DESIGN ASPECTS OF FLEXIBLE PAVEMENT
AND QUALITY CONTROL MANAGEMENT
Two Categories of Roadway Pavements
Rigid Pavement.
Flexible Pavement.
Rigid Pavement Typical Applications
High volume traffic lanes.
Freeway to freeway connections.
Exit ramps with heavy traffic.
3
Rigid Pavement
 Rigid pavements are those posses note worthy flexural strength. The stresses are
not transferred from grain to the lower layers as in case of flexible pavement
layers. The rigid pavements are made of Portland cement concrete-either plain,
reinforced or prestressed concrete. The plain cement concrete slabs are expected
to take up to about 40 kg/cm2 flexural stress. The rigid pavement has the slab
action and is capable of transmitting the wheel load stresses through a wide area
below .
4
Flexible pavement
 Flexible pavements are those, which on the whole have low flexural
strength and are rather flexible in their structural action under the
loads.
 The flexible pavement layers reflect the deformation of the lower
layers on to the surface of the layer.
5
A typical Flexible pavement consists
of four components
1). Surface course
2). Base course
3). Sub base course
4). Soil sub grade
6
Functions of pavement component
 Soil sub-grade:- the soil subgrade is a layer of natural soil prepared to
receive the layers of pavement materials placed over it
 Sub-base and base course:- these layers are made by bound or
unbound aggregate. some times in sub base course a layer of stabilized soil or
selected granular soil is also used.
 Wearing course:- the purpose of wearing course is to give a smooth riding
surface that is dense. it resists pressure exerted by tyres and takes up wear and
tear due to traffic. Wearing course also offers a water tight layer against the
surface water infiltration.
7
Flexible Pavement Typical
Applications
Traffic lanes
Auxiliary lanes
Ramps
Parking areas
Frontage roads
Shoulders
8
DESIGN FACTOR
 The various factors to be considers for the design
pavements:
Design wheel load
Sub-grade soil
Climatic factors
Pavement component materials
Environmental factor.
9
CROSS SECTIONAL ELEMENTS
LANE WIDTH
WIDTH OF SHOULDER
SIDE SLOPES
REDUCTION OF CROSS SECTION
CAMBER
ROAD LAND WIDTH
WIDTH OF MEDIAN AND EDGE STRIP
BASIC PRINCIPLES OF GEOMETRIC DESIGN
10
DESIGN OF PAVEMENT
 Soil and Material properties:-
From the soil and material investigations, the CBR values are found to be more than
10%. From the quarry and borrow area investigations, the good quality material
required for the construction is available in abundance.
 Traffic surveys:
An accurate estimate of the traffic that is likely to use the project road is very
important as it forms the basic input in planning, design, operation and financing.
Hence, detailed traffic surveys were carried out to assess the present day traffic and
its characteristics.
 Design Traffic:-
Traffic for the estimation of the Msa was extracted from the Traffic Report. Present
and estimated traffic for future along the project.
11
12
IRC: 37-2001
Flexible pavement design has been carried out using the IRC: 37-2001
and AASHTO design methods. IRC: 37-2001, a modification to IRC: 37-
1984 has been revised to incorporate the mechanistic design
approach.
The scope of pavement design
in this project can be divided into the following sections
Design of Flexible Pavement for Service roads
Design of Flexible Pavement for the Main carriageway design.
Design period:-
A 20-year design period (2015 - 2035) is assumed for the design of
flexible pavement.
Sub-grade strength:-
The new pavement will be constructed on a sub
grade with minimum soaked CBR of 10
Advantages of Flexible Pavement
 Adjusts to limited differential settlement
 Easily repaired
 Additional thickness added any time
 Non-skid properties do not deteriorate
 Quieter and smoother
 Tolerates a greater range of temperatures
13
Disadvantages of Flexible Pavement
Loses some flexibility and cohesion with time
Needs resurfacing sooner than PC concrete
Not normally chosen where water is expected
14
15
Design composition
16
DESIGN OF SERVICE ROADS
ROAD CONSTRUCTION ACTIVITY
 EARTHWORK EXCAVATION
This item of work deals with earthworks in excavation in all types of
soils is it for stacking of suitable soils or disposal of unsuitable soils
inclusive of necessary lead for transporting materials as per the terms
in contract documents.
 EMBANKMENT CONSTRUCTION
This item of work deals with construction of road embankment with
approved materials as per the terms of contract agreement.
17
EQUIPMENT/MACHINERY
 Motor Grader :1 No. as a minimum
 Tippers :10 -20 No. as a minimum
 Water Sprinkler :1 No. as a minimum
 Vibratory Roller :80 to 100KN 1 No. as a
