SlideShare ist ein Scribd-Unternehmen logo
1 von 3
Downloaden Sie, um offline zu lesen
1
Summary Notes from the Leslie St. Walking Safety Audit, Nov. 20, 10–11 AM
Attending:
Approximately 18 people attended the tour including
• Ward 30 Councillor Paula Fletcher
• Ward 32 Councillor Elect Mary Margaret McMahon
• Residents on or near Leslie
• Cycling Pedestrian advocacy groups (South
Riverdale Bicycle User Group & SoDa Bikes)
• City of Toronto Office of the Public Realm –
Pedestrian Design
• City of Toronto – Transportation Services
• Toronto Transit Commission (Leslie St. Maintenance
Barns Project Managers and design consultants)
• South Riverdale Community Health Centre
Introductions
Paul Young, health promoter and landscape architect from the South Riverdale Community Health
Centre welcomed everyone and explained the objectives of the tour:
1. To see first hand how the area functions as a local destination for shopping and for
recreational trails.
2. To discuss safety issues and improvements on Leslie – changes that would
improve safety for pedestrians (especially seniors and children), people with
disabilities and cyclists.
Paul cited a few statistics about how people move around in Toronto.
For example:
- Approximately half the people in Toronto do not have access to a car (they take transit,
walk or bike)
- On average 6 – 7 pedestrians are hit daily in Toronto, ½ of all traffic related fatalities are
pedestrians (Toronto Star).
- Over ½ people in Toronto are cyclists, of these ½ of these use their bikes for practical
purposes (shopping, work, school, etc.) 2009 Toronto Cycling Survey.
Paul clarified that this tour is not meant to raise expectations about how the TTC may or may not
re-design Leslie if/when the new service tracks go in. It is meant to begin a conversation on how the
TTC, City and community can pool their collective resources and wisdom to ensure Leslie is made
physically safer for our most vulnerable road users.
The Tour Route
The group went from Lakeshore Blvd. up the west side of Leslie to Queen St. E. and back down the
east side of Leslie.
Issues
The intersections and driveway entries feel dangerous and dominated by car and truck movements.
As a pedestrian or cyclist one feels out of place and in danger of being hit.
Local foot and cycling traffic is mixed with regional car commuters and truck traffic without much
physical separation. The car-oriented retail compounds the problem with large parking lots and few
pedestrian / cycling routes.
2
Statistically intersections and driveway crossings are where pedestrians or cyclists are most likely
to be hit. All the intersections on Leslie south of Queen feel dangerous.
Cyclists (especially young people) often use the sidewalks - most commonly on weekends.
Leslie St. sidewalks are dark at night in certain places. The back-lotted town houses make the
sidewalk feel like a back lane, unwatched and unsafe.
Drivers do not seem to respect pedestrians or cyclists (esp. at crossing points).
Connections between the sidewalk and the
store entries are difficult on foot and especially
difficult in a wheelchair. For example, there is
no clear route for pedestrians to access
Loblaws from Eastern and Leslie. The Tim
Hortons entry for pedestrians is dangerous
and not accessible. There are few cycling
connections between the existing bike lanes
(on Eastern, Dundas and Lakeshore) to the
stores.
There is significant flooding at the entrance of
the building at north west corner of Eastern
and Leslie (covers the sidewalk and bottom
steps going to the building). This area needs
to be raised and / or catch basin re-located.
Possible solutions:
Could Leslie become a “green way”
connecting people to the lake – as
Vancouver is doing?
There were discussions about designing
the section between Eastern and Queen
with permanent parking and/or a widened
sidewalk. Car volumes would need to be
considered but peak commuter volumes
seem to use Eastern.
Some pedestrian signals could be
adjusted to provide better conditions for
pedestrians (i.e. at Loblaws / Price
Chopper intersection).
Bright pavement markings might help (“zebra crossings”) where sidewalks cross intersections.
Toronto Hydro will come out if requested, to do a review of
lighting levels.
Re-grade area at north west corner of Leslie and Eastern Ave.
There may be an opportunity (depending on Loblaw’s future
plans) to create a pedestrian and cycling connection along the
east side of Leslie between Lakeshore Blvd. and Eastern Ave.
This would require a discussion with the City of Toronto area
3
planner and the property owner / tenant about feasibility and cost/benefit.
Other opportunities may exist to improve conditions on Leslie (i.e. sidewalks, trees, lighting) if any
new developments are planned. This too would require a meeting with the area planner.
Perhaps car and truck traffic could be re-routed onto Lakeshore Blvd rather than Leslie.
Perhaps a shared pedestrian / cycling facility could be introduced along one side of Leslie.
Speed control: perhaps some
intersections could have raised
crossings (i.e. similar to Esplanade
and Market St.)
A contra-flow bike lane on Leslie north
of Queen could connect Eastern bike
lanes up to the Dundas E. bicycle
lanes.
Next Steps
Councillors Fletcher and McMahon
will post information from the tour and will collect comments from others interested in the issue.
Send ideas to:
Ward 32 Councillor Elect Mary Margaret McMahon – spargy@rogers.com
Ward 30 Councillor Paula Fletcher councillor_fletcher@toronto.ca
It was suggested that the TTC design team will correspond with participants through the Councillors
regarding design options.
It was suggested that the Councillors meet with the Area Planner(s) to review options for the
Loblaw’s site frontage (and any other new development opportunities)
End of Notes
Recorded by Paul Young, South Riverdale Community Health Centre pyoung@srchc.com (416)
461-1925 ext. 241
Cc Attendees, South East Toronto Bicycle Users Group, SoDa Bikes, Toronto Coalition for Active
Transportation

