SlideShare ist ein Scribd-Unternehmen logo
1 von 5
DANIEL W. CHIPS
                                      dwchips@yahoo.com
                      http://www.linkedin.com/pub/daniel-chips/17/5b0/485

                                        MANAGEMENT PROFILE
Process oriented Director of Engineering / Facility General Manager with a 20 year proven
record of achievements, and experience in engineering, facility and manufacturing management
in an ISO certified environment. Data driven, analytical problem solver, with success in
managing numerous manufacturing turn-arounds and lean implementations, and success in
managing major capital projects, including facility start ups and expansions, machine
integrations and environmental compliance projects.

Core Competencies include:

•   Lean Integrations               •    Strategic Planning             •   Manufacturing Turn-arounds
•   People Development              •    Project Management             •   Leadership
•   Technology Integrations         •    Environmental Compliance       •   Problem Solving

                                  PROFESSIONAL EXPERIENCE
SEA RAY BOATS                                                                              1997-2010
Director of Engineering, Eight (8) Facilities in Three (3) States, Knoxville Based (2005-2010)
Responsible for providing management, technical leadership, definition, and direction in six (6)
critical areas for eight (8) Sea Ray facilities and other Brunswick facilities: Capital and Asset
Management, Facility Engineering, Machine & Technology Design & Integrations, Process
Engineering, Environmental Engineering, and Green Initiatives. Managed a Manufacturing
Technology Center including a 15 member engineering staff, a metal fabrication shop, and a
fiberglass tool building operation.

Key Responsibilities:
• Alignment of business strategy with capital project planning for all facilities. Including the
   creation, budgeting and maintenance of a five-year capital plan for facility expansion, facility
   and process improvements, and machine integrations. Made recommendations to the CEO
   and executive staff.
• Lead manager for all litigation involving contract disputes, environmental regulatory
   agencies, and neighboring developers.
• Created and maintained the Technology Center operations budget of $1.3M, and the capital
   budget of $8-16M.
• Monitored all projects from conception to fruition and ensured project success, including
   project reviews and tracking of spending against project budgets.
• Proposal evaluation, contract negotiations and preparation of appropriation requests.
• Ensured safety and environmental compliance performing project reviews with the Director
   of EH&S, and environmental consultants.
• Ensured proper teamwork and interaction with customers, and that customer expectations
   were met or exceeded.

Key Accomplishments:
• Championed the development, installation and integration of a $5.2M wood finishing
   operation “Project Cypress”; the conversion from laminated cabin interiors to real hardwood
   veneers for cruisers above 32’. This included the implementation of a wood processing and
   finishing facility from concept to full production. Project had an internal rate of return (IRR)
   of 20.3% and a payback period of 6.6 years based on material savings alone. Wood
finishes from the operation had surface profile readings of three (3) to ten (10) times better
   than the competition’s (depending on the competitor).
DANIEL W. CHIPS                                                                             PAGE 2

