Partnership To Advance Clean Energy-Deployment (PACE-D)
Technical Assistance Program
Presented by
USAID PACE-D TA Program
Apr-18
Solar PV Rooftop Training Program For Entrepreneurs
Session:
Grid Connected Inverter
Contents
Function of the inverter in Solar PV Rooftop systems
Types of inverter – standalone, grid connected and multi-
mode
Classification of grid connected inverter
Inverter efficiency
Selection of grid connected inverter
Function of the Inverter in Solar PV Rooftop
Systems
 Convert DC to AC (Energy transformation)
 Synchronises voltage to the grid
 Finding Maximum Power Point (MPPT)
 Monitoring Centre for Solar PV Rooftop system
 Provide protection functions (AC and DC side protections)
 Be safe, efficient and reliable in operation
 Provide power quality i.e. no bad effects caused by inverter operation (Power
regulation / Reactive power mode etc.)
Standalone Inverter
 Stand-alone inverters are typically
manufactured to operate from a
specific nominal battery voltage e.g.
12V, 24V, 48V or 120V DC
 The system controller includes
voltage regulator and MPPT
Grid Connected Inverter
 A grid-connected inverter is directly connected to the PV array
 If the AC grid is not present, the inverter will simply not function
IEC 62116 -: “Anti Islanding function ”
CLASSIFICATION OF GRID CONNECTED INVERTER
Classification of Grid Connected Inverter
Grid Connected
Inverter
Based on use of
Transformer
Isolated
Non Isolated
Based on interface
with SPVRT Array
Micro Inverter
String Inverter
Multi String
Inverter
Central Inverter
Classification of Grid Connected Inverter – Isolated v/s Non
Isolated
 Where there is at
least simple
separation
between the input
and output
circuits (e.g. by
means of a
transformer with
separate
windings) it is
categorized as an
isolated inverter
(IEC 62548)
Isolated
Inverter
 Also known as
Transformer less
inverter
 Inverter that does
not have at least
simple separation
between the input
and output
circuits, is
categorized as
non-isolated
inverter
(IEC 62548)
Non Isolated
Inverter
Micro Inverter
 Each module connected one micro
inverter
 Connected in parallel
 Power: 100W – 350W
 Input: 20-40V DC
 Output: 230V AC
 Single phase
 Higher cost in comparison to string
inverter
 Must comply with IEC 62109-2
Micro Inverters
Grid
String Inverter
 Single or multiple strings connected
to a single MPPT inverter
 Power: 1kW – 30kW
 Input: 150-350V DC
 Output: 230V-415V AC
 1- phase or 3-phase
 Higher cost in comparison to central
inverter
 Must comply with IEC 62109-2
Single & multiple MPPT inverter
Central Inverter
 Multiple strings are connected to
normally single MPPTs
 Power: 30kW – 2MW
 Input: 300-800V DC
 Output: 400V AC
 3-phase
 Lower per W cost in comparison to
string inverter
 Must comply with IEC 62109-2
Central Inverter
Grid
Market Segmentation –
Grid Tie Inverter (Capacity & Applications)
Grid Tie
Inverter
(Capacity &
Applictions)
Central Inverters
 Conventional & proven technology
 Solution for large PV projects
 Focus – centralized bulk power generation under central & state initiatives
E.g. Multi Mega Watt Projects
String Inverters
 Well established technology
 Solution for medium ground mounted and rooftop projects
 Focus – captive consumption & net metering
E.g. Private Residential / Commercial / SMEs
Micro Inverters
 Newly developed technology
 Solution for small & medium sized PV plants
 Focus – captive consumption at small scale
E.g. Small systems, Rooftop Commercial Systems etc.
Power Quality of Grid Connected Inverter
 Central Electrical Authority of India (Technical Standards for Connectivity to the
Grid) Regulators, 2007 specifies that the generating sources located near the
load centers must have a power factor between 0.95 leading and 0.85 lagging
 For sources located far from the load centers, the power factor should be
maintained between 0.95 leading and 0.90 lagging
 However many inverters have a power factor of 1
