Quality Management
      Systems


 Introduction
       .
Questions we will cover today:
 • What is ISO 9001?
 • What does a company need to do to Register to
 ISO 9001?
 • What are the requirements?
 – Section 4 – General Requirements
 – Section 5 – Management Responsibility
 – Section 6 – Resource Management
 – Section 7 – Product Realization
 – Section 8 - Measurement, Analysis & Improvement
 • What are our next steps?
The Process Model
               Process Model
               Quality Management System(QMS)
                            Continual Improvement
  C                    Management Responsibilities                        C
  U                                                                       U
  S                                                                       S
  T   Resource Management                         Measurement, Analysis   T
  O                                               and Improvement         O
  M                                                                       M
  E                                                                       E
                            Product Realization                           R
  R
The Process Model
 This example of the process model is included in the
    standard.
   The five clauses are all found on the process model.
   Management Responsibility, Measurement Analysis
    and Improvement,
   Product Realization and Resource Management
    make a cycle.
   The most important input to this cycle is customer
    requirements.
   The output of the cycle is customer satisfaction and
    continual improvement
   of the quality system.
   The standard has been organized around this model
General Requirements
 The organization will establish, document,
 implement, maintain and continually improve a
 Quality Management System (QMS)
 – This is where we find the requirement to identify
 processes that need to be controlled, and
 determine how they interrelate
 – The organization must also determine how to
 control any outsourced processes
General Requirements
   This is where we find the requirement to:
   • identify processes that need to be controlled, and
   • determine how they interrelate.
   Steps that need to be taken are:
   •Identify the processes needed for the QMS
   •Determine the sequence and interaction of these processes
   •Determine criteria and methods required to ensure the effective
    operation and
   control of these processes
   •Ensure the availability of information necessary to support the
    operation and
   monitoring of these processes
   •Measure, monitor and analyze these processes and implement action
    necessary to
   achieve planned results and continual improvement
   This section does not address the documentation of the processes
Design and Development
 Your procedure must outline your system
 including:
 – Design and Development planning
 – Design and Development inputs
 – Design and Development outputs
 – Design and Development review
 – Design and Development verification
 – Design and Development validation
 – Control of Design and Development changes
Design and Development
   Your procedure will have a section for each of the items listed on the slide.
   You will need to state what your process is for each of these sections, and
   what your records are.
   For design, it is good to establish a process where the plan becomes the
   outline for the project. It will identify responsibilities, what the inputs are,
   what the timeline is, who needs to be involved in design review, guidelines
   for when to hold design review meetings, how the verification and validation
   will take place.
   Verification is checking to see if the design output meets design input.
   Validation is checking to see if the design performs what it was intended to.
Purchasing
   Purchasing Information
   – Purchasing documents need to identify all
   the requirements relevant to what you are
   purchasing. For example:
   • Quality requirements
   • Identification of the item: specifications,
   catalogue number or other ID
   • Any required class or grade of product
   • Quantities and delivery dates
Purchasing
 This clause refers to the information that you
  put on your PO or other
 purchase documents. The standard is more
  specific what quality
 requirements you put on, and asks for the
  following where appropriate:
 •Requirements for approval of product
 •Requirements for qualification of personnel
 •Quality Management Systems requirements
Improvement
 • Establish a corrective action procedure
 that includes:
 – Identifying nonconformities with the quality
 system, product, processes
 – Handling customer complaints
 – Identifying root cause, action to take to
 prevent reoccurrence
 – Implementing the action and following up
 to determine effectiveness of the action
 – Record results of corrective action
Purchasing
   Corrective action is for investigating problems that have occurred, and taking
   action to prevent reoccurrence.
   You must investigate root cause, what really made this happen? What can
   we do to prevent it from happening again?
   After you have implemented this idea, follow-up to make sure it worked. Is
   the problem still happening? Or has it been prevented from happening again.
   Record the problem, the root cause, the action taken, the effectiveness of
   the action, and the actual results of the corrective action.
   The results of the corrective action is what actually happened after the
   corrective or preventive action was implemented. Did the problem occur
   again? Were you able to see measurable improvement? If so, how much?
   What date did the problem disappear?
   Record the results that you observed when following up on the corrective
Next Steps
 • Determine timeline for implementation
 • Perform Gap Analysis Review how your
 existing quality system fits into ISO
 9001:2008 format
 • Put together an implementation plan
 and timeline
 • Identify a Registrar
Next Steps
 Each organization will have its own way to
  approach the implementation



