CHALLENGE
 SPM levels of all the Units were much higher than the standard norms.
 Degradation in the performance of ESP’s.
 Chances of enforcement of norms of emissions less than 50 mg/Nm3.
 Characteristics of coal and ash not consistent with the design.
 Requirement of frequent maintenance of ESP’s.
 Reduction in the collection efficiency of ESP’s.
HIGH EMISSIONS
CAUSE & EFFECT
MATERIAL
MACHINE
METHODSMEN
High Ash
High resistivity
Distribution screen
Electrode alignment
PF Coal/Ash grain size
Ash Evacuation
Control of O2
Uniform coal
feeding
Conveying air flow/pressure
Rapping cyclesTemp monitoring
ESP Controllers
Slurry disposal/SILO level control
Maintenance
practices
Ash evacuation
cycle timing
Size of Fields
SPM around 100
mg/Nm3
High flue gas
volume
Transformer sizing
High SCC
ALTERNATIVES CONSIDERED
a. Continue to run with present ESPs with ammonia dosing:
This option was investigated but was not viable due to PCB standards, which
may be even reduced in near future.
b. Going for dual conditioning system Ammonia & SO3 to reduce
emission below 50 mg/Nm3.
This option was investigated and evaluated, and trials were taken with the test
kit for ammonia dosing. This option was financially not viable.
c. Retrofit the ESP and install a fabric filter plant with high temperature
bags:
After comparing this option with the other options and evaluating the
economic benefits of each, it was found that this was both economically and
strategically, the most feasible option
CONCEPT OF HYBRID ESP’s
 ESP-FF hybrid precipitator is a combination of ESP & Fabric filter
 It has an advantage of both ESP & Fabric filter
 Gases are separated from dispersed particles by passing it through
fabric medium
 Particles that are not able to penetrate will remain on the surface of
medium so called “Filter cake”
 90% dust collection is done by ESP
fields rest by bag filters
HYBRID ESP- THE PROJECT
 VAL-CPP has undergone Bag filter modification in a phased manner
 Last two fields of ESP were removed and bag filter was installed
 Modification completed for all the 9 units.
 EPC contractor – SEPCO
HYBRID ESP- THE PROJECT
 Project Zero date – Nov-2011
 Manpower involved in each unit is around 300
 123 m3 of concrete is installed
 454 tones of steel erection
 Timely completion of the project as per schedule.
HYBRID ESP- AFTER COMMISSIONING
 Fabric filter system is fitted with high temperature bags -
Polyphenylenesulphide (PPS) were considered taking the worst scenario
 Low temperature bags - Polyacrylonitrile (PAN) may also be used
 The performance of the plant is good with emission values consistently
below the 50mg/Nm3
Filter Plant Type : Pulse Jet
Filtration Velocity : 1.04 m/min
Bag Material : PPS (PTFE Impregnation Treatment)
Bag Quantity : 5002
Bag Specification : Dia 130 X 8065
Injection Pressure : 0.25 -0.35 MPa
HYBRID ESP- PERFORMANCE
 Reductions in SPM < 40 mg/Nm3
 Improvement in collection efficiency and stable operation of ESP’s.
 Reduction in energy consumption of ESP’s.
 Increase in life of bag filters due to small pressure difference across filter
bags.
 Maintenance friendly.
 OPTIPOW pulse valve adopted to guarantee high efficiency and for.
stable and reliable ash removal
 The operation of the equipment is controlled by PLC through the
temperature, pressure differential pressure, current, voltage and the
travel feedback signal
HYBRID ESP - PERFORMANCE
127
111
99 92
81
71 66
55
47 41 45
24 22 20 23 25 26 28 24 26
0
40
80
120
160
200
Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13
Average SPM Average SPM
Before
After
HYBRID ESP – ASH REMOVAL SYSTEM
 Fiber filter always adopts differential pressure control mode for cleaning
the ash
 Differential pressure of dust collector is the enhancer of ash removal
from bag filters
 Ash removal will not stop until differential pressure of bag filter drops
below the set value
when the differential pressure of the dust
collector surpasses a setting value, PLC will
transmit a signal to the pulse controller, then
the pulse valve will open, the compressed air
in the air tank will instantly release and enter
into the filter bag. The dust cake accumulated
on the outside will break and get loose and
then drop into dust hopper when the filter bag
expands
HYBRID ESP – OPERATION
 Amount of moist, acid and sticky dust collected on the filter bags during
the start-up phase to be minimized
 The FF shall not be connected to the flue gas stream until coal starts to
be fired in the boiler and the thermal power achieves 80% above the
total thermal power
 The flue gas temperature ought to be at least 20℃ above the acid dew
point
Main monitoring Screen
HYBRID ESP – MAINTENANCE
 Regular checking of differential pressure of dust collector.
 Monitoring of gas flow.
 Checking the compressed air of pulse cleaning dust collector
 Checking nozzle compartments and dust hopper for dust accumulations
 When about 10% of the bags in a compartment have been blocked, all
damaged bags shall be replaced
THANK YOU

Weitere ähnliche Inhalte

Was ist angesagt?

Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
Nitin Mahalle
 

Was ist angesagt? (20)

Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
 
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
 
Nexans Euromold 430 TB Interface C Separable Tee Connector Up to 36 kV 630 A ...
Nexans Euromold 430 TB Interface C Separable Tee Connector Up to 36 kV 630 A ...Nexans Euromold 430 TB Interface C Separable Tee Connector Up to 36 kV 630 A ...
Nexans Euromold 430 TB Interface C Separable Tee Connector Up to 36 kV 630 A ...
 
ESP
ESPESP
ESP
 
Esp rectifier transformer
Esp rectifier transformerEsp rectifier transformer
Esp rectifier transformer
 
Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loading
 
Electrostatic precipitator (esp) - working function
Electrostatic precipitator (esp) - working functionElectrostatic precipitator (esp) - working function
Electrostatic precipitator (esp) - working function
 
ELECTROSTATIC PRECIPITATOR
ELECTROSTATIC PRECIPITATORELECTROSTATIC PRECIPITATOR
ELECTROSTATIC PRECIPITATOR
 
Better efficiency of eletrostatic precipitator
Better efficiency of eletrostatic precipitatorBetter efficiency of eletrostatic precipitator
Better efficiency of eletrostatic precipitator
 
Sonic Soot Blower System
Sonic Soot Blower SystemSonic Soot Blower System
Sonic Soot Blower System
 
Air Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance IndicesAir Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance Indices
 
Boiler purge
Boiler purge Boiler purge
Boiler purge
 
Turbine safety protection
Turbine safety protectionTurbine safety protection
Turbine safety protection
 
Heat recovery steam generator
Heat recovery steam generatorHeat recovery steam generator
Heat recovery steam generator
 
HP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineHP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam Turbine
 
Be project - PRDS (Pressure Reducing And Desuperheater Station)
Be project - PRDS (Pressure Reducing And Desuperheater Station)Be project - PRDS (Pressure Reducing And Desuperheater Station)
Be project - PRDS (Pressure Reducing And Desuperheater Station)
 
Cfbc burner startup sequence
Cfbc burner startup sequenceCfbc burner startup sequence
Cfbc burner startup sequence
 
Industrial fan(ID FD Fans)
Industrial fan(ID FD Fans)Industrial fan(ID FD Fans)
Industrial fan(ID FD Fans)
 
Synchronising the 210MW unit to the 220KV grid
Synchronising the 210MW unit to the 220KV gridSynchronising the 210MW unit to the 220KV grid
Synchronising the 210MW unit to the 220KV grid
 
Soot blowing and advantages
Soot blowing and advantagesSoot blowing and advantages
Soot blowing and advantages
 

Andere mochten auch (6)

Tecnologías de control de emisiones para instalaciones térmicas de biomasa pe...
Tecnologías de control de emisiones para instalaciones térmicas de biomasa pe...Tecnologías de control de emisiones para instalaciones térmicas de biomasa pe...
Tecnologías de control de emisiones para instalaciones térmicas de biomasa pe...
 
Thermax power generation group
Thermax   power generation groupThermax   power generation group
Thermax power generation group
 
Esp ppt
Esp pptEsp ppt
Esp ppt
 
EQUIPMENTS TO CONTROL AIR POLLUTION
EQUIPMENTS TO CONTROL AIR POLLUTIONEQUIPMENTS TO CONTROL AIR POLLUTION
EQUIPMENTS TO CONTROL AIR POLLUTION
 
Air pollution control methods and equipments
Air pollution control methods and equipmentsAir pollution control methods and equipments
Air pollution control methods and equipments
 
Electrostatic precipitator design
Electrostatic precipitator designElectrostatic precipitator design
Electrostatic precipitator design
 

Ähnlich wie Hybrid ESP Project

4 b = 58 p 45 basic ur plant description 06.09.2021-1
4 b = 58 p  45 basic ur plant description 06.09.2021-14 b = 58 p  45 basic ur plant description 06.09.2021-1
4 b = 58 p 45 basic ur plant description 06.09.2021-1
ameermudasar
 
Determination of suspended
Determination of suspendedDetermination of suspended
Determination of suspended
ECRD IN
 

Ähnlich wie Hybrid ESP Project (20)

Vedanta Aluminium Ltd.
Vedanta Aluminium Ltd.Vedanta Aluminium Ltd.
Vedanta Aluminium Ltd.
 