 Central Electrical Authority of India (Technical Standards for Connectivity of the
Distributed Generation Resources) Draft Regulations, 2012 specifies that the total
harmonic distortion must not exceed 5% as specified in IEEE 519
Inverter Efficiency – Effect of Input Power
Inverter Efficiency – Effect of DC Voltage &
Temperature
 Lower DC string voltage leads to reduction in efficiency
 Higher working temperatures reduces overall performance
Inverter Efficiency – Various Scenarios
IEC 61683 – Photovoltaic Systems – Power Conditioners – Procedure for
measuring efficiency
Maximum efficiency @ rated output
Weighted average value of Efficiency
Efficiency MPPT at all times
Part loading – Efficiency @ rated output
Selection of Grid Connected Inverter
Supply & Logistics
Balance of
Systems (BoS)
Requirements
Ease in Design,
Installation,
Performance,
Supervision &
Control
System Reliability
& Other Technical
Aspects
Why is Assessment of PV Inverters most Essential
Inverters are the most complex
 Crucial for PV plant performance
Accounts to approximately 8-14% of the overall installation cost
 Other cost associated with technology selection
 Selection significantly affects RoI
Installation requirements
 Supply and logistics - Special infrastructural requirements
 Safety of personnel and product
PV plant configuration
 Site conditions are not same
 Balance of System (BoS) composition changes with technology
 Control & monitoring philosophy depends on technology limitations
Why is Assessment of PV Inverters most Essential
Design flexibilities
 Ease in design thus installation
 Performance monitoring & supervision
System reliability – Depends on the Product Quality
 Life of the product – Project life of 25 years (?)
 Maintenance requirement - Skill labor requirement
 Failure rate and replacement time – What is the warranty?
 Spare part requirements
 Actual cost of maintenance?
Overall impact on energy generation and RoI
GRID CONNECTED INVERTER SPECIFICATIONS & DATA SHEET
INPUT DATA Fronius Symo 20.0-3-M
Max. input current
(Idc max1 / Idc max2)
33.0 A / 27.0 A
Max. usable input current total
(Idc max1 + Idc max2)
51.0 A
Max.array short circuit current (MPP1 / MPP2) 49.5 A / 40.5 A
Min. input voltage (Udc min) 200 V
Feed-in start voltage (Udc start) 200 V
Nominal input voltage (Udc,r) 600 V
Max. input voltage
(Udc max)
1,000 V
MPP voltage range
(Umpp min - Umpp max)
420 - 800 V
Number of MPP trackers 2
Number of DC connections 3 + 3
Max. PV generator output (Pdc max) 30.0 kWpeak
OUTPUT DATA
AC nominal output (Pac,r) 20,000 W
Max. output power 20,000 VA
AC output current (Iac nom) 28.9 A
Grid connection (voltage range) 3~NPE 400 V / 230 V or 3~NPE 380 V / 220 V (+20 % / -30 %)
Frequency (frequency range) 50 Hz / 60 Hz (45 - 65 Hz)
Total harmonic distortion 1.3 %
Power factor (cos φac,r) 0 - 1 ind. / cap.
GENERAL DATA
Dimensions
(height x width x depth)
725 x 510 x 225 mm
Weight 43.4 kg
Degree of protection IP 66
Protection class 1
Overvoltage category (DC / AC)1) 1 + 2 / 3
Night time consumption < 1 W
Inverter design Transformerless
Cooling Regulated air cooling
Installation Indoor and outdoor installation
Ambient temperature range -40°C to +60°C
Permitted humidity 0 % to 100 %
Max. altitude 2,000 m / 3,400 m (unrestricted / restricted voltage range)
DC connection technology 6x DC+ and 6x DC- screw terminals 2.5 mm² - 16 mm²
AC connection technology 5-pin AC screw terminals 2.5 mm² - 16 mm²
* Exclusive technical details
23
Anurag Mishra
Senior Clean Energy Specialist
USAID/India
Email: amishra@usaid.gov
Disclaimer:
This training material is made possible by the support of the American
People through the United States Agency for International
Development (USAID). The contents of this material are the sole
responsibility of Nexant, Inc. and do not necessarily reflect the views of
USAID or the United States Government. This material was prepared
under Contract Number AID-386-C-12-00001.

