Cost Reduction by QMS
Categories of Quality Costs
Conformance Non-Conformance
Quality Costs
AppraisalPrevention External failureInternal failure
FICCI CE
Cost of quality
Cost of quality = Cost of conformance + Cost of non-conformance
• Cost of conformance is the cost of providing products or services as
per the required standards. This can be termed as good amount
spent. (Prevention & Appraisal costs)
• Cost of non-conformance is the failure cost associated with a process
not being operated to the requirements. This can be termed as
unnecessary amount spent.( Internal & External failure costs)
Prevention Costs
 Prevention costs are associated with Tool design & Simulation, Equipment
Maintenance, Strategies for Die Care & HT process validation and planning
prior to actual operation in order to avoid the occurrence of defects.
 The emphasis is on the prevention of defects so as to reduce the probability of
occurrence of defective products. Prevention activities lead to reduction of
appraisal costs and both type of failures (Internal and external).The motto is
“Prevention rather than appraisal”.
Activities associated with Prevention costs
 7.1 Quality Planning – Determine Manufacturing process and
inputs required, Decide check points – Quality Plan / Process Plan
 7.2 Market research – Determine customer requirement
 7.2 Contract review
 7.3 Design review
 7.4 Supplier evaluation, selection, performance monitoring
 7.4 Purchasing specification - Clear communication
 7.5 Production Planning, Job Set up process, Correct Input
 7.6 Calibration
 8.2.4 Field trials
 Process capability review
 Design and manufacture of jigs and fixtures
 Preventive maintenance Quality training programs
FICCI CE
Should we try to reduce Prevention Costs
to
Bring down Cost of Quality ?
No
Why
Better take Preventive Actions to
reduce the Cost of Non-
Conformance
FICCI CE
Should we try to Increase Prevention Costs
To Improve Quality & Reduce Non-Conformance
Yes/No
Right approach would be to optimize
Prevention Costs
By Focusing on:
a) Quality Planning (7.1) –Horizontal deployment of actions while
preparing QUALITY PLAN / PROCESS PLAN of similar successful products .
d) Jigs & Fixture(7.1)-
1)Commonising non critical components of Jigs & Fixtures,
2)video shoot set up and eliminate waste operations.
b) Supplier Evaluation, Performance(7.4)- Upgrading, Educating
& Standardizing Supplier Base.
c) Calibration (7.6)- Usage based frequency, Replacement Strategy.
Appraisal costs
Appraisal costs are spent to detect defects to assure conformance to
quality standards. Appraisal cost activities sums up to the “cost of
checking if things are correct”. The appraisal costs are focused on the
discovery of defects rather than prevention of defects.
FICCI CE
How to Reduce Appraisal Costs?
7.4.2- Vendor Surveillance-
- Standardize Product/ Grade specific Machining/Raw material vendors based
on their Quality & Delivery Performance.
- Motivate standardized product/ Grade specific vendors by giving regular &
sustained long term business.
7.4.3- Incoming Material Inspection-
- Introduce self certification policy for suppliers by intensive education
training & support to improve their processes. Take Experts Help.
- Price incentive & business guarantee for self certified suppliers.
-Motivate & reward self certified suppliers at regular intervals.
8.2.2 & 8.2.4- Process Design & Product
Inspection-
-Design idiot proof process & controls. Validate all special processes e.g HT.
-Cover all critical processes by mistake proofing-Pokayoke
--Reduce 100% part inspection by validating & stabilizing Mfg. Processes
Activities associated with Appraisal costs
 8.2.4 Proto type measurement & testing
 7.4.2 Vendor surveillance
 7.4.3 Incoming material inspection
 8.2.2 Process Design /control
 8.2.4 Product Inspection
 7.6 Laboratory testing / measurement
 8.2.2 Quality audits.
Internal failure costs
Internal failure costs occurs when results of work fail to reach designated
quality standards , and are detected before transfer to the customer takes
place.
ZERO
Activities associated with Internal failure costs
 Design changes/ corrective action
 Scrap due to tool / process design
