Dreadnought
• Continuous at Sea Deterrence
• 4 Submarines
• New Design
• New Reactor
• New Common Missile Compartment
• New Facilities- Barrow, Derby
• New tools- IT systems
• Support Infrastructure- Faslane,
Devonport
• Trainers- Faslane, USA
• National Endeavour
Programme Context: Megaprojects (£ Billions)
2
The Challenge
Trident debate: MPs vote to renew UK's nuclear deterrent system
• “It will be managed by a new delivery body for the procurement
and in-service support of all nuclear submarines. That will ensure
that, unlike in previous warship programmes, the submarines are
delivered on time and on budget.”
Michael Fallon MP, House of Commons, 18 July 2016 (Hansard)
Risk Context
•Dreadnought programme has considerable risk characterised by;
• Novelty: the design incorporates a new reactor, Common Missile Compartment, secondary
propulsion, hull design and weapon handling system.
• New Technology: With only limited prototyping opportunity, new technology will only be
proven on the first of class.
• Complexity: Delivery and operation of Dreadnought will be dependent on the integration of
the many different systems on the platform, and of the platform with the support
infrastructure at Clyde and Devonport and the firing chain.
• Pace: Dreadnought has to relieve the Vanguard Class on time to maintain Continuous At Sea
Deterrence - the pace is high.
• Programme management arrangements need to be designed to manage the risks inherent in
such a novel and complex submarine.
4
The Problem- Avoid this report by NAO/PAC
“Management of the … programme has been extraordinarily poor.
Oversight has been characterised by a failure to understand properly the
nature and enormity of the task, a failure to monitor and challenge
progress regularly and a failure to intervene when problems arose.
Senior managers only became aware of problems through ad hoc
reviews mostly conducted by external reviewers, as inadequate
management information and reporting arrangements had not alerted
them that things were amiss.” King (2013).
King, A., Crewe, I. The Blunders of Our Governments, One World, 2013.
Reality of Major Programmes
• “managers must work at the edge of chaos, where linear
systems begin to fail and non-linear systems begin to
dominate. It is at this edge that managers can continue to
exercise basic controls while hunting for new ideas and
systems to change the way projects are constructed”.
Singh and Singh (2002)
Resilient Themes
Robust
Requirements
Pragmatic
Processes
Adaptive
Organisations
Relational
Contracts
Care of the programme
community
Training and
Learning
Contingent
Approvals
Respect for
Quality
Mindful
Leadership
Relational Contracting
“...of significant duration….. Many individuals with individual
and collective poles of interest are involved in the relations.
Future cooperative behaviour is anticipated. The benefits of
the relation are to be shared rather than divided and
allocated….. Trouble is expected as a matter of course…. It
is an ongoing integration of behaviour in a largely
unforeseeable future.”
Macneill (2001)
The need for Collaboration in addition
to managing the transactions.
Design the Programme=Design the Submarine
• “The lesson is that we have to ensure that we give as much
attention to the design of the programme as we do to the
design of the artefact. We have to give as much attention to
the development of the programme plans as we do to the
working drawings and we have to have the power of
assessing the extent to which the.…facilities are likely to be
sufficient, and we have to ensure quality at every stage.”
Brown, 1983 quoting Sir Rowland Baker RCNC reflecting on
delivering the Dreadnought and Resolution Nuclear Submarine
Programmes in the 1960s
Resilient Organisations Act Mindfully
• Mindfulness - a rich awareness of discriminatory detail and the ability to organise to notice the unexpected, halt it, or
contain it or, if it breaks through containment, focus on resilience to restore system functioning
• Anticipation:
- Preoccupation with failure. They encourage reporting of errors when more options exist for rectifying them.
- Reluctance to simplify. They resist oversimplification by carefully categorising errors and encouraging dialogue
between teams with diverse backgrounds so errors are better understood.
- Sensitivity to operations. They record what is actually happening and not what is supposed to be happening.
• Containment:
- Maintaining capabilities for resilience. This includes the use of expert networks, an extensive action repertoire and
improvisation.
- Deferring to expertise. In response to unexpected events, the organisation can take advantage of shifting locations of
expertise within the organisation for easy access to expert resources.
• Culture:
- Reporting culture where people are prepared to report their errors and near misses which requires care in handling
blame.
- Just culture where people are encouraged to provide information but there is a clear boundary between acceptable
and unacceptable behaviour.
- Sources:
- Weick K., Sutcliffe, K., (2007), Managing the Unexpected. Resilient Performance in an Age of Uncertainty, John
Wiley and Sons, San Francisco, CA.
- Reason, J., (1997), Managing the Risks of Organizational Accidents, Ashgate, Aldershot, Hants, pp. 195.
Coping with Uncertainty
• Processes including project controls are essential but
insufficient.
• “Something one cannot understand constitutes a painful
void, a puncture, a permanent stimulus that insists on being
satisfied.” Primo Levi (1987)
• Truth emerges from arguments between friends- David
Hume
• Relationships to allow questioning, discussion, challenge
and support.
Use of Imperfect Data - Maieutic Machine
Macintosh and Quattrone (2010, pp. 330-334) define a maieutic
machine as a
machine “for producing knowledge by asking questions rather than
giving answers”.