Weitere ähnliche Inhalte

Was ist angesagt?

MPPT using PV Module
MPPT using PV ModuleMPPT using PV Module
MPPT using PV ModuleFaraz Anjum
 
MPPT Based Optimal Charge Controller in PV system
MPPT Based Optimal Charge Controller in PV systemMPPT Based Optimal Charge Controller in PV system
MPPT Based Optimal Charge Controller in PV systemMalik Sameeullah
 
Solar photovoltaic system design
Solar photovoltaic system designSolar photovoltaic system design
Solar photovoltaic system designJay Ranvir
 
Power system voltage stability
Power system voltage stabilityPower system voltage stability
Power system voltage stabilityAkash Choudhary
 
Design Aspect of Standalone PV system
Design Aspect of Standalone PV systemDesign Aspect of Standalone PV system
Design Aspect of Standalone PV systemMalik Sameeullah
 
Choice of converter configuration
Choice of converter configurationChoice of converter configuration
Choice of converter configurationjawaharramaya
 
PPT OF SOLAR NAVEEN' `11
PPT OF SOLAR NAVEEN' `11PPT OF SOLAR NAVEEN' `11
PPT OF SOLAR NAVEEN' `11naveen bhati
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesPuneet Jaggi
 
voltage and power stability of hvdc system
voltage and power stability of hvdc systemvoltage and power stability of hvdc system
voltage and power stability of hvdc systemchandan kumar
 
Ppt of ehv ac transmission
Ppt of ehv ac transmissionPpt of ehv ac transmission
Ppt of ehv ac transmissionSumit Kumar
 

Was ist angesagt? (20)

MPPT using PV Module
MPPT using PV ModuleMPPT using PV Module
MPPT using PV Module
 
Solar system design
Solar system designSolar system design
Solar system design
 
MPPT Based Optimal Charge Controller in PV system
MPPT Based Optimal Charge Controller in PV systemMPPT Based Optimal Charge Controller in PV system
MPPT Based Optimal Charge Controller in PV system
 
Solar Power Plant Design and PV Syst
Solar Power Plant Design and PV SystSolar Power Plant Design and PV Syst
Solar Power Plant Design and PV Syst
 
Introduction to Microgrid
Introduction to Microgrid Introduction to Microgrid
Introduction to Microgrid
 
Solar photovoltaic system design
Solar photovoltaic system designSolar photovoltaic system design
Solar photovoltaic system design
 
Power systems İntroduction
Power systems İntroductionPower systems İntroduction
Power systems İntroduction
 
Solar power plant
Solar power plantSolar power plant
Solar power plant
 
Unit 3 FACTS Technology
Unit 3 FACTS TechnologyUnit 3 FACTS Technology
Unit 3 FACTS Technology
 
Power system voltage stability
Power system voltage stabilityPower system voltage stability
Power system voltage stability
 
Design Aspect of Standalone PV system
Design Aspect of Standalone PV systemDesign Aspect of Standalone PV system
Design Aspect of Standalone PV system
 
Maximum power point tracking algorithms for solar(pv) systems
Maximum power point tracking algorithms for solar(pv) systemsMaximum power point tracking algorithms for solar(pv) systems
Maximum power point tracking algorithms for solar(pv) systems
 
Choice of converter configuration
Choice of converter configurationChoice of converter configuration
Choice of converter configuration
 
Islanding
IslandingIslanding
Islanding
 
Solar photo voltaics
Solar photo voltaics Solar photo voltaics
Solar photo voltaics
 
PPT OF SOLAR NAVEEN' `11
PPT OF SOLAR NAVEEN' `11PPT OF SOLAR NAVEEN' `11
PPT OF SOLAR NAVEEN' `11
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 
Hvdc notes
Hvdc notesHvdc notes
Hvdc notes
 
voltage and power stability of hvdc system
voltage and power stability of hvdc systemvoltage and power stability of hvdc system
voltage and power stability of hvdc system
 
Ppt of ehv ac transmission
Ppt of ehv ac transmissionPpt of ehv ac transmission
Ppt of ehv ac transmission
 

Ähnlich wie Session 05 grid connected inverter

Session 5 - Grid Connected Inverter.pptx
Session 5 - Grid Connected Inverter.pptxSession 5 - Grid Connected Inverter.pptx
Session 5 - Grid Connected Inverter.pptxTaashish
 
Photovoltaic Training Course - Module 1.2 choosing components
Photovoltaic Training Course - Module 1.2 choosing componentsPhotovoltaic Training Course - Module 1.2 choosing components
Photovoltaic Training Course - Module 1.2 choosing componentsLeonardo ENERGY
 
Single Output 40W DC-DC Forward Converter for Space Application
Single Output 40W DC-DC Forward Converter for Space ApplicationSingle Output 40W DC-DC Forward Converter for Space Application
Single Output 40W DC-DC Forward Converter for Space ApplicationIRJET Journal
 
DFAE_Energy_Dalian_2011.pptx
DFAE_Energy_Dalian_2011.pptxDFAE_Energy_Dalian_2011.pptx
DFAE_Energy_Dalian_2011.pptxPatilPushkraj
 
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)GE코리아
 
To know a microinverter powered by fsp
To know a microinverter powered by fspTo know a microinverter powered by fsp
To know a microinverter powered by fspFSP Technology Inc.
 
