Short Communication

Construction Planning of an Offshore Petroleum
Platform1
O. A. Muyiwa & K. Sadeghi
Girne American University, Faculty of Engineering & Architecture, Mersin 10, Turkey
The study evaluated the project life cycle for the construction of a fixed petroleum
platform which comprises of the planning, design, fabrication, load-out,
transportation, installation and commissioning phases.
The project life cycle, like several offshore structures located in open waters and
exposed to severe forces must be planned in great details for a successful
execution. It is therefore necessary to study and gather all necessary information on
the construction of a platform with the objective of creating a client, consultant and
contractor’s work breakdown structure (WBS) template in a project planning
software. The results of this study eventually serve as a guide which can be
adjusted to suit the planning and management for the construction of a fixed
petroleum platform depending on the soil characteristics, environmental and
operational parameters.
An oil platform is a large structure used to house workers and machinery needed to
drill and then produce oil and natural gas in the ocean (Wikipedia 2007). There are
different types of petroleum platforms and each of these types is chosen primarily
due to water depth considerations, and secondarily due to the intended service and
quantity of deck equipment necessary to perform its service. To develop a WBS for
the construction of a fixed jacket petroleum platform, the following issues were
investigated:
1) Planning: It takes into account operational considerations (i.e. the function,
location, and orientation of the platform) and environmental considerations
(including winds, tides, currents, ice, shallow gases, earthquakes and marine
growth) (Sadeghi 2001),
2) Design: It analyzes the dead loads (i.e. weights of the platform structure and any
permanent equipment and appurtenant structures which do not change with the
mode of operation), live loads (loads imposed on the platform during its use and
which may change either during a mode of operation or from one mode of
operation to another) and environmental loads (loads imposed on the platform by
natural phenomena including wind, current, wave, earthquake, snow, ice and earth
movement),
1

This publication is part of a MSc.-thesis in Construction Management of the 1st author presented
to Girne American University.

82
O. A. Muyiwa & K. Sadeghi, GAU J. Soc. & Appl. Sci., 2(4), 82-85, 2007

3) Fabrication: It takes into account the portion of the offshore platform, the jacket
which is manufactured onshore and assembled either in close proximity to the
manufacturing site or at the location where the offshore platform is to be positioned
for production,
4) Transportation: It is the movement of the platform components from the
fabrication yard to an installation site, using cargo barges which should be of
adequate number, proper size and structural strength (American Petroleum Institute
[API] 2001),
5) Installation; It consists of positioning and leveling the platform on the site and
assembling the various components into a stable structure in accordance with the
design drawings and specifications.
Project management is the application of knowledge, skills, tools, and techniques
to project activities to meet project requirements (PMBOK 2004). The project
stakeholders which are primarily made up of the client, consultant and contractor
are individuals and organizations actively involved in the project. The South Pars
gas field and Resalat oil field projects in the Persian Gulf were reviewed to create a
WBS for the project stakeholders and decomposed into project planning and
management levels with each level giving a detailed description of works to be
carried out.
In figure 1, the considered client’s WBS for level 1 of project planning and
management is shown.
ID

Task Name
Qtr 3

1
2
10
23
28
41
47
53
64
150
179
229
237

Qtr 4

2006
Qtr 1

Work Activities (Client)
Project Integration
Site assessment
Scope Management
Project Design
Time/Cost Management
Risk Management
Bidding Process & Selection of contractor
Detailed Engineering
Procurement
Fabrication
Load-out and Transportation
Installation,Hookup, and Commissioning

Figure 1. Client’s WBS for level 1 of Project Planning and Management

83
Short Communication

This can be decomposed further as follows: i) project integration which consists of
assessing project needs, completing major studies and making recommendations,
developing a project charter, developing a preliminary scope statement, and
developing a project management plan, ii) site assessment which consists of
identifying potential sites, assessing regulatory and enviromental impacts,
identifying project sites, recommending sites and applying for permits, iii) scope
management which consists of developing a scope management plan and
statement, iv) project design which consists of a conceptual and basic design, v)
time/cost management which consists of activity definitions, sequencing, resource
estimates and duration, vi) bidding process and selection of contractors which
consist of advertisements to intreseted contractors, evaluation of received proposals
and selection of the contractor, vii) detailed engineering, procurement, fabrication,
load-out and transportation, installation, hookup and commissioing (i.e. the jacket,
piling and topsides). Figure 2, shows the considered consultant’s WBS for level 1
of project planning and management.
ID

