2. POPULATION
1.3 million
(46% of Mongolia)
TERRITORY
4700 km2
(0.3% of
Mongolia)
GDP
₮ 8 784 666 mil.
(63% of Mongolia)
LOANS
84% of Mongolia
AUTOMOBILE
59% of Mongolia
SAVINGS
83% of
Mongolia
UB CITY STATISTICS
3.
INVESTMENT PROJECT
ARRANGEMENT /CITY BUDGET/
/million tugrug/
95 837,8
45%
48 393,9
23%
39 680,0
19%
10 577,0
5%
9 924,1
5% 6 502,6
3%
URBANIZATION, INFRACTRUCTURE BRANCH
SOCIAL BRANCH
AUTO ROAD BRANCH
TRANSPORTATION BRANCH
STATE SERVICE
LANDSCAPING, GREEN AREA
4.
2020 2030
It is projected that population of the capital city will be 50.3% of total population of the country in order to ensure national
security, water resource and keep balance of nature and ecology.
Population of Mongolia - 2020
3,162
UB region
1,534 /48,5%/
Other 4 region
1,628 /51,5%/
Population of Mongolia - 2030
3,501
UB region
1,763 /50,3%/
Other 4 region
1738 /49,7%/
UB REGIONAL POPULATION PROSPECT /thousands/
№ Name of the city, town
2010
/statistics/
Planned population
Population Households 2020 % 2030 %
1
Ulaanbaatar
/Metropolitan/
1058,129 264,311 1235,5 80,5 1400.0 79.4
2 Suburbs 103,656 30,106 298,5 19,4 363.0 20.6
Total population of capital
city
1161,785 294,416 1534,0 1763.0
UB REGIONAL POPULATION PROSPECT
4
5. Needs About 16 bilion USD for Implementation
of the Master Plan of Ulaanbaatar
ULAANBAATAR MASTER PLAN 2020
6.
Capital city budget MCUD /State budget/ MEDS /State budget/
Projects started in 2013 Projects to be done in 2014
Capital city budget
ULAANBAATAR MASTER PLAN 2020
7.
GER DISTRICT
Apartment area 5,857 Ha (21%)
61%
736.0
people
39%
470.6
people
Apartment buildings
Ger area
Ger area 21,823 Ha (79%)
7
8.
Яармаг
Шинэ төв
Сонсголон
Гурвалжин
Bayankhoshuu Selbe
Хотын хуучин
төв
Амгалан
Financed by ADB with a 1.5$ million technical assistance, investment program project for
developing subcenters Bayankhoshuu, Selbe is ready.
The mission of the program is to build a network in sub-centers that has economic
opportunity, housing and urban infrastructure services with healthy, safe, comfortable and
favorable condition
“ULAANBAATAR URBAN SERVICES AND GER AREAS
DEVELOPMENT INVESTMENT PROGRAM”
10.
RAILBUS
Will be open on June 6th
2014
300 million tugrug decided from the
Municipality.
NUMBER OF SITS: 136 PEOPLE
TOTAL NUMBER OF PASSENGERS:
350-400 PEOPLE
NUMBER OF TRAVELS:
AMONG 1 ROAD PER DAY 3 TIMES
AMONG DUAL ROAD PER DAY 6 TIMES
SPEED: 100KM/HOUR
TIME:
TOLGOIT-AMGALAN 47 MIN
AMGALAN-TOLGOIT 45 MIN
SERVICE WORK TEAM: 4 PEOPLE
12.
6.6 km:
Underground
6.2 km: Soaring 4.9 km: Soaring
Tootal length
17.7 km
• Establish a legal framework in relation to the construction of a subway in the city
of Ulaanbaatar
• In 2014, in preparation for construction of a subway in the city of Ulaanbaatar, will
conduct the work such as drafting a plan, detailed engineering studies,
assessment of environmental impact and determining the cost of the project.
ULAANBAATAR – METRO PROJECT
13.
WORK NOTE
1 “Ulaanbaatar New City Hall” project is implemented to build in 6th khoroo
of the Songinokhairkhan district, which general plan is approved by City
Council of Ulaanbaatar.
City council 7/29
decree, 2013
2 On June 7th, 2013, the tender for companies and enterprise that will complete the
construction was announced.
Batch Number
Redevelopment
of ger area
project-2013/8
3 The Mayor of Ulaanbaatar city ratified that “Halla Gonsol” company is
selected for the project from 5 companies.
Mayor’s A/761
th charge,
12/Aug/2013
4 The task force is established by Mayor’s 783th charge on August 19th,
2013.
Held 15 meetings
5 The task force worked and acquainted with the re-planning project in
Korea, agreed mutually about the type of financing, type of agreement,
energy efficient, environmental friendly and containing national patterns.
12/Sep/2013
6 The Mayor requested to Prime Minister Mr. N.Altankhuyag for supporting of
implementation the new administrative center of the city’s construction project.
By 01/788 official
letter and by
himself,
18/March/2014
7 Presented at a meeting of government and recognized by Government. 28/March/2014
THE PROJECT OF ULAANBAATAR
NEW CITY HALL
15.
“New complex of the cities administration:
Building of the City Consul of Ulaanbaatar
/6 floor/;
Building of the Center acceptance for the
citizen /2 floor/;
Governor office of the UB city, Subsidiary
agencies /20 floor/;
Sport hall /1 floor/ consists of these 4 basic
buildings.
For implementing this project from 9,2
hectare square planed building 13%, 57%
landscaping square, 30% road, parking place.
Total building square is 50,000м2 potentially
1429 officers can work here.
Building of the Center acceptance for the
citizen potentially consists of 100
kindergarten, at once can accept 200 people,
100 people can served by library.
