SlideShare ist ein Scribd-Unternehmen logo
1 von 7
Downloaden Sie, um offline zu lesen
SAP Divestiture Projects: Options,
Approach and Challenges
A look at best practices and approaches, based on an extensive case
study, for quickly reshaping the system landscape — with minimal
process disruption — after a spin-off.
Executive Summary
Increasing globalization, ever-changing market
dynamics and volatile business conditions
require organizations to become more agile
and flexible to ensure sustainability, growth and
business continuity. Companies must be aware of
all the factors that impact their businesses and
understand how to embrace new technologies
and ways of working that can deliver enhanced
business benefits, and avoid shortcomings. These
dynamics are making it even more important for
companies to be laser focused on their business
cores while divesting and/or turning to partners
for activities considered noncore.
The systems implications for divestiture are
critical due to legal and statutory reasons.
For example, companies are required to keep
historical data for the previous seven years.
Sometimes this data may be available only in the
business system that accompanies the operation
being divested. Another important reason for
maintaining existing systems of records is the
benefit this data has on process continuity.
Divestitures require significant planning and due
diligence to ensure success for both the selling
and buying parties. A divestiture typically involves
numerous phases, involving legal and financial
concerns, from auditing and accounting through
transition service agreements and operational
separation. It is important, therefore, for both
the seller and buyer to have these issues sorted
before a divestiture moves forward.
This white paper focuses on operational
separation issues and choices encountered by the
buyer company during the migration of the selling
entity’s IT infrastructure. It also examines the
issues faced by a company that we advised with
an SAP infrastructure landscape and the various
complexities involved during and post divestiture.
Divesture Inflection Points
There are several key decisions regarding the
migration that can make or break the divested
company. They include:
•	IT infrastructure setup: The infrastructure
decision needs to be carefully considered to
ensure that the divested company’s operations
are not affected in the long run and scaling
up doesn’t become an issue. The divested
company can either adopt the divesting
company’s IT infrastructure or it can set up a
new and completely different infrastructure.
Both scenarios have their advantages and dis-
advantages and a careful analysis needs to
be carried out to ensure that the best choice
• Cognizant 20-20 Insights
cognizant 20-20 insights | may 2014
Re-implementation Advantages and Disadvantages
2
is made. With an SAP infrastructure already
in place, it becomes critical to address this
with the utmost care as it can make or break
the divested company. This is one critical area
where consulting firms can be called on to
analyze the situation and provide independent
and unbiased recommendations.
•	 Application portfolio rationalization: The ap-
plication portfolio of the divesting company
may include several applications that are ob-
solete or serve no purpose. As a result, an ap-
plication rationalization exercise needs to be
carried out, to ensure that such applications
are not migrated to the divested company’s
infrastructure. If the lines of business for the
divesting and divested company are complete-
ly different, then the majority of the applica-
tions most likely will not be useful, which may
result in a significant number of applications
that require rationalization. This step is crucial
for the operational efficiency of the divested
company.
•	 Change management initiative: As a result
of the multiple changes that take place during
migration, a well-defined change management
strategy needs to be in place to ensure that
there is a smooth transition from the divest-
ing to the divested company — one which takes
into consideration all aspects of both entities.
This change management strategy should con-
sist of legal, financial, HR, IT and various other
reviews, depending on the line of business in
which the divested company is involved.
At the time of separation, an organization may
be faced with various options and the strategy
adopted at that time can go a long way to define
its future IT strategy.
Divestiture Options
Re-implementation
In this option, the buying organization opts to
re-implement the processes powered by the
acquired systems infrastructure, post divestiture.
This option is appealing as it provides flexibility
to implement key processes that an organiza-
tion needs and ignore those that have become
irrelevant (see Figure 1). Moreover, this approach
also gives organizations the opportunity to sort
out any business process on which it relies and
align it with SAP best practices.
Shadow Implementation
This concept sounds different but it is borrowed
from the copy-paste function that we all perform
daily, often multiple times (see Figure 2). The logic
here is to have a reference system — or a copy
of the original system — and then re-implement
the process on a new server by replicating the
process from the reference system, as required.
This is a middle path between implementation
and “carve out” (see below).
Carve Out
This option probably is the most efficient way of
making the system ready with limited resources
available at the organization’s disposal (see
Figure 3). The “carving out” process is more
business oriented than system oriented because
business rules must be identified in advance;
these conditions typically define the carving out
of data and transactions.
As we have shown, each of the above options has
pros and cons. Choosing an option is usually based
on the three factors of project management at
the organization’s disposal: time, resources and
cost. Additionally, the path taken depends on the
maturity of the organization and its IT vision.
cognizant 20-20 insights
Advantages Disadvantages
Flexibility to pick and select processes to be implemented. Training on new processes.
Flexibility to align with best practices. Training on new software.
Can implement the lessons learned from previous
implementations.
Time-consuming process.
Flexibility to choose the type of ERP. May require additional resources.
Costs may be high for above
reasons and due to licensing fees.
Change management.Figure 1
cognizant 20-20 insights 3
Carve Out Advantages and Disadvantages
Advantages Disadvantages
Reduced turnover time. Data separation rules may be complex to code.
Familiarity of the system, process and data. Non-carved-out data may cause performance
issues in the future.
Limited or no retraining required. Incomplete testing may leave many issues in the
carved out system.
Piggy-back on existing licensing costs.
Less costly.
Resource requirements are limited.
No change management.
In-house knowledge bank can be used.
Figure 3
Applying the Carve-Out Strategy
The following case study discusses a carve-out
project we undertook for one client (see Figure 4,
page 5).
This company was formed as a result of an
acquisition by angel investors who purchased
a product division from a large company. The
newly-formed company needed to quickly create
an IT landscape of its own with medium-scale
investment. Since the IT skills of the employees
that accompanied the purchased division were
very limited, the angel investors decided not to
overhaul the existing processes so that data and
process familiarity could be maintained. This also
meant that minimal training would be required,
thus resulting in cost savings.
A carve out is similar to any other project in terms
of the methodology followed but the activities in
each stage may vary. The process followed was
very similar to the SAP ASAP®
™ methodology.
Project Preparation
Project preparation is the phase that follows the
signing of the license and service agreements. In