changes
 Excess inventory
 Rectification / disposition of purchased
raw material
 Rework/rejection in manufacturing
 Downgrading of end product
 Downtime of plant & machinery
 Trouble-shooting & investigation of
defects
FICCI CE
Is it possible to have zero internal failure cost??
NO
Strive to consistently reduce till it is minimized
to best industry practices
Design Changes/ Corrective Actions (7.3.3.2 & 7.3.5 & 7.3.6)
1) Conduct design simulations to validate die design, Validate HT process
for all new parts at development stage.
TO AVOID
a) Scrap cost due to design changes , b) Rework cost, c) set up cost
d) Inspection & re-inspection cost, e) HT rework & Retesting cost,
f) Opportunity Cost etc. etc.
But How?
2) Improve designs & HT processes upfront from lessons learnt & wrongs
done in designing, manufacturing & heat treatment of similar products &
similar material grade in past.
External failure costs
External failure costs occur when the product or service from a
process fails to reach designated quality standards , and is not
detected/ recogonised until informed by the customer.
Activities associated with External failure costs
 Processing / investigation of customer complaint
 Repair/replacement of sold goods
 Warranty claims
 Premium Freights due to delays associated with quality problems
 Loss of customer goodwill & sales.
FICCI CE
Is it possible to have zero external failure cost??
NO
Strive to consistently reduce till it is minimized
& close to best industry norms.
Processing/ Investigation of customer complaints (8.5.2 & 8.5.3)
1. Conduct thorough , sincere & honest root cause analysis fearlessly using
simple QC tools e.g. 3-legged , why-why analysis,
But How?
2. Arrive at achievable corrective & preventive actions
3. Ensure implementation of CAPA.
4. Measure effectiveness of CAPA by conducting Surprise Audits.
5. Standardize CAPA by modifying work instructions supported by pictorials
6. Train & motivate operating level persons to rigorously follow CAPA and
by appraising them the tangible results & benefits of CAPA.
FICCI CE
This Will have Direct Impact on
a. Repair/ Replacement of sold goods.
b. Warranty Claims.
↓
↓
c. Premium Freights. ↓
d. Customer good will & sales. ↑
Size of four categories of quality costs.
 The organizations which do not follow TQM, give less emphasis on
prevention and their main quality efforts are on appraisal with very little
control on internal and external failure costs.
 Various studies have shown that quality cost in manufacturing companies the
world over range from 20 % to 30 % of turnover and in the case of service
companies it can go up to 40 % as illustrated in graph on the next slide.
Size of various quality cost elements
Preventive
1%
Appraisal
4-6%
Internal
Failure
10-12%
External
Failure
10-15%
The total quality
costs 25-35 %
of turnover.
Qualitycostsin%ofsales
Impact of TQM on costs.
 TQM is primarily aimed to improve the quality of the product , higher
customer satisfaction and better working environment for the employees.
The most dramatic impact of TQM is on reduction of quality costs
which directly reflect in profitability in balance sheets .
 Results of TQM program followed in Xerox Corp is demonstrated.
Change in various elements of quality cost before and after launching
TQM by Xerox Corp is shown on the next slide.
Impact of TQM on costs.
prevention
Appraisal
Internal
Failure
Prevention
Appraisal
Internal
Failure
0
5
10
15
20
25
30
35
%ofsales
An example from Xerox Corp.
Before TQM After TQM
1-10-100 Rule
1
10
100
Rs
Rs
Rs
Rs
Rs
Prevention
Correction
Failure
Stages
FICCI CE
cost of quality
Traditionally recorded quality cost generally account for only 4 to
5 percent of sales which mainly comprise of cost of scrap, re-work
and warranty.
BUT IS IT ACTUALLY SO???
FICCI CE
Hidden costs of quality
There are additional costs of quality which are hidden and do not appear in
the account books of the company, as they are intangible and difficult to
measure. These additional costs could be as high as 20-25% of sales and
comprise of low conversion efficiency of materials, cost of resolving
customer problems, inadequate resource utilization, high inventory, long