Megaprojects and Wicked Problems
• Heifetz and Linsky “Leadership on the Line” (2002) emphasise the need to stand
back and reflect on the whole problem to develop the next action. They use the
metaphor of moving between the dance floor and the balcony. They also emphasis
the need to think politically and build relationships but regulate the tension to
maintain progress.
• Grint(2005) which shows that as the solutions to problems become less certain the
need forcollaborative compliance increases. The leader needs to enable more
questions through effective relationships.
Wicked Problems- No obvious solution.
• Stand Back,
• Reflect,
• Build Effective Relationships,
• Ask Questions
Problems don’t come with
labels. Problems often
contain elements that are
critical, tame and wicked.
Problem Solving
Learning
Black Box Thinking by
M Syed.
• Failing Fast to
Learn Fast
• Just Culture
• Humility
• Perseverance
Trusted to deliver excellence
© 2017 Rolls-Royce plc and/or its subsidiaries
The information in this document is the property of Rolls-Royce plc and/or its subsidiaries and may not be copied or communicated to a third party, or
used for any purpose other than that for which it is supplied without the express written consent of Rolls-Royce plc and/or its subsidiaries.
This information is given in good faith based upon the latest information available to Rolls-Royce plc and/or its subsidiaries, no warranty or representation
is given concerning such information, which must not be taken as establishing any contractual or other commitment binding upon Rolls-Royce plc and/or
its subsidiaries.
Dreadnought
Programme Management of a New Reactor Plant
• Complexity and Uncertainty
• In a Collaborative Environment
Trusted to deliver excellence
Rolls-Royce Proprietary Information
Rolls-Royce Submarines
Reactor Compartment –
RR is TA and sole supplier
Key Facts
• A naval reactor core is the size of a TRENT XWB engine, has
greater maximum power and does not need refuelling.
• The sound energy transmitted into the water is equivalent to a
modern car engine at idle.
• The plant has a similar rate of change of power to a gas turbine.
• Naval reactor plant must operate safely and meet naval shock
criteria whilst in a highly manoeuvrable submarine.
Propulsion system –
RR supplies key equipment as
OEM
The Challenge …..
18
RISK FACTORS
NOVELTY, NEW TECHNOLOGY,
COMPLEXITY & PACE
+ first all new project in a
generation and critical path activity
All new design of plant
New ways of working
New people & bigger team and
inexperienced leaders
Re-Capitalisation & Capability Development
Raynesway Engineering Labs
Atlantic House
Factory
Factory
Managing the Uncertainty
20
• Get Help and Value the Views of Others
• Set Out Our Way & Identity
• Focus on Project Framework and Stick to it
Project Framework
21
BAE Systems – Shipyard Whole Boat Design Framework
MoD Customer Governance and Approval
Agree the
Collaboration
Fundamentals
Division of
Responsibilities
Design management
Arrangements
Integrated Project
Teams - managing
master schedules
MoD Phase contracting with developing maturity
Rolls-Royce accept contracts
as uncertainty reduces
contract phased release
Trusted to deliver excellence
The Integrated Programme Management Team (IPMT)
Successor
IPMT
MoD
BAE
Systems
Rolls
Royce
Babcock
Marine
Electric
Boat
•Client
•Design Authority
•Supplier of GF*
•Submarine
•Design
•Build
•Commission
•WBTA
•Design the
support
•Support the
design
•CMC
•NSRP
•Design
•Make
•Commission
•NSRP TA
Enduring Collaboration from Sustained Focus
Key lessons Learnt – no surprise and no
magic
• SECURING AND KEEPING TO KEY DECISIONS & DO IT
COLLABORATIVELY
• BUILD A STABLE AND COMMITTED TEAM – KEY PEOPLE STAYED IN
KEY POSTS
• HEARTBEAT OF STRUCTURED REVIEWS + LEADERSHIP ‘IRON WILL’
• FOCUS ON THE WAR NOT THE BATTLES letting stuff go
• ORGANISATIONAL HUMILITY - KEEP LISTENING AND ACTING ON
EXPERT ADVICE … always seek and face up to the facts, be aware of your
weaknesses and act on these things
24
People and the whole enterprise matters
• A programme team needs the support of the whole business
and surrounding enterprise and mobilising that energy was
key in the latter stages of detailed design
• ENGAGEMENT KEY – working with unions and operations
management
• Do lots of little things that enable staff focus eg deferring non
critical activities identified by them, flex the holiday rules +
many late night whole team sessions fuelled by pizzas
25
Challenge Now – Design to Production
APQP framework
– Integrated Product and Production Readiness at Rolls- Royce
Long lead buys and
supply chain mobilisation
Develop the Integrated
project team to the next
stage for build
Achievements to Date – on time to the day (5yrs and £3bn+)
• Design Maturity
• Supply Chain
- Contractor Furnished Equipment (CFE)
- Government Furnished Equipment (GFE)
• Enablers
- Facilities
- IPDE
- Build processes
• Construction
• Programme Management
• Training solution
• In-service
- Support solution
Conclusion
• Project Controls are necessary but
insufficient
• Mindful Leadership
• Effective Relationships- high challenge
and support
• Questions to inform discussions
• Solutions emerge
• Culture - just and reporting and learning
• Planned uncertainty remains high
• Phased release of build will manage this
• The Project Organisation & Frameworks
will continue to evolve ….
Larciani Giovanni di Lorenzo
Allegoria della fortuna
Described as the allegory of
uncertainty in Uffizi Museum
Florence.
“It is what you don’t think about that gets
you”
• TV signals 'being blocked' by huge new BAE submarine
complex for building Trident replacement
• Defence contractors BAE are building the 135 foot high
extension at their Barrow shipyard, in Cumbria. Daily Mirror
Dec.2015.
This presentation was delivered
at an APM event
To find out more about
upcoming events please visit our
website www.apm.org.uk/events