Interactive inverters
Interactive invertersInteractive inverters
Interactive invertersmareenotmarie
 
An Overview Of Agbami Fpso Electrical Power System
An Overview Of Agbami Fpso Electrical Power SystemAn Overview Of Agbami Fpso Electrical Power System
An Overview Of Agbami Fpso Electrical Power Systemvkmalik
 
Huawei ups product and solution 02 (20140318)
Huawei ups product and solution 02 (20140318)Huawei ups product and solution 02 (20140318)
Huawei ups product and solution 02 (20140318)Jason Koffler
 
TBEA INVERTER-CENTRAL-500KW,630KW,1MW -SOLAR
TBEA INVERTER-CENTRAL-500KW,630KW,1MW -SOLARTBEA INVERTER-CENTRAL-500KW,630KW,1MW -SOLAR
TBEA INVERTER-CENTRAL-500KW,630KW,1MW -SOLARjefry sahayam
 
Powersines presentation (lec)
Powersines presentation (lec)Powersines presentation (lec)
Powersines presentation (lec)greenacquisition
 
Powersines presentation (lec)
Powersines presentation (lec)Powersines presentation (lec)
Powersines presentation (lec)greenacquisition
 
Power Quality Analysis Using Active NPC Multilevel inverter in PV sourced sta...
Power Quality Analysis Using Active NPC Multilevel inverter in PV sourced sta...Power Quality Analysis Using Active NPC Multilevel inverter in PV sourced sta...
Power Quality Analysis Using Active NPC Multilevel inverter in PV sourced sta...IRJET Journal
 
Power Quality Analysis Using Active NPC Multilevel inverter in PV sourced sta...
Power Quality Analysis Using Active NPC Multilevel inverter in PV sourced sta...Power Quality Analysis Using Active NPC Multilevel inverter in PV sourced sta...
Power Quality Analysis Using Active NPC Multilevel inverter in PV sourced sta...IRJET Journal
 
IRJET- Design and Implementaion of DC-DC Boost Converter using Output Voltage...
IRJET- Design and Implementaion of DC-DC Boost Converter using Output Voltage...IRJET- Design and Implementaion of DC-DC Boost Converter using Output Voltage...
IRJET- Design and Implementaion of DC-DC Boost Converter using Output Voltage...IRJET Journal
 
PC 3-fāžu UPS izvēles iespējas ražošanas uzņēmumu vajadzībām
PC 3-fāžu UPS izvēles iespējas ražošanas uzņēmumu vajadzībāmPC 3-fāžu UPS izvēles iespējas ražošanas uzņēmumu vajadzībām
PC 3-fāžu UPS izvēles iespējas ražošanas uzņēmumu vajadzībāmElektrumlv
 
Iaetsd design, engineerning and analysis
Iaetsd design, engineerning and analysisIaetsd design, engineerning and analysis
Iaetsd design, engineerning and analysisIaetsd Iaetsd
 
Session 08 design & safety overview
Session 08   design & safety overviewSession 08   design & safety overview
Session 08 design & safety overviewChirag Jain
 

Ähnlich wie Session 05 grid connected inverter (20)

Session 5 - Grid Connected Inverter.pptx
Session 5 - Grid Connected Inverter.pptxSession 5 - Grid Connected Inverter.pptx
Session 5 - Grid Connected Inverter.pptx
 
Photovoltaic Training Course - Module 1.2 choosing components
Photovoltaic Training Course - Module 1.2 choosing componentsPhotovoltaic Training Course - Module 1.2 choosing components
Photovoltaic Training Course - Module 1.2 choosing components
 
Grid Inverters
Grid InvertersGrid Inverters
Grid Inverters
 
Single Output 40W DC-DC Forward Converter for Space Application
Single Output 40W DC-DC Forward Converter for Space ApplicationSingle Output 40W DC-DC Forward Converter for Space Application
Single Output 40W DC-DC Forward Converter for Space Application
 
