2. Advance is Leader in Management Training and Certifications and provides Solutions in the areas of
Operations and Supply Chain Management.
It is APICS Premier Channel Partner since 2006 and has offices in Switzerland, Basel and in Italy,
Milan and Bologna.
Its Mission is to contribute to the success of its partners, being them enterprises or professionals,
throughout the training of skills based on international recognized Body of Knowledge.
ABOUT US
2
3. 3.000 professionals trained from different functions a all levels
+250 companies from different industries
+40 Certified Instructors worldwide, with significant managerial
experience in multinational companies
ADVANCE SOLUTIONS
ADVANCE SCHOOL
2 Divisions to provide Value to our Customers
3
4. Our Live Webinars – «Officine Operations»
4
www.advanceschool.org
28 Luglio 14:30-16:00
Luc Roesems, VP Manufacturing
Samsonite
8. SHORTLY INTRODUCING MYSELF
• My name is Luc Roesems and I am presently working as
Vice President Manufacturing at Samsonite
• Associated with Advance Operations Management School
as a free-lance teacher
• I have founded my own consultancy company PerfectOps in
2017 (ww.perfectops.be)
• Throughout my career I have held several positions working
for multinational companies; From Demand and Supply
Manager, to Head of Supply Chain and S&OP, Director
Global Operations & PMO, Divisional Plant Operations
Director
• Holding following certifications: APICS CPIM, CSCP and
SCOR-P, Lean and Six Sigma Black Belt
9. WHAT WILL WE TALK ABOUT ?
HOW TO INSTILL OPERATIONAL EXCELLENCE &
CONTINUOUS IMPROVEMENT
OPENINING REMARKS AND VISION
THEORY AND REAL LIFE PRACTICE
HOW TO DRIVE AND SUSTAIN SUCCESS
CASE STUDY
RESULTS AFTER 1 YEAR WITH DETAILED
FIGURES AND EXPLANATION
NEXT STEPS AND SUSTAINED CONTINUATION
20. EXECUTIVE SUMMARY
ACCOMPLISHMENTS CHALLENGES & OPPORTUNITIES
ü General output at lower level in line with sales
=> Stock at level 128 660 pcs – 3,5 coverage
when sales remain on 1700 pcs/d ?!?
Production reduced to 20 % = max
unemployment
ü S’CURE 75 TOP second mold:
ü On schedule at SET/AHA T2 16/2/20 –
texturing Cavity
ü INJECTION MOLDING M/C:
ü ENG004 overhaul done
ü Toggle knee worn E1-2-3-4-5-6
=> support for molds, pilot model is in
production & OK
ü CORONA VIRUS
Output to be aligned with sales
Assy & Pressforming Ramp up PROXIS.
ü PRC RM supply: seems to be under control
ü S’Cure Top grip mold: worn – copy mold ?
ECO version is major cause texture polution
ü ENG009&10:
ü Upgrade with additional corepuller for
MAGNUM 55/69 molds:
Hydraulics & Electronics ENGEL: Delay
in delivery
ü INJECTION MOLDING M/C:
Aging => maintenance, major repairs
21. PRODUCTION – SALES – STOCK: MTD 25 March
107
115
131
23 21 26 0 0 0 0 0 0 0 0 0
0
20
40
60
80
100
120
140
160
JAN FEB MRT APR MEI JUN JUL AUG SEP OKT NOV DEC
[k pcs]
2020
T Stock R Stock
Nmb Produced Nmb Shipped