cycle times, more set-up times, penalties due to late delivery and lost
customer loyalty and goodwill.
•Scrap
•Rework
•Warranty costs
Hidden Costs
Visible costs
• Excessive use of material
• High inventory
• Inadequate resource utilization
• Cost of redesign and re-inspection
• Cost of resolving customer problems
• Lost customers / Goodwill
Visible and hidden costs
• Conversion efficiency of materials
FICCI CE
10 Steps to reduce hidden costs.
 Identify Hidden Costs
 Measure Hidden Costs
 Appraise Impact of Hidden costs to CFT
 Explore solutions to reduce Hidden costs
 Get sanctions for investments if any
 Implement &Evaluate effectiveness of solutions
 Share the Impact with CFT
 Appraise tangible benefits to Top Management
 Identify new opportunities.
 Repeat the cycle
FICCI CE
Slide- 27
Cost of Poor Quality in Rupees.
Cost Of Poor Quality= [{Cost of Internal Rejection + Cost of External Rejections + QAAppraisal
Cost(wages of QA persons) + Expenses incurred on account of Travel to attend quality complaint + Cost of
prevention (cost incurred on calibration of instruments/equipments + cost of new instruments+ cost of repair
of instruments) + Opportunity cost.(cost of opportunity lost for making good forgings due to rejections
produced) + Rework/salvage cost + Transportation cost incurred for incoming rejection and replacement}÷
Total sales ] X 100
Month 1st
Month 2nd
Month 3rd
Month 4th
Month
Target for Internal Rejection <1.50% <1.50% <1.50% <1.50%
Actual Internal rejection 1.21% 1.22% 1.24% 1.20
Costs not included to
compute COPQ
Calibration Cost+ Opportunity
cost+ cost of RW at
hammer+Salvage cost by
machining or Grinding.
Opportunity cost+ Salvage
cost by Machining /
grinding+ Cost of RW at
hammer.
Opportunity cost+
Salvage cost by
machining or grinding.
Opportunity cost
Cost of Internal Rejection 4.84 Lacs 6.3 Lacs 7.75 Lacs 9.0 Lacs
Cost of Poor Quality
12.80 Lacs
(Air Freight-0.69 Lacs)
11 Lacs
(Air Freight-0.12 Lacs)
10.8 Lacs.
(Air Freight-0.12 Lacs)
10.5 Lacs
(Air Freight-0.10 Lacs)
Difference(∂) between
COPQ and cost of Internal
rejection
7.96 Lacs 5.3 Lacs 3.05 Lacs 1.5 Lacs
FICCI CE
Slide- 28
Cost of Poor Quality(COPQ) Calculation Sheet –of Forging Industry
Red Box- Focus Area to reduce COPQ
Sr. No. Cost Heads 1st Month 2nd Month 3rd Month 4th Month 5th Month 6th Month
1 Cost of Appraisal
a QA & QC salary 281534 285000 286500 283450
b
Cost of Calibration of measuring Equipments(
Dimensions+ Metallurgy)
247950 140230 98405 56490 0 0
A=a+b TOTAL SALE VALUE 529484 425230 384905.00 339940.00 #REF! #REF!
% =(A/G)100 % of A W.R.T. SALE VALUE 0.75% 0.60% 0.52% 0.43% #REF! #REF!
2 Internal Cost
c Sale Value of internal Scrap 484245 630243 775200 906500
b Recovery from scrap
d Cost of In-house Re-work Forge 0 41900 34900
e
Opportunity cost (cost of opportunity lost by
producing rejected parts i.e cost of lost shifts
to recover scrap parts
f
Cost incurred for salvaging by Machining /
grinding
0 0 0 24510 0 0
B=c+d+e+f TOTAL SALE VALUE 484245 630243 817100 965910 0 0
% of B W.R.T. SALE VALUE 0.68% 0.88% 1.11% 1.21% #DIV/0! #DIV/0!
3 External cost
f
Sale price of rejections received in plant &
Scrapped
154050 149900 150690 132740 0 0
g Sale price of parts scrapped at cust end 0 0 0 0 0 0
h
Cost incurred to travel to attend customer
complaint
5060 3600 2900 2500 0 0
i Cost Incurred for rework at customer end 35090 21860 22750 12450 0 0
j Debit Note Values( export + domestic) 285096 104906 37068 21654 0 0
C=f+g+h+i TOTAL SALE VALUE 479296 280266 213408 169344 0 0
% of C W.R.T. SALE VALUE 0.68% 0.39% 0.29% 0.21% #DIV/0! #DIV/0!
D= A+B+C SUB TOTAL 1493025 1335739 1415413 1475194 #REF! #REF!
E Recovery from scrap 212450 235650 334950 425090
F= D--E Final Cost for calculating COPQ 1280575 1100089 1080463 1050104
G SALE VALUE 70978000 71250000 73690000 79980000
5=F÷Gx100 COST OF POOR QUALITY(COPQ) 1.80% 1.87% 1.92% 1.84% #REF! #REF!
FICCI CE
Conclusion.
Cost Reduction with Systemic approach is simple
 Use Quality Management Systems to your advantage
OK is no longer OK
Race against time and strive to be the best
Be your own critic
Do not keep systems bound in manuals for audits
 Success Guaranteed
Thanks