this project phase business goals are determined
Shadow Implementation Advantages and Disadvantages
Advantages Disadvantages
Pick and choose only the relevant processes and
functions to be implemented.
Training on new processes.
Flexibility to align with best practices. Training on new software.
Can implement the lessons learned from previous
implementations.
Time-consuming process.
Flexibility to choose the type of ERP. May require additional resources.
Costs may be high due to reasons cited above.
Additional licensing may be required.
Change management.
May run into some data proprietary issues
present in the reference system.
Figure 2
cognizant 20-20 insights 4
and expectations defined. Involvement of all the
stakeholders in this phase is vital for the overall
success of the project. The decisions taken during
this phase will set the path for the ensuing stages
and will make or break the project.
The activities performed during this phase
included:
•	Creation of preliminary project plan: This
was critical because the client’s budget and
resources were limited. Additionally, there
were multiple vendors involved so all project
plans had to merge seamlessly.
•	Creation of preliminary resource plan: Since
the long-term client requirement was for us
to take over the regular maintenance of the
system post go-live, we had to make sure that
the resource plan enabled continuity to be
maintained.
•	Identification of resource mix: Since the client
landscape was exceptionally complex, the right
resource mix was very important.
Blueprinting
This phase consists of analyzing the company’s
“as-is” processes, designing the “to-be” processes
and setting the path for the transition. This stage
is also called the “solution definition phase” since
it defines the roadmap for the transition of the
processes from the existing to the future scenario.
The activities performed during this phase
included:
•	Analysis of IT infrastructure: The existing
infrastructure was very complex; for example,
it consisted of multiple instances of various
applications, such as PeopleSoft, Biztalk,
legacy plant systems, etc. There were at least
10 different servers all talking to one another.
The complexity of managing the infrastructure
was heightened because our client wanted to
host some of its apps in the cloud.
•	Analysis of IT applications: Existing business
applications were also operating in an excep-
tionally complex environment, involving
multiple systems talking to each other: ECC
(ERP central component), CRM, SCM, BI, portal,
ERP (PeopleSoft), document management (IBM
Filenet), Biztalk, etc. Some had a full landscape
of development, quality and production envi-
ronments, while others did not have exclusive
development or quality-control environments.
•	Analysis of proposed IT infrastructure and
applications infrastructure as required by
the divested company: This was driven by the
budgets of the company and the processes it
prioritized. Decisions were also influenced by
systems versions that were either too old and/
or not supported now by vendors. Example:
The version of Biztalk used was no longer
supported by Microsoft.
Realization
The purpose of this phase is to implement the
business and process requirements and the
validated business model as defined in the blue-
printing phase. The objective includes translating
the solution from the blueprinting phase for final
systems implementation testing and preparation
for the production environment.
•	Only relevant data, processes and transac-
tions were identified and applied. This was by
far the most important part. For this activity,
the client used SLO®
, a proprietary SAP tool
for separating the systems. The tool works on
the basis of marking the data and organiza-
tion structure that needs to be separated and
then, based on the processes and transactions
related to that data, carving those out.
•	Tool design was critical to the whole
carve-out process. Since SAP is designed
based on a network of tables, and since most
often these tables are interlinked through
dependent conditions, it is very important to
know the sequence of carving out the data.
•	Testing cycles played a key role. Each time
the SLO tool was applied, we went through four
test cycles in a period of three months to make
sure the carved out data was exact.
The testing strategy was threefold:
>> Test if the carved-out system does not con-
tain the divesting company’s data.
>> Test if the carved-out system has all the data
as required by the divested company.
>> Run test transactions to make sure that
the processes and functions of the divested
company work correctly.
During each of these cycles we discovered
issues such as:
>> Divesting organization data still existed in
the system.
>> Divested company’s data did not exist in the
carved-out system.
>> Certain transactions relevant to the divested
company did not work correctly.
During subsequent cycles these issues were
corrected and the final testing revealed sound
results. Edits were required to the SLO tool as per
the issues identified.
There was some data identified that was not
possible to be carved out. So, we took an alter-
native approach of extracting and then reloading
this data.
Final Preparation
This phase is the final preparation before the
cutover/go-live phase. It included testing, user
training, system management and cutover
activities and finalizing the readiness of the
go-live environment.
•	This stage was very important since it
was the last step to confirm readiness for
the go-live. Since multiple test cycles were
involved, we adopted a strategy to make sure
that the issues identified in all the previous
cycles had been addressed.
•	Final preparation also included the process
to be followed by the business during the
blackout period of system migration.
•	A checklist was prepared based on the
sequence of events to be followed for the
next step of go-live.
Go-Live and Support
This is the final phase in the project lifecycle. It
includes the migration to the new system which
follows the to-be processes as defined in the
blueprinting stage and realized in the realiza-
tion phase. Once the system goes live, then
support activities kick off wherein monitoring and
feedback takes place.
•	A successful go-live was performed over
the weekend when impact on the business
processes was at a minimum. This meant that
the blackout period was minimized.
•	Go-live included making the system ready for
all the transactions, performing a last check of
whether all the critical data was imported as
well as validating user authorizations and con-
nections to the other systems.
•	This stage also included verification of critical
processes and data and releasing the system
for usage.
•	Support to stabilize the system was also
provided as well as ongoing system fine-tun-
ing. Since the client needed process enhance-
ments on current projects, we executed those
projects after the stabilization period.
Major Challenges and Proposed Mitigations
•	Key decisions involving IT infrastructure,
application rationalization and streamlining
5cognizant 20-20 insights
Figure 4
Apply SLO tool to the SAP on
divesting company server.
Take a copy of divesting company
SAP on divesting company server.
Divesting company verifies that no divesting
company data exists there, thus leaving only
relevant divested company data on this system.
Divesting company server partner
imports the divested company data
into an NAS device.
NAS device is exported to a divested company server to
create exclusive divested company SAP. Divested
company verifies all the data is there in the server.
Legend
SLO tool: A proprietary SAP tool
used for divestiture functions.
NAS: A device to store the data.
Stepping Through the Systems Migration
cognizant 20-20 insights 6
of business processes must be proactively
addressed to ensure long-term stability.
>> Mitigation: The best way to mitigate the
above is to make sure that the organization
goals with respect to the future IT landscape
