ttrt        Redesigning the Montreal Letter Processing
AT A GLANCE:
                                Center
D/AP PROVIDED A COMPL ET E
REDESIGN OF T HE MONT REAL      SITUATION
LETT ER PROCESSING CENT ER AS   Canada Post Corporation (CPC) is undergoing a major modernization effort
PART OF CANADA POST’ MAJOR
                                to equip itself with new mail sequencing equipment. The deployment of the
MODERNIZATIONS EFFORT.
                                new equipment requires a complete redesign of major processing centers
                                with minimal building alterations and in a way that minimizes impacts on
CANADA POST TOOK OWNERSHIP
OF T HE CAPACITY MODEL
                                operations during the transition period.
DEV ELOPED BY D/AP AS PART OF
                                CPC retained the services of decision/analysis partners (d/ap) to help
THE PROJECT.
                                design a plant layout that would accommodate all operating equipment,
                                reduce non-value added mail movements, and minimize labor costs.

                                APPROACH
                                decision/analysis partners developed a comprehensive approach consisting
                                of the following major steps:

                                    Developed block layout diagrams to identify key work centers and
                                    dimension them based on projected workload

                                    Built a detailed simulation model of the operations to estimate capacity
                                    requirements (number and type of processing equipment, and labor
                                    requirements)

                                    Developed detailed work center designs to estimate spatial
                                    requirements at work centers to accommodate for staging areas

                                    Developed multiple layout scenarios to present alternative options.

                                    Evaluated each option in terms of impact on operation during transition,
                                    adherence to safety standards, material flows between work-centers,
                                    expansion and/or building renovation requirements, and related costs.
RESULTS
CPC adopted one of the layouts proposed, and has taken ownership of the
capacity model built by d/ap to evaluate impacts of varying operational
alternatives. The model is now being used by CPC as a planning tool to
estimate labor requirements.

Weitere ähnliche Inhalte

Andere mochten auch

Webinar 2013 performance measurement slideshare
Webinar 2013   performance measurement slideshareWebinar 2013   performance measurement slideshare
Webinar 2013 performance measurement slideshare
decision/analysis partners
 
2013 03 18 webinar 2013 combating revenue leakage
2013 03 18 webinar 2013   combating revenue leakage2013 03 18 webinar 2013   combating revenue leakage
2013 03 18 webinar 2013 combating revenue leakage
decision/analysis partners
 

Andere mochten auch (11)

Webinar 2013 performance measurement slideshare
Webinar 2013   performance measurement slideshareWebinar 2013   performance measurement slideshare
Webinar 2013 performance measurement slideshare
 
2013 03 18 webinar 2013 combating revenue leakage
2013 03 18 webinar 2013   combating revenue leakage2013 03 18 webinar 2013   combating revenue leakage
2013 03 18 webinar 2013 combating revenue leakage
 
Carrier owned delivery routes webinar final version
Carrier owned delivery routes webinar final versionCarrier owned delivery routes webinar final version
Carrier owned delivery routes webinar final version
 
The Adaptable Post
The Adaptable PostThe Adaptable Post
The Adaptable Post
 
2012 02 mer developing postal platforms
2012 02 mer developing postal platforms2012 02 mer developing postal platforms
2012 02 mer developing postal platforms
 
Webinar 2013 delivery sequencing vslideshare
Webinar 2013   delivery sequencing vslideshareWebinar 2013   delivery sequencing vslideshare
Webinar 2013 delivery sequencing vslideshare
 
Webinar 2013 delivery operations
Webinar 2013   delivery operationsWebinar 2013   delivery operations
Webinar 2013 delivery operations
 
The Concept of Postal Platform and Its Applications
The Concept of Postal Platform and Its ApplicationsThe Concept of Postal Platform and Its Applications
The Concept of Postal Platform and Its Applications
 
The Adaptable Post
The Adaptable PostThe Adaptable Post
The Adaptable Post
 
Webinar business models for parcels terminals
Webinar business models for parcels terminalsWebinar business models for parcels terminals
Webinar business models for parcels terminals
 
Dap webinar automation for emerging economies
Dap webinar   automation for emerging economiesDap webinar   automation for emerging economies
Dap webinar automation for emerging economies
 

Ähnlich wie Case study redesigning the montreal lpp

Meeting Deadlines of Scientific Workflows in Public Clouds with Tasks Replica...
Meeting Deadlines of Scientific Workflows in Public Clouds with Tasks Replica...Meeting Deadlines of Scientific Workflows in Public Clouds with Tasks Replica...
Meeting Deadlines of Scientific Workflows in Public Clouds with Tasks Replica...
AAKASH S
 