Weitere ähnliche Inhalte

Was ist angesagt? (20)

Culinary R&D
Culinary R&DCulinary R&D
Culinary R&D
 
Quality control
Quality controlQuality control
Quality control
 
Quality Assurance Vs Quality Control
Quality Assurance Vs Quality ControlQuality Assurance Vs Quality Control
Quality Assurance Vs Quality Control
 
Critical Control Point (CCP): www.chefqtrainer.blogspot.com
Critical Control Point (CCP): www.chefqtrainer.blogspot.comCritical Control Point (CCP): www.chefqtrainer.blogspot.com
Critical Control Point (CCP): www.chefqtrainer.blogspot.com
 
Unit no 4 introduction of ham,bacon, gammon
Unit no 4 introduction of ham,bacon, gammonUnit no 4 introduction of ham,bacon, gammon
Unit no 4 introduction of ham,bacon, gammon
 
Chapter 14 sausages
Chapter 14 sausagesChapter 14 sausages
Chapter 14 sausages
 
Adulteration in meat
Adulteration in meatAdulteration in meat
Adulteration in meat
 
Use of wine in kitchen
Use of wine in kitchenUse of wine in kitchen
Use of wine in kitchen
 
Food Allergens 2014
Food Allergens 2014Food Allergens 2014
Food Allergens 2014
 
Addtives in Food
Addtives in FoodAddtives in Food
Addtives in Food
 
Wheat quality improvement in kenya final
Wheat quality improvement in kenya finalWheat quality improvement in kenya final
Wheat quality improvement in kenya final
 
Haccp The Total Story
Haccp The Total StoryHaccp The Total Story
Haccp The Total Story
 
Adulteration of Meat
Adulteration of MeatAdulteration of Meat
Adulteration of Meat
 
Halal internal audit checklist slides
Halal internal audit   checklist slidesHalal internal audit   checklist slides
Halal internal audit checklist slides
 
Usda vs fssai new
Usda vs fssai newUsda vs fssai new
Usda vs fssai new
 
Quality control
Quality controlQuality control
Quality control
 
Thai cuisine
Thai cuisineThai cuisine
Thai cuisine
 
Quality assurance and quality control
Quality assurance and quality controlQuality assurance and quality control
Quality assurance and quality control
 
Haccp
HaccpHaccp
Haccp
 
Quality control vs Quality assurance
Quality control vs Quality assuranceQuality control vs Quality assurance
Quality control vs Quality assurance
 

Andere mochten auch

Cost of quality concept and advantages
Cost of quality   concept and advantagesCost of quality   concept and advantages
Cost of quality concept and advantagesImran Jamil
 
Do end-users fit the informatics requirements?
Do end-users fit the informatics requirements?Do end-users fit the informatics requirements?
Do end-users fit the informatics requirements?John Trigg
 
Laboratory Integration John Trigg
Laboratory Integration  John TriggLaboratory Integration  John Trigg
Laboratory Integration John TriggJohn Trigg
 
Measuring instrument in science lab
Measuring instrument in science labMeasuring instrument in science lab
Measuring instrument in science labcsm5722
 
Quality and reliability in health care
Quality and reliability in health careQuality and reliability in health care
Quality and reliability in health careKiran Hanjar
 
Quality is a cost
Quality is a costQuality is a cost
Quality is a costbatch18
 
THE ROLE OF QA IN PHARMACEUTICALS
THE ROLE OF QA IN PHARMACEUTICALSTHE ROLE OF QA IN PHARMACEUTICALS
THE ROLE OF QA IN PHARMACEUTICALSKostas Skopelitis
 
Quality management in health care - nhi
Quality management in health care - nhi Quality management in health care - nhi
Quality management in health care - nhi Hoàng Lan
 
Qms kick off meeting ppt
Qms kick off meeting pptQms kick off meeting ppt
Qms kick off meeting pptANUPAM RAY
 
1 health care quality concepts
1 health care quality concepts 1 health care quality concepts
1 health care quality concepts Olaya El Ghariny
 
Handling an OOS in a QC Lab
Handling an OOS in a QC LabHandling an OOS in a QC Lab
Handling an OOS in a QC Labanezlin
 

Andere mochten auch (20)

Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Cost of quality concept and advantages
Cost of quality   concept and advantagesCost of quality   concept and advantages
Cost of quality concept and advantages
 
Do end-users fit the informatics requirements?
Do end-users fit the informatics requirements?Do end-users fit the informatics requirements?
Do end-users fit the informatics requirements?
 