and policies are clearly defined. Our in-house
experience in infrastructure management
can add value to these discussions.
•	Developing cooperation among the various
parties involved such as the divesting company,
divested company and other vendors.
>> Mitigation: The best way here is to have
periodic touch-point meetings and build
a bridge of trust since mistrust can easily
creep in especially when the reasons for a
carve out may be different.
•	Overlapping dependencies, too many critical
paths and tight delivery schedules with
numerous milestones.
>> Mitigation: Establishing a sound project
plan and adhering to it is very important.
The project sponsor and all the concerned
stakeholders need to be on board with this
project plan. The project manager’s role in
this case becomes even more important.
•	Business process validations, enhancements,
synchronization and stabilization involving
SAP and other applications.
>> Mitigation: Having a knowledgeable user
community always helps, but the divesti-
ture organizations may not always be work-
ing with a plugged-in set of users who are
well versed on existing business processes.
Third parties can help by staffing a project
with experts who have strong business back-
grounds and thus can function as business
analysts.
•	Maintaining budget and time lines because of
dependence on various other vendors in multi-
vendor scenarios.
>> Mitigation: Having a sound and effective
project plan is important. Adhering to the
same and the involvement of the stakehold-
ers are equally important factors.
Words to the Wise
Here are some of the “gotchas” to be aware of
during divestiture projects. The following are a
few examples of the most critical concerns:
•	Printer migration.
•	Batch job migration and changes.
•	Intermediate document separation and
migration.
•	Hard coding in customization objects referring
to the parent company’s data.
Achievements
•	Successfully implemented the carved-out
system with minimal deviation from the client’s
suggested time lines and budget.
•	Effectively managed the testing scenarios and
made sure that all the data and processes were
migrated.
•	The system was up and running immediately
post migration within the planned five days
(including weekend) of system blackout, thus
saving the client the hardship of going through
extended downtime.
Lessons Learned
•	There is no one best approach for divestiture
projects. The option, approach and stages will
differ based on the situation.
•	Validation of critical data and processes is
crucial during divestiture.
•	An alternative approach apart from the system
approach is very important for achieving an
effective divestiture.
Looking Forward
Pulling off a successful divestiture is critical for
both the selling and buying companies. It requires
careful planning and due diligence in the areas
of regulatory compliance, financial setup and IT
landscape setup. These decisions can be the cor-
nerstone of a successful or failed divestiture.
IT plays an important role across all industries in
business strategy and execution. It therefore is
necessary to involve IT partners during the initial
planning stages of the divestiture so that they
can understand the IT landscape of the divesting
company, requirements of the divested company
and suggest the landscape that the divested
company should adopt after the separation. This
is one of the most important steps for ensuring
that the divested company’s IT infrastructure
and application portfolio remains in sync with
business goals and requirements.
ERP applications are ubiquitous in large organi-
zations, with their promise to simplify business
processes, enhance productivity and provide
seamless information transfer. Thus it is essential
to ensure that the effort that goes into the
separation of critical data and processes is taken
About Cognizant
Cognizant (NASDAQ: CTSH) is a leading provider of information technology, consulting, and business process outsourc-
ing services, dedicated to helping the world’s leading companies build stronger businesses. Headquartered in Teaneck,
New Jersey (U.S.), Cognizant combines a passion for client satisfaction, technology innovation, deep industry and busi-
ness process expertise, and a global, collaborative workforce that embodies the future of work. With over 75 develop-
ment and delivery centers worldwide and approximately 178,600 employees as of March 31, 2014, Cognizant is a member
of the NASDAQ-100, the S&P 500, the Forbes Global 2000, and the Fortune 500 and is ranked among the top performing
and fastest growing companies in the world. Visit us online at www.cognizant.com or follow us on Twitter: Cognizant.
World Headquarters
500 Frank W. Burr Blvd.
Teaneck, NJ 07666 USA
Phone: +1 201 801 0233
Fax: +1 201 801 0243
Toll Free: +1 888 937 3277
Email: inquiry@cognizant.com
European Headquarters
1 Kingdom Street
Paddington Central
London W2 6BD
Phone: +44 (0) 20 7297 7600
Fax: +44 (0) 20 7121 0102
Email: infouk@cognizant.com
India Operations Headquarters
#5/535, Old Mahabalipuram Road
Okkiyam Pettai, Thoraipakkam
Chennai, 600 096 India
Phone: +91 (0) 44 4209 6000
Fax: +91 (0) 44 4209 6060
Email: inquiryindia@cognizant.com
­­© Copyright 2014, Cognizant. All rights reserved. No part of this document may be reproduced, stored in a retrieval system, transmitted in any form or by any
means, electronic, mechanical, photocopying, recording, or otherwise, without the express written permission from Cognizant. The information contained herein is
subject to change without notice. All other trademarks mentioned herein are the property of their respective owners.
About the Authors
Aniruddha Agnihotri is a Consulting Manager within Cognizant’s EAS Practice, with a focus on SAP
products. He has 15 years of experience working on execution and management of large-scale SAP
implementation, upgrade and rollout projects. Aniruddha has a wide range of experience in SAP
products including SCM, CRM, BW and ERP across numerous sectors, such as manufacturing-logistics,
energy and utilities and healthcare. Aniruddha holds a bachelor’s degree in mechanical engineering and
a master’s in management from Symbiosis International Education Center India. He can be reached at
Aniruddha.Agnihotri@cognizant.com.
Avijit Sen is an Associate Director of Projects within Cognizant’s EAS Practice. He has 15-plus years of
industry experience in disciplines such as program management, project management, ERP consulting,
DW-BI consulting and business process reengineering. He has strong work experience in the areas of
due diligence, product evaluation, consulting, implementation, rollout, upgrade and application support
projects. Avijit holds a bachelor’s degree of engineering from Bengal Engineering and Science University,
Shibpur and a post-graduate degree in business management from Indian Institute of Technology,
Kharagpur. He can be reached at Avijit.Sen@cognizant.com.
Hardik Sanghavi is a Principal Consultant within Cognizant’s SAP Retail Consulting Practice. His key
areas of expertise include retail consulting, business process modeling, requirements gathering and
analysis, SAP sales and distribution and SAP materials management. Hardik holds a bachelor’s degree
in information and communication technology from Indian Institute of Technology, New Delhi and a post-
graduate degree in business management from the S P Jain Center of Management, Dubai – Singapore.
He can be reached at Hardik.Sanghavi@cognizant.com.
into account and planned for in the initial stages
to ensure minimal disruption during the opera-
tional separation phase.
The integrity of the data to be divested is of core
importance, so all efforts should be made to have
business rules to correctly identify them. Pre-
planning, in terms of engaging the customers and
vendors and helping them understand imminent
system changes, is also hypercritical. Lastly, it’s
the people who build the systems, so core team
members from all functional areas should be
identified and involved in the execution process
from start to finish.