INTRODUCTION TO CAD,WORKSTATION & DESIGN PROCESS
INTRODUCTION TO CAD,WORKSTATION & DESIGN PROCESSINTRODUCTION TO CAD,WORKSTATION & DESIGN PROCESS
INTRODUCTION TO CAD,WORKSTATION & DESIGN PROCESS
Abhilash kk
 
AAI Notable Projects
AAI Notable ProjectsAAI Notable Projects
AAI Notable Projects
Srijita Mori
 

Ähnlich wie Case study redesigning the montreal lpp (20)

Cost and performance aware scheduling technique for cloud computing environment
Cost and performance aware scheduling technique for cloud  computing environmentCost and performance aware scheduling technique for cloud  computing environment
Cost and performance aware scheduling technique for cloud computing environment
 
Meeting Deadlines of Scientific Workflows in Public Clouds with Tasks Replica...
Meeting Deadlines of Scientific Workflows in Public Clouds with Tasks Replica...Meeting Deadlines of Scientific Workflows in Public Clouds with Tasks Replica...
Meeting Deadlines of Scientific Workflows in Public Clouds with Tasks Replica...
 
Ashwin_L&T
Ashwin_L&TAshwin_L&T
Ashwin_L&T
 
Anitha Vanga
Anitha VangaAnitha Vanga
Anitha Vanga
 
Energy-Efficient Task Scheduling in Cloud Environment
Energy-Efficient Task Scheduling in Cloud EnvironmentEnergy-Efficient Task Scheduling in Cloud Environment
Energy-Efficient Task Scheduling in Cloud Environment
 
Accelerating Digital Transformation: It's About Digital Enablement
Accelerating Digital Transformation:  It's About Digital EnablementAccelerating Digital Transformation:  It's About Digital Enablement
Accelerating Digital Transformation: It's About Digital Enablement
 
High Dimensionality Structures Selection for Efficient Economic Big data usin...
High Dimensionality Structures Selection for Efficient Economic Big data usin...High Dimensionality Structures Selection for Efficient Economic Big data usin...
High Dimensionality Structures Selection for Efficient Economic Big data usin...
 
IEEE 2014 JAVA CLOUD COMPUTING PROJECTS Transformation based monetary cost op...
IEEE 2014 JAVA CLOUD COMPUTING PROJECTS Transformation based monetary cost op...IEEE 2014 JAVA CLOUD COMPUTING PROJECTS Transformation based monetary cost op...
IEEE 2014 JAVA CLOUD COMPUTING PROJECTS Transformation based monetary cost op...
 
INTRODUCTION TO CAD,WORKSTATION & DESIGN PROCESS
INTRODUCTION TO CAD,WORKSTATION & DESIGN PROCESSINTRODUCTION TO CAD,WORKSTATION & DESIGN PROCESS
INTRODUCTION TO CAD,WORKSTATION & DESIGN PROCESS
 
Computer Aided Process Planning Using Neutral File Step for Rotational Parts
Computer Aided Process Planning Using Neutral File Step for Rotational PartsComputer Aided Process Planning Using Neutral File Step for Rotational Parts
Computer Aided Process Planning Using Neutral File Step for Rotational Parts
 
CAPP , JIT, FMS
CAPP , JIT, FMSCAPP , JIT, FMS
CAPP , JIT, FMS
 
AAI Notable Projects
AAI Notable ProjectsAAI Notable Projects
AAI Notable Projects
 
Proactive Scheduling in Cloud Computing
Proactive Scheduling in Cloud ComputingProactive Scheduling in Cloud Computing
Proactive Scheduling in Cloud Computing
 
DOC of Crank shaft
DOC of Crank shaftDOC of Crank shaft
DOC of Crank shaft
 
Nephele efficient parallel data processing in the cloud
Nephele  efficient parallel data processing in the cloudNephele  efficient parallel data processing in the cloud
Nephele efficient parallel data processing in the cloud
 
Best Practices for Data Center Migration Planning - August 2016 Monthly Webin...
Best Practices for Data Center Migration Planning - August 2016 Monthly Webin...Best Practices for Data Center Migration Planning - August 2016 Monthly Webin...
Best Practices for Data Center Migration Planning - August 2016 Monthly Webin...
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
IRJET- Time and Resource Efficient Task Scheduling in Cloud Computing Environ...
IRJET- Time and Resource Efficient Task Scheduling in Cloud Computing Environ...IRJET- Time and Resource Efficient Task Scheduling in Cloud Computing Environ...
IRJET- Time and Resource Efficient Task Scheduling in Cloud Computing Environ...
 