Laboratory Integration John Trigg
Laboratory Integration  John TriggLaboratory Integration  John Trigg
Laboratory Integration John Trigg
 
Measuring instrument in science lab
Measuring instrument in science labMeasuring instrument in science lab
Measuring instrument in science lab
 
Labview final
Labview finalLabview final
Labview final
 
Quality in health care
Quality in health careQuality in health care
Quality in health care
 
Quality and reliability in health care
Quality and reliability in health careQuality and reliability in health care
Quality and reliability in health care
 
Quality is a cost
Quality is a costQuality is a cost
Quality is a cost
 
THE ROLE OF QA IN PHARMACEUTICALS
THE ROLE OF QA IN PHARMACEUTICALSTHE ROLE OF QA IN PHARMACEUTICALS
THE ROLE OF QA IN PHARMACEUTICALS
 
Quality management in health care - nhi
Quality management in health care - nhi Quality management in health care - nhi
Quality management in health care - nhi
 
Understanding Lab Instruments
Understanding Lab InstrumentsUnderstanding Lab Instruments
Understanding Lab Instruments
 
Cost of Quality
Cost of  QualityCost of  Quality
Cost of Quality
 
Cost of Quality
Cost of QualityCost of Quality
Cost of Quality
 
Cost Of Quality
Cost Of QualityCost Of Quality
Cost Of Quality
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
QUALITY & COST
QUALITY & COSTQUALITY & COST
QUALITY & COST
 
Qms kick off meeting ppt
Qms kick off meeting pptQms kick off meeting ppt
Qms kick off meeting ppt
 
1 health care quality concepts
1 health care quality concepts 1 health care quality concepts
1 health care quality concepts
 
Handling an OOS in a QC Lab
Handling an OOS in a QC LabHandling an OOS in a QC Lab
Handling an OOS in a QC Lab
 

Ähnlich wie Cost Reduction using QMS-1

Costofquality
Costofquality Costofquality
Costofquality VarunRao78
 
Theophilus Ato Fletcher COST OF QUALITY.pptx
Theophilus Ato Fletcher COST OF QUALITY.pptxTheophilus Ato Fletcher COST OF QUALITY.pptx
Theophilus Ato Fletcher COST OF QUALITY.pptxTHEOPHILUSATOFLETCHE
 
Costof quality
Costof qualityCostof quality
Costof qualityOmnex Inc.
 
Cof Qpresentation1
Cof Qpresentation1Cof Qpresentation1
Cof Qpresentation1tqmron
 
Cost of quality : CA Final : AMA Notes
Cost of quality : CA Final : AMA NotesCost of quality : CA Final : AMA Notes
Cost of quality : CA Final : AMA NotesSathyanarayan Acharya
 
Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control
Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control
Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control Yesica Adicondro
 
Impacts of the Cost of Quality Components on Business Execution and the Strat...
Impacts of the Cost of Quality Components on Business Execution and the Strat...Impacts of the Cost of Quality Components on Business Execution and the Strat...
Impacts of the Cost of Quality Components on Business Execution and the Strat...Dr. Amarjeet Singh
 

Ähnlich wie Cost Reduction using QMS-1 (20)

Cost Reduction.pdf
Cost Reduction.pdfCost Reduction.pdf
Cost Reduction.pdf
 
Costofquality
Costofquality Costofquality
Costofquality
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Theophilus Ato Fletcher COST OF QUALITY.pptx
Theophilus Ato Fletcher COST OF QUALITY.pptxTheophilus Ato Fletcher COST OF QUALITY.pptx
Theophilus Ato Fletcher COST OF QUALITY.pptx
 
Costof quality
Costof qualityCostof quality
Costof quality
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Cof Qpresentation1
Cof Qpresentation1Cof Qpresentation1
Cof Qpresentation1
 
olivier_a.pdf
olivier_a.pdfolivier_a.pdf
olivier_a.pdf
 
cost of quality
cost of qualitycost of quality
cost of quality
 
Assignment 2 of qrm
Assignment 2 of qrm Assignment 2 of qrm
Assignment 2 of qrm
 
Cost of quality : CA Final : AMA Notes
Cost of quality : CA Final : AMA NotesCost of quality : CA Final : AMA Notes
Cost of quality : CA Final : AMA Notes
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control
Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control
Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Quality cost
Quality costQuality cost
Quality cost
 
Impacts of the Cost of Quality Components on Business Execution and the Strat...
Impacts of the Cost of Quality Components on Business Execution and the Strat...Impacts of the Cost of Quality Components on Business Execution and the Strat...
Impacts of the Cost of Quality Components on Business Execution and the Strat...
 