Performing a gap analysis of
your current system versus the
requirements of
the Standard will give you a task
list to work from to plan your
implementation project.
Next Steps
 A good next step would be to identify and process
    map your key processes.
   The information you get from your Gap, combined
    with the process map and
   list of key processes should give you a good idea of
    what you will need to do
   to implement the standard. Then you can build a
    Gantt chart for the project,
   outlining the task you need to do and the documents
    you will need to get into
   place.

Weitere ähnliche Inhalte

Was ist angesagt?

An introduction-to-quality
An introduction-to-qualityAn introduction-to-quality
An introduction-to-quality
slenois
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
Mudassar Salman
 
Quality Management System PowerPoint Presentation Slide
Quality Management System PowerPoint Presentation Slide  Quality Management System PowerPoint Presentation Slide
Quality Management System PowerPoint Presentation Slide
SlideTeam
 

Was ist angesagt? (20)

Quality management systems (QMS)
Quality management systems (QMS)Quality management systems (QMS)
Quality management systems (QMS)
 
Introduction to ISO 9001-2008
Introduction to ISO 9001-2008Introduction to ISO 9001-2008
Introduction to ISO 9001-2008
 
An introduction-to-quality
An introduction-to-qualityAn introduction-to-quality
An introduction-to-quality
 
Quality management
Quality managementQuality management
Quality management
 
Quality management ppt
Quality management pptQuality management ppt
Quality management ppt
 
ISO 9001: 2008 QMS Awareness PPT
ISO 9001: 2008 QMS Awareness PPTISO 9001: 2008 QMS Awareness PPT
ISO 9001: 2008 QMS Awareness PPT
 
ISO 9001
ISO 9001ISO 9001
ISO 9001
 
TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM) TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
 
Quality Management System
Quality Management SystemQuality Management System
Quality Management System
 
ISO Certifications
ISO CertificationsISO Certifications
ISO Certifications
 
Quality Assurance and Quality Control
Quality Assurance and Quality ControlQuality Assurance and Quality Control
Quality Assurance and Quality Control
 
Six sigma ppt
Six sigma pptSix sigma ppt
Six sigma ppt
 
Quality control vs Quality assurance
Quality control vs Quality assuranceQuality control vs Quality assurance
Quality control vs Quality assurance
 
Iso 9001 2015 Understanding
Iso 9001 2015 Understanding Iso 9001 2015 Understanding
Iso 9001 2015 Understanding
 
Quality Management System PowerPoint Presentation Slide
Quality Management System PowerPoint Presentation Slide  Quality Management System PowerPoint Presentation Slide
Quality Management System PowerPoint Presentation Slide
 
Quality concepts
Quality conceptsQuality concepts
Quality concepts
 
Quality assurance ppt
Quality assurance pptQuality assurance ppt
Quality assurance ppt
 
Concept of quality assurance and TQM
Concept of quality assurance and TQMConcept of quality assurance and TQM
Concept of quality assurance and TQM
 
Benefits of ISO Certification
Benefits of ISO CertificationBenefits of ISO Certification
Benefits of ISO Certification
 

Andere mochten auch

Total quality management 1 .pps
Total quality management 1 .ppsTotal quality management 1 .pps
Total quality management 1 .pps
harshavardhanan
 

Andere mochten auch (13)

