12. Walkway Around Pond 1050 ft long, 3.5 ft wide. 2 Main Costs Clearing costs: $145 per foot x 1050 ft = $152,250 Pavement costs: $33.5 per foot x 1050 ft = $35,175 Total Pond Walkway Costs: $187,425
13. Walkway Extension Walkway Ends 150 ft short of parking lot 2 Main Costs Clearing costs = $145 per foot x 150 ft = $21,750 Paving costs = $33.5 per foot x 150 ft = $5,025 Total Extension costs = $26,775 Total Walkway costs =$214,200
15. Poll of Siena Community Poll of the Siena Campus Sample size: 30 97% were unaware of the park 63% were interested in utilizing the park Approximately 2,200 people 53% were interested in recreational benefits 47% were interested in aesthetic benefits
20. Property Valuation Justifications: easy access, utilization of the parks is desired for safe living within a community’s recreational area Single family homes adjacent to a trail: 29% say existence of the trail increase the selling price of their home. 57% of residents say that the trail make the home easier to sell 29% were positively influenced by the trail near the home they bought
21. Taxes Zoning Zone 1: 10-15% increase Includes 15 houses Zone 2:5-10% increase Includes 15 houses Taxes cancel out Physical Expense Intrinsic Benefit