Total quality management (tqm) final
Total quality management (tqm) finalTotal quality management (tqm) final
Total quality management (tqm) final
 
Process and product inspection
Process and product inspectionProcess and product inspection
Process and product inspection
 

Cost Reduction using QMS-1

  • 2. Categories of Quality Costs Conformance Non-Conformance Quality Costs AppraisalPrevention External failureInternal failure
  • 3. FICCI CE Cost of quality Cost of quality = Cost of conformance + Cost of non-conformance • Cost of conformance is the cost of providing products or services as per the required standards. This can be termed as good amount spent. (Prevention & Appraisal costs) • Cost of non-conformance is the failure cost associated with a process not being operated to the requirements. This can be termed as unnecessary amount spent.( Internal & External failure costs)
  • 4. Prevention Costs  Prevention costs are associated with Tool design & Simulation, Equipment Maintenance, Strategies for Die Care & HT process validation and planning prior to actual operation in order to avoid the occurrence of defects.  The emphasis is on the prevention of defects so as to reduce the probability of occurrence of defective products. Prevention activities lead to reduction of appraisal costs and both type of failures (Internal and external).The motto is “Prevention rather than appraisal”.
  • 5. Activities associated with Prevention costs  7.1 Quality Planning – Determine Manufacturing process and inputs required, Decide check points – Quality Plan / Process Plan  7.2 Market research – Determine customer requirement  7.2 Contract review  7.3 Design review  7.4 Supplier evaluation, selection, performance monitoring  7.4 Purchasing specification - Clear communication  7.5 Production Planning, Job Set up process, Correct Input  7.6 Calibration  8.2.4 Field trials  Process capability review  Design and manufacture of jigs and fixtures  Preventive maintenance Quality training programs
  • 6. FICCI CE Should we try to reduce Prevention Costs to Bring down Cost of Quality ? No Why Better take Preventive Actions to reduce the Cost of Non- Conformance
  • 7. FICCI CE Should we try to Increase Prevention Costs To Improve Quality & Reduce Non-Conformance Yes/No Right approach would be to optimize Prevention Costs By Focusing on: a) Quality Planning (7.1) –Horizontal deployment of actions while preparing QUALITY PLAN / PROCESS PLAN of similar successful products . d) Jigs & Fixture(7.1)- 1)Commonising non critical components of Jigs & Fixtures, 2)video shoot set up and eliminate waste operations. b) Supplier Evaluation, Performance(7.4)- Upgrading, Educating & Standardizing Supplier Base. c) Calibration (7.6)- Usage based frequency, Replacement Strategy.
  • 8. Appraisal costs Appraisal costs are spent to detect defects to assure conformance to quality standards. Appraisal cost activities sums up to the “cost of checking if things are correct”. The appraisal costs are focused on the discovery of defects rather than prevention of defects.
  • 9. FICCI CE How to Reduce Appraisal Costs? 7.4.2- Vendor Surveillance- - Standardize Product/ Grade specific Machining/Raw material vendors based on their Quality & Delivery Performance. - Motivate standardized product/ Grade specific vendors by giving regular & sustained long term business. 7.4.3- Incoming Material Inspection- - Introduce self certification policy for suppliers by intensive education training & support to improve their processes. Take Experts Help. - Price incentive & business guarantee for self certified suppliers. -Motivate & reward self certified suppliers at regular intervals. 8.2.2 & 8.2.4- Process Design & Product Inspection- -Design idiot proof process & controls. Validate all special processes e.g HT. -Cover all critical processes by mistake proofing-Pokayoke --Reduce 100% part inspection by validating & stabilizing Mfg. Processes
  • 10. Activities associated with Appraisal costs  8.2.4 Proto type measurement & testing  7.4.2 Vendor surveillance  7.4.3 Incoming material inspection  8.2.2 Process Design /control  8.2.4 Product Inspection  7.6 Laboratory testing / measurement  8.2.2 Quality audits.
