2. Introduction to the Group
John Wood Group PLC
Servicing Energy Industries Worldwide
A Global Market Leader in:
• Engineering and Project Management for
Oil and Gas and Renewable Energy
Developments
• Field Operation and Maintenance
• Industrial Turbines
38,000 Operations in
$5.5bn sales
employees 50 countries
3. Engineering – Market Leading Positions
Structures & topsides Subsea solutions
• 40 years of unrivalled offshore expertise • LARGEST independent SUBSEA technology
• We have worked on group of its kind in the world
– 75% of GOM deepwater facilities • Engineered more than 500,000km of cables &
pipelines
– 30% of deepwater facilities worldwide
• Engineered, managed or appraised OVER
• We have engineered the WORLD’S DEEPEST HALF of all subsea development worldwide
– TLP - Magnolia 4,744’ • We have DESIGNED and PROJECT MANAGED
– SPAR – Perdido 7,800’ subsea developments in water depths up to
3,000 METRES
– Production platform – Independence Hub
Semi 7,920’ • Experienced working in HIGH ENERGY areas –
large waves, currents, cyclones, etc
• Involvement in access of 800 RENEWABLE
ENERGY projects to date
• Assessed OVER 60,000 MW of renewable
energy development internationally
Wood Group Renewables
4. Health, Safety & Environment
As expressed in our Vision for HSE Excellence,
as an integral part of our business we will
Maintain a healthy workplace
Prevent accidents
Minimise adverse environmental impact
Safety Cases*
7.1
5.8
4.6 4.2 3.9 3.33 3.26 2.94 2.49
2003 2004 2005 2006 2007 2008 2009 2010 2011
Oct
* Total Recordable Case Frequency per million man hours
5 “Maintaining the highest standards in safety across
all of our operations worldwide at all times is of paramount importance”
10. Project Management & Construction
Turbine and key component assessment and selection
EPCM (incl Installation Management)
Commissioning
Cost estimation & management
construction management
HSEQ
QA/QC
11
Wood Group Renewables
11. Marine Energy
Experienced in design for high energy environments
– Landfalls
– Cyclone areas
– Straits of Gibraltar
– Wave & Tidal projects
World leading geotechnical/rock interaction FE
capabilities
3D CFD seabed modelling capability to fully
understand fluid flow
World leading project experience
– Wave Hub – World’s largest wave farm
– Sound Of Islay – World’s first tidal array
Able to provide rock dump sizing & assessment of
cable protection methodologies
Installation & construction methodologies
12
Wood Group Renewables
12. Reasons for Rock Dumping
Stability Freespans
Flift
Vortices
Finertia wave
Wsub &
Fdrag current
Friction
Wood Group Renewables
13. Cable Protection
• Rock dump may be needed for
– On-bottom stability
– Freespan correction
– Cable protection
– Scour protection
– Protection/stabilisation
of structures
• Experience with
– Mattresses
– Uraduct
– Cast Iron Pipe
– Cable trenching tools
Wood Group Renewables
14. Rock Dump Design Experience
Severe Environments
• Experience in high energy environments
– Wave & tidal energy projects
– Cyclone conditions in Perth
– Straits of Gibraltar
– Landfalls throughout the world
Wood Group Renewables
15. Offshore Logistics
40 years experience in managing and
delivering offshore maintenance
campaigns
Utilise offshore knowledge to identify
the best methods for deploying
personnel to site
Offshore Interventions are expensive
and potentially dangerous
Planning and training are essential to
the success of offshore interventions
20
Wood Group Renewables
17. Relevant Experience
Project Description
Development of Wave Hub
Project scope
• Conceptual System Design
• Cost Estimating
• Detailed design of subsea cable,
connections, transformers, grid connection
• Procurement and fabrication management
• Project Management
• Construction Supervision
Achievements
Saved client ~£20m (60% of
budget) compared to initial bids
Wood Group Renewables
18. Relevant Experience
Project Description
Kawasaki Tidal Device Design
Project scope
•Conceptual design of foundation and
substructure
•Mooring Analysis
•Cost estimate
•Manufacture review
•Review of installation and O&M strategies
Achievements
Allowed Kawasaki to generate a
robust business case for their
design.
Wood Group Renewables
19. Case Studies – Wood Group Kenny
MORL Gamesa Technology RWE
Moray Firth Offshore Wind Farm Offshore WTG Safety and Risk Gwynt y Mor
Concept engineering of the HSE and lifecycle risk advice to Review and recommendation of
MORL 1.5GW Round 3 Zone support development of internal and external cable entry
including cable routing, Gamesa’s 5MW and 7MW systems for the proposed WTG
construction, ports and harbours, offshore wind turbines for UK structures including design,
access solutions and operations projects installation, maintenance, cable
& maintenance protection, material selection and
corrosion protection
28
Wood Group Renewables