Abb pvs 100-tl
Abb pvs 100-tlAbb pvs 100-tl
Abb pvs 100-tl
 
DFAE_Energy_Dalian_2011.pptx
DFAE_Energy_Dalian_2011.pptxDFAE_Energy_Dalian_2011.pptx
DFAE_Energy_Dalian_2011.pptx
 
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
 
To know a microinverter powered by fsp
To know a microinverter powered by fspTo know a microinverter powered by fsp
To know a microinverter powered by fsp
 
Interactive inverters
Interactive invertersInteractive inverters
Interactive inverters
 
An Overview Of Agbami Fpso Electrical Power System
An Overview Of Agbami Fpso Electrical Power SystemAn Overview Of Agbami Fpso Electrical Power System
An Overview Of Agbami Fpso Electrical Power System
 
Huawei ups product and solution 02 (20140318)
Huawei ups product and solution 02 (20140318)Huawei ups product and solution 02 (20140318)
Huawei ups product and solution 02 (20140318)
 
TBEA INVERTER-CENTRAL-500KW,630KW,1MW -SOLAR
TBEA INVERTER-CENTRAL-500KW,630KW,1MW -SOLARTBEA INVERTER-CENTRAL-500KW,630KW,1MW -SOLAR
TBEA INVERTER-CENTRAL-500KW,630KW,1MW -SOLAR
 
Powersines presentation (lec)
Powersines presentation (lec)Powersines presentation (lec)
Powersines presentation (lec)
 
Powersines presentation (lec)
Powersines presentation (lec)Powersines presentation (lec)
Powersines presentation (lec)
 
Power Quality Analysis Using Active NPC Multilevel inverter in PV sourced sta...
Power Quality Analysis Using Active NPC Multilevel inverter in PV sourced sta...Power Quality Analysis Using Active NPC Multilevel inverter in PV sourced sta...
Power Quality Analysis Using Active NPC Multilevel inverter in PV sourced sta...
 
Power Quality Analysis Using Active NPC Multilevel inverter in PV sourced sta...
Power Quality Analysis Using Active NPC Multilevel inverter in PV sourced sta...Power Quality Analysis Using Active NPC Multilevel inverter in PV sourced sta...
Power Quality Analysis Using Active NPC Multilevel inverter in PV sourced sta...
 
IRJET- Design and Implementaion of DC-DC Boost Converter using Output Voltage...
IRJET- Design and Implementaion of DC-DC Boost Converter using Output Voltage...IRJET- Design and Implementaion of DC-DC Boost Converter using Output Voltage...
IRJET- Design and Implementaion of DC-DC Boost Converter using Output Voltage...
 
PC 3-fāžu UPS izvēles iespējas ražošanas uzņēmumu vajadzībām
PC 3-fāžu UPS izvēles iespējas ražošanas uzņēmumu vajadzībāmPC 3-fāžu UPS izvēles iespējas ražošanas uzņēmumu vajadzībām
PC 3-fāžu UPS izvēles iespējas ražošanas uzņēmumu vajadzībām
 
Iaetsd design, engineerning and analysis
Iaetsd design, engineerning and analysisIaetsd design, engineerning and analysis
Iaetsd design, engineerning and analysis
 
Session 08 design & safety overview
Session 08   design & safety overviewSession 08   design & safety overview
Session 08 design & safety overview
 

Mehr von Chirag Jain

quiz Solar PV Rooftop Training Entrepreneurship Development
quiz Solar PV Rooftop Training Entrepreneurship Developmentquiz Solar PV Rooftop Training Entrepreneurship Development
quiz Solar PV Rooftop Training Entrepreneurship DevelopmentChirag Jain
 
Session 09 spvrt business models
Session 09   spvrt business modelsSession 09   spvrt business models
Session 09 spvrt business modelsChirag Jain
 
Session 21 preparation of techno commercial report
Session 21   preparation of techno commercial reportSession 21   preparation of techno commercial report
Session 21 preparation of techno commercial reportChirag Jain
 
Session 20 interacting with the client
Session 20   interacting with the clientSession 20   interacting with the client
Session 20 interacting with the clientChirag Jain
 
Session 19 project performance evaluation Operation & Maintenance planning
Session 19   project performance evaluation Operation & Maintenance planningSession 19   project performance evaluation Operation & Maintenance planning
Session 19 project performance evaluation Operation & Maintenance planningChirag Jain
 
Session 18 tender preparation & evaluation
Session 18   tender preparation & evaluationSession 18   tender preparation & evaluation
Session 18 tender preparation & evaluationChirag Jain
 