Regarding the technology should contain
energy saving (eco-friendly), advanced smart
technology (intelligent building), veracious for
the public (openness, transparency), national
features style.
ABOUT THE
BUILDING
16.
Working title Halla Gonsol /dollars/
Construction 38,917,465
Land 6,827,625
Equipment 10,241,438
Electricity 10,525,922
Public tied house
operation
9,956,956
Sum 76,469,406
Drawing 2,294,082
Total 78,763,488
Construction value, cost
statement
17.
FINANCING STRUCTURE OF PROJECT
MUB Customer bank
Contractor bankHalla
Gonsol
Financing (Credit / Bond)
Collateral, Sponsion
Financing (non-project
company)
Monthly bill
(Monthly
payment
claims/IPC
approvals)
Letters of credit
or bonds (due
within 3 years
from the date of
commissioning)
18. Hui Doloon Hudag
is a beautiful green
valley where
Mongolians used to
celebrate its great
Summer Festival and
located 32 km
westward on the
main road to the
Western province
from UB central
Chingis Khan
square.
“Mongol Naadam Complex” situated in Hui Doloon
Hudag
19. The “Mongol Naadam Complex” plans to
construct the following buildings in its 13600
square m land.
20.
Construction works planned from 2014 to 2020
1. Arena for horse racing
2. Stadium
3. Open stadium for archery
4. Ankle bone shooting tent
5. Road along with horse race route
6. Ski and Snowboard camps
7. Complex for horse racing
8. Sport center for the capital city dwellers
9. Horse symbol
10. Archery symbol
11. Wrestler symbol
12. Car park
1
2
3
4
5
6
7
8
9
10
11
12
21.
STADIUM
40.000 capacity stadium
designed for football and
other mass sport events shall
take place. In future during
national Great Holiday
Naadam it will be major
arena for wrestling and other
sport and mass events.
22.
Arena for Horse Racing
VERSION 1 /DESIGN/ 200Х34Х24М SIZE 40.000 CAPACITY HALF OPEN ARENA, WITH
METAL AND CONCRETE COVER, ON THE LOWER FLOOR SERVICE CENTER, EXHIBITION
HALL, CONFERENCE HALL AND VIP ROOM.
23.
Complex for horse racing:
There will be built 40.000 seats
stadium with capacity to allow betting
through the internet.
In this stadium:
House for horse breeding
Service center
Shop for horse racing sport
Restaurant
24.
Open Stadium for Archery competitions:
On 3 square km land, will be built arena with capacity for 3000 viewers and 600 archery
sportsmen. There also will be mounted large tent with seats for 1000 spectators and where
simultaneously can compete 64 teams in ankle bone shooting.
25.
Ankle bone shooting tent
There also will be
mounted large tent for ankle
bone shooting competition for
1000 spectators and where
simultaneously can compete 64
teams in ankle bone shooting.
26.
Ski and Snowboard Camps
There is plan to construct skiing
center for international competitions on
100 square m land. It shall have capacity
to serve in one day for 3000 people. There
will be arena also for snowboarding and
other types of winter sports.
27.
МММмМ
Sport center for the capital city dwellers:
1. Office
2. Warehouse
3. Security
office
4. Hotel
5. Ger camp
6. Water slide
7. Conference
hall
8. Spa sauna
9. Play grounds
10. Green house
for flowers
warehouse Ger camp Play grounds Water slide
Hotel
Massage
Spa
Sauna
28.
10th khoroo of Khan-Uul district
Model project of Morindavaa area
Project
Action Plan of Governor and
Mayor of Ulaanbaatar city,
2013-2016
City goals for economic and
social 2014,
The Ulaanbaatar city urban
planning policy “ Master Plan “
up to 2020 ,
Action plan documents of the
development trend up to 2030,
City land management plan
2014,
On 30th May, 2013, the City
Council based on the №10/39th
resolution “Domestic demand
for defining the location of land
to citizens".
31.
HOUSING SUPPLY /2030/
Total of 215000
household People who can afford direct
payment
People who can afford mortgage
with advanced payment
People who live abroad
People without savings
-with permanent income
-rural residences
From total of 215 000 housing required household current statistic shows that
70% /140 000/ household will be involved in HOCK program.
33.
NORTH SIDE OF THE YARMAG SPORT COMPLEX
KHAN-UUL district, 16th khoroo /959 family, 3836 people/
34.
According the partial overall
planning nearly Buyant-Uhaa
scheduled consists of 9
buildings, 15 floors, one-two
entrances
Regarding the buildings all the
first floors and the buildings
grounded along the mean road
from first to third floors should
be used for service.
For the outside parking space
planned openly 300, inside 400
cars, totally provide 70% of the
family.
NORTH SIDE OF THE YARMAG SPORT COMPLEX
KHAN-UUL district, 16th khoroo /959 family, 3836 people/
35.
NORTH SIDE OF THE YARMAG SPORT COMPLEX
KHAN-UUL district, 16th khoroo /959 family, 3836 people/
Notes: 46% or 1.3 million of total population of the country live only in 0.3% of total land of the country. The reason is that remaining territory of the country lacks engineering infrastructure, jobs, schools and hospitals thus people have a tendency to move to UB.
Notes: Total population of the capital city (UB) is projected to increase to 2 million people if we don’t manage the mechanical growth through planning.
Notes:
MCUD = Ministry of Construction and Urban Development
MEDS = Ministry of Education, Culture and Science
Notes:
39% or 471k people live in apartment buildings while 61% or 736k people live in ger area, which means 22% more people live in gers than apartment. But ger area (79%) covers almost 4 times higher land than apartment area (21%). If people who live in ger areas move in to apartments as planned in UB Master Plan 2020, some of the issues such as traffic jam and air pollution will be reduced.