IND Application Process and Best Practices
IND Application Process and Best PracticesIND Application Process and Best Practices
IND Application Process and Best Practices
 
Good manufacturing practice (GMP)
Good manufacturing practice (GMP)Good manufacturing practice (GMP)
Good manufacturing practice (GMP)
 
Quality Management Systems Potential LLC Brochure
Quality Management Systems Potential LLC BrochureQuality Management Systems Potential LLC Brochure
Quality Management Systems Potential LLC Brochure
 
Supplier Selection
Supplier SelectionSupplier Selection
Supplier Selection
 
Quality & compliance excellence in pharmaceuticals
Quality & compliance excellence in pharmaceuticalsQuality & compliance excellence in pharmaceuticals
Quality & compliance excellence in pharmaceuticals
 
Reg & Qa GMP
Reg & Qa GMPReg & Qa GMP
Reg & Qa GMP
 
INDs: When Required and Contents
INDs: When Required and ContentsINDs: When Required and Contents
INDs: When Required and Contents
 
Quality management systems for medical, pharmaceutical,
Quality management systems for medical, pharmaceutical,Quality management systems for medical, pharmaceutical,
Quality management systems for medical, pharmaceutical,
 
Quality Management System of Coca-Cola
Quality Management System of Coca-ColaQuality Management System of Coca-Cola
Quality Management System of Coca-Cola
 
Quality Management Systems in different industries - from ISO 9001 to cGxP
Quality Management Systems in different industries - from ISO 9001 to cGxPQuality Management Systems in different industries - from ISO 9001 to cGxP
Quality Management Systems in different industries - from ISO 9001 to cGxP
 
Total quality management 1 .pps
Total quality management 1 .ppsTotal quality management 1 .pps
Total quality management 1 .pps
 
QUALITY ASSURANCE
QUALITY ASSURANCEQUALITY ASSURANCE
QUALITY ASSURANCE
 
Total quality management (tqm)ادارة الجودة الشاملة
Total quality management (tqm)ادارة الجودة الشاملةTotal quality management (tqm)ادارة الجودة الشاملة
Total quality management (tqm)ادارة الجودة الشاملة
 

Ähnlich wie Quality Management Systems

Business Excellence Through QMS
Business Excellence Through QMSBusiness Excellence Through QMS
Business Excellence Through QMS
Arefin Khan
 
Quality management system process
Quality management system processQuality management system process
Quality management system process
selinasimpson331
 
Implementation of quality management system
Implementation of quality management systemImplementation of quality management system
Implementation of quality management system
selinasimpson2301
 
Implementing quality management system
Implementing quality management systemImplementing quality management system
Implementing quality management system
selinasimpson341
 

Ähnlich wie Quality Management Systems (20)

Iso 9001 2008 qms
Iso 9001 2008 qmsIso 9001 2008 qms
Iso 9001 2008 qms
 
9001
90019001
9001
 
ISO 9001 Quality Management Systems: Implementation and Integration
ISO 9001 Quality Management Systems: Implementation and IntegrationISO 9001 Quality Management Systems: Implementation and Integration
ISO 9001 Quality Management Systems: Implementation and Integration
 
Project Quality - Chapter 1.pptx
Project Quality - Chapter 1.pptxProject Quality - Chapter 1.pptx
Project Quality - Chapter 1.pptx
 
qms.pptx
qms.pptxqms.pptx
qms.pptx
 
part Chem- industrial quality management
part Chem- industrial quality managementpart Chem- industrial quality management
part Chem- industrial quality management
 
Quality management
Quality managementQuality management
Quality management
 
Business Excellence Through QMS
Business Excellence Through QMSBusiness Excellence Through QMS
Business Excellence Through QMS
 
Quality management system process
Quality management system processQuality management system process
Quality management system process
 
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Implementation of quality management system
Implementation of quality management systemImplementation of quality management system
Implementation of quality management system
 