minimum
18
SUBGRADE CONSTRUCTION
 The material used in subgrade shall generally be soil, moorum, gravel, a mixture of
these or any other approved material. In respect of quality of material, such
material shall be ensured to be free of logs, stumps, roots, rubbish for any
ingredients likely deteriorate or affect the stability of the subgrade. The material
resulting from the roadway excavation if found suitable will also be used. Material
which is having CBR value mentioned in technical specification shall be used in
subgrade.
 Procedure:
 The toe line and centre line are marked and pegs will be driven.
 The material shall be dumped in site at respective location.
 The material shall be spread in layers of uniform thickness not exceeding 200 mm
compacted thicknesses over the entire width of the subgrade by mechanical
means and will be graded with grader to the required camber.
 Moisture content of the material shall be checked and extra required will be
added.  
19
 The moisture content of each layer shall be checked and it should be within the range of 
OMC +1% to OMC -2 percent. If moisture content is found out of these limits the same will 
be brought within limits by addition of water or by aeration as the case may be. 
 The compaction shall be done with the help of vibratory roller of 8 to 10 ton static weight. 
Each layer shall be thoroughly compacted to the densities specified in the specifications 
which are mentioned at the end of this document for reference. The rolling pattern will be 
finalized in trial stretch. 
 On compaction of the particular stretch necessary field testing shall be carried out Field 
density shall be done in the manner and frequency as specified below.  
 If the required field density is not achieved, compaction shall be continued till required 
density is achieved.  
 Loose pockets if any will be removed and replaced with approved material.  
 The above stages shall be repeated till the top level of the subgrade is reached to the 
specified levels and grades. The top levels shall be checked and shall be within +20mm to 
-25mm of designed level. 
 All relevant QA and QC documents will be maintained for all stages of subgrade 
Construction. 
20
WET MIX MACADAM CONSTRUCTION
Preparation of Mix:
 The individual materials gradation shall be checked combined, proportions shall be 
fixed and combined gradation confirming to table 400-11 shall be arrived. 
 Material shall be fed to the mixing plant bins provided for individual sizes of 
aggregates to meet the required gradation. 
 While adding water, loss due to evaporation shall be taken in account. 
 Water in the wet mix shall not vary from the optimum by more than in the limits of +l/-
2 of OMC
Preparation of Base:
 The sub base shall be checked for proper lines and levels. It shall be made free from dust. Before the 
laying starts it should be made slightly wet and shall be given one plain pass. The lateral confinement 
for wet mix shall be provided by placing material before laying WMM in the adjoining shoulder portion. 
21
Laying of Wet Mix Macadam:
 The wet mix shall be transported from the mixing plant to the site with trippers. The mix 
shall be laid with paver finisher. The paver shall have suitable loading hoppers and 
distribution mechanism. The mix shall be laid manually in places where the paver 
movement is not possible. High or low spots shall be rectified as per MoRTH clause 
No406.6. The material shall be uniform and shall be free of pockets of fine material. The 
compaction of wet mix shall be done as per clause 406.3.5. The rolling shall be done with 
80-100KN vibratory roller. The rolling pattern shall be established in the trial stretch. Care 
shall be given at every stage so that there will not be any segregation. 
 Equipment/Machinery:
 WMM Plant : 1 No. 
 Grader : 1 No. as a minimum. 
 Tippers : 10 - 20 No. as a minimum 
 Roller (Vibratory) : 80 to 100KN.
 Paver Finisher : 1 No.
22
DENSE BITUMINOUS MACADAM
CONSTRUCTION
 Procedure:
 Mix Design:
The mix design shall be carried out according to MS-2 of Asphalt Institute. 
Preparation and Transportation of Mix:
 The individual bins of hot mix plant shall be calibrated for the particular size of material. 
 Material shall be fed to the mixing plant bins provided for individual sizes of aggregates to 
meet the required gradation. The temperature of binder at the time of mixing shall be in 
the range of 150'C-165'C and the aggregate in the range 150'C to 170'C .The difference 
between and the aggregate temperature shall not exceed 14'C any time. The mix shall be 
transported to the site with trippers properly covered with tarpaulins