Weitere ähnliche Inhalte

Was ist angesagt?

Bike DFW
Bike DFWBike DFW
Bike DFW
fdperez1
 
Pwpb chattanooga
Pwpb chattanoogaPwpb chattanooga
Pwpb chattanooga
Sharon Roerty
 
Complete streets activists call presentation - part 1
Complete streets activists call presentation - part 1Complete streets activists call presentation - part 1
Complete streets activists call presentation - part 1
rachel_butler
 

Was ist angesagt? (20)

Bike Path Presentation
Bike Path PresentationBike Path Presentation
Bike Path Presentation
 
Complete streetsintro ar.leela immadisetty_alumni(auce architecture)
Complete streetsintro ar.leela immadisetty_alumni(auce architecture)Complete streetsintro ar.leela immadisetty_alumni(auce architecture)
Complete streetsintro ar.leela immadisetty_alumni(auce architecture)
 
Bike DFW
Bike DFWBike DFW
Bike DFW
 
Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...
Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...
Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...
 
Complete Streets Presentation
Complete Streets PresentationComplete Streets Presentation
Complete Streets Presentation
 
Bikes and buses
Bikes and busesBikes and buses
Bikes and buses
 
Roundabouts - Township Council Presentation January 19, 2009
Roundabouts - Township Council Presentation January 19, 2009Roundabouts - Township Council Presentation January 19, 2009
Roundabouts - Township Council Presentation January 19, 2009
 
Pwpb chattanooga
Pwpb chattanoogaPwpb chattanooga
Pwpb chattanooga
 
Rotary 2015 final 2
Rotary 2015 final 2Rotary 2015 final 2
Rotary 2015 final 2
 
Dan Burden Presentation
Dan Burden PresentationDan Burden Presentation
Dan Burden Presentation
 
Road Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic DevelopmentRoad Diet: Improving Safety, Livability, and Economic Development
Road Diet: Improving Safety, Livability, and Economic Development
 
Complete streets activists call presentation - part 1
Complete streets activists call presentation - part 1Complete streets activists call presentation - part 1
Complete streets activists call presentation - part 1
 