Implementing quality management system
Implementing quality management systemImplementing quality management system
Implementing quality management system
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Performance Measurement
Performance MeasurementPerformance Measurement
Performance Measurement
 
Qms for iso_9001_2015
Qms for iso_9001_2015Qms for iso_9001_2015
Qms for iso_9001_2015
 
ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
As9100c
As9100cAs9100c
As9100c
 

Mehr von The Bulgarian Association of Regional Development Agencies (BARDA)

Mehr von The Bulgarian Association of Regional Development Agencies (BARDA) (13)

Системи за управление на качеството
Системи за управление на качествотоСистеми за управление на качеството
Системи за управление на качеството
 
Системи за управление на качеството
Системи за управление на качествотоСистеми за управление на качеството
Системи за управление на качеството
 
Социален маркетинг
Социален маркетингСоциален маркетинг
Социален маркетинг
 
Финансиране на социални предприятия
Финансиране на социални предприятияФинансиране на социални предприятия
Финансиране на социални предприятия
 
СОЦИАЛНО СЧЕТОВОДСТВО И СОЦИАЛЕН ОДИТ
СОЦИАЛНО СЧЕТОВОДСТВО И СОЦИАЛЕН ОДИТСОЦИАЛНО СЧЕТОВОДСТВО И СОЦИАЛЕН ОДИТ
СОЦИАЛНО СЧЕТОВОДСТВО И СОЦИАЛЕН ОДИТ
 
Маркетингово проучване
Маркетингово проучванеМаркетингово проучване
Маркетингово проучване
 
Управление на отношенията с клиенти
Управление на отношенията с клиентиУправление на отношенията с клиенти
Управление на отношенията с клиенти
 
Капиталово бюджетиране
Капиталово бюджетиранеКапиталово бюджетиране
Капиталово бюджетиране
 
Development of Social Enterprises in Bulgaria
Development of Social Enterprises in BulgariaDevelopment of Social Enterprises in Bulgaria
Development of Social Enterprises in Bulgaria
 
INNOVATIVE SOCIAL ENTERPRISE DEVELOPMENT NETWORK (ISEDE-NET)
INNOVATIVE SOCIAL ENTERPRISE DEVELOPMENT NETWORK (ISEDE-NET)INNOVATIVE SOCIAL ENTERPRISE DEVELOPMENT NETWORK (ISEDE-NET)
INNOVATIVE SOCIAL ENTERPRISE DEVELOPMENT NETWORK (ISEDE-NET)
 
Проект ISEDE NET
Проект ISEDE NET Проект ISEDE NET
Проект ISEDE NET
 
УПРАВЛЕНИЕ НА ЧОВЕШКИТЕ РЕСУРСИ
УПРАВЛЕНИЕ НА ЧОВЕШКИТЕ РЕСУРСИУПРАВЛЕНИЕ НА ЧОВЕШКИТЕ РЕСУРСИ
УПРАВЛЕНИЕ НА ЧОВЕШКИТЕ РЕСУРСИ
 
Бизнес план - основни насоки
Бизнес план - основни насокиБизнес план - основни насоки
Бизнес план - основни насоки
 

Kürzlich hochgeladen

Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 

Kürzlich hochgeladen (20)

Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 

Quality Management Systems

  • 1. Quality Management Systems Introduction .
  • 2. Questions we will cover today:  • What is ISO 9001?  • What does a company need to do to Register to  ISO 9001?  • What are the requirements?  – Section 4 – General Requirements  – Section 5 – Management Responsibility  – Section 6 – Resource Management  – Section 7 – Product Realization  – Section 8 - Measurement, Analysis & Improvement  • What are our next steps?
  • 3. The Process Model Process Model Quality Management System(QMS) Continual Improvement C Management Responsibilities C U U S S T Resource Management Measurement, Analysis T O and Improvement O M M E E Product Realization R R
  • 4. The Process Model  This example of the process model is included in the standard.  The five clauses are all found on the process model.  Management Responsibility, Measurement Analysis and Improvement,  Product Realization and Resource Management make a cycle.  The most important input to this cycle is customer requirements.  The output of the cycle is customer satisfaction and continual improvement  of the quality system.  The standard has been organized around this model
  • 5. General Requirements  The organization will establish, document,  implement, maintain and continually improve a  Quality Management System (QMS)  – This is where we find the requirement to identify  processes that need to be controlled, and  determine how they interrelate  – The organization must also determine how to  control any outsourced processes
  • 6. General Requirements  This is where we find the requirement to:  • identify processes that need to be controlled, and  • determine how they interrelate.  Steps that need to be taken are:  •Identify the processes needed for the QMS  •Determine the sequence and interaction of these processes  •Determine criteria and methods required to ensure the effective operation and  control of these processes  •Ensure the availability of information necessary to support the operation and  monitoring of these processes  •Measure, monitor and analyze these processes and implement action necessary to  achieve planned results and continual improvement  This section does not address the documentation of the processes
  • 7. Design and Development  Your procedure must outline your system  including:  – Design and Development planning  – Design and Development inputs  – Design and Development outputs  – Design and Development review  – Design and Development verification  – Design and Development validation  – Control of Design and Development changes
  • 8. Design and Development  Your procedure will have a section for each of the items listed on the slide.  You will need to state what your process is for each of these sections, and  what your records are.  For design, it is good to establish a process where the plan becomes the  outline for the project. It will identify responsibilities, what the inputs are,  what the timeline is, who needs to be involved in design review, guidelines  for when to hold design review meetings, how the verification and validation  will take place.  Verification is checking to see if the design output meets design input.  Validation is checking to see if the design performs what it was intended to.
  • 9. Purchasing  Purchasing Information  – Purchasing documents need to identify all  the requirements relevant to what you are  purchasing. For example:  • Quality requirements  • Identification of the item: specifications,  catalogue number or other ID  • Any required class or grade of product  • Quantities and delivery dates
  • 10. Purchasing  This clause refers to the information that you put on your PO or other  purchase documents. The standard is more specific what quality  requirements you put on, and asks for the following where appropriate:  •Requirements for approval of product  •Requirements for qualification of personnel  •Quality Management Systems requirements
  • 11. Improvement  • Establish a corrective action procedure  that includes:  – Identifying nonconformities with the quality  system, product, processes  – Handling customer complaints  – Identifying root cause, action to take to  prevent reoccurrence  – Implementing the action and following up  to determine effectiveness of the action  – Record results of corrective action
  • 12. Purchasing  Corrective action is for investigating problems that have occurred, and taking  action to prevent reoccurrence.  You must investigate root cause, what really made this happen? What can  we do to prevent it from happening again?  After you have implemented this idea, follow-up to make sure it worked. Is  the problem still happening? Or has it been prevented from happening again.  Record the problem, the root cause, the action taken, the effectiveness of  the action, and the actual results of the corrective action.  The results of the corrective action is what actually happened after the  corrective or preventive action was implemented. Did the problem occur  again? Were you able to see measurable improvement? If so, how much?  What date did the problem disappear?  Record the results that you observed when following up on the corrective
  • 13. Next Steps  • Determine timeline for implementation  • Perform Gap Analysis Review how your  existing quality system fits into ISO  9001:2008 format  • Put together an implementation plan  and timeline  • Identify a Registrar
  • 14. Next Steps  Each organization will have its own way to approach the implementation Performing a gap analysis of your current system versus the requirements of the Standard will give you a task list to work from to plan your implementation project.
  • 15. Next Steps  A good next step would be to identify and process map your key processes.  The information you get from your Gap, combined with the process map and  list of key processes should give you a good idea of what you will need to do  to implement the standard. Then you can build a Gantt chart for the project,  outlining the task you need to do and the documents you will need to get into  place.