23
 Preparation of Base:
 The sub base shall be checked for proper lines and levels. The surface shall be swept free 
from dust with air compressor. The tack coat shall be done if the WMM surface was 
primed and left for quite some time. 
 Laying of Dense Bituminous Macadam:
 The mix shall be laid with paver finisher. The paver shall have suitable loading hoppers 
and distribution mechanism. The paver shall have electronic sensor paver and string wire 
shall be run on steel pegs driven on both sides at 10m interval in straight portions and 
5m interval in curved portions. The mix shall be laid manually in places where the paver 
movement is not possible. The finished layer shall be checked for compaction. The 
compaction shall be checked by taking cores for every 250sq.m area and the degree of 
compaction shall not be less than 98% of lab Marshall Density or as specified by 
technical specification. 
 Equipment/Machinery:
 Hot Mix Plant (Batch Mix Type) 
 Paver Finisher ( Hydraulic) 
 Steel pegs
 Mechanical broomer/Air Compressor 
 Wheel borrow
 Edge cutter  24
BITUMINOUS CONCRETE CONSTRUCTION
 Procedure:
 Mix Design:
 The mix design shall be carried out according to MS-2 of Asphalt Institute.
 Preparation and Transportation of Mix:
 The individual bins of hot mix plant shall be calibrated for the particular size of material. 
Material shall be fed to the mixing plant bins provided for individual sizes of aggregates to 
meet the required gradation. The temperature of binder at the time of mixing shall be in 
the range of 150'C-165'C and the aggregate in the range 150'C to 170'C .
 Preparation of Base:
 The base shall be checked for proper lines and levels. The surface shall be swept free from 
dust with air compressor. The tack coat shall be done if the DBM surface was old for quite 
some time. 
25
 Laying of Bituminous Concrete:
 The mix shall be laid with paver finisher. The paver shall have suitable loading hoppers and 
distribution mechanism. The paver shall be electronic sensor paver and string wire shall be 
run on steel pegs driven on both sides at 10m interval in straight portions and 5m interval in 
curved portions. The mix shall be laid manually in places where the paver movement is not 
possible.The compaction of BC shall be done as per clause 501.6 and 501.7. The rolling shall 
be done with 80-100KN smooth wheeled tandem roller, 12-15 tones pneumatic tyred 
roller.
26
Equipment/Machinery:
 Excavators:
 Excavators are heavy construction equipment consisting of a boom, stick, bucket and cab 
on a rotating platform (known as the "house"). The house sits atop an undercarriage with 
tracks or wheels.
 Motor Grader:
        A motor grader is a construction machine with a long blade used to create a flat surface. 
The grader's purpose is to "finish grade" the "rough grading" performed by heavy 
equipment such as scrapers and bulldozers. Motor graders are commonly used in the 
construction and maintenance of dirt roads and gravel roads.
Bulldozer:
 A bulldozer is equipped with a substantial metal plate known as a blade used to push large 
quantities of soil, sand, rubble, or other such material during construction or conversion 
work and is also equipped at the rear with a claw-like device known as a ripper to loosen 
densely-compacted materials
27
Equipment/Machinery
 Motor Grader
28
 Excavator
 Bulldozer  Wheel Loader
29
 WMM Plant  Hot Mix Plant
30
Sensor Paver
31
Quality Management
 The Globalization and developing Technology in the Construction Industry is
leading to High competition in the Current market. The best response to a
competitive challenge in the Construction Industry is to become more
competitive. The best means of achieving this is by improving the product quality
and meeting the project schedule through a well designed Quality Management
system. The Quality Management system shall focus on providing improved
control on processes and practices, thus enhancing customer satisfaction through
its effective implementation.
Quality Policy
Quality System
Quality Strategy
32
CONCLUSION
 Design of flexible pavement as per IRC-37and quality control methods for
construction of fully access control express highway as ORR –package
(@km 72 to 83)
 As per the Design of the pavement the thickness of each layers are
observed as follows:
 As per the Design of the pavement the thickness of each layers are
observed as follows:
 Sub Grade: 500mm.
 GSB: 200mm.
 WMM: 250mm.
 DBM: 130mm.
 BC: 50mm.
 For the above design the material properties of the aggregate and
bitumen tests conducted as per the IS code and are within the allowable
limits.
33
THANK
YOU
34