Weitere ähnliche Inhalte

Mehr von Cognizant

The Work Ahead: Transportation and Logistics Delivering on the Digital-Physic...
The Work Ahead: Transportation and Logistics Delivering on the Digital-Physic...The Work Ahead: Transportation and Logistics Delivering on the Digital-Physic...
The Work Ahead: Transportation and Logistics Delivering on the Digital-Physic...Cognizant
 
Enhancing Desirability: Five Considerations for Winning Digital Initiatives
Enhancing Desirability: Five Considerations for Winning Digital InitiativesEnhancing Desirability: Five Considerations for Winning Digital Initiatives
Enhancing Desirability: Five Considerations for Winning Digital InitiativesCognizant
 
The Work Ahead in Manufacturing: Fulfilling the Agility Mandate
The Work Ahead in Manufacturing: Fulfilling the Agility MandateThe Work Ahead in Manufacturing: Fulfilling the Agility Mandate
The Work Ahead in Manufacturing: Fulfilling the Agility MandateCognizant
 
The Work Ahead in Higher Education: Repaving the Road for the Employees of To...
The Work Ahead in Higher Education: Repaving the Road for the Employees of To...The Work Ahead in Higher Education: Repaving the Road for the Employees of To...
The Work Ahead in Higher Education: Repaving the Road for the Employees of To...Cognizant
 
Engineering the Next-Gen Digital Claims Organisation for Australian General I...
Engineering the Next-Gen Digital Claims Organisation for Australian General I...Engineering the Next-Gen Digital Claims Organisation for Australian General I...
Engineering the Next-Gen Digital Claims Organisation for Australian General I...Cognizant
 
Profitability in the Direct-to-Consumer Marketplace: A Playbook for Media and...
Profitability in the Direct-to-Consumer Marketplace: A Playbook for Media and...Profitability in the Direct-to-Consumer Marketplace: A Playbook for Media and...
Profitability in the Direct-to-Consumer Marketplace: A Playbook for Media and...Cognizant
 
Green Rush: The Economic Imperative for Sustainability
Green Rush: The Economic Imperative for SustainabilityGreen Rush: The Economic Imperative for Sustainability
Green Rush: The Economic Imperative for SustainabilityCognizant
 
Policy Administration Modernization: Four Paths for Insurers
Policy Administration Modernization: Four Paths for InsurersPolicy Administration Modernization: Four Paths for Insurers
Policy Administration Modernization: Four Paths for InsurersCognizant
 
The Work Ahead in Utilities: Powering a Sustainable Future with Digital
The Work Ahead in Utilities: Powering a Sustainable Future with DigitalThe Work Ahead in Utilities: Powering a Sustainable Future with Digital
The Work Ahead in Utilities: Powering a Sustainable Future with DigitalCognizant
 
AI in Media & Entertainment: Starting the Journey to Value
AI in Media & Entertainment: Starting the Journey to ValueAI in Media & Entertainment: Starting the Journey to Value
AI in Media & Entertainment: Starting the Journey to ValueCognizant
 
Operations Workforce Management: A Data-Informed, Digital-First Approach
Operations Workforce Management: A Data-Informed, Digital-First ApproachOperations Workforce Management: A Data-Informed, Digital-First Approach
Operations Workforce Management: A Data-Informed, Digital-First ApproachCognizant
 
Five Priorities for Quality Engineering When Taking Banking to the Cloud
Five Priorities for Quality Engineering When Taking Banking to the CloudFive Priorities for Quality Engineering When Taking Banking to the Cloud
Five Priorities for Quality Engineering When Taking Banking to the CloudCognizant
 
Getting Ahead With AI: How APAC Companies Replicate Success by Remaining Focused
Getting Ahead With AI: How APAC Companies Replicate Success by Remaining FocusedGetting Ahead With AI: How APAC Companies Replicate Success by Remaining Focused
Getting Ahead With AI: How APAC Companies Replicate Success by Remaining FocusedCognizant
 
Crafting the Utility of the Future
Crafting the Utility of the FutureCrafting the Utility of the Future
Crafting the Utility of the FutureCognizant
 
Utilities Can Ramp Up CX with a Customer Data Platform
Utilities Can Ramp Up CX with a Customer Data PlatformUtilities Can Ramp Up CX with a Customer Data Platform
Utilities Can Ramp Up CX with a Customer Data PlatformCognizant
 
The Work Ahead in Intelligent Automation: Coping with Complexity in a Post-Pa...
The Work Ahead in Intelligent Automation: Coping with Complexity in a Post-Pa...The Work Ahead in Intelligent Automation: Coping with Complexity in a Post-Pa...
The Work Ahead in Intelligent Automation: Coping with Complexity in a Post-Pa...Cognizant
 
The Timeline of Next
The Timeline of NextThe Timeline of Next
The Timeline of NextCognizant
 
