

Ähnlich wie Seminar on cim 02

Production planning and control
Production planning and controlProduction planning and control
Production planning and control
Laxmikant Deshmukh
 
Cb12e basic ppt ch11
Cb12e basic ppt ch11Cb12e basic ppt ch11
Cb12e basic ppt ch11
Eric
 
Production And Planning control.ppt
Production And Planning control.pptProduction And Planning control.ppt
Production And Planning control.ppt
SrinuKN
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
Gerald Michael
 

Ähnlich wie Seminar on cim 02 (20)

Computer integrated production planning
Computer integrated production planningComputer integrated production planning
Computer integrated production planning
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
MIn-218_chap 1.pptx
MIn-218_chap 1.pptxMIn-218_chap 1.pptx
MIn-218_chap 1.pptx
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Ppc unit-4-production scheduling
Ppc   unit-4-production schedulingPpc   unit-4-production scheduling
Ppc unit-4-production scheduling
 
Lead Time.pptx
Lead Time.pptxLead Time.pptx
Lead Time.pptx
 
Product Operation Planning & Control
Product Operation Planning & ControlProduct Operation Planning & Control
Product Operation Planning & Control
 
Cb12e basic ppt ch11
Cb12e basic ppt ch11Cb12e basic ppt ch11
Cb12e basic ppt ch11
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Production And Planning control.ppt
Production And Planning control.pptProduction And Planning control.ppt
Production And Planning control.ppt
 
Production planning and control - PPC
Production planning and control - PPCProduction planning and control - PPC
Production planning and control - PPC
 
Production and Operation Management.pptx
Production and Operation Management.pptxProduction and Operation Management.pptx
Production and Operation Management.pptx
 
Production and planning control
Production and planning controlProduction and planning control
Production and planning control
 
Nitish Sharma.pptx
Nitish Sharma.pptxNitish Sharma.pptx
Nitish Sharma.pptx
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Unit 1-automation of assembly lines
Unit 1-automation of assembly linesUnit 1-automation of assembly lines
Unit 1-automation of assembly lines
 
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdfPRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
AssignmentFile_568_17062022152242.pptx
AssignmentFile_568_17062022152242.pptxAssignmentFile_568_17062022152242.pptx
AssignmentFile_568_17062022152242.pptx
 
PPC
PPCPPC
PPC
 

Mehr von Tushar Aneyrao (7)

Varaiational formulation fem
Varaiational formulation fem Varaiational formulation fem
Varaiational formulation fem
 
General purpose simulation System (GPSS)
General purpose simulation System (GPSS)General purpose simulation System (GPSS)
General purpose simulation System (GPSS)
 
Array implementation and linked list as datat structure
Array implementation and linked list as datat structureArray implementation and linked list as datat structure
Array implementation and linked list as datat structure
 
Safety of vehicles
Safety of vehiclesSafety of vehicles
Safety of vehicles
 
Presentation on robotics
Presentation on roboticsPresentation on robotics
Presentation on robotics
 
Seminar o nm aterial enginering
Seminar o nm aterial engineringSeminar o nm aterial enginering
Seminar o nm aterial enginering
 
Seminar on fatigue
Seminar on fatigueSeminar on fatigue
Seminar on fatigue
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

WSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptxWSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptx
 
Connecting the Dots in Product Design at KAYAK
Connecting the Dots in Product Design at KAYAKConnecting the Dots in Product Design at KAYAK
Connecting the Dots in Product Design at KAYAK
 
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
 
WebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM PerformanceWebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM Performance
 
Buy Epson EcoTank L3210 Colour Printer Online.pptx
Buy Epson EcoTank L3210 Colour Printer Online.pptxBuy Epson EcoTank L3210 Colour Printer Online.pptx
Buy Epson EcoTank L3210 Colour Printer Online.pptx
 
A Business-Centric Approach to Design System Strategy
A Business-Centric Approach to Design System StrategyA Business-Centric Approach to Design System Strategy
A Business-Centric Approach to Design System Strategy
 
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
 
UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1
 
PLAI - Acceleration Program for Generative A.I. Startups
PLAI - Acceleration Program for Generative A.I. StartupsPLAI - Acceleration Program for Generative A.I. Startups
PLAI - Acceleration Program for Generative A.I. Startups
 
UiPath Test Automation using UiPath Test Suite series, part 2
UiPath Test Automation using UiPath Test Suite series, part 2UiPath Test Automation using UiPath Test Suite series, part 2
UiPath Test Automation using UiPath Test Suite series, part 2
 
Optimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through ObservabilityOptimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through Observability
 
The UX of Automation by AJ King, Senior UX Researcher, Ocado
The UX of Automation by AJ King, Senior UX Researcher, OcadoThe UX of Automation by AJ King, Senior UX Researcher, Ocado
The UX of Automation by AJ King, Senior UX Researcher, Ocado
 
What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024
 
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
 
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
 
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdfSimplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
 
ECS 2024 Teams Premium - Pretty Secure
ECS 2024   Teams Premium - Pretty SecureECS 2024   Teams Premium - Pretty Secure
ECS 2024 Teams Premium - Pretty Secure
 
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi IbrahimzadeFree and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
 
The Metaverse: Are We There Yet?
The  Metaverse:    Are   We  There  Yet?The  Metaverse:    Are   We  There  Yet?
The Metaverse: Are We There Yet?
 
Salesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
Salesforce Adoption – Metrics, Methods, and Motivation, Antone KomSalesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
Salesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
 

Seminar on cim 02

  • 1. SEMINAR ON 1)SCHEDULING 2)KNOWLEDGE BASED SCHEDULING 3)COMPUTER HIERARCHY CONTROL 4)SUPERVISORY CONTROL PRESENTED BY: AKSHAY WADALKAR ROLL NO. 02
  • 2. SCHEDULING • Scheduling is an important tool or manufacturing and engineering, where it can have a major impact on the productivity of a process. • Scheduling relates to the timing of each individual delivery. • It mainly deals with handling application. • It increases efficiency of production. • Scheduling decreases material handling cost and waiting time for work in process.
  • 3. SCHEDULING • It co-ordinate man, machine and production facility for obtaining higher output. • It uses graphical data plotted by taking readings to identify the errors in process • Corrective actions are taken and manufacturing lead time is minimized • Scheduling is the study of process and organizing them to obtain higher effficiency
  • 4. Advantages of Scheduling • Process change-over reduction • Inventory reduction, leveling • Reduced scheduling effort • Increased production efficiency • Labor load leveling • Accurate delivery date quotes • Real time information
  • 5. KNOWLEDGE BASED SCHEDULING • A general knowledge-based system consists of three components: – a database – a knowledge base – an inference engine
  • 6. • The database stores declarative knowledge about the goals, the current situation of the world, and the semi finished plan. • The knowledge-base stores the domain-specific and procedural knowledge, often represented by production rules or operators. • the inference engine stores control knowledge indicating how to select operators and when to apply them.
  • 7. KNOWLEDGE-BASED SCHEDULER CAN PERFORM THE FOLLOWING TYPES OF SCHEDULING FUNCTIONS: 1. Adaptive scheduling: Schedules are generated by goal-driven procedures; the scheduler can perform dynamic scheduling to adapt to changes in the FMS environment. 2. Planning: State-space inference and heuristic search are used to derive production processes.
  • 8. 3. Optimizing: Simulation and selection of plans from alternates are done by evaluating performance criteria and heuristics. 4. Learning: Recognition, refinement, encoding, and integration of processes are performed to enhance the scheduling performance.
  • 9.
  • 10. COMPUTER HIERARCHY CONTROL • The term computer hierarchy control is used to describe such configuration which consist of following components. – Multiple process control station located throughout the plant to control the individual loop and device of the process.
  • 11. – A certain control room equipped with the operator stations where supervisory control of plant occurs – All process and operator stations interact with each other by means of communication network.
  • 12.
  • 13. SUPERVISORY CONTROL • The term supervisory control is usually associated with the process industries, but the concept applies equally well to discrete manufacturing automation. • Supervisory control represent a higher level of control than DDC, NC & PLCs. • Supervisory control denotes a control system that manage the activities of a number of integrated units operations to achieve certain economic objectives for the process.
  • 14. • Supervisory control is not much more than regulatory control or feed forward control. • In other application the supervisory control system is designed to implement optimal or adaptive control. • Supervisory control can be defined as the control system that directs and co-ordinates the activities of several interacting pieces of equipment in manufacturing cell or system.
  • 15.
  • 16. REFFERENCES • “AUTOMATION IN PRODUCTION SYSTEM” by Mikell P. Grover • “COMPUTER INTEGRATED MANUFACTURING” by N. Venkateshwaran • “Knowledge based Scheduling in FMS” by Michael J. Shaw. • http://production-scheduling.com/