Session 17 project management & monitoring
Session 17   project management & monitoringSession 17   project management & monitoring
Session 17 project management & monitoringChirag Jain
 
Session 16 contract structure & agreement
Session 16   contract structure & agreementSession 16   contract structure & agreement
Session 16 contract structure & agreementChirag Jain
 
Session 15 spvrt project financing
Session 15   spvrt project financingSession 15   spvrt project financing
Session 15 spvrt project financingChirag Jain
 
Session 14 market trends & business proposals
Session 14   market trends & business proposalsSession 14   market trends & business proposals
Session 14 market trends & business proposalsChirag Jain
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentivesChirag Jain
 
Session 12 project costing & economics
Session 12   project costing & economicsSession 12   project costing & economics
Session 12 project costing & economicsChirag Jain
 
Session 11 overview of simulation software
Session 11   overview of simulation softwareSession 11   overview of simulation software
Session 11 overview of simulation softwareChirag Jain
 
Session 10 grid interconnections & commissioning test procedures
Session 10   grid interconnections & commissioning test proceduresSession 10   grid interconnections & commissioning test procedures
Session 10 grid interconnections & commissioning test proceduresChirag Jain
 
Session 07 site assessment & planning
Session 07   site assessment & planningSession 07   site assessment & planning
Session 07 site assessment & planningChirag Jain
 
Session 06 balance of system components
Session 06   balance of system componentsSession 06   balance of system components
Session 06 balance of system componentsChirag Jain
 
Session 04 solar pv modules
Session 04   solar pv modulesSession 04   solar pv modules
Session 04 solar pv modulesChirag Jain
 
Session 03 solar pv rooftop technology overview
Session 03   solar pv rooftop technology overviewSession 03   solar pv rooftop technology overview
Session 03 solar pv rooftop technology overviewChirag Jain
 
Session 02 solar energy technologies
Session 02   solar energy technologiesSession 02   solar energy technologies
Session 02 solar energy technologiesChirag Jain
 
Session 01 Introduction to the course
Session 01   Introduction to the courseSession 01   Introduction to the course
Session 01 Introduction to the courseChirag Jain
 

Mehr von Chirag Jain (20)

quiz Solar PV Rooftop Training Entrepreneurship Development
quiz Solar PV Rooftop Training Entrepreneurship Developmentquiz Solar PV Rooftop Training Entrepreneurship Development
quiz Solar PV Rooftop Training Entrepreneurship Development
 
Session 09 spvrt business models
Session 09   spvrt business modelsSession 09   spvrt business models
Session 09 spvrt business models
 
Session 21 preparation of techno commercial report
Session 21   preparation of techno commercial reportSession 21   preparation of techno commercial report
Session 21 preparation of techno commercial report
 
Session 20 interacting with the client
Session 20   interacting with the clientSession 20   interacting with the client
Session 20 interacting with the client
 
Session 19 project performance evaluation Operation & Maintenance planning
Session 19   project performance evaluation Operation & Maintenance planningSession 19   project performance evaluation Operation & Maintenance planning
Session 19 project performance evaluation Operation & Maintenance planning
 
Session 18 tender preparation & evaluation
Session 18   tender preparation & evaluationSession 18   tender preparation & evaluation
Session 18 tender preparation & evaluation
 
Session 17 project management & monitoring
Session 17   project management & monitoringSession 17   project management & monitoring
Session 17 project management & monitoring
 
Session 16 contract structure & agreement
Session 16   contract structure & agreementSession 16   contract structure & agreement
Session 16 contract structure & agreement
 
Session 15 spvrt project financing
Session 15   spvrt project financingSession 15   spvrt project financing
Session 15 spvrt project financing
 
Session 14 market trends & business proposals
Session 14   market trends & business proposalsSession 14   market trends & business proposals
Session 14 market trends & business proposals
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentives
 
Session 12 project costing & economics
Session 12   project costing & economicsSession 12   project costing & economics
Session 12 project costing & economics
 
Session 11 overview of simulation software
Session 11   overview of simulation softwareSession 11   overview of simulation software
Session 11 overview of simulation software
 
Session 10 grid interconnections & commissioning test procedures
Session 10   grid interconnections & commissioning test proceduresSession 10   grid interconnections & commissioning test procedures
Session 10 grid interconnections & commissioning test procedures
 
Session 07 site assessment & planning
Session 07   site assessment & planningSession 07   site assessment & planning
Session 07 site assessment & planning
 