ESP.ppt
ESP.pptESP.ppt
ESP.ppt
 
Instrument air package
Instrument air packageInstrument air package
Instrument air package
 
Italy Air Sampling Project
Italy Air Sampling ProjectItaly Air Sampling Project
Italy Air Sampling Project
 
Mine air sampling
Mine air samplingMine air sampling
Mine air sampling
 
PAMS: A Study of Performance in Low and High Humidity Environments
PAMS: A Study of Performance in Low and High Humidity EnvironmentsPAMS: A Study of Performance in Low and High Humidity Environments
PAMS: A Study of Performance in Low and High Humidity Environments
 
Waste Heat Recovery in Power Station Boilers by Greens Power Equipment
Waste Heat Recovery in Power Station Boilers by Greens Power EquipmentWaste Heat Recovery in Power Station Boilers by Greens Power Equipment
Waste Heat Recovery in Power Station Boilers by Greens Power Equipment
 
Ammonia Refrigeration System Set up and Parameters
Ammonia Refrigeration System Set up and ParametersAmmonia Refrigeration System Set up and Parameters
Ammonia Refrigeration System Set up and Parameters
 
Low charge ammonia vapour compression refrigeration system for residential ai...
Low charge ammonia vapour compression refrigeration system for residential ai...Low charge ammonia vapour compression refrigeration system for residential ai...
Low charge ammonia vapour compression refrigeration system for residential ai...
 
Australasian Lab managers Conference: Gas Generation Dr Nicole Pendini 2019
Australasian Lab managers Conference: Gas Generation Dr Nicole Pendini 2019Australasian Lab managers Conference: Gas Generation Dr Nicole Pendini 2019
Australasian Lab managers Conference: Gas Generation Dr Nicole Pendini 2019
 
Ammonia plant GSFC by Vishal Tapiawala
Ammonia plant GSFC by Vishal TapiawalaAmmonia plant GSFC by Vishal Tapiawala
Ammonia plant GSFC by Vishal Tapiawala
 
“STUDY AND FABRICATION OF OUTDOOR MIST/FOG COOLING SYSTEM THROUGH HIGH PRESSU...
“STUDY AND FABRICATION OF OUTDOOR MIST/FOG COOLING SYSTEM THROUGH HIGH PRESSU...“STUDY AND FABRICATION OF OUTDOOR MIST/FOG COOLING SYSTEM THROUGH HIGH PRESSU...
“STUDY AND FABRICATION OF OUTDOOR MIST/FOG COOLING SYSTEM THROUGH HIGH PRESSU...
 
Operation & Maintenance WTP.pptx
Operation & Maintenance WTP.pptxOperation & Maintenance WTP.pptx
Operation & Maintenance WTP.pptx
 
Ozone in package bottled drinking water
Ozone in package bottled drinking waterOzone in package bottled drinking water
Ozone in package bottled drinking water
 
4 b = 58 p 45 basic ur plant description 06.09.2021-1
4 b = 58 p  45 basic ur plant description 06.09.2021-14 b = 58 p  45 basic ur plant description 06.09.2021-1
4 b = 58 p 45 basic ur plant description 06.09.2021-1
 
liqui cel product overview
liqui cel product overviewliqui cel product overview
liqui cel product overview
 
Discussion on Urea Product Quality by Prem Baboo.pdf
Discussion on Urea Product Quality by Prem Baboo.pdfDiscussion on Urea Product Quality by Prem Baboo.pdf
Discussion on Urea Product Quality by Prem Baboo.pdf
 
Determination of suspended pm in atomosphere
Determination of suspended pm in atomosphereDetermination of suspended pm in atomosphere
Determination of suspended pm in atomosphere
 
Determination of suspended
Determination of suspendedDetermination of suspended
Determination of suspended
 
Determination of Suspended PM in Atmosphere
Determination of Suspended PM in AtmosphereDetermination of Suspended PM in Atmosphere
Determination of Suspended PM in Atmosphere
 

Kürzlich hochgeladen

Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 

Kürzlich hochgeladen (20)

Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 

Hybrid ESP Project

  • 1.
  • 2. CHALLENGE  SPM levels of all the Units were much higher than the standard norms.  Degradation in the performance of ESP’s.  Chances of enforcement of norms of emissions less than 50 mg/Nm3.  Characteristics of coal and ash not consistent with the design.  Requirement of frequent maintenance of ESP’s.  Reduction in the collection efficiency of ESP’s. HIGH EMISSIONS
  • 3. CAUSE & EFFECT MATERIAL MACHINE METHODSMEN High Ash High resistivity Distribution screen Electrode alignment PF Coal/Ash grain size Ash Evacuation Control of O2 Uniform coal feeding Conveying air flow/pressure Rapping cyclesTemp monitoring ESP Controllers Slurry disposal/SILO level control Maintenance practices Ash evacuation cycle timing Size of Fields SPM around 100 mg/Nm3 High flue gas volume Transformer sizing High SCC
  • 4. ALTERNATIVES CONSIDERED a. Continue to run with present ESPs with ammonia dosing: This option was investigated but was not viable due to PCB standards, which may be even reduced in near future. b. Going for dual conditioning system Ammonia & SO3 to reduce emission below 50 mg/Nm3. This option was investigated and evaluated, and trials were taken with the test kit for ammonia dosing. This option was financially not viable. c. Retrofit the ESP and install a fabric filter plant with high temperature bags: After comparing this option with the other options and evaluating the economic benefits of each, it was found that this was both economically and strategically, the most feasible option
  • 5. CONCEPT OF HYBRID ESP’s  ESP-FF hybrid precipitator is a combination of ESP & Fabric filter  It has an advantage of both ESP & Fabric filter  Gases are separated from dispersed particles by passing it through fabric medium  Particles that are not able to penetrate will remain on the surface of medium so called “Filter cake”  90% dust collection is done by ESP fields rest by bag filters
  • 6. HYBRID ESP- THE PROJECT  VAL-CPP has undergone Bag filter modification in a phased manner  Last two fields of ESP were removed and bag filter was installed  Modification completed for all the 9 units.  EPC contractor – SEPCO
  • 7. HYBRID ESP- THE PROJECT  Project Zero date – Nov-2011  Manpower involved in each unit is around 300  123 m3 of concrete is installed  454 tones of steel erection  Timely completion of the project as per schedule.
  • 8. HYBRID ESP- AFTER COMMISSIONING  Fabric filter system is fitted with high temperature bags - Polyphenylenesulphide (PPS) were considered taking the worst scenario  Low temperature bags - Polyacrylonitrile (PAN) may also be used  The performance of the plant is good with emission values consistently below the 50mg/Nm3 Filter Plant Type : Pulse Jet Filtration Velocity : 1.04 m/min Bag Material : PPS (PTFE Impregnation Treatment) Bag Quantity : 5002 Bag Specification : Dia 130 X 8065 Injection Pressure : 0.25 -0.35 MPa
  • 9. HYBRID ESP- PERFORMANCE  Reductions in SPM < 40 mg/Nm3  Improvement in collection efficiency and stable operation of ESP’s.  Reduction in energy consumption of ESP’s.  Increase in life of bag filters due to small pressure difference across filter bags.  Maintenance friendly.  OPTIPOW pulse valve adopted to guarantee high efficiency and for. stable and reliable ash removal  The operation of the equipment is controlled by PLC through the temperature, pressure differential pressure, current, voltage and the travel feedback signal
  • 10. HYBRID ESP - PERFORMANCE 127 111 99 92 81 71 66 55 47 41 45 24 22 20 23 25 26 28 24 26 0 40 80 120 160 200 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Average SPM Average SPM Before After
  • 11. HYBRID ESP – ASH REMOVAL SYSTEM  Fiber filter always adopts differential pressure control mode for cleaning the ash  Differential pressure of dust collector is the enhancer of ash removal from bag filters  Ash removal will not stop until differential pressure of bag filter drops below the set value when the differential pressure of the dust collector surpasses a setting value, PLC will transmit a signal to the pulse controller, then the pulse valve will open, the compressed air in the air tank will instantly release and enter into the filter bag. The dust cake accumulated on the outside will break and get loose and then drop into dust hopper when the filter bag expands
  • 12. HYBRID ESP – OPERATION  Amount of moist, acid and sticky dust collected on the filter bags during the start-up phase to be minimized  The FF shall not be connected to the flue gas stream until coal starts to be fired in the boiler and the thermal power achieves 80% above the total thermal power  The flue gas temperature ought to be at least 20℃ above the acid dew point Main monitoring Screen
  • 13. HYBRID ESP – MAINTENANCE  Regular checking of differential pressure of dust collector.  Monitoring of gas flow.  Checking the compressed air of pulse cleaning dust collector  Checking nozzle compartments and dust hopper for dust accumulations  When about 10% of the bags in a compartment have been blocked, all damaged bags shall be replaced