Weitere ähnliche Inhalte

Was ist angesagt?

Pavement failures and maintenance
Pavement failures and maintenancePavement failures and maintenance
Pavement failures and maintenanceSatyapal Singh
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavementpjainrahul
 
Geometric Design of highway
Geometric Design of highway Geometric Design of highway
Geometric Design of highway RAMPRASAD KUMAWAT
 
Study of design of the flexible pavements ppt
Study of design of the flexible pavements pptStudy of design of the flexible pavements ppt
Study of design of the flexible pavements pptShaik Asif Ahmed
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavementpjainrahul
 
Highway route location
Highway route locationHighway route location
Highway route locationwrya hade
 
Overtaking sight distance
Overtaking sight distanceOvertaking sight distance
Overtaking sight distanceAglaia Connect
 
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTUVATSAL PATEL
 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPTVikas Sukhwal
 
Design Considerations for AASHTO Flexible pavement design
Design Considerations for AASHTO Flexible pavement designDesign Considerations for AASHTO Flexible pavement design
Design Considerations for AASHTO Flexible pavement designImran Nawaz
 
Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavementspradip dangar
 
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTUVATSAL PATEL
 
Seal coat,prime coat and tack coat
Seal coat,prime coat and tack coatSeal coat,prime coat and tack coat
Seal coat,prime coat and tack coatMuhammadArif856
 
Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Civil Zone
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)Anil Gupta
 

Was ist angesagt? (20)

Pavement failures and maintenance
Pavement failures and maintenancePavement failures and maintenance
Pavement failures and maintenance
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
Highway drainage
Highway drainageHighway drainage
Highway drainage
 
Geometric Design of highway
Geometric Design of highway Geometric Design of highway
Geometric Design of highway
 
Study of design of the flexible pavements ppt
Study of design of the flexible pavements pptStudy of design of the flexible pavements ppt
Study of design of the flexible pavements ppt
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
Highway route location
Highway route locationHighway route location
Highway route location
 
Unit 4
Unit 4Unit 4
Unit 4
 
Overtaking sight distance
Overtaking sight distanceOvertaking sight distance
Overtaking sight distance
 
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPT
 
Design Considerations for AASHTO Flexible pavement design
Design Considerations for AASHTO Flexible pavement designDesign Considerations for AASHTO Flexible pavement design
Design Considerations for AASHTO Flexible pavement design
 
Highway unit-1-hand-outs
Highway unit-1-hand-outsHighway unit-1-hand-outs
Highway unit-1-hand-outs
 
Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavements
 
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
 
water bound macadam road
water bound macadam roadwater bound macadam road
water bound macadam road
 
Seal coat,prime coat and tack coat
Seal coat,prime coat and tack coatSeal coat,prime coat and tack coat
Seal coat,prime coat and tack coat
 
Road construction
Road constructionRoad construction
Road construction
 
Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
 

Andere mochten auch

Narendra nagar flexible road pavement training report
Narendra nagar  flexible road pavement training reportNarendra nagar  flexible road pavement training report
Narendra nagar flexible road pavement training reportNarendra Nagar
 
Advanced road transporlation system report
Advanced road transporlation system reportAdvanced road transporlation system report
Advanced road transporlation system reportAbdul Aziz
 
Road Development and Maintenance of Rural Areas
Road Development and Maintenance of Rural AreasRoad Development and Maintenance of Rural Areas
Road Development and Maintenance of Rural AreasAmit Yadav
 
research project for civil engineering students
research project for civil engineering studentsresearch project for civil engineering students
research project for civil engineering studentsshivam96913245
 
" Design of Flexible Pavement "
" Design of Flexible Pavement "" Design of Flexible Pavement "
" Design of Flexible Pavement "Nishant Pandey
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement designRohit Ranjan
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentationPawan Kumar
 
Design Of Flexible Pavements
Design Of Flexible PavementsDesign Of Flexible Pavements
Design Of Flexible Pavementswhutton1
 
Dense Bituminous macadam
Dense Bituminous macadamDense Bituminous macadam
Dense Bituminous macadampradip dangar
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONGLA University
 

Andere mochten auch (14)

Narendra nagar flexible road pavement training report
Narendra nagar  flexible road pavement training reportNarendra nagar  flexible road pavement training report
Narendra nagar flexible road pavement training report
 
Advanced road transporlation system report
Advanced road transporlation system reportAdvanced road transporlation system report
Advanced road transporlation system report
 
Road Development and Maintenance of Rural Areas
Road Development and Maintenance of Rural AreasRoad Development and Maintenance of Rural Areas
Road Development and Maintenance of Rural Areas
 
Tools for Pavement Preservation
Tools for Pavement PreservationTools for Pavement Preservation
Tools for Pavement Preservation
 
research project for civil engineering students
research project for civil engineering studentsresearch project for civil engineering students
research project for civil engineering students
 
" Design of Flexible Pavement "
" Design of Flexible Pavement "" Design of Flexible Pavement "
" Design of Flexible Pavement "
 
FINAL REPORT
FINAL REPORTFINAL REPORT
FINAL REPORT
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement design
 
Lecture#01
Lecture#01Lecture#01
Lecture#01
 
4. wbm roads 10 sep
4. wbm roads 10 sep4. wbm roads 10 sep
4. wbm roads 10 sep
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentation
 
Design Of Flexible Pavements
Design Of Flexible PavementsDesign Of Flexible Pavements
Design Of Flexible Pavements
 
Dense Bituminous macadam
Dense Bituminous macadamDense Bituminous macadam
Dense Bituminous macadam
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTION
 