Session 06 balance of system components
Session 06   balance of system componentsSession 06   balance of system components
Session 06 balance of system components
 
Session 04 solar pv modules
Session 04   solar pv modulesSession 04   solar pv modules
Session 04 solar pv modules
 
Session 03 solar pv rooftop technology overview
Session 03   solar pv rooftop technology overviewSession 03   solar pv rooftop technology overview
Session 03 solar pv rooftop technology overview
 
Session 02 solar energy technologies
Session 02   solar energy technologiesSession 02   solar energy technologies
Session 02 solar energy technologies
 
Session 01 Introduction to the course
Session 01   Introduction to the courseSession 01   Introduction to the course
Session 01 Introduction to the course
 

Kürzlich hochgeladen

Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 

Kürzlich hochgeladen (20)

Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 

Session 05 grid connected inverter

  • 1. Partnership To Advance Clean Energy-Deployment (PACE-D) Technical Assistance Program Presented by USAID PACE-D TA Program Apr-18 Solar PV Rooftop Training Program For Entrepreneurs Session: Grid Connected Inverter
  • 2. Contents Function of the inverter in Solar PV Rooftop systems Types of inverter – standalone, grid connected and multi- mode Classification of grid connected inverter Inverter efficiency Selection of grid connected inverter
  • 3. Function of the Inverter in Solar PV Rooftop Systems  Convert DC to AC (Energy transformation)  Synchronises voltage to the grid  Finding Maximum Power Point (MPPT)  Monitoring Centre for Solar PV Rooftop system  Provide protection functions (AC and DC side protections)  Be safe, efficient and reliable in operation  Provide power quality i.e. no bad effects caused by inverter operation (Power regulation / Reactive power mode etc.)
  • 4. Standalone Inverter  Stand-alone inverters are typically manufactured to operate from a specific nominal battery voltage e.g. 12V, 24V, 48V or 120V DC  The system controller includes voltage regulator and MPPT
  • 5. Grid Connected Inverter  A grid-connected inverter is directly connected to the PV array  If the AC grid is not present, the inverter will simply not function IEC 62116 -: “Anti Islanding function ”
  • 6. CLASSIFICATION OF GRID CONNECTED INVERTER
  • 7. Classification of Grid Connected Inverter Grid Connected Inverter Based on use of Transformer Isolated Non Isolated Based on interface with SPVRT Array Micro Inverter String Inverter Multi String Inverter Central Inverter
  • 8. Classification of Grid Connected Inverter – Isolated v/s Non Isolated  Where there is at least simple separation between the input and output circuits (e.g. by means of a transformer with separate windings) it is categorized as an isolated inverter (IEC 62548) Isolated Inverter  Also known as Transformer less inverter  Inverter that does not have at least simple separation between the input and output circuits, is categorized as non-isolated inverter (IEC 62548) Non Isolated Inverter
  • 9. Micro Inverter  Each module connected one micro inverter  Connected in parallel  Power: 100W – 350W  Input: 20-40V DC  Output: 230V AC  Single phase  Higher cost in comparison to string inverter  Must comply with IEC 62109-2 Micro Inverters Grid
  • 10. String Inverter  Single or multiple strings connected to a single MPPT inverter  Power: 1kW – 30kW  Input: 150-350V DC  Output: 230V-415V AC  1- phase or 3-phase  Higher cost in comparison to central inverter  Must comply with IEC 62109-2 Single & multiple MPPT inverter
  • 11. Central Inverter  Multiple strings are connected to normally single MPPTs  Power: 30kW – 2MW  Input: 300-800V DC  Output: 400V AC  3-phase  Lower per W cost in comparison to string inverter  Must comply with IEC 62109-2 Central Inverter Grid
  • 12. Market Segmentation – Grid Tie Inverter (Capacity & Applications) Grid Tie Inverter (Capacity & Applictions) Central Inverters  Conventional & proven technology  Solution for large PV projects  Focus – centralized bulk power generation under central & state initiatives E.g. Multi Mega Watt Projects String Inverters  Well established technology  Solution for medium ground mounted and rooftop projects  Focus – captive consumption & net metering E.g. Private Residential / Commercial / SMEs Micro Inverters  Newly developed technology  Solution for small & medium sized PV plants  Focus – captive consumption at small scale E.g. Small systems, Rooftop Commercial Systems etc.