Task Name

1

Work Activities (Consultant)
Endorsement of Basic Design
Performing the Calculations
Preparing MTO and Requisitions
Preparing Technical specifications
Preparing Procedures
Preparing Drawings
Close out of Detail Design

2
44
99
110
119
124
133

Figure 2. Consultant’s WBS for level 1 of Project Planning and Management
This can be decomposed further as follows: i) endorsements of basic deign; would
consist of revision of calculated notes, drawings, and technical specifications ,
procedures, MTO and listing of deficiencies and missed points, ii) performing
calculations; would consist the performance of the following analyses: in-place,
earthquake, fatigue, load-out, transportation, cathodic protection, sea fastening,
launch/lift, installation and topside installation (Sadeghi 2001). Figure 3, shows the
considered contractor’s WBS for level 1 of project planning and management. This
can be decomposed further as follows: i) award of contract; would consist of
receiving notice to proceed and signing of the contract, submission of bonds and
insurance documents, and preparation and submitting the project schedule, ii)
fabrication of materials, load-out and transportation, launch/lift and installation;
84
O. A. Muyiwa & K. Sadeghi, GAU J. Soc. & Appl. Sci., 2(4), 82-85, 2007

would consist of the jacket, piling and topsides, iii) delivery and close-out of
project; would consist of submitting the shop drawings, as-built drawings and
operational manuals.
ID

Task Name
Qtr 4

1
2
15
23
37
123
142
181
190
201

2005
Qtr 1

Qtr 2

Work Activities (Contractor)
Site Assessment
Award of Contract
Endorsement of Basic Design and Documents
Performing of the Detail Design
Performing the procurement
Fabrication of Materials
Load-Out and Transportation
Launch and Installation
Commissioning

Figure 3. Contractor’s WBS for level 1 of Project Planning and Management
The study identified the necessary workpackages required for the construction of
an offshore petroleum platform. With the input of these levels in a project planning
software, the client, consultant and contractor would be able to determine their
roles and responsibilities for the execution of the platform construction as well as
planning, monitoring, and controlling the scope of the project.
References
API, 2001. Recommended Practice for Planning, Designing and Constructing,
Fixed Offshore Platform, 21st ed. American Petroleum Instititute.
PMBOK 2004. A Guide to the Project Management Body of knowlege, 3rd ed
Project Management Institue, Inc.
Sadeghi K, 2001. Coasts, Ports and Offshore Structures Engineering, Power and
Water Univeresity of Technonology, ISBN 964-93442-0-9.
Wikipedia, 2007. The Free Encyclopedia. [WWW document; retrieved March
2007]. URL http://en.wikipedia.org/wiki/Oil_platform.

85

Weitere ähnliche Inhalte

Was ist angesagt? (17)

CV OF MOHAMMAD ALI.doc-01
CV OF MOHAMMAD ALI.doc-01CV OF MOHAMMAD ALI.doc-01
CV OF MOHAMMAD ALI.doc-01
 
13
1313
13
 
Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)
 
150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-Cargo150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-Cargo
 
Madian CV_Sr Civil Structural Tech Eng
Madian CV_Sr Civil Structural  Tech EngMadian CV_Sr Civil Structural  Tech Eng
Madian CV_Sr Civil Structural Tech Eng
 
HG-RESUME UPDATE 11012016
HG-RESUME UPDATE 11012016HG-RESUME UPDATE 11012016
HG-RESUME UPDATE 11012016
 
Resume 3-16-15docx
Resume 3-16-15docxResume 3-16-15docx
Resume 3-16-15docx
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016
 
Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 
CV updated February 2017
CV updated  February 2017CV updated  February 2017
CV updated February 2017
 
CV - Jorge Elias Maia - Mechanical Engineer
CV - Jorge Elias Maia - Mechanical EngineerCV - Jorge Elias Maia - Mechanical Engineer
CV - Jorge Elias Maia - Mechanical Engineer
 
William T Moore 2016 resume
William T Moore 2016 resumeWilliam T Moore 2016 resume
William T Moore 2016 resume
 
Chris Rainey Resume 2016
Chris Rainey Resume 2016Chris Rainey Resume 2016
Chris Rainey Resume 2016
 
walid salah.CV
walid salah.CVwalid salah.CV
walid salah.CV
 
CFF.CV_10.07.2016
CFF.CV_10.07.2016CFF.CV_10.07.2016
CFF.CV_10.07.2016
 
2016-0429 John Szadzinski
2016-0429 John Szadzinski2016-0429 John Szadzinski
2016-0429 John Szadzinski
 