A HYPER-HEURISTIC METHOD FOR SCHEDULING THEJOBS IN CLOUD ENVIRONMENT
A HYPER-HEURISTIC METHOD FOR SCHEDULING THEJOBS IN CLOUD ENVIRONMENTA HYPER-HEURISTIC METHOD FOR SCHEDULING THEJOBS IN CLOUD ENVIRONMENT
A HYPER-HEURISTIC METHOD FOR SCHEDULING THEJOBS IN CLOUD ENVIRONMENT
 

Mehr von decision/analysis partners LLC

Mehr von decision/analysis partners LLC (15)

Postal Performance Measurement slideshare
Postal Performance Measurement slidesharePostal Performance Measurement slideshare
Postal Performance Measurement slideshare
 
Webinar 2013 delivery sequencing webinar
Webinar 2013   delivery sequencing webinarWebinar 2013   delivery sequencing webinar
Webinar 2013 delivery sequencing webinar
 
Combating Revenue Leakage 2013 03 18 webinar 2013
 Combating Revenue Leakage 2013 03 18 webinar 2013    Combating Revenue Leakage 2013 03 18 webinar 2013
Combating Revenue Leakage 2013 03 18 webinar 2013
 
Webinar 2013 the adaptable post
Webinar 2013   the adaptable postWebinar 2013   the adaptable post
Webinar 2013 the adaptable post
 
Plateforme et Solutions : Le Futur de la Poste
Plateforme et Solutions : Le Futur de la PostePlateforme et Solutions : Le Futur de la Poste
Plateforme et Solutions : Le Futur de la Poste
 
The Adaptable Post
The Adaptable PostThe Adaptable Post
The Adaptable Post
 
Case study ghana postal policy
Case study   ghana postal policyCase study   ghana postal policy
Case study ghana postal policy
 
Capability operations management
Capability   operations managementCapability   operations management
Capability operations management
 
Case study canada post transformation
Case study   canada post transformationCase study   canada post transformation
Case study canada post transformation
 
Capability network management
Capability   network managementCapability   network management
Capability network management
 
Capability labor planning scheduling
Capability   labor planning  schedulingCapability   labor planning  scheduling
Capability labor planning scheduling
 
Capability delivery management v2
Capability   delivery management v2Capability   delivery management v2
Capability delivery management v2
 
Capabilities postal industry
Capabilities   postal industryCapabilities   postal industry
Capabilities postal industry
 
Business intelligence for the postal operator
Business intelligence for the postal operatorBusiness intelligence for the postal operator
Business intelligence for the postal operator
 
Address systems and the future of the mail
Address systems and the future of the mailAddress systems and the future of the mail
Address systems and the future of the mail
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 

Case study redesigning the montreal lpp

  • 1. ttrt Redesigning the Montreal Letter Processing AT A GLANCE: Center D/AP PROVIDED A COMPL ET E REDESIGN OF T HE MONT REAL SITUATION LETT ER PROCESSING CENT ER AS Canada Post Corporation (CPC) is undergoing a major modernization effort PART OF CANADA POST’ MAJOR to equip itself with new mail sequencing equipment. The deployment of the MODERNIZATIONS EFFORT. new equipment requires a complete redesign of major processing centers with minimal building alterations and in a way that minimizes impacts on CANADA POST TOOK OWNERSHIP OF T HE CAPACITY MODEL operations during the transition period. DEV ELOPED BY D/AP AS PART OF CPC retained the services of decision/analysis partners (d/ap) to help THE PROJECT. design a plant layout that would accommodate all operating equipment, reduce non-value added mail movements, and minimize labor costs. APPROACH decision/analysis partners developed a comprehensive approach consisting of the following major steps: Developed block layout diagrams to identify key work centers and dimension them based on projected workload Built a detailed simulation model of the operations to estimate capacity requirements (number and type of processing equipment, and labor requirements) Developed detailed work center designs to estimate spatial requirements at work centers to accommodate for staging areas Developed multiple layout scenarios to present alternative options. Evaluated each option in terms of impact on operation during transition, adherence to safety standards, material flows between work-centers, expansion and/or building renovation requirements, and related costs.
  • 2. RESULTS CPC adopted one of the layouts proposed, and has taken ownership of the capacity model built by d/ap to evaluate impacts of varying operational alternatives. The model is now being used by CPC as a planning tool to estimate labor requirements.