Weitere ähnliche Inhalte

Was ist angesagt?

Dialogue program, 14th to 16th May 2014
Dialogue program, 14th to 16th May 2014Dialogue program, 14th to 16th May 2014
Dialogue program, 14th to 16th May 2014Clt-Services
 
John Murray, Presentation TCI2018 European Conference Sofia
John Murray, Presentation TCI2018 European Conference SofiaJohn Murray, Presentation TCI2018 European Conference Sofia
John Murray, Presentation TCI2018 European Conference SofiaTCI Network
 
Simply Irresistible: A Contemporary Approach to Membership
Simply Irresistible: A Contemporary Approach to MembershipSimply Irresistible: A Contemporary Approach to Membership
Simply Irresistible: A Contemporary Approach to MembershipRotary International
 
Programa Icsei 2017 . Ottawa. 30th annual International Congress for School ...
Programa Icsei 2017 . Ottawa.  30th annual International Congress for School ...Programa Icsei 2017 . Ottawa.  30th annual International Congress for School ...
Programa Icsei 2017 . Ottawa. 30th annual International Congress for School ...eraser Juan José Calderón
 
We're here... and our testers are there
We're here... and our testers are thereWe're here... and our testers are there
We're here... and our testers are thereMichele Playfair
 
Dynamic Collaboration For Distributed Teams
Dynamic Collaboration For Distributed TeamsDynamic Collaboration For Distributed Teams
Dynamic Collaboration For Distributed TeamsJudy Rees
 
Cairn symposium utah alliance for econ dev
Cairn symposium   utah alliance for econ devCairn symposium   utah alliance for econ dev
Cairn symposium utah alliance for econ devMarian Hein
 
Community Services Agency: TED
Community Services Agency: TEDCommunity Services Agency: TED
Community Services Agency: TEDembeth2014
 
TCILatinAmerica15 Pillars for Sustainable Cluster Ini2a2ves
TCILatinAmerica15 Pillars for Sustainable Cluster Ini2a2vesTCILatinAmerica15 Pillars for Sustainable Cluster Ini2a2ves
TCILatinAmerica15 Pillars for Sustainable Cluster Ini2a2vesTCI Network
 
Think & Do - Emerging Lessons
Think & Do - Emerging LessonsThink & Do - Emerging Lessons
Think & Do - Emerging LessonsNoel Hatch
 
Transforming an Offshore QA Team
Transforming an Offshore QA TeamTransforming an Offshore QA Team
Transforming an Offshore QA TeamMichele Playfair
 
Principles of the HelpAge International network
Principles of the HelpAge International networkPrinciples of the HelpAge International network
Principles of the HelpAge International networkHelpAge International
 
Improving Lives: Supporting Adults with Learning Disabilities conference
Improving Lives: Supporting Adults with Learning Disabilities conferenceImproving Lives: Supporting Adults with Learning Disabilities conference
Improving Lives: Supporting Adults with Learning Disabilities conferencemckenln
 
Glass House Community Led Design (Maja Luna Jorgensen) UK Network of Age-Frie...
Glass House Community Led Design (Maja Luna Jorgensen) UK Network of Age-Frie...Glass House Community Led Design (Maja Luna Jorgensen) UK Network of Age-Frie...
Glass House Community Led Design (Maja Luna Jorgensen) UK Network of Age-Frie...UK_UAC
 

Was ist angesagt? (15)

Dialogue program, 14th to 16th May 2014
Dialogue program, 14th to 16th May 2014Dialogue program, 14th to 16th May 2014
Dialogue program, 14th to 16th May 2014
 
GCP Models Show
GCP Models ShowGCP Models Show
GCP Models Show
 
John Murray, Presentation TCI2018 European Conference Sofia
John Murray, Presentation TCI2018 European Conference SofiaJohn Murray, Presentation TCI2018 European Conference Sofia
John Murray, Presentation TCI2018 European Conference Sofia
 
Simply Irresistible: A Contemporary Approach to Membership
Simply Irresistible: A Contemporary Approach to MembershipSimply Irresistible: A Contemporary Approach to Membership
Simply Irresistible: A Contemporary Approach to Membership
 
Programa Icsei 2017 . Ottawa. 30th annual International Congress for School ...
Programa Icsei 2017 . Ottawa.  30th annual International Congress for School ...Programa Icsei 2017 . Ottawa.  30th annual International Congress for School ...
Programa Icsei 2017 . Ottawa. 30th annual International Congress for School ...
 
We're here... and our testers are there
We're here... and our testers are thereWe're here... and our testers are there
We're here... and our testers are there
 
Dynamic Collaboration For Distributed Teams
Dynamic Collaboration For Distributed TeamsDynamic Collaboration For Distributed Teams
Dynamic Collaboration For Distributed Teams
 
Cairn symposium utah alliance for econ dev
Cairn symposium   utah alliance for econ devCairn symposium   utah alliance for econ dev
Cairn symposium utah alliance for econ dev
 
Community Services Agency: TED
Community Services Agency: TEDCommunity Services Agency: TED
Community Services Agency: TED
 
TCILatinAmerica15 Pillars for Sustainable Cluster Ini2a2ves
TCILatinAmerica15 Pillars for Sustainable Cluster Ini2a2vesTCILatinAmerica15 Pillars for Sustainable Cluster Ini2a2ves
TCILatinAmerica15 Pillars for Sustainable Cluster Ini2a2ves
 
Think & Do - Emerging Lessons
Think & Do - Emerging LessonsThink & Do - Emerging Lessons
Think & Do - Emerging Lessons
 
Transforming an Offshore QA Team
Transforming an Offshore QA TeamTransforming an Offshore QA Team
Transforming an Offshore QA Team
 
Principles of the HelpAge International network
Principles of the HelpAge International networkPrinciples of the HelpAge International network
Principles of the HelpAge International network
 
Improving Lives: Supporting Adults with Learning Disabilities conference
Improving Lives: Supporting Adults with Learning Disabilities conferenceImproving Lives: Supporting Adults with Learning Disabilities conference
Improving Lives: Supporting Adults with Learning Disabilities conference
 
Glass House Community Led Design (Maja Luna Jorgensen) UK Network of Age-Frie...
Glass House Community Led Design (Maja Luna Jorgensen) UK Network of Age-Frie...Glass House Community Led Design (Maja Luna Jorgensen) UK Network of Age-Frie...
Glass House Community Led Design (Maja Luna Jorgensen) UK Network of Age-Frie...
 