  • 11. Internal failure costs Internal failure costs occurs when results of work fail to reach designated quality standards , and are detected before transfer to the customer takes place. ZERO
  • 12. Activities associated with Internal failure costs  Design changes/ corrective action  Scrap due to tool / process design changes  Excess inventory  Rectification / disposition of purchased raw material  Rework/rejection in manufacturing  Downgrading of end product  Downtime of plant & machinery  Trouble-shooting & investigation of defects
  • 13. FICCI CE Is it possible to have zero internal failure cost?? NO Strive to consistently reduce till it is minimized to best industry practices Design Changes/ Corrective Actions (7.3.3.2 & 7.3.5 & 7.3.6) 1) Conduct design simulations to validate die design, Validate HT process for all new parts at development stage. TO AVOID a) Scrap cost due to design changes , b) Rework cost, c) set up cost d) Inspection & re-inspection cost, e) HT rework & Retesting cost, f) Opportunity Cost etc. etc. But How? 2) Improve designs & HT processes upfront from lessons learnt & wrongs done in designing, manufacturing & heat treatment of similar products & similar material grade in past.
  • 14. External failure costs External failure costs occur when the product or service from a process fails to reach designated quality standards , and is not detected/ recogonised until informed by the customer.
  • 15. Activities associated with External failure costs  Processing / investigation of customer complaint  Repair/replacement of sold goods  Warranty claims  Premium Freights due to delays associated with quality problems  Loss of customer goodwill & sales.
  • 16. FICCI CE Is it possible to have zero external failure cost?? NO Strive to consistently reduce till it is minimized & close to best industry norms. Processing/ Investigation of customer complaints (8.5.2 & 8.5.3) 1. Conduct thorough , sincere & honest root cause analysis fearlessly using simple QC tools e.g. 3-legged , why-why analysis, But How? 2. Arrive at achievable corrective & preventive actions 3. Ensure implementation of CAPA. 4. Measure effectiveness of CAPA by conducting Surprise Audits. 5. Standardize CAPA by modifying work instructions supported by pictorials 6. Train & motivate operating level persons to rigorously follow CAPA and by appraising them the tangible results & benefits of CAPA.
  • 17. FICCI CE This Will have Direct Impact on a. Repair/ Replacement of sold goods. b. Warranty Claims. ↓ ↓ c. Premium Freights. ↓ d. Customer good will & sales. ↑
  • 18. Size of four categories of quality costs.  The organizations which do not follow TQM, give less emphasis on prevention and their main quality efforts are on appraisal with very little control on internal and external failure costs.  Various studies have shown that quality cost in manufacturing companies the world over range from 20 % to 30 % of turnover and in the case of service companies it can go up to 40 % as illustrated in graph on the next slide.
  • 19. Size of various quality cost elements Preventive 1% Appraisal 4-6% Internal Failure 10-12% External Failure 10-15% The total quality costs 25-35 % of turnover. Qualitycostsin%ofsales
  • 20. Impact of TQM on costs.  TQM is primarily aimed to improve the quality of the product , higher customer satisfaction and better working environment for the employees. The most dramatic impact of TQM is on reduction of quality costs which directly reflect in profitability in balance sheets .  Results of TQM program followed in Xerox Corp is demonstrated. Change in various elements of quality cost before and after launching TQM by Xerox Corp is shown on the next slide.
  • 21. Impact of TQM on costs. prevention Appraisal Internal Failure Prevention Appraisal Internal Failure 0 5 10 15 20 25 30 35 %ofsales An example from Xerox Corp. Before TQM After TQM
  • 23. FICCI CE cost of quality Traditionally recorded quality cost generally account for only 4 to 5 percent of sales which mainly comprise of cost of scrap, re-work and warranty. BUT IS IT ACTUALLY SO???
  • 24. FICCI CE Hidden costs of quality There are additional costs of quality which are hidden and do not appear in the account books of the company, as they are intangible and difficult to measure. These additional costs could be as high as 20-25% of sales and comprise of low conversion efficiency of materials, cost of resolving customer problems, inadequate resource utilization, high inventory, long cycle times, more set-up times, penalties due to late delivery and lost customer loyalty and goodwill.