                            PROFESSIONAL EXPERIENCE (CONT’D)
SEA RAY BOATS (CONT’D)
Director of Engineering, Eight (8) Facilities in Three (3) States, Knoxville Based (2005-2010)
Key Accomplishments:
• Negotiated $4.5M in contributions from the state, county, and neighboring residential
   developers and developed an $8M solution for a styrene mitigation and Lamination
   reorganization project at a Florida Facility. Project included the development of the
   complete solution, and preparing a draft settlement agreement between Sea Ray and
   encroaching residential developers. The solution allowed local residents to coexist in
   harmony with the manufacturing facility.
• Significantly improved product quality, and removed people from an unhealthy work
   environment by developing and integrating robotic fiberglass cut and trim solutions for three
   (3) facilities in Tennessee.
• Reduced styrene emissions from a gel coat operation by 85% by leading the purchase,
   installation, and integration of the world’s first and only carbon-bio filter used for styrene
   mitigation at a boat manufacturing facility.
• Reduced employee exposure to styrene to levels well below state and federal guidelines, a
   reduction of up to 82%, and reduced turnover by implementing $3.3M in Air Quality
   initiatives at three (3) Tennessee facilities.
        o These solutions were developed using computerized fluid dynamic (CFD) modeling.
        o All solutions included multi-sensor, PLC controlled heating and cooling.
• Developed solutions for Air Quality issues for three (3) Florida facilities including:
        o Eliminated fence line nuisance odors.
        o Reduced employee styrene exposure levels by up to 75%.
        o Improved styrene capture efficiency and control.
        o Reduced emission concentrations by over 70%.
        o Sight and sound obstruction and emission dispersion barriers.
• Managed the disposition, distribution, and redeployment of all assets and non-asset
   equipment displaced by the closing of two (2) Sea Ray operated facilities, and five (5) US
   Marine facilities in seven (7) states reducing capital costs for the remaining production
   facilities in the Brunswick Boat Group.
• Eliminated equipment crashes due to human interface errors, and eliminated accidents due
   to untrained equipment operators by implementing solutions for Radio Frequency
   Identification (RFID) program error proofing for all robotic gel coat operations and RFID for
   operators of dangerous equipment.
• Improved product quality, and removed people from an unhealthy work environment by
   developing robotic gel coat application solutions for two (2) facilities in Tennessee.
• Obtained a $1M Knox County grant to fund VOC bio filtration solutions at facilities in Knox
   County.

General Manager, 600 employees (2004-2005)
Responsibilities included managing the facility to achieve organizational and facility goals for
sales projections, gross margin, labor variances, material variances, quality & first time
throughput, warranty as a percent of sales, turnover, safety and environmental compliance.
Lead the expansion and conversion of a facility to a larger and more profitable model mix.
• Executed conversion with a focus on point-of-use material management and manufacturing,
    Just In Time (JIT) material handling, single piece flow, and line balancing.
•   The facility conversion netted a 11 point efficiency gain, and seven point gain in GP
    ($11.34M) and included:
DANIEL W. CHIPS                                                                                 PAGE 3

                              PROFESSIONAL EXPERIENCE (CONT’D)
SEA RAY BOATS (CONT’D)
General Manager, 600 employees (2004-2005)
      o A first for any Sea Ray facility; the integration of five (5) new incremental models in a
          nine (9) month period, converting the facility from small runabouts to more profitable
          large runabouts and small cruisers.
      o The reorganization of lamination for single piece flow.
      o A $1.2M building expansion to complete the single piece flow process from
          Lamination to Assembly.
      o The reorganization of the Fabrication area to better serve Assembly through point-of-
          use material handling and fabrication. Fabrication was also converted from batch
          building, to single piece flow cells.
      o The integration of JIT material deliveries to all manufacturing areas
• Rectified the facility’s long standing 6.7% material variance.
      o Implemented stringent material handling processes; conducted material studies for
          all product models.
      o Optimized the processing and accounting of raw materials including wood,
          fiberglass, and resin.

Production Manager (Assistant to the Plant Manager Role), 500 employees (2002-2004)
Responsibilities included managing manufacturing to achieve organizational and facility goals
for sales projections, gross margin, labor variances, material variances, quality & first time
throughput, warranty as a percent of sales, turnover, safety and environmental compliance.
• Increased overall facility efficiencies from 84% to 98% through lean implementations,
    enhanced interdepartmental communication, issue resolution, and material handling and
    control initiatives.
• Drove material savings of over $340K in the first year, and over $700K in the second year
    by integrating a point-of-use resin and fiberglass monitoring and tracking system in
    Lamination.
• Increased efficiencies by 20 points in Fabrication by integrating single piece flow
    manufacturing cells.
• Selected as special guest key note speaker for the International Robotics Convention in
    Orlando. Presented the industry’s first hull and deck robotic fiberglass trim and cut cell
    including its development, installation and integration. Developed and managed this project
    from concept to full integration during facility senior staff rotations, including several industry
    firsts in the world of robotics.
• Featured guest in the TV show Ship Shape TV. Showcased many parts of the
    manufacturing process that make Sea Ray a world-class boat manufacturer.
• Facilitated a dealer sales seminar for the sales staff of all Sea Ray dealers.

