Marie Reed Modernization Project Update – 4/21/2017
Prepared on: April 21, 2017
Location: ​2201 18th Street
Ward:​ 1
Overall Project Budget: ​$61.5M
Design Builder/Architects: ​Gilbane Construction Company
Project Manager(s): ​Teddy Grebremichael,​ ​Jennifer Battle, Kyle Whitley II
Project Status:​ In​ ​Construction
Construction Start Date: ​Summer 2016
Project Completion Date: ​Summer 2017
General Project Summary
● Marie Reed Community Learning Center is a wonderfully diverse school located in the Adams
Morgan neighborhood. The modernization includes renovations to the school, DPR and
community partner spaces. The scope of work included, but was not limited to: right-sizing of
classrooms, installation of new lighting fixtures, new ceilings, new flooring, new data
connectivity, new audio-visual equipment, and new furniture, fixtures and equipment (FF&E).
Project Status
● Work Scheduled From 4/21/2017 to 5/5/2017
● Roof Activities
○ Mechanical Piping
○ Installation of Elevator Machine Equipment
○ Electrical Conduit Rough-In @ Penthouse
○ Commissioning Process is ongoing
■ Building Commissioning (Cx)​ is the process of verifying, in new construction,
the subsystems (​mechanical (HVAC), plumbing, electrical​, fire/life safety), to
achieve the owner's project requirements as designed by the building
architects and engineers.
● 4th Floor Activities
○ Continuation of Fire Alarm Rough-In and Electrical Riser Installation
○ Continuation of the installation of Metal Frames and Glass Panels
○ Continuation of Flooring (70% complete)
○ Continuation of Tile in Bathrooms
● 3rd Floor Activities
○ Installation of New Canopies
○ Continuation of Installing Glass throughout the building.
○ Continuation of Fire Protection Rooms, Corridors and Stairwells
○ Continuation of Fire Alarm Rough-In and Electrical Riser Installation
Marie Reed Modernization Project Update – 4/21/2017
○ Continuation of Mechanical, Electrical and Plumbing Rough-In’s
○ Continuation of Fireproofing throughout the 3rd Floor
○ Continuation of Flooring
○ Continuation of Tile in Bathrooms
● 2nd Floor Activities
○ Preparation Work for Elevator Mechanisms
○ Pour Concrete at Metal Decks for Loading Dock Area & Cafeteria
○ Install Steel above Loading Dock
○ Continuation of Hanging Drywall Ceilings
○ Continuation of Mechanical, Electrical and Plumbing Rough-In’s
○ Continuation of Fireproofing throughout the 2nd Floor
● Parking Garage
○ Continuation of Stick Pin Insulation
■ Stick Pin Application​ is used to install insulation that normally would not have
anyway to adhere the insulation. Anchors are glued in place and used to support
rigid board and batt type insulation on walls, ceilings and roof application.
● Sitework
○ Install Water Line on North Champlain Street
○ Foundation Wall Waterproofing is ongoing
■ Foundation Waterproofing​ involves techniques and materials used to prevent
water from penetrating the basement of a house or a building.
○ Exterior Facade Point-Up and Cleaning
■ Repointing or “Point-Up”​ is the process of renewing the 'pointing, which is the
external part of mortar joints, in masonry construction. Over time, weathering
and decay cause voids in the joints between masonry units, usually in bricks,
allowing the undesirable entrance of water.
○ Backfill Foundation Wall (West)
Please see below for recent photos from the project site.
Marie Reed Modernization Project Update – 4/21/2017
​4th Floor Corridor
Marie Reed Modernization Project Update – 4/21/2017
Flooring Installation (Arts & Science Commons - 4th Floor)
Marie Reed Modernization Project Update – 4/21/2017
Metal Framing (Kitchen / Cafeteria)
Marie Reed Modernization Project Update – 4/21/2017
West Addition

Weitere ähnliche Inhalte

Was ist angesagt?

Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019
Crosstown TO
 
Eglinton Crosstown Update
Eglinton Crosstown UpdateEglinton Crosstown Update
Eglinton Crosstown Update
Crosstown TO
 

Was ist angesagt? (20)

Leaside-Laird CLC Meeting - Presentation - January 10, 2022
Leaside-Laird CLC Meeting - Presentation - January 10, 2022Leaside-Laird CLC Meeting - Presentation - January 10, 2022
Leaside-Laird CLC Meeting - Presentation - January 10, 2022
 
Eglinton & Mt Pleasant CLC - march 9 2022
Eglinton & Mt Pleasant CLC - march 9 2022Eglinton & Mt Pleasant CLC - march 9 2022
Eglinton & Mt Pleasant CLC - march 9 2022
 
CLC Pharmacy to Kennedy - March 29, 2022 Compressed.pptx
CLC Pharmacy to Kennedy - March 29, 2022 Compressed.pptxCLC Pharmacy to Kennedy - March 29, 2022 Compressed.pptx
CLC Pharmacy to Kennedy - March 29, 2022 Compressed.pptx
 
Eglinton & Mt Pleasant CLC - January 2022
Eglinton & Mt Pleasant CLC - January 2022Eglinton & Mt Pleasant CLC - January 2022
Eglinton & Mt Pleasant CLC - January 2022
 
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
 
Avenue & Chaplin CLC - Construction Update: January 5, 2022
Avenue & Chaplin CLC - Construction Update: January 5, 2022Avenue & Chaplin CLC - Construction Update: January 5, 2022
Avenue & Chaplin CLC - Construction Update: January 5, 2022
 
Cedarvale & Forest Hill Construction Update (January 2022)
Cedarvale & Forest Hill Construction Update (January 2022)Cedarvale & Forest Hill Construction Update (January 2022)
Cedarvale & Forest Hill Construction Update (January 2022)
 
Brentcliffe to Victoria Park CLC Meeting - Presentation - November 4, 2021
Brentcliffe to Victoria Park CLC Meeting -  Presentation - November 4, 2021 Brentcliffe to Victoria Park CLC Meeting -  Presentation - November 4, 2021
Brentcliffe to Victoria Park CLC Meeting - Presentation - November 4, 2021
 
CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021 CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021
 
Fairbank-Oakwood Construction Update - November 2021
Fairbank-Oakwood Construction Update - November 2021Fairbank-Oakwood Construction Update - November 2021
Fairbank-Oakwood Construction Update - November 2021
 
Avenue & Chaplin CLC - Construction Update: November 3, 2021
Avenue & Chaplin CLC - Construction Update: November 3, 2021Avenue & Chaplin CLC - Construction Update: November 3, 2021
Avenue & Chaplin CLC - Construction Update: November 3, 2021
 
Cedarvale & Forest Hill Construction Update (November 24, 2021)
Cedarvale & Forest Hill Construction Update (November 24, 2021)Cedarvale & Forest Hill Construction Update (November 24, 2021)
Cedarvale & Forest Hill Construction Update (November 24, 2021)
 
wayne prescott cv
wayne prescott cvwayne prescott cv
wayne prescott cv
 
Prefab House Assembly
Prefab House AssemblyPrefab House Assembly
Prefab House Assembly
 
Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
Brentcliffe-Victoria Park CLC Meeting
Brentcliffe-Victoria Park CLC MeetingBrentcliffe-Victoria Park CLC Meeting
Brentcliffe-Victoria Park CLC Meeting
 
Eglinton Crosstown Update
Eglinton Crosstown UpdateEglinton Crosstown Update
Eglinton Crosstown Update
 
Eastern Segment 5 works monthly meeting January 2021
Eastern Segment 5 works monthly meeting January 2021Eastern Segment 5 works monthly meeting January 2021
Eastern Segment 5 works monthly meeting January 2021
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
 

Ähnlich wie Marie Reed School Construction Project Update (April 21, 2017)

Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011
Jamal Nelson, CCM
 
Creek Road Case Study - D.Higgins
Creek Road Case Study - D.HigginsCreek Road Case Study - D.Higgins
Creek Road Case Study - D.Higgins
Darren Higgins
 
Portfolio_Hyunjong Choi
Portfolio_Hyunjong ChoiPortfolio_Hyunjong Choi
Portfolio_Hyunjong Choi
Hyunjong Choi
 
ICE Case Study 2016
ICE Case Study 2016ICE Case Study 2016
ICE Case Study 2016
Steve Edgson
 
DJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalDJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - Final
Chris Humphries
 

Ähnlich wie Marie Reed School Construction Project Update (April 21, 2017) (20)

Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011
 
Creek Road Case Study - D.Higgins
Creek Road Case Study - D.HigginsCreek Road Case Study - D.Higgins
Creek Road Case Study - D.Higgins
 
Building services-i (2)
Building services-i (2)Building services-i (2)
Building services-i (2)
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Portfolio_Hyunjong Choi
Portfolio_Hyunjong ChoiPortfolio_Hyunjong Choi
Portfolio_Hyunjong Choi
 
ICE Case Study 2016
ICE Case Study 2016ICE Case Study 2016
ICE Case Study 2016
 
Roof replacement and internal remedial works
Roof replacement and internal remedial worksRoof replacement and internal remedial works
Roof replacement and internal remedial works
 
The National Eco House Oman
The National Eco House OmanThe National Eco House Oman
The National Eco House Oman
 
TOMS RESUME
TOMS RESUMETOMS RESUME
TOMS RESUME
 
Guildford High School
Guildford High SchoolGuildford High School
Guildford High School
 
Guildford High School
Guildford High SchoolGuildford High School
Guildford High School
 
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxChaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
 
Leaside and Laird CLC - 10 May 2021
Leaside and Laird CLC - 10 May 2021 Leaside and Laird CLC - 10 May 2021
Leaside and Laird CLC - 10 May 2021
 
Beyond Zero Carbon Housing - Peter Conboy
Beyond Zero Carbon Housing - Peter ConboyBeyond Zero Carbon Housing - Peter Conboy
Beyond Zero Carbon Housing - Peter Conboy
 
DJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalDJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - Final
 
Getting to Net Zero Energy Buildings with Solar Energy
Getting to Net Zero Energy Buildings with Solar EnergyGetting to Net Zero Energy Buildings with Solar Energy
Getting to Net Zero Energy Buildings with Solar Energy
 
Walkie Talkie.pptx
Walkie Talkie.pptxWalkie Talkie.pptx
Walkie Talkie.pptx
 
Uniworld garden-2 up date
Uniworld garden-2 up dateUniworld garden-2 up date
Uniworld garden-2 up date
 

Mehr von DC Department of General Services

Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
DC Department of General Services
 
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
DC Department of General Services
 
Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)
DC Department of General Services
 
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
DC Department of General Services
 
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
DC Department of General Services
 
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
DC Department of General Services
 
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
DC Department of General Services
 
Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)
DC Department of General Services
 

Mehr von DC Department of General Services (20)

Hearst community meeting 11.16.2017 430pm final
Hearst community meeting 11.16.2017 430pm finalHearst community meeting 11.16.2017 430pm final
Hearst community meeting 11.16.2017 430pm final
 
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
 
Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)
 
Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)
 
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
 
Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)
 
Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)
 
Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)
 
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
 
Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)
 
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
 
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
 
Bancroft School Community Meeting Presentation (July 9, 2016)
Bancroft School Community Meeting Presentation (July 9, 2016)Bancroft School Community Meeting Presentation (July 9, 2016)
Bancroft School Community Meeting Presentation (July 9, 2016)
 
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
 
Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)
 
Lafayette School - SIT Meeting Presentation (July 27, 2016)
Lafayette School - SIT Meeting Presentation (July 27, 2016)Lafayette School - SIT Meeting Presentation (July 27, 2016)
Lafayette School - SIT Meeting Presentation (July 27, 2016)
 
Benning Park Meeting Presentation (July 28, 2016)
Benning Park Meeting Presentation (July 28, 2016)Benning Park Meeting Presentation (July 28, 2016)
Benning Park Meeting Presentation (July 28, 2016)
 
Friendship Recreation Center Meeting Presentation (July 26, 2016)
Friendship Recreation Center Meeting Presentation (July 26, 2016)Friendship Recreation Center Meeting Presentation (July 26, 2016)
Friendship Recreation Center Meeting Presentation (July 26, 2016)
 
Lafayette School SIT Meeting Presentation (June 1, 2016)
Lafayette School SIT Meeting Presentation (June 1, 2016)Lafayette School SIT Meeting Presentation (June 1, 2016)
Lafayette School SIT Meeting Presentation (June 1, 2016)
 