Andere mochten auch

Virtual Leadership, APM Programme Management SIG Conference 2017, 02 March 17...
Virtual Leadership, APM Programme Management SIG Conference 2017, 02 March 17...Virtual Leadership, APM Programme Management SIG Conference 2017, 02 March 17...
Virtual Leadership, APM Programme Management SIG Conference 2017, 02 March 17...Association for Project Management
 
Public and private sector collaboration, APM Programme Management SIG Confere...
Public and private sector collaboration, APM Programme Management SIG Confere...Public and private sector collaboration, APM Programme Management SIG Confere...
Public and private sector collaboration, APM Programme Management SIG Confere...Association for Project Management
 
Dounreay’s Nuclear Flask Loading Facility Project – A New Delivery Strategy, ...
Dounreay’s Nuclear Flask Loading Facility Project – A New Delivery Strategy, ...Dounreay’s Nuclear Flask Loading Facility Project – A New Delivery Strategy, ...
Dounreay’s Nuclear Flask Loading Facility Project – A New Delivery Strategy, ...Association for Project Management
 
Dealers in Hope - Programme Leaders in the 21st Century, APM Programme Manage...
Dealers in Hope - Programme Leaders in the 21st Century, APM Programme Manage...Dealers in Hope - Programme Leaders in the 21st Century, APM Programme Manage...
Dealers in Hope - Programme Leaders in the 21st Century, APM Programme Manage...Association for Project Management
 
Looking! and Thinking Ahead! APM Programme Management SIG Conference 2017, 0...
Looking! and Thinking Ahead!  APM Programme Management SIG Conference 2017, 0...Looking! and Thinking Ahead!  APM Programme Management SIG Conference 2017, 0...
Looking! and Thinking Ahead! APM Programme Management SIG Conference 2017, 0...Association for Project Management
 
War at the sea and the eastern front
War at the sea and the eastern frontWar at the sea and the eastern front
War at the sea and the eastern frontevansloth
 
Massagem shiatsu
Massagem shiatsuMassagem shiatsu
Massagem shiatsuAruna Yoga
 
DELOVE multi speed rabbit silicone vabrator
DELOVE multi speed rabbit silicone vabratorDELOVE multi speed rabbit silicone vabrator
DELOVE multi speed rabbit silicone vabratorDelovesex
 
Lockwood electronic timekeeping unit 4
Lockwood electronic timekeeping unit 4Lockwood electronic timekeeping unit 4
Lockwood electronic timekeeping unit 4shadowrider92
 
Es 2 tar färgen från putsen på fasaden
Es 2 tar färgen från putsen på fasadenEs 2 tar färgen från putsen på fasaden
Es 2 tar färgen från putsen på fasadenwww.takcare.se
 
03 - SG - Flyer - Executive Coaching - V7 - 15 Oct 2015
03 - SG - Flyer - Executive Coaching - V7 - 15 Oct 201503 - SG - Flyer - Executive Coaching - V7 - 15 Oct 2015
03 - SG - Flyer - Executive Coaching - V7 - 15 Oct 2015Lynne Brisdon
 
The need for why and the importance of how! Thames Valley Guildford 26th Feb...
The need for why and the importance of how!  Thames Valley Guildford 26th Feb...The need for why and the importance of how!  Thames Valley Guildford 26th Feb...
The need for why and the importance of how! Thames Valley Guildford 26th Feb...Association for Project Management
 
Nejlepší cache je žádná cache
Nejlepší cache je žádná cacheNejlepší cache je žádná cache
Nejlepší cache je žádná cacheFilip Procházka
 
Jon Vierk Welcome Home Wyoming Program Flyer
Jon Vierk Welcome Home Wyoming Program FlyerJon Vierk Welcome Home Wyoming Program Flyer
Jon Vierk Welcome Home Wyoming Program FlyerJON VIERK
 

Andere mochten auch (20)

Virtual Leadership, APM Programme Management SIG Conference 2017, 02 March 17...
Virtual Leadership, APM Programme Management SIG Conference 2017, 02 March 17...Virtual Leadership, APM Programme Management SIG Conference 2017, 02 March 17...
Virtual Leadership, APM Programme Management SIG Conference 2017, 02 March 17...
 
A Career in Project Management
A Career in Project ManagementA Career in Project Management
A Career in Project Management
 
Public and private sector collaboration, APM Programme Management SIG Confere...
Public and private sector collaboration, APM Programme Management SIG Confere...Public and private sector collaboration, APM Programme Management SIG Confere...
Public and private sector collaboration, APM Programme Management SIG Confere...
 
Dounreay’s Nuclear Flask Loading Facility Project – A New Delivery Strategy, ...
Dounreay’s Nuclear Flask Loading Facility Project – A New Delivery Strategy, ...Dounreay’s Nuclear Flask Loading Facility Project – A New Delivery Strategy, ...
Dounreay’s Nuclear Flask Loading Facility Project – A New Delivery Strategy, ...
 
Dealers in Hope - Programme Leaders in the 21st Century, APM Programme Manage...
Dealers in Hope - Programme Leaders in the 21st Century, APM Programme Manage...Dealers in Hope - Programme Leaders in the 21st Century, APM Programme Manage...
Dealers in Hope - Programme Leaders in the 21st Century, APM Programme Manage...
 
Looking! and Thinking Ahead! APM Programme Management SIG Conference 2017, 0...
Looking! and Thinking Ahead!  APM Programme Management SIG Conference 2017, 0...Looking! and Thinking Ahead!  APM Programme Management SIG Conference 2017, 0...
Looking! and Thinking Ahead! APM Programme Management SIG Conference 2017, 0...
 