Realising Digital’s Full Potential in the Value Chain
Realising Digital’s Full Potential in the Value ChainRealising Digital’s Full Potential in the Value Chain
Realising Digital’s Full Potential in the Value ChainCognizant
 
The Work Ahead in M&E: Scaling a Three-Dimensional Chessboard
The Work Ahead in M&E: Scaling a Three-Dimensional ChessboardThe Work Ahead in M&E: Scaling a Three-Dimensional Chessboard
The Work Ahead in M&E: Scaling a Three-Dimensional ChessboardCognizant
 
Use AI to Build Member Loyalty as Medicare Eligibility Dates Draw Near
Use AI to Build Member Loyalty as Medicare Eligibility Dates Draw NearUse AI to Build Member Loyalty as Medicare Eligibility Dates Draw Near
Use AI to Build Member Loyalty as Medicare Eligibility Dates Draw NearCognizant
 

Mehr von Cognizant (20)

The Work Ahead: Transportation and Logistics Delivering on the Digital-Physic...
The Work Ahead: Transportation and Logistics Delivering on the Digital-Physic...The Work Ahead: Transportation and Logistics Delivering on the Digital-Physic...
The Work Ahead: Transportation and Logistics Delivering on the Digital-Physic...
 
Enhancing Desirability: Five Considerations for Winning Digital Initiatives
Enhancing Desirability: Five Considerations for Winning Digital InitiativesEnhancing Desirability: Five Considerations for Winning Digital Initiatives
Enhancing Desirability: Five Considerations for Winning Digital Initiatives
 
The Work Ahead in Manufacturing: Fulfilling the Agility Mandate
The Work Ahead in Manufacturing: Fulfilling the Agility MandateThe Work Ahead in Manufacturing: Fulfilling the Agility Mandate
The Work Ahead in Manufacturing: Fulfilling the Agility Mandate
 
The Work Ahead in Higher Education: Repaving the Road for the Employees of To...
The Work Ahead in Higher Education: Repaving the Road for the Employees of To...The Work Ahead in Higher Education: Repaving the Road for the Employees of To...
The Work Ahead in Higher Education: Repaving the Road for the Employees of To...
 
Engineering the Next-Gen Digital Claims Organisation for Australian General I...
Engineering the Next-Gen Digital Claims Organisation for Australian General I...Engineering the Next-Gen Digital Claims Organisation for Australian General I...
Engineering the Next-Gen Digital Claims Organisation for Australian General I...
 
Profitability in the Direct-to-Consumer Marketplace: A Playbook for Media and...
Profitability in the Direct-to-Consumer Marketplace: A Playbook for Media and...Profitability in the Direct-to-Consumer Marketplace: A Playbook for Media and...
Profitability in the Direct-to-Consumer Marketplace: A Playbook for Media and...
 
Green Rush: The Economic Imperative for Sustainability
Green Rush: The Economic Imperative for SustainabilityGreen Rush: The Economic Imperative for Sustainability
Green Rush: The Economic Imperative for Sustainability
 
Policy Administration Modernization: Four Paths for Insurers
Policy Administration Modernization: Four Paths for InsurersPolicy Administration Modernization: Four Paths for Insurers
Policy Administration Modernization: Four Paths for Insurers
 
The Work Ahead in Utilities: Powering a Sustainable Future with Digital
The Work Ahead in Utilities: Powering a Sustainable Future with DigitalThe Work Ahead in Utilities: Powering a Sustainable Future with Digital
The Work Ahead in Utilities: Powering a Sustainable Future with Digital
 
AI in Media & Entertainment: Starting the Journey to Value
AI in Media & Entertainment: Starting the Journey to ValueAI in Media & Entertainment: Starting the Journey to Value
AI in Media & Entertainment: Starting the Journey to Value
 
Operations Workforce Management: A Data-Informed, Digital-First Approach
Operations Workforce Management: A Data-Informed, Digital-First ApproachOperations Workforce Management: A Data-Informed, Digital-First Approach
Operations Workforce Management: A Data-Informed, Digital-First Approach
 
Five Priorities for Quality Engineering When Taking Banking to the Cloud
Five Priorities for Quality Engineering When Taking Banking to the CloudFive Priorities for Quality Engineering When Taking Banking to the Cloud
Five Priorities for Quality Engineering When Taking Banking to the Cloud
 
Getting Ahead With AI: How APAC Companies Replicate Success by Remaining Focused
Getting Ahead With AI: How APAC Companies Replicate Success by Remaining FocusedGetting Ahead With AI: How APAC Companies Replicate Success by Remaining Focused
Getting Ahead With AI: How APAC Companies Replicate Success by Remaining Focused
 
Crafting the Utility of the Future
Crafting the Utility of the FutureCrafting the Utility of the Future
Crafting the Utility of the Future
 
Utilities Can Ramp Up CX with a Customer Data Platform
Utilities Can Ramp Up CX with a Customer Data PlatformUtilities Can Ramp Up CX with a Customer Data Platform
Utilities Can Ramp Up CX with a Customer Data Platform
 
The Work Ahead in Intelligent Automation: Coping with Complexity in a Post-Pa...
The Work Ahead in Intelligent Automation: Coping with Complexity in a Post-Pa...The Work Ahead in Intelligent Automation: Coping with Complexity in a Post-Pa...
The Work Ahead in Intelligent Automation: Coping with Complexity in a Post-Pa...
 