Ähnlich wie presentation on road pavement (zeeshan)

Village networking ppt
Village networking pptVillage networking ppt
Village networking pptPatel Tapan
 
Lecture one_introffffffffffffduction.pdf
Lecture one_introffffffffffffduction.pdfLecture one_introffffffffffffduction.pdf
Lecture one_introffffffffffffduction.pdfOmarAbdi39
 
PRESENTATION ON RIGID PAVEMExNT.pptx for
PRESENTATION ON RIGID PAVEMExNT.pptx forPRESENTATION ON RIGID PAVEMExNT.pptx for
PRESENTATION ON RIGID PAVEMExNT.pptx forVishalshukla347388
 
Rigid Pavements Design Part - I
Rigid Pavements Design Part - IRigid Pavements Design Part - I
Rigid Pavements Design Part - ISachin Kulkarni
 
Design and analysis of flexible pavemeT
Design and analysis of flexible pavemeTDesign and analysis of flexible pavemeT
Design and analysis of flexible pavemeTDevesh Chaurasia
 
Transportation Pavement.pptx
Transportation Pavement.pptxTransportation Pavement.pptx
Transportation Pavement.pptxWajehUlHassan
 
Pavement_design.pptx
Pavement_design.pptxPavement_design.pptx
Pavement_design.pptxShabbirAli81
 
Presentation on design of Rigid pavement.pptx
Presentation on design of Rigid pavement.pptxPresentation on design of Rigid pavement.pptx
Presentation on design of Rigid pavement.pptxamanpandey659864
 
Road construction pavements flexible rigid
Road construction pavements flexible rigidRoad construction pavements flexible rigid
Road construction pavements flexible rigidKumarS250747
 
CONSTRUCTION OF ROADS
CONSTRUCTION OF ROADSCONSTRUCTION OF ROADS
CONSTRUCTION OF ROADSreemajadwani
 
FOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptxFOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptxDolanGhosh4
 
journal publishing, how to publish research paper, Call For research paper, i...
journal publishing, how to publish research paper, Call For research paper, i...journal publishing, how to publish research paper, Call For research paper, i...
journal publishing, how to publish research paper, Call For research paper, i...IJERD Editor
 
MD NEHAL 8TH SEM PPT- 2pptx.pptx
MD NEHAL 8TH SEM PPT- 2pptx.pptxMD NEHAL 8TH SEM PPT- 2pptx.pptx
MD NEHAL 8TH SEM PPT- 2pptx.pptxnehal103998
 
Highway Construction Materials and Practice
Highway Construction Materials and PracticeHighway Construction Materials and Practice
Highway Construction Materials and PracticeSenthamizhan M
 

Ähnlich wie presentation on road pavement (zeeshan) (20)

Village networking ppt
Village networking pptVillage networking ppt
Village networking ppt
 
Lecture one_introffffffffffffduction.pdf
Lecture one_introffffffffffffduction.pdfLecture one_introffffffffffffduction.pdf
Lecture one_introffffffffffffduction.pdf
 
Rigid pavements
Rigid pavements Rigid pavements
Rigid pavements
 
DESIGN OF FLEXIBLE PEVEMENT
DESIGN OF FLEXIBLE PEVEMENTDESIGN OF FLEXIBLE PEVEMENT
DESIGN OF FLEXIBLE PEVEMENT
 
PRESENTATION ON RIGID PAVEMExNT.pptx for
PRESENTATION ON RIGID PAVEMExNT.pptx forPRESENTATION ON RIGID PAVEMExNT.pptx for
PRESENTATION ON RIGID PAVEMExNT.pptx for
 
PPT FINAL.pptx
PPT FINAL.pptxPPT FINAL.pptx
PPT FINAL.pptx
 
Rigid Pavements Design Part - I
Rigid Pavements Design Part - IRigid Pavements Design Part - I
Rigid Pavements Design Part - I
 
Design and analysis of flexible pavemeT
Design and analysis of flexible pavemeTDesign and analysis of flexible pavemeT
Design and analysis of flexible pavemeT
 
Transportation Pavement.pptx
Transportation Pavement.pptxTransportation Pavement.pptx
Transportation Pavement.pptx
 
Pavement_design.pptx
Pavement_design.pptxPavement_design.pptx
Pavement_design.pptx
 
Highway Pavement
Highway PavementHighway Pavement
Highway Pavement
 
Presentation on design of Rigid pavement.pptx
Presentation on design of Rigid pavement.pptxPresentation on design of Rigid pavement.pptx
Presentation on design of Rigid pavement.pptx
 
Road construction pavements flexible rigid
Road construction pavements flexible rigidRoad construction pavements flexible rigid
Road construction pavements flexible rigid
 
CONSTRUCTION OF ROADS
CONSTRUCTION OF ROADSCONSTRUCTION OF ROADS
CONSTRUCTION OF ROADS
 
Pavement design
Pavement designPavement design
Pavement design
 
Anshuman.pptx
Anshuman.pptxAnshuman.pptx
Anshuman.pptx
 
FOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptxFOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptx
 
journal publishing, how to publish research paper, Call For research paper, i...
journal publishing, how to publish research paper, Call For research paper, i...journal publishing, how to publish research paper, Call For research paper, i...
journal publishing, how to publish research paper, Call For research paper, i...
 