Why project managers should be leading BIM, 6 March 2017
Why project managers should be leading BIM, 6 March 2017Why project managers should be leading BIM, 6 March 2017
Why project managers should be leading BIM, 6 March 2017
 
Getting the risk basics right, 30th November 2016
Getting the risk basics right, 30th November 2016Getting the risk basics right, 30th November 2016
Getting the risk basics right, 30th November 2016
 
War at the sea and the eastern front
War at the sea and the eastern frontWar at the sea and the eastern front
War at the sea and the eastern front
 
Tampo de mesa de vidro
Tampo de mesa de vidro Tampo de mesa de vidro
Tampo de mesa de vidro
 
Massagem shiatsu
Massagem shiatsuMassagem shiatsu
Massagem shiatsu
 
DELOVE multi speed rabbit silicone vabrator
DELOVE multi speed rabbit silicone vabratorDELOVE multi speed rabbit silicone vabrator
DELOVE multi speed rabbit silicone vabrator
 
Methodology: IT test
Methodology: IT testMethodology: IT test
Methodology: IT test
 
Lockwood electronic timekeeping unit 4
Lockwood electronic timekeeping unit 4Lockwood electronic timekeeping unit 4
Lockwood electronic timekeeping unit 4
 
Es 2 tar färgen från putsen på fasaden
Es 2 tar färgen från putsen på fasadenEs 2 tar färgen från putsen på fasaden
Es 2 tar färgen från putsen på fasaden
 
03 - SG - Flyer - Executive Coaching - V7 - 15 Oct 2015
03 - SG - Flyer - Executive Coaching - V7 - 15 Oct 201503 - SG - Flyer - Executive Coaching - V7 - 15 Oct 2015
03 - SG - Flyer - Executive Coaching - V7 - 15 Oct 2015
 
The need for why and the importance of how! Thames Valley Guildford 26th Feb...
The need for why and the importance of how!  Thames Valley Guildford 26th Feb...The need for why and the importance of how!  Thames Valley Guildford 26th Feb...
The need for why and the importance of how! Thames Valley Guildford 26th Feb...
 
Nejlepší cache je žádná cache
Nejlepší cache je žádná cacheNejlepší cache je žádná cache
Nejlepší cache je žádná cache
 
Jon Vierk Welcome Home Wyoming Program Flyer
Jon Vierk Welcome Home Wyoming Program FlyerJon Vierk Welcome Home Wyoming Program Flyer
Jon Vierk Welcome Home Wyoming Program Flyer
 
Data Collection and Diagnosis
Data Collection and DiagnosisData Collection and Diagnosis
Data Collection and Diagnosis
 

Ähnlich wie Building the Dreadnought, APM Programme Management SIG Conference 2017, 02 March 17, Derby

CMAD Group Workbook 2 Sustainable Development
CMAD Group Workbook 2 Sustainable DevelopmentCMAD Group Workbook 2 Sustainable Development
CMAD Group Workbook 2 Sustainable DevelopmentAlexander Doré
 
Webinar: A discussion of the findings and implications of Synthesis of CCS So...
Webinar: A discussion of the findings and implications of Synthesis of CCS So...Webinar: A discussion of the findings and implications of Synthesis of CCS So...
Webinar: A discussion of the findings and implications of Synthesis of CCS So...Global CCS Institute
 
Co-Design for innovation - Keynote address @ SSPA (Social Service Providers A...
Co-Design for innovation - Keynote address @ SSPA (Social Service Providers A...Co-Design for innovation - Keynote address @ SSPA (Social Service Providers A...
Co-Design for innovation - Keynote address @ SSPA (Social Service Providers A...Chris Jansen
 
Scaling agricultural innovation
Scaling agricultural innovationScaling agricultural innovation
Scaling agricultural innovationILRI
 
Agility from First Principles
Agility from First PrinciplesAgility from First Principles
Agility from First PrinciplesTathagat Varma
 
Making communications land - Pertinence and proximity webinar, 6 September 2023
Making communications land - Pertinence and proximity webinar, 6 September 2023Making communications land - Pertinence and proximity webinar, 6 September 2023
Making communications land - Pertinence and proximity webinar, 6 September 2023Association for Project Management
 
Knowledge Management - By Joe Hessmiller
Knowledge Management - By Joe HessmillerKnowledge Management - By Joe Hessmiller
Knowledge Management - By Joe HessmillerComputer Aid, Inc
 
Facilitating the Evolution of our Collective IQ
Facilitating the Evolution of our Collective IQ Facilitating the Evolution of our Collective IQ
Facilitating the Evolution of our Collective IQ Doug Engelbart Institute
 
Sharing knowledge effectively across boundaries, between projects and organis...
Sharing knowledge effectively across boundaries, between projects and organis...Sharing knowledge effectively across boundaries, between projects and organis...
Sharing knowledge effectively across boundaries, between projects and organis...Association for Project Management
 
Change management: science fiction or fantasy? Professor Tim Brady
Change management: science fiction or fantasy? Professor Tim BradyChange management: science fiction or fantasy? Professor Tim Brady
Change management: science fiction or fantasy? Professor Tim BradyAssociation for Project Management
 
ORION Workshop: XSEDE and Building a National/International Cyberinfrastructure
ORION Workshop: XSEDE and Building a National/International CyberinfrastructureORION Workshop: XSEDE and Building a National/International Cyberinfrastructure
ORION Workshop: XSEDE and Building a National/International CyberinfrastructureJohn Towns
 
Lean Kanban India 2016 | Confronting the Challenge of Scale: Making Ants the ...
Lean Kanban India 2016 | Confronting the Challenge of Scale: Making Ants the ...Lean Kanban India 2016 | Confronting the Challenge of Scale: Making Ants the ...
Lean Kanban India 2016 | Confronting the Challenge of Scale: Making Ants the ...LeanKanbanIndia
 