The Timeline of Next
The Timeline of NextThe Timeline of Next
The Timeline of Next
 
Realising Digital’s Full Potential in the Value Chain
Realising Digital’s Full Potential in the Value ChainRealising Digital’s Full Potential in the Value Chain
Realising Digital’s Full Potential in the Value Chain
 
The Work Ahead in M&E: Scaling a Three-Dimensional Chessboard
The Work Ahead in M&E: Scaling a Three-Dimensional ChessboardThe Work Ahead in M&E: Scaling a Three-Dimensional Chessboard
The Work Ahead in M&E: Scaling a Three-Dimensional Chessboard
 
Use AI to Build Member Loyalty as Medicare Eligibility Dates Draw Near
Use AI to Build Member Loyalty as Medicare Eligibility Dates Draw NearUse AI to Build Member Loyalty as Medicare Eligibility Dates Draw Near
Use AI to Build Member Loyalty as Medicare Eligibility Dates Draw Near
 

Kürzlich hochgeladen

Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embeddingZilliz
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 

Kürzlich hochgeladen (20)

Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embedding
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 

SAP Divestiture Projects: Options, Approach and Challenges

  • 1. SAP Divestiture Projects: Options, Approach and Challenges A look at best practices and approaches, based on an extensive case study, for quickly reshaping the system landscape — with minimal process disruption — after a spin-off. Executive Summary Increasing globalization, ever-changing market dynamics and volatile business conditions require organizations to become more agile and flexible to ensure sustainability, growth and business continuity. Companies must be aware of all the factors that impact their businesses and understand how to embrace new technologies and ways of working that can deliver enhanced business benefits, and avoid shortcomings. These dynamics are making it even more important for companies to be laser focused on their business cores while divesting and/or turning to partners for activities considered noncore. The systems implications for divestiture are critical due to legal and statutory reasons. For example, companies are required to keep historical data for the previous seven years. Sometimes this data may be available only in the business system that accompanies the operation being divested. Another important reason for maintaining existing systems of records is the benefit this data has on process continuity. Divestitures require significant planning and due diligence to ensure success for both the selling and buying parties. A divestiture typically involves numerous phases, involving legal and financial concerns, from auditing and accounting through transition service agreements and operational separation. It is important, therefore, for both the seller and buyer to have these issues sorted before a divestiture moves forward. This white paper focuses on operational separation issues and choices encountered by the buyer company during the migration of the selling entity’s IT infrastructure. It also examines the issues faced by a company that we advised with an SAP infrastructure landscape and the various complexities involved during and post divestiture. Divesture Inflection Points There are several key decisions regarding the migration that can make or break the divested company. They include: • IT infrastructure setup: The infrastructure decision needs to be carefully considered to ensure that the divested company’s operations are not affected in the long run and scaling up doesn’t become an issue. The divested company can either adopt the divesting company’s IT infrastructure or it can set up a new and completely different infrastructure. Both scenarios have their advantages and dis- advantages and a careful analysis needs to be carried out to ensure that the best choice • Cognizant 20-20 Insights cognizant 20-20 insights | may 2014
  • 2. Re-implementation Advantages and Disadvantages 2 is made. With an SAP infrastructure already in place, it becomes critical to address this with the utmost care as it can make or break the divested company. This is one critical area where consulting firms can be called on to analyze the situation and provide independent and unbiased recommendations. • Application portfolio rationalization: The ap- plication portfolio of the divesting company may include several applications that are ob- solete or serve no purpose. As a result, an ap- plication rationalization exercise needs to be carried out, to ensure that such applications are not migrated to the divested company’s infrastructure. If the lines of business for the divesting and divested company are complete- ly different, then the majority of the applica- tions most likely will not be useful, which may result in a significant number of applications that require rationalization. This step is crucial for the operational efficiency of the divested company. • Change management initiative: As a result of the multiple changes that take place during migration, a well-defined change management strategy needs to be in place to ensure that there is a smooth transition from the divest- ing to the divested company — one which takes into consideration all aspects of both entities. This change management strategy should con- sist of legal, financial, HR, IT and various other reviews, depending on the line of business in which the divested company is involved. At the time of separation, an organization may be faced with various options and the strategy adopted at that time can go a long way to define its future IT strategy. Divestiture Options Re-implementation In this option, the buying organization opts to re-implement the processes powered by the acquired systems infrastructure, post divestiture. This option is appealing as it provides flexibility to implement key processes that an organiza- tion needs and ignore those that have become irrelevant (see Figure 1). Moreover, this approach also gives organizations the opportunity to sort out any business process on which it relies and align it with SAP best practices. Shadow Implementation This concept sounds different but it is borrowed from the copy-paste function that we all perform daily, often multiple times (see Figure 2). The logic here is to have a reference system — or a copy of the original system — and then re-implement the process on a new server by replicating the process from the reference system, as required. This is a middle path between implementation and “carve out” (see below). Carve Out This option probably is the most efficient way of making the system ready with limited resources available at the organization’s disposal (see Figure 3). The “carving out” process is more business oriented than system oriented because business rules must be identified in advance; these conditions typically define the carving out of data and transactions. As we have shown, each of the above options has pros and cons. Choosing an option is usually based on the three factors of project management at the organization’s disposal: time, resources and cost. Additionally, the path taken depends on the maturity of the organization and its IT vision. cognizant 20-20 insights Advantages Disadvantages Flexibility to pick and select processes to be implemented. Training on new processes. Flexibility to align with best practices. Training on new software. Can implement the lessons learned from previous implementations. Time-consuming process. Flexibility to choose the type of ERP. May require additional resources. Costs may be high for above reasons and due to licensing fees. Change management.Figure 1