Hearst Park Improvement Survey Presentation
Hearst Park Improvement Survey PresentationHearst Park Improvement Survey Presentation
Hearst Park Improvement Survey Presentation
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
 
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORSPPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
 
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 

Marie Reed School Construction Project Update (April 21, 2017)

  • 1. Marie Reed Modernization Project Update – 4/21/2017 Prepared on: April 21, 2017 Location: ​2201 18th Street Ward:​ 1 Overall Project Budget: ​$61.5M Design Builder/Architects: ​Gilbane Construction Company Project Manager(s): ​Teddy Grebremichael,​ ​Jennifer Battle, Kyle Whitley II Project Status:​ In​ ​Construction Construction Start Date: ​Summer 2016 Project Completion Date: ​Summer 2017 General Project Summary ● Marie Reed Community Learning Center is a wonderfully diverse school located in the Adams Morgan neighborhood. The modernization includes renovations to the school, DPR and community partner spaces. The scope of work included, but was not limited to: right-sizing of classrooms, installation of new lighting fixtures, new ceilings, new flooring, new data connectivity, new audio-visual equipment, and new furniture, fixtures and equipment (FF&E). Project Status ● Work Scheduled From 4/21/2017 to 5/5/2017 ● Roof Activities ○ Mechanical Piping ○ Installation of Elevator Machine Equipment ○ Electrical Conduit Rough-In @ Penthouse ○ Commissioning Process is ongoing ■ Building Commissioning (Cx)​ is the process of verifying, in new construction, the subsystems (​mechanical (HVAC), plumbing, electrical​, fire/life safety), to achieve the owner's project requirements as designed by the building architects and engineers. ● 4th Floor Activities ○ Continuation of Fire Alarm Rough-In and Electrical Riser Installation ○ Continuation of the installation of Metal Frames and Glass Panels ○ Continuation of Flooring (70% complete) ○ Continuation of Tile in Bathrooms ● 3rd Floor Activities ○ Installation of New Canopies ○ Continuation of Installing Glass throughout the building. ○ Continuation of Fire Protection Rooms, Corridors and Stairwells ○ Continuation of Fire Alarm Rough-In and Electrical Riser Installation
  • 2. Marie Reed Modernization Project Update – 4/21/2017 ○ Continuation of Mechanical, Electrical and Plumbing Rough-In’s ○ Continuation of Fireproofing throughout the 3rd Floor ○ Continuation of Flooring ○ Continuation of Tile in Bathrooms ● 2nd Floor Activities ○ Preparation Work for Elevator Mechanisms ○ Pour Concrete at Metal Decks for Loading Dock Area & Cafeteria ○ Install Steel above Loading Dock ○ Continuation of Hanging Drywall Ceilings ○ Continuation of Mechanical, Electrical and Plumbing Rough-In’s ○ Continuation of Fireproofing throughout the 2nd Floor ● Parking Garage ○ Continuation of Stick Pin Insulation ■ Stick Pin Application​ is used to install insulation that normally would not have anyway to adhere the insulation. Anchors are glued in place and used to support rigid board and batt type insulation on walls, ceilings and roof application. ● Sitework ○ Install Water Line on North Champlain Street ○ Foundation Wall Waterproofing is ongoing ■ Foundation Waterproofing​ involves techniques and materials used to prevent water from penetrating the basement of a house or a building. ○ Exterior Facade Point-Up and Cleaning ■ Repointing or “Point-Up”​ is the process of renewing the 'pointing, which is the external part of mortar joints, in masonry construction. Over time, weathering and decay cause voids in the joints between masonry units, usually in bricks, allowing the undesirable entrance of water. ○ Backfill Foundation Wall (West) Please see below for recent photos from the project site.
  • 3. Marie Reed Modernization Project Update – 4/21/2017 ​4th Floor Corridor
  • 4. Marie Reed Modernization Project Update – 4/21/2017 Flooring Installation (Arts & Science Commons - 4th Floor)
  • 5. Marie Reed Modernization Project Update – 4/21/2017 Metal Framing (Kitchen / Cafeteria)
  • 6. Marie Reed Modernization Project Update – 4/21/2017 West Addition