  • 25. •Scrap •Rework •Warranty costs Hidden Costs Visible costs • Excessive use of material • High inventory • Inadequate resource utilization • Cost of redesign and re-inspection • Cost of resolving customer problems • Lost customers / Goodwill Visible and hidden costs • Conversion efficiency of materials
  • 26. FICCI CE 10 Steps to reduce hidden costs.  Identify Hidden Costs  Measure Hidden Costs  Appraise Impact of Hidden costs to CFT  Explore solutions to reduce Hidden costs  Get sanctions for investments if any  Implement &Evaluate effectiveness of solutions  Share the Impact with CFT  Appraise tangible benefits to Top Management  Identify new opportunities.  Repeat the cycle
  • 27. FICCI CE Slide- 27 Cost of Poor Quality in Rupees. Cost Of Poor Quality= [{Cost of Internal Rejection + Cost of External Rejections + QAAppraisal Cost(wages of QA persons) + Expenses incurred on account of Travel to attend quality complaint + Cost of prevention (cost incurred on calibration of instruments/equipments + cost of new instruments+ cost of repair of instruments) + Opportunity cost.(cost of opportunity lost for making good forgings due to rejections produced) + Rework/salvage cost + Transportation cost incurred for incoming rejection and replacement}÷ Total sales ] X 100 Month 1st Month 2nd Month 3rd Month 4th Month Target for Internal Rejection <1.50% <1.50% <1.50% <1.50% Actual Internal rejection 1.21% 1.22% 1.24% 1.20 Costs not included to compute COPQ Calibration Cost+ Opportunity cost+ cost of RW at hammer+Salvage cost by machining or Grinding. Opportunity cost+ Salvage cost by Machining / grinding+ Cost of RW at hammer. Opportunity cost+ Salvage cost by machining or grinding. Opportunity cost Cost of Internal Rejection 4.84 Lacs 6.3 Lacs 7.75 Lacs 9.0 Lacs Cost of Poor Quality 12.80 Lacs (Air Freight-0.69 Lacs) 11 Lacs (Air Freight-0.12 Lacs) 10.8 Lacs. (Air Freight-0.12 Lacs) 10.5 Lacs (Air Freight-0.10 Lacs) Difference(∂) between COPQ and cost of Internal rejection 7.96 Lacs 5.3 Lacs 3.05 Lacs 1.5 Lacs
  • 28. FICCI CE Slide- 28 Cost of Poor Quality(COPQ) Calculation Sheet –of Forging Industry Red Box- Focus Area to reduce COPQ Sr. No. Cost Heads 1st Month 2nd Month 3rd Month 4th Month 5th Month 6th Month 1 Cost of Appraisal a QA & QC salary 281534 285000 286500 283450 b Cost of Calibration of measuring Equipments( Dimensions+ Metallurgy) 247950 140230 98405 56490 0 0 A=a+b TOTAL SALE VALUE 529484 425230 384905.00 339940.00 #REF! #REF! % =(A/G)100 % of A W.R.T. SALE VALUE 0.75% 0.60% 0.52% 0.43% #REF! #REF! 2 Internal Cost c Sale Value of internal Scrap 484245 630243 775200 906500 b Recovery from scrap d Cost of In-house Re-work Forge 0 41900 34900 e Opportunity cost (cost of opportunity lost by producing rejected parts i.e cost of lost shifts to recover scrap parts f Cost incurred for salvaging by Machining / grinding 0 0 0 24510 0 0 B=c+d+e+f TOTAL SALE VALUE 484245 630243 817100 965910 0 0 % of B W.R.T. SALE VALUE 0.68% 0.88% 1.11% 1.21% #DIV/0! #DIV/0! 3 External cost f Sale price of rejections received in plant & Scrapped 154050 149900 150690 132740 0 0 g Sale price of parts scrapped at cust end 0 0 0 0 0 0 h Cost incurred to travel to attend customer complaint 5060 3600 2900 2500 0 0 i Cost Incurred for rework at customer end 35090 21860 22750 12450 0 0 j Debit Note Values( export + domestic) 285096 104906 37068 21654 0 0 C=f+g+h+i TOTAL SALE VALUE 479296 280266 213408 169344 0 0 % of C W.R.T. SALE VALUE 0.68% 0.39% 0.29% 0.21% #DIV/0! #DIV/0! D= A+B+C SUB TOTAL 1493025 1335739 1415413 1475194 #REF! #REF! E Recovery from scrap 212450 235650 334950 425090 F= D--E Final Cost for calculating COPQ 1280575 1100089 1080463 1050104 G SALE VALUE 70978000 71250000 73690000 79980000 5=F÷Gx100 COST OF POOR QUALITY(COPQ) 1.80% 1.87% 1.92% 1.84% #REF! #REF!
  • 29. FICCI CE Conclusion. Cost Reduction with Systemic approach is simple  Use Quality Management Systems to your advantage OK is no longer OK Race against time and strive to be the best Be your own critic Do not keep systems bound in manuals for audits  Success Guaranteed Thanks