  • 3. cognizant 20-20 insights 3 Carve Out Advantages and Disadvantages Advantages Disadvantages Reduced turnover time. Data separation rules may be complex to code. Familiarity of the system, process and data. Non-carved-out data may cause performance issues in the future. Limited or no retraining required. Incomplete testing may leave many issues in the carved out system. Piggy-back on existing licensing costs. Less costly. Resource requirements are limited. No change management. In-house knowledge bank can be used. Figure 3 Applying the Carve-Out Strategy The following case study discusses a carve-out project we undertook for one client (see Figure 4, page 5). This company was formed as a result of an acquisition by angel investors who purchased a product division from a large company. The newly-formed company needed to quickly create an IT landscape of its own with medium-scale investment. Since the IT skills of the employees that accompanied the purchased division were very limited, the angel investors decided not to overhaul the existing processes so that data and process familiarity could be maintained. This also meant that minimal training would be required, thus resulting in cost savings. A carve out is similar to any other project in terms of the methodology followed but the activities in each stage may vary. The process followed was very similar to the SAP ASAP® ™ methodology. Project Preparation Project preparation is the phase that follows the signing of the license and service agreements. In this project phase business goals are determined Shadow Implementation Advantages and Disadvantages Advantages Disadvantages Pick and choose only the relevant processes and functions to be implemented. Training on new processes. Flexibility to align with best practices. Training on new software. Can implement the lessons learned from previous implementations. Time-consuming process. Flexibility to choose the type of ERP. May require additional resources. Costs may be high due to reasons cited above. Additional licensing may be required. Change management. May run into some data proprietary issues present in the reference system. Figure 2
  • 4. cognizant 20-20 insights 4 and expectations defined. Involvement of all the stakeholders in this phase is vital for the overall success of the project. The decisions taken during this phase will set the path for the ensuing stages and will make or break the project. The activities performed during this phase included: • Creation of preliminary project plan: This was critical because the client’s budget and resources were limited. Additionally, there were multiple vendors involved so all project plans had to merge seamlessly. • Creation of preliminary resource plan: Since the long-term client requirement was for us to take over the regular maintenance of the system post go-live, we had to make sure that the resource plan enabled continuity to be maintained. • Identification of resource mix: Since the client landscape was exceptionally complex, the right resource mix was very important. Blueprinting This phase consists of analyzing the company’s “as-is” processes, designing the “to-be” processes and setting the path for the transition. This stage is also called the “solution definition phase” since it defines the roadmap for the transition of the processes from the existing to the future scenario. The activities performed during this phase included: • Analysis of IT infrastructure: The existing infrastructure was very complex; for example, it consisted of multiple instances of various applications, such as PeopleSoft, Biztalk, legacy plant systems, etc. There were at least 10 different servers all talking to one another. The complexity of managing the infrastructure was heightened because our client wanted to host some of its apps in the cloud. • Analysis of IT applications: Existing business applications were also operating in an excep- tionally complex environment, involving multiple systems talking to each other: ECC (ERP central component), CRM, SCM, BI, portal, ERP (PeopleSoft), document management (IBM Filenet), Biztalk, etc. Some had a full landscape of development, quality and production envi- ronments, while others did not have exclusive development or quality-control environments. • Analysis of proposed IT infrastructure and applications infrastructure as required by the divested company: This was driven by the budgets of the company and the processes it prioritized. Decisions were also influenced by systems versions that were either too old and/ or not supported now by vendors. Example: The version of Biztalk used was no longer supported by Microsoft. Realization The purpose of this phase is to implement the business and process requirements and the validated business model as defined in the blue- printing phase. The objective includes translating the solution from the blueprinting phase for final systems implementation testing and preparation for the production environment. • Only relevant data, processes and transac- tions were identified and applied. This was by far the most important part. For this activity, the client used SLO® , a proprietary SAP tool for separating the systems. The tool works on the basis of marking the data and organiza- tion structure that needs to be separated and then, based on the processes and transactions related to that data, carving those out. • Tool design was critical to the whole carve-out process. Since SAP is designed based on a network of tables, and since most often these tables are interlinked through dependent conditions, it is very important to know the sequence of carving out the data. • Testing cycles played a key role. Each time the SLO tool was applied, we went through four test cycles in a period of three months to make sure the carved out data was exact. The testing strategy was threefold: >> Test if the carved-out system does not con- tain the divesting company’s data. >> Test if the carved-out system has all the data as required by the divested company. >> Run test transactions to make sure that the processes and functions of the divested company work correctly. During each of these cycles we discovered issues such as: >> Divesting organization data still existed in the system. >> Divested company’s data did not exist in the carved-out system. >> Certain transactions relevant to the divested company did not work correctly.
  • 5. During subsequent cycles these issues were corrected and the final testing revealed sound results. Edits were required to the SLO tool as per the issues identified. There was some data identified that was not possible to be carved out. So, we took an alter- native approach of extracting and then reloading this data. Final Preparation This phase is the final preparation before the cutover/go-live phase. It included testing, user training, system management and cutover activities and finalizing the readiness of the go-live environment. • This stage was very important since it was the last step to confirm readiness for the go-live. Since multiple test cycles were involved, we adopted a strategy to make sure that the issues identified in all the previous cycles had been addressed. • Final preparation also included the process to be followed by the business during the blackout period of system migration. • A checklist was prepared based on the sequence of events to be followed for the next step of go-live. Go-Live and Support This is the final phase in the project lifecycle. It includes the migration to the new system which follows the to-be processes as defined in the blueprinting stage and realized in the realiza- tion phase. Once the system goes live, then support activities kick off wherein monitoring and feedback takes place. • A successful go-live was performed over the weekend when impact on the business processes was at a minimum. This meant that the blackout period was minimized. • Go-live included making the system ready for all the transactions, performing a last check of whether all the critical data was imported as well as validating user authorizations and con- nections to the other systems. • This stage also included verification of critical processes and data and releasing the system for usage. • Support to stabilize the system was also provided as well as ongoing system fine-tun- ing. Since the client needed process enhance- ments on current projects, we executed those projects after the stabilization period. Major Challenges and Proposed Mitigations • Key decisions involving IT infrastructure, application rationalization and streamlining 5cognizant 20-20 insights Figure 4 Apply SLO tool to the SAP on divesting company server. Take a copy of divesting company SAP on divesting company server. Divesting company verifies that no divesting company data exists there, thus leaving only relevant divested company data on this system. Divesting company server partner imports the divested company data into an NAS device. NAS device is exported to a divested company server to create exclusive divested company SAP. Divested company verifies all the data is there in the server. Legend SLO tool: A proprietary SAP tool used for divestiture functions. NAS: A device to store the data. Stepping Through the Systems Migration