MD NEHAL 8TH SEM PPT- 2pptx.pptx
MD NEHAL 8TH SEM PPT- 2pptx.pptxMD NEHAL 8TH SEM PPT- 2pptx.pptx
MD NEHAL 8TH SEM PPT- 2pptx.pptx
 
Highway Construction Materials and Practice
Highway Construction Materials and PracticeHighway Construction Materials and Practice
Highway Construction Materials and Practice
 

Kürzlich hochgeladen

Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 

Kürzlich hochgeladen (20)

Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 

presentation on road pavement (zeeshan)

  • 1. 1 Presented by:- Shahrukh khan (1248900058) Md. Zeeshan Qumer (1248900035) Tarique Ali (1248900066) Sadique Aziz (1248900052)
  • 2. 2 DESIGN ASPECTS OF FLEXIBLE PAVEMENT AND QUALITY CONTROL MANAGEMENT
  • 3. Two Categories of Roadway Pavements Rigid Pavement. Flexible Pavement. Rigid Pavement Typical Applications High volume traffic lanes. Freeway to freeway connections. Exit ramps with heavy traffic. 3
  • 4. Rigid Pavement  Rigid pavements are those posses note worthy flexural strength. The stresses are not transferred from grain to the lower layers as in case of flexible pavement layers. The rigid pavements are made of Portland cement concrete-either plain, reinforced or prestressed concrete. The plain cement concrete slabs are expected to take up to about 40 kg/cm2 flexural stress. The rigid pavement has the slab action and is capable of transmitting the wheel load stresses through a wide area below . 4
  • 5. Flexible pavement  Flexible pavements are those, which on the whole have low flexural strength and are rather flexible in their structural action under the loads.  The flexible pavement layers reflect the deformation of the lower layers on to the surface of the layer. 5
  • 6. A typical Flexible pavement consists of four components 1). Surface course 2). Base course 3). Sub base course 4). Soil sub grade 6
  • 7. Functions of pavement component  Soil sub-grade:- the soil subgrade is a layer of natural soil prepared to receive the layers of pavement materials placed over it  Sub-base and base course:- these layers are made by bound or unbound aggregate. some times in sub base course a layer of stabilized soil or selected granular soil is also used.  Wearing course:- the purpose of wearing course is to give a smooth riding surface that is dense. it resists pressure exerted by tyres and takes up wear and tear due to traffic. Wearing course also offers a water tight layer against the surface water infiltration. 7
  • 8. Flexible Pavement Typical Applications Traffic lanes Auxiliary lanes Ramps Parking areas Frontage roads Shoulders 8
  • 9. DESIGN FACTOR  The various factors to be considers for the design pavements: Design wheel load Sub-grade soil Climatic factors Pavement component materials Environmental factor. 9
  • 10. CROSS SECTIONAL ELEMENTS LANE WIDTH WIDTH OF SHOULDER SIDE SLOPES REDUCTION OF CROSS SECTION CAMBER ROAD LAND WIDTH WIDTH OF MEDIAN AND EDGE STRIP BASIC PRINCIPLES OF GEOMETRIC DESIGN 10
  • 11. DESIGN OF PAVEMENT  Soil and Material properties:- From the soil and material investigations, the CBR values are found to be more than 10%. From the quarry and borrow area investigations, the good quality material required for the construction is available in abundance.  Traffic surveys: An accurate estimate of the traffic that is likely to use the project road is very important as it forms the basic input in planning, design, operation and financing. Hence, detailed traffic surveys were carried out to assess the present day traffic and its characteristics.  Design Traffic:- Traffic for the estimation of the Msa was extracted from the Traffic Report. Present and estimated traffic for future along the project. 11
  • 12. 12 IRC: 37-2001 Flexible pavement design has been carried out using the IRC: 37-2001 and AASHTO design methods. IRC: 37-2001, a modification to IRC: 37- 1984 has been revised to incorporate the mechanistic design approach. The scope of pavement design in this project can be divided into the following sections Design of Flexible Pavement for Service roads Design of Flexible Pavement for the Main carriageway design. Design period:- A 20-year design period (2015 - 2035) is assumed for the design of flexible pavement. Sub-grade strength:- The new pavement will be constructed on a sub grade with minimum soaked CBR of 10
  • 13. Advantages of Flexible Pavement  Adjusts to limited differential settlement  Easily repaired  Additional thickness added any time  Non-skid properties do not deteriorate  Quieter and smoother  Tolerates a greater range of temperatures 13
  • 14. Disadvantages of Flexible Pavement Loses some flexibility and cohesion with time Needs resurfacing sooner than PC concrete Not normally chosen where water is expected 14