Rotation of facility senior staff level positions required for advancement to Production
Manager and General Manager (1997-2002)
Production and Product Engineering, Quality Control, Customer Service, ISO, and Information
Systems Manager, Operations Manager, Assembly Manager, Lamination Manager, and
Fabrication Manager. Set performance records in all areas.

Previous experience as Vice President of Manufacturing at Mako Marine International and
Production Manager at Wellcraft Marine.
                                             EDUCATION
Bachelor of Science in Organizational Management, Tusculum College, Greeneville, TN
Electrical & Mechanical Engineering, West Virginia University, Morgantown, WV

Weitere ähnliche Inhalte

Was ist angesagt?

Integration of modules on site _ final
Integration of modules on site _ finalIntegration of modules on site _ final
Integration of modules on site _ final
Scott Coombes
 
Green building rating system on des innovations
Green building rating system on des innovationsGreen building rating system on des innovations
Green building rating system on des innovations
saif hasan
 
LEED Existing Buildings Process And Issues Burnet D Brown 1 31 2009
LEED Existing Buildings Process And Issues   Burnet D Brown 1 31 2009LEED Existing Buildings Process And Issues   Burnet D Brown 1 31 2009
LEED Existing Buildings Process And Issues Burnet D Brown 1 31 2009
burnet53
 
160730_Resume_Swaroop
160730_Resume_Swaroop160730_Resume_Swaroop
160730_Resume_Swaroop
swaroop patil
 
Executive Summary Of Federal State Climate Change Policy Rebates Grants
Executive Summary Of Federal State Climate Change Policy Rebates GrantsExecutive Summary Of Federal State Climate Change Policy Rebates Grants
Executive Summary Of Federal State Climate Change Policy Rebates Grants
DermotDuncan
 

Was ist angesagt? (20)

Green Brochure
Green BrochureGreen Brochure
Green Brochure
 
Integration of modules on site _ final
Integration of modules on site _ finalIntegration of modules on site _ final
Integration of modules on site _ final
 
Green Building Basics
Green Building BasicsGreen Building Basics
Green Building Basics
 
Waste management on construction sites
Waste management on construction sitesWaste management on construction sites
Waste management on construction sites
 
IGBC RATING SYSTEM
IGBC RATING SYSTEMIGBC RATING SYSTEM
IGBC RATING SYSTEM
 
W White Resume
W White ResumeW White Resume
W White Resume
 
Green building rating system on des innovations
Green building rating system on des innovationsGreen building rating system on des innovations
Green building rating system on des innovations
 
Resume
ResumeResume
Resume
 
Roofing Case Studies by Sodexo
Roofing Case Studies by SodexoRoofing Case Studies by Sodexo
Roofing Case Studies by Sodexo
 
Leed ga answer
Leed ga answerLeed ga answer
Leed ga answer
 
CMA Pharma Bio & Medical Devices brochure 2017
CMA Pharma Bio & Medical Devices brochure 2017 CMA Pharma Bio & Medical Devices brochure 2017
CMA Pharma Bio & Medical Devices brochure 2017
 
BREEAM Presentation
BREEAM PresentationBREEAM Presentation
BREEAM Presentation
 
LEED Existing Buildings Process And Issues Burnet D Brown 1 31 2009
LEED Existing Buildings Process And Issues   Burnet D Brown 1 31 2009LEED Existing Buildings Process And Issues   Burnet D Brown 1 31 2009
LEED Existing Buildings Process And Issues Burnet D Brown 1 31 2009
 
Leed for SWE WE 14
Leed for SWE WE 14Leed for SWE WE 14
Leed for SWE WE 14
 
160730_Resume_Swaroop
160730_Resume_Swaroop160730_Resume_Swaroop
160730_Resume_Swaroop
 
Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17
 
Executive Summary Of Federal State Climate Change Policy Rebates Grants
Executive Summary Of Federal State Climate Change Policy Rebates GrantsExecutive Summary Of Federal State Climate Change Policy Rebates Grants
Executive Summary Of Federal State Climate Change Policy Rebates Grants
 
Leed green associate v. acquisition, installation, and management of project ...
Leed green associate v. acquisition, installation, and management of project ...Leed green associate v. acquisition, installation, and management of project ...
Leed green associate v. acquisition, installation, and management of project ...
 