  • 6. cognizant 20-20 insights 6 of business processes must be proactively addressed to ensure long-term stability. >> Mitigation: The best way to mitigate the above is to make sure that the organization goals with respect to the future IT landscape and policies are clearly defined. Our in-house experience in infrastructure management can add value to these discussions. • Developing cooperation among the various parties involved such as the divesting company, divested company and other vendors. >> Mitigation: The best way here is to have periodic touch-point meetings and build a bridge of trust since mistrust can easily creep in especially when the reasons for a carve out may be different. • Overlapping dependencies, too many critical paths and tight delivery schedules with numerous milestones. >> Mitigation: Establishing a sound project plan and adhering to it is very important. The project sponsor and all the concerned stakeholders need to be on board with this project plan. The project manager’s role in this case becomes even more important. • Business process validations, enhancements, synchronization and stabilization involving SAP and other applications. >> Mitigation: Having a knowledgeable user community always helps, but the divesti- ture organizations may not always be work- ing with a plugged-in set of users who are well versed on existing business processes. Third parties can help by staffing a project with experts who have strong business back- grounds and thus can function as business analysts. • Maintaining budget and time lines because of dependence on various other vendors in multi- vendor scenarios. >> Mitigation: Having a sound and effective project plan is important. Adhering to the same and the involvement of the stakehold- ers are equally important factors. Words to the Wise Here are some of the “gotchas” to be aware of during divestiture projects. The following are a few examples of the most critical concerns: • Printer migration. • Batch job migration and changes. • Intermediate document separation and migration. • Hard coding in customization objects referring to the parent company’s data. Achievements • Successfully implemented the carved-out system with minimal deviation from the client’s suggested time lines and budget. • Effectively managed the testing scenarios and made sure that all the data and processes were migrated. • The system was up and running immediately post migration within the planned five days (including weekend) of system blackout, thus saving the client the hardship of going through extended downtime. Lessons Learned • There is no one best approach for divestiture projects. The option, approach and stages will differ based on the situation. • Validation of critical data and processes is crucial during divestiture. • An alternative approach apart from the system approach is very important for achieving an effective divestiture. Looking Forward Pulling off a successful divestiture is critical for both the selling and buying companies. It requires careful planning and due diligence in the areas of regulatory compliance, financial setup and IT landscape setup. These decisions can be the cor- nerstone of a successful or failed divestiture. IT plays an important role across all industries in business strategy and execution. It therefore is necessary to involve IT partners during the initial planning stages of the divestiture so that they can understand the IT landscape of the divesting company, requirements of the divested company and suggest the landscape that the divested company should adopt after the separation. This is one of the most important steps for ensuring that the divested company’s IT infrastructure and application portfolio remains in sync with business goals and requirements. ERP applications are ubiquitous in large organi- zations, with their promise to simplify business processes, enhance productivity and provide seamless information transfer. Thus it is essential to ensure that the effort that goes into the separation of critical data and processes is taken
  • 7. About Cognizant Cognizant (NASDAQ: CTSH) is a leading provider of information technology, consulting, and business process outsourc- ing services, dedicated to helping the world’s leading companies build stronger businesses. Headquartered in Teaneck, New Jersey (U.S.), Cognizant combines a passion for client satisfaction, technology innovation, deep industry and busi- ness process expertise, and a global, collaborative workforce that embodies the future of work. With over 75 develop- ment and delivery centers worldwide and approximately 178,600 employees as of March 31, 2014, Cognizant is a member of the NASDAQ-100, the S&P 500, the Forbes Global 2000, and the Fortune 500 and is ranked among the top performing and fastest growing companies in the world. Visit us online at www.cognizant.com or follow us on Twitter: Cognizant. World Headquarters 500 Frank W. Burr Blvd. Teaneck, NJ 07666 USA Phone: +1 201 801 0233 Fax: +1 201 801 0243 Toll Free: +1 888 937 3277 Email: inquiry@cognizant.com European Headquarters 1 Kingdom Street Paddington Central London W2 6BD Phone: +44 (0) 20 7297 7600 Fax: +44 (0) 20 7121 0102 Email: infouk@cognizant.com India Operations Headquarters #5/535, Old Mahabalipuram Road Okkiyam Pettai, Thoraipakkam Chennai, 600 096 India Phone: +91 (0) 44 4209 6000 Fax: +91 (0) 44 4209 6060 Email: inquiryindia@cognizant.com ­­© Copyright 2014, Cognizant. All rights reserved. No part of this document may be reproduced, stored in a retrieval system, transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the express written permission from Cognizant. The information contained herein is subject to change without notice. All other trademarks mentioned herein are the property of their respective owners. About the Authors Aniruddha Agnihotri is a Consulting Manager within Cognizant’s EAS Practice, with a focus on SAP products. He has 15 years of experience working on execution and management of large-scale SAP implementation, upgrade and rollout projects. Aniruddha has a wide range of experience in SAP products including SCM, CRM, BW and ERP across numerous sectors, such as manufacturing-logistics, energy and utilities and healthcare. Aniruddha holds a bachelor’s degree in mechanical engineering and a master’s in management from Symbiosis International Education Center India. He can be reached at Aniruddha.Agnihotri@cognizant.com. Avijit Sen is an Associate Director of Projects within Cognizant’s EAS Practice. He has 15-plus years of industry experience in disciplines such as program management, project management, ERP consulting, DW-BI consulting and business process reengineering. He has strong work experience in the areas of due diligence, product evaluation, consulting, implementation, rollout, upgrade and application support projects. Avijit holds a bachelor’s degree of engineering from Bengal Engineering and Science University, Shibpur and a post-graduate degree in business management from Indian Institute of Technology, Kharagpur. He can be reached at Avijit.Sen@cognizant.com. Hardik Sanghavi is a Principal Consultant within Cognizant’s SAP Retail Consulting Practice. His key areas of expertise include retail consulting, business process modeling, requirements gathering and analysis, SAP sales and distribution and SAP materials management. Hardik holds a bachelor’s degree in information and communication technology from Indian Institute of Technology, New Delhi and a post- graduate degree in business management from the S P Jain Center of Management, Dubai – Singapore. He can be reached at Hardik.Sanghavi@cognizant.com. into account and planned for in the initial stages to ensure minimal disruption during the opera- tional separation phase. The integrity of the data to be divested is of core importance, so all efforts should be made to have business rules to correctly identify them. Pre- planning, in terms of engaging the customers and vendors and helping them understand imminent system changes, is also hypercritical. Lastly, it’s the people who build the systems, so core team members from all functional areas should be identified and involved in the execution process from start to finish.