ThinkBike Workshops DC Recommendations
ThinkBike Workshops DC RecommendationsThinkBike Workshops DC Recommendations
ThinkBike Workshops DC Recommendations
 
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
 
December 8, 2020 BPAC Virtual Workshop
December 8, 2020 BPAC Virtual Workshop December 8, 2020 BPAC Virtual Workshop
December 8, 2020 BPAC Virtual Workshop
 
Roundabouts for Traffic Engineering ~ Athens GA
Roundabouts for Traffic Engineering ~ Athens GARoundabouts for Traffic Engineering ~ Athens GA
Roundabouts for Traffic Engineering ~ Athens GA
 
Uli hines student competition 2016
Uli hines student competition 2016Uli hines student competition 2016
Uli hines student competition 2016
 
SMART STEP Project: SE 8th Street & Brickell Avenue
SMART STEP Project: SE 8th Street & Brickell AvenueSMART STEP Project: SE 8th Street & Brickell Avenue
SMART STEP Project: SE 8th Street & Brickell Avenue
 
KAI - Modern Urban Roundabouts
KAI - Modern Urban RoundaboutsKAI - Modern Urban Roundabouts
KAI - Modern Urban Roundabouts
 
Presentation to Farrells By Finlay McNab for Sustrans
Presentation to Farrells By Finlay McNab for SustransPresentation to Farrells By Finlay McNab for Sustrans
Presentation to Farrells By Finlay McNab for Sustrans
 

Andere mochten auch

Rodriguez silvestri 11am_socialmediacampaign
Rodriguez silvestri 11am_socialmediacampaignRodriguez silvestri 11am_socialmediacampaign
Rodriguez silvestri 11am_socialmediacampaign
Dana Marie
 
Toronto Zoning Bylaw - Toronto Cyclists Union Amendment Submission
Toronto Zoning Bylaw - Toronto Cyclists Union Amendment SubmissionToronto Zoning Bylaw - Toronto Cyclists Union Amendment Submission
Toronto Zoning Bylaw - Toronto Cyclists Union Amendment Submission
bikingtoronto
 
Bike Month Pedal Ad 1
Bike Month Pedal Ad 1Bike Month Pedal Ad 1
Bike Month Pedal Ad 1
bikingtoronto
 
Bloor Danforth Bikeway RFP for EA
Bloor Danforth Bikeway RFP for EABloor Danforth Bikeway RFP for EA
Bloor Danforth Bikeway RFP for EA
bikingtoronto
 
Alliance for Biking and Walking 2010 Benchmarking Report Media Facts Sheet
Alliance for Biking and Walking 2010 Benchmarking Report Media Facts SheetAlliance for Biking and Walking 2010 Benchmarking Report Media Facts Sheet
Alliance for Biking and Walking 2010 Benchmarking Report Media Facts Sheet
bikingtoronto
 
Bicycling and Walking in the U.S. - 2007 Benchmarking Report
Bicycling and Walking in the U.S. - 2007 Benchmarking ReportBicycling and Walking in the U.S. - 2007 Benchmarking Report
Bicycling and Walking in the U.S. - 2007 Benchmarking Report
bikingtoronto
 

Andere mochten auch (6)

Rodriguez silvestri 11am_socialmediacampaign
Rodriguez silvestri 11am_socialmediacampaignRodriguez silvestri 11am_socialmediacampaign
Rodriguez silvestri 11am_socialmediacampaign
 
Toronto Zoning Bylaw - Toronto Cyclists Union Amendment Submission
Toronto Zoning Bylaw - Toronto Cyclists Union Amendment SubmissionToronto Zoning Bylaw - Toronto Cyclists Union Amendment Submission
Toronto Zoning Bylaw - Toronto Cyclists Union Amendment Submission
 
Bike Month Pedal Ad 1
Bike Month Pedal Ad 1Bike Month Pedal Ad 1
Bike Month Pedal Ad 1
 