  • 13. Power Quality of Grid Connected Inverter  Central Electrical Authority of India (Technical Standards for Connectivity to the Grid) Regulators, 2007 specifies that the generating sources located near the load centers must have a power factor between 0.95 leading and 0.85 lagging  For sources located far from the load centers, the power factor should be maintained between 0.95 leading and 0.90 lagging  However many inverters have a power factor of 1  Central Electrical Authority of India (Technical Standards for Connectivity of the Distributed Generation Resources) Draft Regulations, 2012 specifies that the total harmonic distortion must not exceed 5% as specified in IEEE 519
  • 14. Inverter Efficiency – Effect of Input Power
  • 15. Inverter Efficiency – Effect of DC Voltage & Temperature  Lower DC string voltage leads to reduction in efficiency  Higher working temperatures reduces overall performance
  • 16. Inverter Efficiency – Various Scenarios IEC 61683 – Photovoltaic Systems – Power Conditioners – Procedure for measuring efficiency Maximum efficiency @ rated output Weighted average value of Efficiency Efficiency MPPT at all times Part loading – Efficiency @ rated output
  • 17. Selection of Grid Connected Inverter Supply & Logistics Balance of Systems (BoS) Requirements Ease in Design, Installation, Performance, Supervision & Control System Reliability & Other Technical Aspects
  • 18. Why is Assessment of PV Inverters most Essential Inverters are the most complex  Crucial for PV plant performance Accounts to approximately 8-14% of the overall installation cost  Other cost associated with technology selection  Selection significantly affects RoI Installation requirements  Supply and logistics - Special infrastructural requirements  Safety of personnel and product PV plant configuration  Site conditions are not same  Balance of System (BoS) composition changes with technology  Control & monitoring philosophy depends on technology limitations
  • 19. Why is Assessment of PV Inverters most Essential Design flexibilities  Ease in design thus installation  Performance monitoring & supervision System reliability – Depends on the Product Quality  Life of the product – Project life of 25 years (?)  Maintenance requirement - Skill labor requirement  Failure rate and replacement time – What is the warranty?  Spare part requirements  Actual cost of maintenance? Overall impact on energy generation and RoI
  • 20. GRID CONNECTED INVERTER SPECIFICATIONS & DATA SHEET
  • 21. INPUT DATA Fronius Symo 20.0-3-M Max. input current (Idc max1 / Idc max2) 33.0 A / 27.0 A Max. usable input current total (Idc max1 + Idc max2) 51.0 A Max.array short circuit current (MPP1 / MPP2) 49.5 A / 40.5 A Min. input voltage (Udc min) 200 V Feed-in start voltage (Udc start) 200 V Nominal input voltage (Udc,r) 600 V Max. input voltage (Udc max) 1,000 V MPP voltage range (Umpp min - Umpp max) 420 - 800 V Number of MPP trackers 2 Number of DC connections 3 + 3 Max. PV generator output (Pdc max) 30.0 kWpeak OUTPUT DATA AC nominal output (Pac,r) 20,000 W Max. output power 20,000 VA AC output current (Iac nom) 28.9 A Grid connection (voltage range) 3~NPE 400 V / 230 V or 3~NPE 380 V / 220 V (+20 % / -30 %) Frequency (frequency range) 50 Hz / 60 Hz (45 - 65 Hz) Total harmonic distortion 1.3 % Power factor (cos φac,r) 0 - 1 ind. / cap.
  • 22. GENERAL DATA Dimensions (height x width x depth) 725 x 510 x 225 mm Weight 43.4 kg Degree of protection IP 66 Protection class 1 Overvoltage category (DC / AC)1) 1 + 2 / 3 Night time consumption < 1 W Inverter design Transformerless Cooling Regulated air cooling Installation Indoor and outdoor installation Ambient temperature range -40°C to +60°C Permitted humidity 0 % to 100 % Max. altitude 2,000 m / 3,400 m (unrestricted / restricted voltage range) DC connection technology 6x DC+ and 6x DC- screw terminals 2.5 mm² - 16 mm² AC connection technology 5-pin AC screw terminals 2.5 mm² - 16 mm² * Exclusive technical details
  • 23. 23 Anurag Mishra Senior Clean Energy Specialist USAID/India Email: amishra@usaid.gov Disclaimer: This training material is made possible by the support of the American People through the United States Agency for International Development (USAID). The contents of this material are the sole responsibility of Nexant, Inc. and do not necessarily reflect the views of USAID or the United States Government. This material was prepared under Contract Number AID-386-C-12-00001.