Moayer kapur sustainable advantage
Moayer kapur sustainable advantageMoayer kapur sustainable advantage
Moayer kapur sustainable advantageactkm
 
Carleton_Sustainability_Guide-3
Carleton_Sustainability_Guide-3Carleton_Sustainability_Guide-3
Carleton_Sustainability_Guide-3Sarah Lukins
 
The challenge of wicked problems in airlines engineering ahmad arafat
The challenge of wicked problems in airlines engineering   ahmad arafatThe challenge of wicked problems in airlines engineering   ahmad arafat
The challenge of wicked problems in airlines engineering ahmad arafatAhmad Arafat
 
SunFunder deck
SunFunder deckSunFunder deck
SunFunder decksunfunder
 

Ähnlich wie Building the Dreadnought, APM Programme Management SIG Conference 2017, 02 March 17, Derby (20)

CMAD Group Workbook 2 Sustainable Development
CMAD Group Workbook 2 Sustainable DevelopmentCMAD Group Workbook 2 Sustainable Development
CMAD Group Workbook 2 Sustainable Development
 
Webinar: A discussion of the findings and implications of Synthesis of CCS So...
Webinar: A discussion of the findings and implications of Synthesis of CCS So...Webinar: A discussion of the findings and implications of Synthesis of CCS So...
Webinar: A discussion of the findings and implications of Synthesis of CCS So...
 
Co-Design for innovation - Keynote address @ SSPA (Social Service Providers A...
Co-Design for innovation - Keynote address @ SSPA (Social Service Providers A...Co-Design for innovation - Keynote address @ SSPA (Social Service Providers A...
Co-Design for innovation - Keynote address @ SSPA (Social Service Providers A...
 
Scaling agricultural innovation
Scaling agricultural innovationScaling agricultural innovation
Scaling agricultural innovation
 
Agility from First Principles
Agility from First PrinciplesAgility from First Principles
Agility from First Principles
 
Making communications land - Pertinence and proximity webinar, 6 September 2023
Making communications land - Pertinence and proximity webinar, 6 September 2023Making communications land - Pertinence and proximity webinar, 6 September 2023
Making communications land - Pertinence and proximity webinar, 6 September 2023
 
Knowledge Management - By Joe Hessmiller
Knowledge Management - By Joe HessmillerKnowledge Management - By Joe Hessmiller
Knowledge Management - By Joe Hessmiller
 
Quality, requirements and success webinar, 6 March 2019
Quality, requirements and success webinar, 6 March 2019Quality, requirements and success webinar, 6 March 2019
Quality, requirements and success webinar, 6 March 2019
 
ebbf25 secondmuse what have we learnt about co creating prosperity?
ebbf25 secondmuse what have we learnt about co creating prosperity?ebbf25 secondmuse what have we learnt about co creating prosperity?
ebbf25 secondmuse what have we learnt about co creating prosperity?
 
Facilitating the Evolution of our Collective IQ
Facilitating the Evolution of our Collective IQ Facilitating the Evolution of our Collective IQ
Facilitating the Evolution of our Collective IQ
 
Sharing knowledge effectively across boundaries, between projects and organis...
Sharing knowledge effectively across boundaries, between projects and organis...Sharing knowledge effectively across boundaries, between projects and organis...
Sharing knowledge effectively across boundaries, between projects and organis...
 
Knowledge Management Australia 2016
Knowledge Management Australia 2016Knowledge Management Australia 2016
Knowledge Management Australia 2016
 
Change management: science fiction or fantasy? Professor Tim Brady
Change management: science fiction or fantasy? Professor Tim BradyChange management: science fiction or fantasy? Professor Tim Brady
Change management: science fiction or fantasy? Professor Tim Brady
 
ORION Workshop: XSEDE and Building a National/International Cyberinfrastructure
ORION Workshop: XSEDE and Building a National/International CyberinfrastructureORION Workshop: XSEDE and Building a National/International Cyberinfrastructure
ORION Workshop: XSEDE and Building a National/International Cyberinfrastructure
 
Lean Kanban India 2016 | Confronting the Challenge of Scale: Making Ants the ...
Lean Kanban India 2016 | Confronting the Challenge of Scale: Making Ants the ...Lean Kanban India 2016 | Confronting the Challenge of Scale: Making Ants the ...
Lean Kanban India 2016 | Confronting the Challenge of Scale: Making Ants the ...
 
Moayer kapur sustainable advantage
Moayer kapur sustainable advantageMoayer kapur sustainable advantage
Moayer kapur sustainable advantage
 
Preparing to fail by failing to prepare, 25th feb, london
Preparing to fail by failing to prepare, 25th feb, londonPreparing to fail by failing to prepare, 25th feb, london
Preparing to fail by failing to prepare, 25th feb, london
 
Carleton_Sustainability_Guide-3
Carleton_Sustainability_Guide-3Carleton_Sustainability_Guide-3
Carleton_Sustainability_Guide-3
 
The challenge of wicked problems in airlines engineering ahmad arafat
The challenge of wicked problems in airlines engineering   ahmad arafatThe challenge of wicked problems in airlines engineering   ahmad arafat
The challenge of wicked problems in airlines engineering ahmad arafat
 
SunFunder deck
SunFunder deckSunFunder deck
SunFunder deck
 

Mehr von Association for Project Management

Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Association for Project Management
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...Association for Project Management
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024Association for Project Management
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...Association for Project Management
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakAssociation for Project Management
 
Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Association for Project Management
 
Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Association for Project Management
 
Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Association for Project Management
 
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...Association for Project Management
 

Mehr von Association for Project Management (20)

Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Staurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptxStaurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptx
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...
 
Katharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainabilityKatharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainability
 
The silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutionsThe silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutions
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peak
 
Demystifying digital accessibility webinar
Demystifying digital accessibility webinarDemystifying digital accessibility webinar
Demystifying digital accessibility webinar
 
Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...
 
Burnout_ Prevention Intervention Recovery.pdf
Burnout_ Prevention Intervention  Recovery.pdfBurnout_ Prevention Intervention  Recovery.pdf
Burnout_ Prevention Intervention Recovery.pdf
 
Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...
 
Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...
 
Risk in the changing world – Opportunity or threat
Risk in the changing world – Opportunity or threatRisk in the changing world – Opportunity or threat
Risk in the changing world – Opportunity or threat
 
Time-Honored Wisdom: African Teachings for VUCA Leaders
Time-Honored Wisdom: African Teachings for VUCA LeadersTime-Honored Wisdom: African Teachings for VUCA Leaders
Time-Honored Wisdom: African Teachings for VUCA Leaders
 
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
 
Including mental health support in project delivery
Including mental health support in project deliveryIncluding mental health support in project delivery
Including mental health support in project delivery
 

Kürzlich hochgeladen

The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 

Kürzlich hochgeladen (20)

The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 

Building the Dreadnought, APM Programme Management SIG Conference 2017, 02 March 17, Derby