Bloor Danforth Bikeway RFP for EA
Bloor Danforth Bikeway RFP for EABloor Danforth Bikeway RFP for EA
Bloor Danforth Bikeway RFP for EA
 
Alliance for Biking and Walking 2010 Benchmarking Report Media Facts Sheet
Alliance for Biking and Walking 2010 Benchmarking Report Media Facts SheetAlliance for Biking and Walking 2010 Benchmarking Report Media Facts Sheet
Alliance for Biking and Walking 2010 Benchmarking Report Media Facts Sheet
 
Bicycling and Walking in the U.S. - 2007 Benchmarking Report
Bicycling and Walking in the U.S. - 2007 Benchmarking ReportBicycling and Walking in the U.S. - 2007 Benchmarking Report
Bicycling and Walking in the U.S. - 2007 Benchmarking Report
 

Ähnlich wie Leslie safety tour nov 20 2010

Final recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DCFinal recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DC
NLandUSA
 
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Design South East
 
Roundabouts - May14 -PA Township News
Roundabouts - May14 -PA Township NewsRoundabouts - May14 -PA Township News
Roundabouts - May14 -PA Township News
Andy Duerr
 
Remove jcfo booklet
Remove jcfo bookletRemove jcfo booklet
Remove jcfo booklet
GardinerEast
 
Complete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric SnyderComplete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric Snyder
njbikeped
 
Remove jcfo boards
Remove jcfo boardsRemove jcfo boards
Remove jcfo boards
GardinerEast
 
Midtown Portland
Midtown PortlandMidtown Portland
Midtown Portland
John Dornoff
 

Ähnlich wie Leslie safety tour nov 20 2010 (20)

Final recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DCFinal recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DC
 
Deanhill Road LTN response
Deanhill Road LTN responseDeanhill Road LTN response
Deanhill Road LTN response
 
Nwep sfot presentation_nov_9_2010
Nwep sfot presentation_nov_9_2010Nwep sfot presentation_nov_9_2010
Nwep sfot presentation_nov_9_2010
 
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
Hurst Lane Place Workshop- Solihull Metropolitan Borough Council, 23.04.2013
 
North Beach Neighbors: Slow Streets Initiative Stakeholder Survey
North Beach Neighbors: Slow Streets Initiative Stakeholder SurveyNorth Beach Neighbors: Slow Streets Initiative Stakeholder Survey
North Beach Neighbors: Slow Streets Initiative Stakeholder Survey
 
Roundabouts - May14 -PA Township News
Roundabouts - May14 -PA Township NewsRoundabouts - May14 -PA Township News
Roundabouts - May14 -PA Township News
 
Remove jcfo booklet
Remove jcfo bookletRemove jcfo booklet
Remove jcfo booklet
 
Great streets
Great streetsGreat streets
Great streets
 
Complete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric SnyderComplete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric Snyder
 
Hastings Way Redevelopment by Jeremy Gragert

Hastings Way Redevelopment by Jeremy Gragert
Hastings Way Redevelopment by Jeremy Gragert

Hastings Way Redevelopment by Jeremy Gragert

 
Oakwood Avenue Bump-outs (panels)
Oakwood Avenue Bump-outs (panels)Oakwood Avenue Bump-outs (panels)
Oakwood Avenue Bump-outs (panels)
 
Oxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm Strategy
 
Ham United Group presentation
Ham United Group presentationHam United Group presentation
Ham United Group presentation
 
Remove jcfo boards
Remove jcfo boardsRemove jcfo boards
Remove jcfo boards
 
NACTO 2013
NACTO  2013NACTO  2013
NACTO 2013
 
Proposal Example- NEGEF
Proposal Example- NEGEFProposal Example- NEGEF
Proposal Example- NEGEF
 
Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014
 
Midtown Portland
Midtown PortlandMidtown Portland
Midtown Portland
 
The Tube
The Tube The Tube
The Tube
 
Removing Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a TimeRemoving Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a Time
 