Nishanth N
Nishanth NNishanth N
Nishanth N
 

Andere mochten auch

Seguin Development Phase II Prospectus
Seguin Development Phase II ProspectusSeguin Development Phase II Prospectus
Seguin Development Phase II ProspectusHayley German
 
Seguin Development Phase II
Seguin Development Phase IISeguin Development Phase II
Seguin Development Phase IIDavid Scales
 
HH-- Leader onshore, explorer offshore
HH-- Leader onshore, explorer offshoreHH-- Leader onshore, explorer offshore
HH-- Leader onshore, explorer offshoreWang Steven
 
Use of Data from Business Registry in Norway
Use of Data from Business Registry in NorwayUse of Data from Business Registry in Norway
Use of Data from Business Registry in NorwayCorporate Registers Forum
 
Hydrogen embrittlement of steels
Hydrogen embrittlement of steelsHydrogen embrittlement of steels
Hydrogen embrittlement of steelsvishnu90
 
Offshore platform-design
Offshore platform-designOffshore platform-design
Offshore platform-designRahul Ranakoti
 

Andere mochten auch (9)

Seguin Development Phase II Prospectus
Seguin Development Phase II ProspectusSeguin Development Phase II Prospectus
Seguin Development Phase II Prospectus
 
Seguin Development Phase II
Seguin Development Phase IISeguin Development Phase II
Seguin Development Phase II
 
HH-- Leader onshore, explorer offshore
HH-- Leader onshore, explorer offshoreHH-- Leader onshore, explorer offshore
HH-- Leader onshore, explorer offshore
 
Use of Data from Business Registry in Norway
Use of Data from Business Registry in NorwayUse of Data from Business Registry in Norway
Use of Data from Business Registry in Norway
 
Culture Hacking for Change Management
Culture Hacking for Change ManagementCulture Hacking for Change Management
Culture Hacking for Change Management
 
Hydrogen embrittlement of steels
Hydrogen embrittlement of steelsHydrogen embrittlement of steels
Hydrogen embrittlement of steels
 
Change Management
Change Management  Change Management
Change Management
 
Introduction to Offshore Oil and Gas Surface Facilities
Introduction to Offshore Oil and Gas Surface FacilitiesIntroduction to Offshore Oil and Gas Surface Facilities
Introduction to Offshore Oil and Gas Surface Facilities
 
Offshore platform-design
Offshore platform-designOffshore platform-design
Offshore platform-design
 

Ähnlich wie Construction Planning of an Offshore Petroleum Platform

A Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction ProjectsA Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction ProjectsRick Vogel
 
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...IRJET Journal
 
National building code
National building codeNational building code
National building codeMayank Rawat
 
Design appraisal for the construction of a water off-take channel following c...
Design appraisal for the construction of a water off-take channel following c...Design appraisal for the construction of a water off-take channel following c...
Design appraisal for the construction of a water off-take channel following c...Khalid Abdel Naser Abdel Rahim
 
I0313048051
I0313048051I0313048051
I0313048051theijes
 
Final -jan-apr_2013
Final  -jan-apr_2013Final  -jan-apr_2013
Final -jan-apr_2013Sporsho
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviromentjuwes
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli
 
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...World-Academic Journal
 
1Erwin N De La Rosa jan2016CV
1Erwin N  De La Rosa jan2016CV1Erwin N  De La Rosa jan2016CV
1Erwin N De La Rosa jan2016CVErwin de la Rosa
 
CDS Construction Execution Process ^0 Strategy
CDS Construction Execution Process ^0 StrategyCDS Construction Execution Process ^0 Strategy
CDS Construction Execution Process ^0 StrategyRobert Doig
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTNur Ain Samsudin
 
construction-project-management-ppt-india-ppt.pptx
construction-project-management-ppt-india-ppt.pptxconstruction-project-management-ppt-india-ppt.pptx
construction-project-management-ppt-india-ppt.pptxBlackEagles1
 
MY CV AB - Lng-2014
MY  CV AB - Lng-2014MY  CV AB - Lng-2014
MY CV AB - Lng-2014ALBERT AUDU
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas Rushi Pru Dhvi
 

Ähnlich wie Construction Planning of an Offshore Petroleum Platform (20)

A Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction ProjectsA Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction Projects
 
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
 
final year presentation revised
final year presentation revisedfinal year presentation revised
final year presentation revised
 
National building code
National building codeNational building code
National building code
 
Analysis Of Concreting Process’s Productivity In The Distrito Federal: Charac...
Analysis Of Concreting Process’s Productivity In The Distrito Federal: Charac...Analysis Of Concreting Process’s Productivity In The Distrito Federal: Charac...
Analysis Of Concreting Process’s Productivity In The Distrito Federal: Charac...
 
Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
 
C4 - Scope of Work.pdf
C4 - Scope of Work.pdfC4 - Scope of Work.pdf
C4 - Scope of Work.pdf
 
Design appraisal for the construction of a water off-take channel following c...
Design appraisal for the construction of a water off-take channel following c...Design appraisal for the construction of a water off-take channel following c...
Design appraisal for the construction of a water off-take channel following c...
 
I0313048051
I0313048051I0313048051
I0313048051
 
Final -jan-apr_2013
Final  -jan-apr_2013Final  -jan-apr_2013
Final -jan-apr_2013
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli Resume
 
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
 
LECT 2a.ppt
LECT 2a.pptLECT 2a.ppt
LECT 2a.ppt
 
1Erwin N De La Rosa jan2016CV
1Erwin N  De La Rosa jan2016CV1Erwin N  De La Rosa jan2016CV
1Erwin N De La Rosa jan2016CV
 
CDS Construction Execution Process ^0 Strategy
CDS Construction Execution Process ^0 StrategyCDS Construction Execution Process ^0 Strategy
CDS Construction Execution Process ^0 Strategy
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
construction-project-management-ppt-india-ppt.pptx
construction-project-management-ppt-india-ppt.pptxconstruction-project-management-ppt-india-ppt.pptx
construction-project-management-ppt-india-ppt.pptx
 
MY CV AB - Lng-2014
MY  CV AB - Lng-2014MY  CV AB - Lng-2014
MY CV AB - Lng-2014
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 

Kürzlich hochgeladen

Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escortdlhescort
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 

Kürzlich hochgeladen (20)

Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 

Construction Planning of an Offshore Petroleum Platform

  • 1. Short Communication Construction Planning of an Offshore Petroleum Platform1 O. A. Muyiwa & K. Sadeghi Girne American University, Faculty of Engineering & Architecture, Mersin 10, Turkey The study evaluated the project life cycle for the construction of a fixed petroleum platform which comprises of the planning, design, fabrication, load-out, transportation, installation and commissioning phases. The project life cycle, like several offshore structures located in open waters and exposed to severe forces must be planned in great details for a successful execution. It is therefore necessary to study and gather all necessary information on the construction of a platform with the objective of creating a client, consultant and contractor’s work breakdown structure (WBS) template in a project planning software. The results of this study eventually serve as a guide which can be adjusted to suit the planning and management for the construction of a fixed petroleum platform depending on the soil characteristics, environmental and operational parameters. An oil platform is a large structure used to house workers and machinery needed to drill and then produce oil and natural gas in the ocean (Wikipedia 2007). There are different types of petroleum platforms and each of these types is chosen primarily due to water depth considerations, and secondarily due to the intended service and quantity of deck equipment necessary to perform its service. To develop a WBS for the construction of a fixed jacket petroleum platform, the following issues were investigated: 1) Planning: It takes into account operational considerations (i.e. the function, location, and orientation of the platform) and environmental considerations (including winds, tides, currents, ice, shallow gases, earthquakes and marine growth) (Sadeghi 2001), 2) Design: It analyzes the dead loads (i.e. weights of the platform structure and any permanent equipment and appurtenant structures which do not change with the mode of operation), live loads (loads imposed on the platform during its use and which may change either during a mode of operation or from one mode of operation to another) and environmental loads (loads imposed on the platform by natural phenomena including wind, current, wave, earthquake, snow, ice and earth movement), 1 This publication is part of a MSc.-thesis in Construction Management of the 1st author presented to Girne American University. 82
  • 2. O. A. Muyiwa & K. Sadeghi, GAU J. Soc. & Appl. Sci., 2(4), 82-85, 2007 3) Fabrication: It takes into account the portion of the offshore platform, the jacket which is manufactured onshore and assembled either in close proximity to the manufacturing site or at the location where the offshore platform is to be positioned for production, 4) Transportation: It is the movement of the platform components from the fabrication yard to an installation site, using cargo barges which should be of adequate number, proper size and structural strength (American Petroleum Institute [API] 2001), 5) Installation; It consists of positioning and leveling the platform on the site and assembling the various components into a stable structure in accordance with the design drawings and specifications. Project management is the application of knowledge, skills, tools, and techniques to project activities to meet project requirements (PMBOK 2004). The project stakeholders which are primarily made up of the client, consultant and contractor are individuals and organizations actively involved in the project. The South Pars gas field and Resalat oil field projects in the Persian Gulf were reviewed to create a WBS for the project stakeholders and decomposed into project planning and management levels with each level giving a detailed description of works to be carried out. In figure 1, the considered client’s WBS for level 1 of project planning and management is shown. ID Task Name Qtr 3 1 2 10 23 28 41 47 53 64 150 179 229 237 Qtr 4 2006 Qtr 1 Work Activities (Client) Project Integration Site assessment Scope Management Project Design Time/Cost Management Risk Management Bidding Process & Selection of contractor Detailed Engineering Procurement Fabrication Load-out and Transportation Installation,Hookup, and Commissioning Figure 1. Client’s WBS for level 1 of Project Planning and Management 83
  • 3. Short Communication This can be decomposed further as follows: i) project integration which consists of assessing project needs, completing major studies and making recommendations, developing a project charter, developing a preliminary scope statement, and developing a project management plan, ii) site assessment which consists of identifying potential sites, assessing regulatory and enviromental impacts, identifying project sites, recommending sites and applying for permits, iii) scope management which consists of developing a scope management plan and statement, iv) project design which consists of a conceptual and basic design, v) time/cost management which consists of activity definitions, sequencing, resource estimates and duration, vi) bidding process and selection of contractors which consist of advertisements to intreseted contractors, evaluation of received proposals and selection of the contractor, vii) detailed engineering, procurement, fabrication, load-out and transportation, installation, hookup and commissioing (i.e. the jacket, piling and topsides). Figure 2, shows the considered consultant’s WBS for level 1 of project planning and management. ID Task Name 1 Work Activities (Consultant) Endorsement of Basic Design Performing the Calculations Preparing MTO and Requisitions Preparing Technical specifications Preparing Procedures Preparing Drawings Close out of Detail Design 2 44 99 110 119 124 133 Figure 2. Consultant’s WBS for level 1 of Project Planning and Management This can be decomposed further as follows: i) endorsements of basic deign; would consist of revision of calculated notes, drawings, and technical specifications , procedures, MTO and listing of deficiencies and missed points, ii) performing calculations; would consist the performance of the following analyses: in-place, earthquake, fatigue, load-out, transportation, cathodic protection, sea fastening, launch/lift, installation and topside installation (Sadeghi 2001). Figure 3, shows the considered contractor’s WBS for level 1 of project planning and management. This can be decomposed further as follows: i) award of contract; would consist of receiving notice to proceed and signing of the contract, submission of bonds and insurance documents, and preparation and submitting the project schedule, ii) fabrication of materials, load-out and transportation, launch/lift and installation; 84
  • 4. O. A. Muyiwa & K. Sadeghi, GAU J. Soc. & Appl. Sci., 2(4), 82-85, 2007 would consist of the jacket, piling and topsides, iii) delivery and close-out of project; would consist of submitting the shop drawings, as-built drawings and operational manuals. ID Task Name Qtr 4 1 2 15 23 37 123 142 181 190 201 2005 Qtr 1 Qtr 2 Work Activities (Contractor) Site Assessment Award of Contract Endorsement of Basic Design and Documents Performing of the Detail Design Performing the procurement Fabrication of Materials Load-Out and Transportation Launch and Installation Commissioning Figure 3. Contractor’s WBS for level 1 of Project Planning and Management The study identified the necessary workpackages required for the construction of an offshore petroleum platform. With the input of these levels in a project planning software, the client, consultant and contractor would be able to determine their roles and responsibilities for the execution of the platform construction as well as planning, monitoring, and controlling the scope of the project. References API, 2001. Recommended Practice for Planning, Designing and Constructing, Fixed Offshore Platform, 21st ed. American Petroleum Instititute. PMBOK 2004. A Guide to the Project Management Body of knowlege, 3rd ed Project Management Institue, Inc. Sadeghi K, 2001. Coasts, Ports and Offshore Structures Engineering, Power and Water Univeresity of Technonology, ISBN 964-93442-0-9. Wikipedia, 2007. The Free Encyclopedia. [WWW document; retrieved March 2007]. URL http://en.wikipedia.org/wiki/Oil_platform. 85