Breeam
BreeamBreeam
Breeam
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminar
 

Ähnlich wie Chips.Daniel On Line 6 1 10

Kaiser 2013 resume[7]
Kaiser 2013  resume[7]Kaiser 2013  resume[7]
Kaiser 2013 resume[7]
John Kaiser
 
William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016
Randy Kent
 
Taylor, Michael J Resume
Taylor, Michael J   ResumeTaylor, Michael J   Resume
Taylor, Michael J Resume
mjtaylor52
 
Petrochko CV+Supplemental Profile Details v2020-March
Petrochko CV+Supplemental Profile Details v2020-MarchPetrochko CV+Supplemental Profile Details v2020-March
Petrochko CV+Supplemental Profile Details v2020-March
PPM Services
 
Rick Stinnett Resume
Rick Stinnett ResumeRick Stinnett Resume
Rick Stinnett Resume
rstinnett
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project Management
James Gilmore
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16
Eric Stemen
 
Dufour,Don E Resume C
Dufour,Don E Resume CDufour,Don E Resume C
Dufour,Don E Resume C
Don Dufour
 
Resume for Jerry Rodgers
Resume for Jerry RodgersResume for Jerry Rodgers
Resume for Jerry Rodgers
Jerry Rodgers
 
Resume for Jerry Rodgers
Resume for Jerry RodgersResume for Jerry Rodgers
Resume for Jerry Rodgers
Jerry Rodgers
 

Ähnlich wie Chips.Daniel On Line 6 1 10 (20)

Kaiser 2013 resume[7]
Kaiser 2013  resume[7]Kaiser 2013  resume[7]
Kaiser 2013 resume[7]
 
William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016
 
Taylor, Michael J Resume
Taylor, Michael J   ResumeTaylor, Michael J   Resume
Taylor, Michael J Resume
 
Res414
Res414Res414
Res414
 
Petrochko CV+Supplemental Profile Details v2020-March
Petrochko CV+Supplemental Profile Details v2020-MarchPetrochko CV+Supplemental Profile Details v2020-March
Petrochko CV+Supplemental Profile Details v2020-March
 
Rick Stinnett Resume
Rick Stinnett ResumeRick Stinnett Resume
Rick Stinnett Resume
 
RobertKulick_2016
RobertKulick_2016RobertKulick_2016
RobertKulick_2016
 
RobertKulick2016
RobertKulick2016RobertKulick2016
RobertKulick2016
 
D Ford Resume 3 14 10
D Ford Resume 3 14 10D Ford Resume 3 14 10
D Ford Resume 3 14 10
 
Resume
ResumeResume
Resume
 
Daniel K Hom Resume And Projects 031611 Li
Daniel K Hom Resume And Projects 031611 LiDaniel K Hom Resume And Projects 031611 Li
Daniel K Hom Resume And Projects 031611 Li
 
Resume 3-16-15docx
Resume 3-16-15docxResume 3-16-15docx
Resume 3-16-15docx
 
Scott E Huston Resume
Scott E Huston ResumeScott E Huston Resume
Scott E Huston Resume
 
Final project report
Final project reportFinal project report
Final project report
 
Michael Douglas Anderson
Michael Douglas AndersonMichael Douglas Anderson
Michael Douglas Anderson
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project Management
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16
 
Dufour,Don E Resume C
Dufour,Don E Resume CDufour,Don E Resume C
Dufour,Don E Resume C
 
Resume for Jerry Rodgers
Resume for Jerry RodgersResume for Jerry Rodgers
Resume for Jerry Rodgers
 
Resume for Jerry Rodgers
Resume for Jerry RodgersResume for Jerry Rodgers
Resume for Jerry Rodgers
 

Kürzlich hochgeladen

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
instagramfab782445
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 

Kürzlich hochgeladen (20)

Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Rice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsRice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna Exports
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 