Mehr von bikingtoronto

Cycling Committee May 14 2001
Cycling Committee   May 14 2001Cycling Committee   May 14 2001
Cycling Committee May 14 2001
bikingtoronto
 
Cycling Committee June 18 2001
Cycling Committee   June 18 2001Cycling Committee   June 18 2001
Cycling Committee June 18 2001
bikingtoronto
 
Cycling Committee July 16 2001
Cycling Committee   July 16 2001Cycling Committee   July 16 2001
Cycling Committee July 16 2001
bikingtoronto
 
Cycling Committee Apr 23 2001
Cycling Committee   Apr 23 2001Cycling Committee   Apr 23 2001
Cycling Committee Apr 23 2001
bikingtoronto
 
Cycling Committee Mar 19 2001
Cycling Committee   Mar 19 2001Cycling Committee   Mar 19 2001
Cycling Committee Mar 19 2001
bikingtoronto
 
Cycling Committee Feb 19 2001
Cycling Committee   Feb 19 2001Cycling Committee   Feb 19 2001
Cycling Committee Feb 19 2001
bikingtoronto
 
Bicycle Parking Guide
Bicycle Parking GuideBicycle Parking Guide
Bicycle Parking Guide
bikingtoronto
 

Mehr von bikingtoronto (7)

Cycling Committee May 14 2001
Cycling Committee   May 14 2001Cycling Committee   May 14 2001
Cycling Committee May 14 2001
 
Cycling Committee June 18 2001
Cycling Committee   June 18 2001Cycling Committee   June 18 2001
Cycling Committee June 18 2001
 
Cycling Committee July 16 2001
Cycling Committee   July 16 2001Cycling Committee   July 16 2001
Cycling Committee July 16 2001
 
Cycling Committee Apr 23 2001
Cycling Committee   Apr 23 2001Cycling Committee   Apr 23 2001
Cycling Committee Apr 23 2001
 
Cycling Committee Mar 19 2001
Cycling Committee   Mar 19 2001Cycling Committee   Mar 19 2001
Cycling Committee Mar 19 2001
 
Cycling Committee Feb 19 2001
Cycling Committee   Feb 19 2001Cycling Committee   Feb 19 2001
Cycling Committee Feb 19 2001
 
Bicycle Parking Guide
Bicycle Parking GuideBicycle Parking Guide
Bicycle Parking Guide
 

KĂźrzlich hochgeladen

Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Sheetaleventcompany
 

KĂźrzlich hochgeladen (20)

Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 

Leslie safety tour nov 20 2010

  • 1. 1 Summary Notes from the Leslie St. Walking Safety Audit, Nov. 20, 10–11 AM Attending: Approximately 18 people attended the tour including • Ward 30 Councillor Paula Fletcher • Ward 32 Councillor Elect Mary Margaret McMahon • Residents on or near Leslie • Cycling Pedestrian advocacy groups (South Riverdale Bicycle User Group & SoDa Bikes) • City of Toronto Office of the Public Realm – Pedestrian Design • City of Toronto – Transportation Services • Toronto Transit Commission (Leslie St. Maintenance Barns Project Managers and design consultants) • South Riverdale Community Health Centre Introductions Paul Young, health promoter and landscape architect from the South Riverdale Community Health Centre welcomed everyone and explained the objectives of the tour: 1. To see first hand how the area functions as a local destination for shopping and for recreational trails. 2. To discuss safety issues and improvements on Leslie – changes that would improve safety for pedestrians (especially seniors and children), people with disabilities and cyclists. Paul cited a few statistics about how people move around in Toronto. For example: - Approximately half the people in Toronto do not have access to a car (they take transit, walk or bike) - On average 6 – 7 pedestrians are hit daily in Toronto, ½ of all traffic related fatalities are pedestrians (Toronto Star). - Over ½ people in Toronto are cyclists, of these ½ of these use their bikes for practical purposes (shopping, work, school, etc.) 2009 Toronto Cycling Survey. Paul clarified that this tour is not meant to raise expectations about how the TTC may or may not re-design Leslie if/when the new service tracks go in. It is meant to begin a conversation on how the TTC, City and community can pool their collective resources and wisdom to ensure Leslie is made physically safer for our most vulnerable road users. The Tour Route The group went from Lakeshore Blvd. up the west side of Leslie to Queen St. E. and back down the east side of Leslie. Issues The intersections and driveway entries feel dangerous and dominated by car and truck movements. As a pedestrian or cyclist one feels out of place and in danger of being hit. Local foot and cycling traffic is mixed with regional car commuters and truck traffic without much physical separation. The car-oriented retail compounds the problem with large parking lots and few pedestrian / cycling routes.
  • 2. 2 Statistically intersections and driveway crossings are where pedestrians or cyclists are most likely to be hit. All the intersections on Leslie south of Queen feel dangerous. Cyclists (especially young people) often use the sidewalks - most commonly on weekends. Leslie St. sidewalks are dark at night in certain places. The back-lotted town houses make the sidewalk feel like a back lane, unwatched and unsafe. Drivers do not seem to respect pedestrians or cyclists (esp. at crossing points). Connections between the sidewalk and the store entries are difficult on foot and especially difficult in a wheelchair. For example, there is no clear route for pedestrians to access Loblaws from Eastern and Leslie. The Tim Hortons entry for pedestrians is dangerous and not accessible. There are few cycling connections between the existing bike lanes (on Eastern, Dundas and Lakeshore) to the stores. There is significant flooding at the entrance of the building at north west corner of Eastern and Leslie (covers the sidewalk and bottom steps going to the building). This area needs to be raised and / or catch basin re-located. Possible solutions: Could Leslie become a “green way” connecting people to the lake – as Vancouver is doing? There were discussions about designing the section between Eastern and Queen with permanent parking and/or a widened sidewalk. Car volumes would need to be considered but peak commuter volumes seem to use Eastern. Some pedestrian signals could be adjusted to provide better conditions for pedestrians (i.e. at Loblaws / Price Chopper intersection). Bright pavement markings might help (“zebra crossings”) where sidewalks cross intersections. Toronto Hydro will come out if requested, to do a review of lighting levels. Re-grade area at north west corner of Leslie and Eastern Ave. There may be an opportunity (depending on Loblaw’s future plans) to create a pedestrian and cycling connection along the east side of Leslie between Lakeshore Blvd. and Eastern Ave. This would require a discussion with the City of Toronto area
  • 3. 3 planner and the property owner / tenant about feasibility and cost/benefit. Other opportunities may exist to improve conditions on Leslie (i.e. sidewalks, trees, lighting) if any new developments are planned. This too would require a meeting with the area planner. Perhaps car and truck traffic could be re-routed onto Lakeshore Blvd rather than Leslie. Perhaps a shared pedestrian / cycling facility could be introduced along one side of Leslie. Speed control: perhaps some intersections could have raised crossings (i.e. similar to Esplanade and Market St.) A contra-flow bike lane on Leslie north of Queen could connect Eastern bike lanes up to the Dundas E. bicycle lanes. Next Steps Councillors Fletcher and McMahon will post information from the tour and will collect comments from others interested in the issue. Send ideas to: Ward 32 Councillor Elect Mary Margaret McMahon – spargy@rogers.com Ward 30 Councillor Paula Fletcher councillor_fletcher@toronto.ca It was suggested that the TTC design team will correspond with participants through the Councillors regarding design options. It was suggested that the Councillors meet with the Area Planner(s) to review options for the Loblaw’s site frontage (and any other new development opportunities) End of Notes Recorded by Paul Young, South Riverdale Community Health Centre pyoung@srchc.com (416) 461-1925 ext. 241 Cc Attendees, South East Toronto Bicycle Users Group, SoDa Bikes, Toronto Coalition for Active Transportation