  • 17. ROAD CONSTRUCTION ACTIVITY  EARTHWORK EXCAVATION This item of work deals with earthworks in excavation in all types of soils is it for stacking of suitable soils or disposal of unsuitable soils inclusive of necessary lead for transporting materials as per the terms in contract documents.  EMBANKMENT CONSTRUCTION This item of work deals with construction of road embankment with approved materials as per the terms of contract agreement. 17
  • 18. EQUIPMENT/MACHINERY  Motor Grader :1 No. as a minimum  Tippers :10 -20 No. as a minimum  Water Sprinkler :1 No. as a minimum  Vibratory Roller :80 to 100KN 1 No. as a minimum 18
  • 19. SUBGRADE CONSTRUCTION  The material used in subgrade shall generally be soil, moorum, gravel, a mixture of these or any other approved material. In respect of quality of material, such material shall be ensured to be free of logs, stumps, roots, rubbish for any ingredients likely deteriorate or affect the stability of the subgrade. The material resulting from the roadway excavation if found suitable will also be used. Material which is having CBR value mentioned in technical specification shall be used in subgrade.  Procedure:  The toe line and centre line are marked and pegs will be driven.  The material shall be dumped in site at respective location.  The material shall be spread in layers of uniform thickness not exceeding 200 mm compacted thicknesses over the entire width of the subgrade by mechanical means and will be graded with grader to the required camber.  Moisture content of the material shall be checked and extra required will be added.   19
  • 20.  The moisture content of each layer shall be checked and it should be within the range of  OMC +1% to OMC -2 percent. If moisture content is found out of these limits the same will  be brought within limits by addition of water or by aeration as the case may be.   The compaction shall be done with the help of vibratory roller of 8 to 10 ton static weight.  Each layer shall be thoroughly compacted to the densities specified in the specifications  which are mentioned at the end of this document for reference. The rolling pattern will be  finalized in trial stretch.   On compaction of the particular stretch necessary field testing shall be carried out Field  density shall be done in the manner and frequency as specified below.    If the required field density is not achieved, compaction shall be continued till required  density is achieved.    Loose pockets if any will be removed and replaced with approved material.    The above stages shall be repeated till the top level of the subgrade is reached to the  specified levels and grades. The top levels shall be checked and shall be within +20mm to  -25mm of designed level.   All relevant QA and QC documents will be maintained for all stages of subgrade  Construction.  20
  • 21. WET MIX MACADAM CONSTRUCTION Preparation of Mix:  The individual materials gradation shall be checked combined, proportions shall be  fixed and combined gradation confirming to table 400-11 shall be arrived.   Material shall be fed to the mixing plant bins provided for individual sizes of  aggregates to meet the required gradation.   While adding water, loss due to evaporation shall be taken in account.   Water in the wet mix shall not vary from the optimum by more than in the limits of +l/- 2 of OMC Preparation of Base:  The sub base shall be checked for proper lines and levels. It shall be made free from dust. Before the  laying starts it should be made slightly wet and shall be given one plain pass. The lateral confinement  for wet mix shall be provided by placing material before laying WMM in the adjoining shoulder portion.  21
  • 22. Laying of Wet Mix Macadam:  The wet mix shall be transported from the mixing plant to the site with trippers. The mix  shall be laid with paver finisher. The paver shall have suitable loading hoppers and  distribution mechanism. The mix shall be laid manually in places where the paver  movement is not possible. High or low spots shall be rectified as per MoRTH clause  No406.6. The material shall be uniform and shall be free of pockets of fine material. The  compaction of wet mix shall be done as per clause 406.3.5. The rolling shall be done with  80-100KN vibratory roller. The rolling pattern shall be established in the trial stretch. Care  shall be given at every stage so that there will not be any segregation.   Equipment/Machinery:  WMM Plant : 1 No.   Grader : 1 No. as a minimum.   Tippers : 10 - 20 No. as a minimum   Roller (Vibratory) : 80 to 100KN.  Paver Finisher : 1 No. 22
  • 23. DENSE BITUMINOUS MACADAM CONSTRUCTION  Procedure:  Mix Design: The mix design shall be carried out according to MS-2 of Asphalt Institute.  Preparation and Transportation of Mix:  The individual bins of hot mix plant shall be calibrated for the particular size of material.   Material shall be fed to the mixing plant bins provided for individual sizes of aggregates to  meet the required gradation. The temperature of binder at the time of mixing shall be in  the range of 150'C-165'C and the aggregate in the range 150'C to 170'C .The difference  between and the aggregate temperature shall not exceed 14'C any time. The mix shall be  transported to the site with trippers properly covered with tarpaulins 23