Chips.Daniel On Line 6 1 10

  • 1. DANIEL W. CHIPS dwchips@yahoo.com http://www.linkedin.com/pub/daniel-chips/17/5b0/485 MANAGEMENT PROFILE Process oriented Director of Engineering / Facility General Manager with a 20 year proven record of achievements, and experience in engineering, facility and manufacturing management in an ISO certified environment. Data driven, analytical problem solver, with success in managing numerous manufacturing turn-arounds and lean implementations, and success in managing major capital projects, including facility start ups and expansions, machine integrations and environmental compliance projects. Core Competencies include: • Lean Integrations • Strategic Planning • Manufacturing Turn-arounds • People Development • Project Management • Leadership • Technology Integrations • Environmental Compliance • Problem Solving PROFESSIONAL EXPERIENCE SEA RAY BOATS 1997-2010 Director of Engineering, Eight (8) Facilities in Three (3) States, Knoxville Based (2005-2010) Responsible for providing management, technical leadership, definition, and direction in six (6) critical areas for eight (8) Sea Ray facilities and other Brunswick facilities: Capital and Asset Management, Facility Engineering, Machine & Technology Design & Integrations, Process Engineering, Environmental Engineering, and Green Initiatives. Managed a Manufacturing Technology Center including a 15 member engineering staff, a metal fabrication shop, and a fiberglass tool building operation. Key Responsibilities: • Alignment of business strategy with capital project planning for all facilities. Including the creation, budgeting and maintenance of a five-year capital plan for facility expansion, facility and process improvements, and machine integrations. Made recommendations to the CEO and executive staff. • Lead manager for all litigation involving contract disputes, environmental regulatory agencies, and neighboring developers. • Created and maintained the Technology Center operations budget of $1.3M, and the capital budget of $8-16M. • Monitored all projects from conception to fruition and ensured project success, including project reviews and tracking of spending against project budgets. • Proposal evaluation, contract negotiations and preparation of appropriation requests. • Ensured safety and environmental compliance performing project reviews with the Director of EH&S, and environmental consultants. • Ensured proper teamwork and interaction with customers, and that customer expectations were met or exceeded. Key Accomplishments: • Championed the development, installation and integration of a $5.2M wood finishing operation “Project Cypress”; the conversion from laminated cabin interiors to real hardwood veneers for cruisers above 32’. This included the implementation of a wood processing and finishing facility from concept to full production. Project had an internal rate of return (IRR) of 20.3% and a payback period of 6.6 years based on material savings alone. Wood
  • 2. finishes from the operation had surface profile readings of three (3) to ten (10) times better than the competition’s (depending on the competitor). DANIEL W. CHIPS PAGE 2 PROFESSIONAL EXPERIENCE (CONT’D) SEA RAY BOATS (CONT’D) Director of Engineering, Eight (8) Facilities in Three (3) States, Knoxville Based (2005-2010) Key Accomplishments: • Negotiated $4.5M in contributions from the state, county, and neighboring residential developers and developed an $8M solution for a styrene mitigation and Lamination reorganization project at a Florida Facility. Project included the development of the complete solution, and preparing a draft settlement agreement between Sea Ray and encroaching residential developers. The solution allowed local residents to coexist in harmony with the manufacturing facility. • Significantly improved product quality, and removed people from an unhealthy work environment by developing and integrating robotic fiberglass cut and trim solutions for three (3) facilities in Tennessee. • Reduced styrene emissions from a gel coat operation by 85% by leading the purchase, installation, and integration of the world’s first and only carbon-bio filter used for styrene mitigation at a boat manufacturing facility. • Reduced employee exposure to styrene to levels well below state and federal guidelines, a reduction of up to 82%, and reduced turnover by implementing $3.3M in Air Quality initiatives at three (3) Tennessee facilities. o These solutions were developed using computerized fluid dynamic (CFD) modeling. o All solutions included multi-sensor, PLC controlled heating and cooling. • Developed solutions for Air Quality issues for three (3) Florida facilities including: o Eliminated fence line nuisance odors. o Reduced employee styrene exposure levels by up to 75%. o Improved styrene capture efficiency and control. o Reduced