  • 1. Dreadnought • Continuous at Sea Deterrence • 4 Submarines • New Design • New Reactor • New Common Missile Compartment • New Facilities- Barrow, Derby • New tools- IT systems • Support Infrastructure- Faslane, Devonport • Trainers- Faslane, USA • National Endeavour
  • 3. The Challenge Trident debate: MPs vote to renew UK's nuclear deterrent system • “It will be managed by a new delivery body for the procurement and in-service support of all nuclear submarines. That will ensure that, unlike in previous warship programmes, the submarines are delivered on time and on budget.” Michael Fallon MP, House of Commons, 18 July 2016 (Hansard)
  • 4. Risk Context •Dreadnought programme has considerable risk characterised by; • Novelty: the design incorporates a new reactor, Common Missile Compartment, secondary propulsion, hull design and weapon handling system. • New Technology: With only limited prototyping opportunity, new technology will only be proven on the first of class. • Complexity: Delivery and operation of Dreadnought will be dependent on the integration of the many different systems on the platform, and of the platform with the support infrastructure at Clyde and Devonport and the firing chain. • Pace: Dreadnought has to relieve the Vanguard Class on time to maintain Continuous At Sea Deterrence - the pace is high. • Programme management arrangements need to be designed to manage the risks inherent in such a novel and complex submarine. 4
  • 5. The Problem- Avoid this report by NAO/PAC “Management of the … programme has been extraordinarily poor. Oversight has been characterised by a failure to understand properly the nature and enormity of the task, a failure to monitor and challenge progress regularly and a failure to intervene when problems arose. Senior managers only became aware of problems through ad hoc reviews mostly conducted by external reviewers, as inadequate management information and reporting arrangements had not alerted them that things were amiss.” King (2013). King, A., Crewe, I. The Blunders of Our Governments, One World, 2013.
  • 6. Reality of Major Programmes • “managers must work at the edge of chaos, where linear systems begin to fail and non-linear systems begin to dominate. It is at this edge that managers can continue to exercise basic controls while hunting for new ideas and systems to change the way projects are constructed”. Singh and Singh (2002)
  • 7. Resilient Themes Robust Requirements Pragmatic Processes Adaptive Organisations Relational Contracts Care of the programme community Training and Learning Contingent Approvals Respect for Quality Mindful Leadership
  • 8. Relational Contracting “...of significant duration….. Many individuals with individual and collective poles of interest are involved in the relations. Future cooperative behaviour is anticipated. The benefits of the relation are to be shared rather than divided and allocated….. Trouble is expected as a matter of course…. It is an ongoing integration of behaviour in a largely unforeseeable future.” Macneill (2001) The need for Collaboration in addition to managing the transactions.
  • 9. Design the Programme=Design the Submarine • “The lesson is that we have to ensure that we give as much attention to the design of the programme as we do to the design of the artefact. We have to give as much attention to the development of the programme plans as we do to the working drawings and we have to have the power of assessing the extent to which the.…facilities are likely to be sufficient, and we have to ensure quality at every stage.” Brown, 1983 quoting Sir Rowland Baker RCNC reflecting on delivering the Dreadnought and Resolution Nuclear Submarine Programmes in the 1960s
  • 10. Resilient Organisations Act Mindfully • Mindfulness - a rich awareness of discriminatory detail and the ability to organise to notice the unexpected, halt it, or contain it or, if it breaks through containment, focus on resilience to restore system functioning • Anticipation: - Preoccupation with failure. They encourage reporting of errors when more options exist for rectifying them. - Reluctance to simplify. They resist oversimplification by carefully categorising errors and encouraging dialogue between teams with diverse backgrounds so errors are better understood. - Sensitivity to operations. They record what is actually happening and not what is supposed to be happening. • Containment: - Maintaining capabilities for resilience. This includes the use of expert networks, an extensive action repertoire and improvisation. - Deferring to expertise. In response to unexpected events, the organisation can take advantage of shifting locations of expertise within the organisation for easy access to expert resources. • Culture: - Reporting culture where people are prepared to report their errors and near misses which requires care in handling blame. - Just culture where people are encouraged to provide information but there is a clear boundary between acceptable and unacceptable behaviour. - Sources: - Weick K., Sutcliffe, K., (2007), Managing the Unexpected. Resilient Performance in an Age of Uncertainty, John Wiley and Sons, San Francisco, CA. - Reason, J., (1997), Managing the Risks of Organizational Accidents, Ashgate, Aldershot, Hants, pp. 195.
  • 11. Coping with Uncertainty • Processes including project controls are essential but insufficient. • “Something one cannot understand constitutes a painful void, a puncture, a permanent stimulus that insists on being satisfied.” Primo Levi (1987) • Truth emerges from arguments between friends- David Hume • Relationships to allow questioning, discussion, challenge and support.
  • 12. Use of Imperfect Data - Maieutic Machine Macintosh and Quattrone (2010, pp. 330-334) define a maieutic machine as a machine “for producing knowledge by asking questions rather than giving answers”.
  • 13. Megaprojects and Wicked Problems • Heifetz and Linsky “Leadership on the Line” (2002) emphasise the need to stand back and reflect on the whole problem to develop the next action. They use the metaphor of moving between the dance floor and the balcony. They also emphasis the need to think politically and build relationships but regulate the tension to maintain progress. • Grint(2005) which shows that as the solutions to problems become less certain the need forcollaborative compliance increases. The leader needs to enable more questions through effective relationships. Wicked Problems- No obvious solution. • Stand Back, • Reflect, • Build Effective Relationships, • Ask Questions
  • 14. Problems don’t come with labels. Problems often contain elements that are critical, tame and wicked. Problem Solving
  • 15. Learning Black Box Thinking by M Syed. • Failing Fast to Learn Fast • Just Culture • Humility • Perseverance
  • 16. Trusted to deliver excellence © 2017 Rolls-Royce plc and/or its subsidiaries The information in this document is the property of Rolls-Royce plc and/or its subsidiaries and may not be copied or communicated to a third party, or used for any purpose other than that for which it is supplied without the express written consent of Rolls-Royce plc and/or its subsidiaries. This information is given in good faith based upon the latest information available to Rolls-Royce plc and/or its subsidiaries, no warranty or representation is given concerning such information, which must not be taken as establishing any contractual or other commitment binding upon Rolls-Royce plc and/or its subsidiaries. Dreadnought Programme Management of a New Reactor Plant • Complexity and Uncertainty • In a Collaborative Environment
  • 17. Trusted to deliver excellence Rolls-Royce Proprietary Information Rolls-Royce Submarines Reactor Compartment – RR is TA and sole supplier Key Facts • A naval reactor core is the size of a TRENT XWB engine, has greater maximum power and does not need refuelling. • The sound energy transmitted into the water is equivalent to a modern car engine at idle. • The plant has a similar rate of change of power to a gas turbine. • Naval reactor plant must operate safely and meet naval shock criteria whilst in a highly manoeuvrable submarine. Propulsion system – RR supplies key equipment as OEM
  • 18. The Challenge ….. 18 RISK FACTORS NOVELTY, NEW TECHNOLOGY, COMPLEXITY & PACE + first all new project in a generation and critical path activity All new design of plant New ways of working New people & bigger team and inexperienced leaders
  • 19. Re-Capitalisation & Capability Development Raynesway Engineering Labs Atlantic House Factory Factory
  • 20. Managing the Uncertainty 20 • Get Help and Value the Views of Others • Set Out Our Way & Identity • Focus on Project Framework and Stick to it
  • 21. Project Framework 21 BAE Systems – Shipyard Whole Boat Design Framework MoD Customer Governance and Approval Agree the Collaboration Fundamentals Division of Responsibilities Design management Arrangements Integrated Project Teams - managing master schedules MoD Phase contracting with developing maturity Rolls-Royce accept contracts as uncertainty reduces contract phased release
  • 22. Trusted to deliver excellence The Integrated Programme Management Team (IPMT) Successor IPMT MoD BAE Systems Rolls Royce Babcock Marine Electric Boat •Client •Design Authority •Supplier of GF* •Submarine •Design •Build •Commission •WBTA •Design the support •Support the design •CMC •NSRP •Design •Make •Commission •NSRP TA
  • 23. Enduring Collaboration from Sustained Focus
  • 24. Key lessons Learnt – no surprise and no magic • SECURING AND KEEPING TO KEY DECISIONS & DO IT COLLABORATIVELY • BUILD A STABLE AND COMMITTED TEAM – KEY PEOPLE STAYED IN KEY POSTS • HEARTBEAT OF STRUCTURED REVIEWS + LEADERSHIP ‘IRON WILL’ • FOCUS ON THE WAR NOT THE BATTLES letting stuff go • ORGANISATIONAL HUMILITY - KEEP LISTENING AND ACTING ON EXPERT ADVICE … always seek and face up to the facts, be aware of your weaknesses and act on these things 24
  • 25. People and the whole enterprise matters • A programme team needs the support of the whole business and surrounding enterprise and mobilising that energy was key in the latter stages of detailed design • ENGAGEMENT KEY – working with unions and operations management • Do lots of little things that enable staff focus eg deferring non critical activities identified by them, flex the holiday rules + many late night whole team sessions fuelled by pizzas 25
  • 26. Challenge Now – Design to Production APQP framework – Integrated Product and Production Readiness at Rolls- Royce Long lead buys and supply chain mobilisation Develop the Integrated project team to the next stage for build
  • 27. Achievements to Date – on time to the day (5yrs and £3bn+) • Design Maturity • Supply Chain - Contractor Furnished Equipment (CFE) - Government Furnished Equipment (GFE) • Enablers - Facilities - IPDE - Build processes • Construction • Programme Management • Training solution • In-service - Support solution
  • 28. Conclusion • Project Controls are necessary but insufficient • Mindful Leadership • Effective Relationships- high challenge and support • Questions to inform discussions • Solutions emerge • Culture - just and reporting and learning • Planned uncertainty remains high • Phased release of build will manage this • The Project Organisation & Frameworks will continue to evolve …. Larciani Giovanni di Lorenzo Allegoria della fortuna Described as the allegory of uncertainty in Uffizi Museum Florence.