  • 24.  Preparation of Base:  The sub base shall be checked for proper lines and levels. The surface shall be swept free  from dust with air compressor. The tack coat shall be done if the WMM surface was  primed and left for quite some time.   Laying of Dense Bituminous Macadam:  The mix shall be laid with paver finisher. The paver shall have suitable loading hoppers  and distribution mechanism. The paver shall have electronic sensor paver and string wire  shall be run on steel pegs driven on both sides at 10m interval in straight portions and  5m interval in curved portions. The mix shall be laid manually in places where the paver  movement is not possible. The finished layer shall be checked for compaction. The  compaction shall be checked by taking cores for every 250sq.m area and the degree of  compaction shall not be less than 98% of lab Marshall Density or as specified by  technical specification.   Equipment/Machinery:  Hot Mix Plant (Batch Mix Type)   Paver Finisher ( Hydraulic)   Steel pegs  Mechanical broomer/Air Compressor   Wheel borrow  Edge cutter  24
  • 25. BITUMINOUS CONCRETE CONSTRUCTION  Procedure:  Mix Design:  The mix design shall be carried out according to MS-2 of Asphalt Institute.  Preparation and Transportation of Mix:  The individual bins of hot mix plant shall be calibrated for the particular size of material.  Material shall be fed to the mixing plant bins provided for individual sizes of aggregates to  meet the required gradation. The temperature of binder at the time of mixing shall be in  the range of 150'C-165'C and the aggregate in the range 150'C to 170'C .  Preparation of Base:  The base shall be checked for proper lines and levels. The surface shall be swept free from  dust with air compressor. The tack coat shall be done if the DBM surface was old for quite  some time.  25
  • 26.  Laying of Bituminous Concrete:  The mix shall be laid with paver finisher. The paver shall have suitable loading hoppers and  distribution mechanism. The paver shall be electronic sensor paver and string wire shall be  run on steel pegs driven on both sides at 10m interval in straight portions and 5m interval in  curved portions. The mix shall be laid manually in places where the paver movement is not  possible.The compaction of BC shall be done as per clause 501.6 and 501.7. The rolling shall  be done with 80-100KN smooth wheeled tandem roller, 12-15 tones pneumatic tyred  roller. 26
  • 27. Equipment/Machinery:  Excavators:  Excavators are heavy construction equipment consisting of a boom, stick, bucket and cab  on a rotating platform (known as the "house"). The house sits atop an undercarriage with  tracks or wheels.  Motor Grader:         A motor grader is a construction machine with a long blade used to create a flat surface.  The grader's purpose is to "finish grade" the "rough grading" performed by heavy  equipment such as scrapers and bulldozers. Motor graders are commonly used in the  construction and maintenance of dirt roads and gravel roads. Bulldozer:  A bulldozer is equipped with a substantial metal plate known as a blade used to push large  quantities of soil, sand, rubble, or other such material during construction or conversion  work and is also equipped at the rear with a claw-like device known as a ripper to loosen  densely-compacted materials 27
  • 29.  Bulldozer  Wheel Loader 29
  • 30.  WMM Plant  Hot Mix Plant 30
  • 32. Quality Management  The Globalization and developing Technology in the Construction Industry is leading to High competition in the Current market. The best response to a competitive challenge in the Construction Industry is to become more competitive. The best means of achieving this is by improving the product quality and meeting the project schedule through a well designed Quality Management system. The Quality Management system shall focus on providing improved control on processes and practices, thus enhancing customer satisfaction through its effective implementation. Quality Policy Quality System Quality Strategy 32
  • 33. CONCLUSION  Design of flexible pavement as per IRC-37and quality control methods for construction of fully access control express highway as ORR –package (@km 72 to 83)  As per the Design of the pavement the thickness of each layers are observed as follows:  As per the Design of the pavement the thickness of each layers are observed as follows:  Sub Grade: 500mm.  GSB: 200mm.  WMM: 250mm.  DBM: 130mm.  BC: 50mm.  For the above design the material properties of the aggregate and bitumen tests conducted as per the IS code and are within the allowable limits. 33