emission concentrations by over 70%. o Sight and sound obstruction and emission dispersion barriers. • Managed the disposition, distribution, and redeployment of all assets and non-asset equipment displaced by the closing of two (2) Sea Ray operated facilities, and five (5) US Marine facilities in seven (7) states reducing capital costs for the remaining production facilities in the Brunswick Boat Group. • Eliminated equipment crashes due to human interface errors, and eliminated accidents due to untrained equipment operators by implementing solutions for Radio Frequency Identification (RFID) program error proofing for all robotic gel coat operations and RFID for operators of dangerous equipment. • Improved product quality, and removed people from an unhealthy work environment by developing robotic gel coat application solutions for two (2) facilities in Tennessee. • Obtained a $1M Knox County grant to fund VOC bio filtration solutions at facilities in Knox County. General Manager, 600 employees (2004-2005) Responsibilities included managing the facility to achieve organizational and facility goals for sales projections, gross margin, labor variances, material variances, quality & first time throughput, warranty as a percent of sales, turnover, safety and environmental compliance. Lead the expansion and conversion of a facility to a larger and more profitable model mix. • Executed conversion with a focus on point-of-use material management and manufacturing, Just In Time (JIT) material handling, single piece flow, and line balancing.
  • 3. The facility conversion netted a 11 point efficiency gain, and seven point gain in GP ($11.34M) and included:
  • 4. DANIEL W. CHIPS PAGE 3 PROFESSIONAL EXPERIENCE (CONT’D) SEA RAY BOATS (CONT’D) General Manager, 600 employees (2004-2005) o A first for any Sea Ray facility; the integration of five (5) new incremental models in a nine (9) month period, converting the facility from small runabouts to more profitable large runabouts and small cruisers. o The reorganization of lamination for single piece flow. o A $1.2M building expansion to complete the single piece flow process from Lamination to Assembly. o The reorganization of the Fabrication area to better serve Assembly through point-of- use material handling and fabrication. Fabrication was also converted from batch building, to single piece flow cells. o The integration of JIT material deliveries to all manufacturing areas • Rectified the facility’s long standing 6.7% material variance. o Implemented stringent material handling processes; conducted material studies for all product models. o Optimized the processing and accounting of raw materials including wood, fiberglass, and resin. Production Manager (Assistant to the Plant Manager Role), 500 employees (2002-2004) Responsibilities included managing manufacturing to achieve organizational and facility goals for sales projections, gross margin, labor variances, material variances, quality & first time throughput, warranty as a percent of sales, turnover, safety and environmental compliance. • Increased overall facility efficiencies from 84% to 98% through lean implementations, enhanced interdepartmental communication, issue resolution, and material handling and control initiatives. • Drove material savings of over $340K in the first year, and over $700K in the second year by integrating a point-of-use resin and fiberglass monitoring and tracking system in Lamination. • Increased efficiencies by 20 points in Fabrication by integrating single piece flow manufacturing cells. • Selected as special guest key note speaker for the International Robotics Convention in Orlando. Presented the industry’s first hull and deck robotic fiberglass trim and cut cell including its development, installation and integration. Developed and managed this project from concept to full integration during facility senior staff rotations, including several industry firsts in the world of robotics. • Featured guest in the TV show Ship Shape TV. Showcased many parts of the manufacturing process that make Sea Ray a world-class boat manufacturer. • Facilitated a dealer sales seminar for the sales staff of all Sea Ray dealers. Rotation of facility senior staff level positions required for advancement to Production Manager and General Manager (1997-2002) Production and Product Engineering, Quality Control, Customer Service, ISO, and Information Systems Manager, Operations Manager, Assembly Manager, Lamination Manager, and Fabrication Manager. Set performance records in all areas. Previous experience as Vice President of Manufacturing at Mako Marine International and Production Manager at Wellcraft Marine. EDUCATION
  • 5. Bachelor of Science in Organizational Management, Tusculum College, Greeneville, TN Electrical & Mechanical Engineering, West Virginia University, Morgantown, WV