RAILWAY
SIGNALLING
Aditi K. Shah
Roll No.: 38
SALIENT FEATURES OF IR
• More than 150 years old
• In beginning it was total private ownership
• Now it is owned and managed by the Govt.
Of India.
• Mix of the oldest technology to the latest
state of the art
• Largest employer
• Annual output measured in billions
• Perceived as harbinger of economic
development
• Considered the lifeline of the nation
IR’S DAILY TRANSPORT OUTPUT
17 Million Passengers
2 Million Tonnes freight loading
8800 Passenger trains
5900 Freight trains
Thus, IR's trains cover the round-trip
distance between earth and moon,
four times a day !
To err is human…
To safeguard against that is
Railway Signalling
HISTORY OF RAILWAY SIGNALLING
1825: FIRST RAILWAY LINE FOR GOODS
TRAFFIC WAS OPENED BETWEEN
DARLINGTON TO STOCKTON(U.K.)
UNIFORMED MEN ON HORSESUNIFORMED MEN ON HORSES
GUIDED THE TRAINGUIDED THE TRAIN
1830 : FIRST PASSENGER TRAIN BETWEEN
LIVERPOOL AND MANCHESTER
POLICEMAN WERE POSTED ATPOLICEMAN WERE POSTED AT
FIXED INTERVALSFIXED INTERVALS
HISTORY OF RAILWAY SIGNALLING
1838 : POLICEMEN WERE REPLACED BY
FIXED MECHANICAL SIGNALSFIXED MECHANICAL SIGNALS
1853 : FIRST TRAIN SERVICE INTRODUCED
ON INDIAN RAILWAYS,
SEMAPHORE SIGNALS WERE USED.SEMAPHORE SIGNALS WERE USED.
 Operating rail traffic, safely, speedily and economically.
 Increasing line capacity.
 Providing systems on safe principles.
 Preventing conflicting movements of trains.
 Ensuring adequate interval of space between following
trains or those which can cross or approach each other’s
path.
SIGNALLING
Signalling is a device by which the movement of the train is
controlled
PURPOSE OF SIGNALLING
CLASSIFICATION OF SIGNALS
SIGNALS
FUNCTION PURPOSELOCATION OPERATION
STOP
WARNER
DISC
COLORED
OUTER
HOME
STARTER
ADVANCE
ROUTING
REPEATER
CALL ON
HAND
FIXED
DETONATING
CLASSIFICATION OF SIGNALS
Controlling signals
Which are mandatory to
observe for train movement
CLASSIFICATION OF SIGNALS
Indicating signals
Correspond to the traffic signs
of highways. Also mandatory to
observe.
CLASSIFICATION OF SIGNALS
Warning signals
They provide a pre-hand
warning to the driver
about the controlling
signals ahead. These only
enhance the efficiency
and provide a further
safety caution.
STOP SIGNAL
• The normal position of the signal is horizontal
& it can be lowered at an angle of 45o
to 60o
with horizontal by pulling the wire from the
signal cabin. In the horizontal position, the
signal indicates the “danger stop” & it is said
“on position”. When the arm is in inclined
position it indicates “clear-proceed” & is said
in “off-position”.
• In the night, the light of the lamp passing
through the spectacles gives signals. Thus red
light indicates danger and green light
indicates clear.
STOP SIGNAL
The length and width of arm vary from
120-167 cm and 23-35 cm respectively
The outer end of the arm is about 2.45 cm
Broader than that of the hinged end
It is placed on the left hand side of the
direction of movement of train
The side of the arm facing the driver is
painted red with white band near the end
The other side is painted white with black
bands
7.67 m
SEMAPHORE
Operation Time Position Of Arm Position Of Signal Indication Given
Horizontal Arm ON Stop
Inclined At 60
o
or 45
o
OFF Proceed
Red Light ON Stop
Green Light OFF Proceed
Day Time
Night Time
STOP SIGNAL
WARNER SIGNAL
These signals are similar to stop signals with the
exception that at their free end V notch is cut to
distinguish it from stop signals
Signals placed ahead of the stop signals to warn the
driver before entering the station
Warner signals are placed generally at about 540 m
away from the stop signals
SIGNAL INDICATIONS
Inclined Position: Track is clear and driver can
proceed with confidence
Horizontal Position: Deriver can take his train
upto Stop signal cautiously
SEMAPHORE AND WARNER SIGNAL
Semaphore and Warner Signals can be placed on same the
pole. Semaphore is placed on top and the Warner at about
2 m below it
SIGNAL INDICATIONS
Both in Horizontal Position: Neither approaching
section nor next block is clear
When Semaphore is inclined and Warner Horizontal
proceed with precaution i.e. section up to station is clear but
not the block beyond.
Both in Inclined Position:
Track is clear and proceed
with confidence
SEMAPHORE
WARNER
DISC SIGNAL
These are shunting signals which are used for low speed
movements during shunting operations. They consist of
circular discs with red bands on white background
SIGNAL INDICATIONS
When Red band is Horizontal: Stop
When Red band is Inclined: Proceed
COLORED LIGHT SIGNALS
These are automatic signals & give
indications by electric lights both
during the day as well as in night.
The signals are provided with
green, yellow and red light.
These signals are provided with
special lenses & hoods to emit beam
of light which can be visible from a
long distance even during the day.
Proceed
Proceed with
Caution
Stop
OPERATIONAL SIGNAL
Fixed.
(a) Semaphore.
(b) Colour light.
Moveable.
(a) HAND SIGNALS. (Such as Flags,
hand lights)
(b) Detonators.
(c) Cabin Signals.
OUTER SIGNAL
This is Warner signal for the driver which gives the
indication of the position ahead whether the platform is
clear or not.
A certain distance is required to bring a moving train to
halt. This distance depends upon the speed of the train, its
weight, brake power of the locomotive etc.
Thus the first signal is provided at this distance beyond
the station limit, that is why it is know as outer signal
ASS
SSHS
OS
OHS
SIGNALS ACCORDING TO LOCATION
INTERLOCKING STANDARDS
STANDARD-I Applicable for station for train speeds upto 50 kmph
STANDARD-II Applicable for station for train speeds upto 75 kmph
STANDARD-III Applicable for station for unrestrictedspeeds
In the inclined or proceed position it indicates that track and
platform is clear and proceed normally without any danger.
In horizontal or stop position it indicates that the driver
must bring his train to halt within 90 m before outer signal
and than proceed to the home signal with caution
OUTER SIGNAL
OS
HOME SIGNAL
After the outer signal towards station is a stop signal and
exactly placed at the station limit is called home or stop
signal. Its main function is to protect the stations. The
permission to enter the platform is given by the operation of
this signal. The maximum unprotected distance between the
signal and the point, it is intended to protect is specified as
180 m due to its location at the door of station, it is called
home signal.
HSOHS
STARTER SIGNAL
This signal is provided at the forward end of platform and
controls the movement of the train as they leave the station.
It gives permission to the train to leave the platform for next
station. No train can leave the platform unless this signal is
lowered, that is why it is called starter signal. A separate
signal is provided for each line.
SS
ADVANCE STARTER SIGNAL
The limit of a station section lies between the home
signal and the advance starter signal. The signal which
allows the train to enter in block section is called advance
starter signal. It is always placed beyond the outer most set
of the point connections.
ASS
SSHSOHS
station section
ROUTING SIGNAL
When many branch lines diverge in different directions
from the main line, it is very difficult to provide individual
signal for each line at the divergent point.
In such situations various signals for main line and
branch lines are fixed on the same vertical post. These
signals are called routing signal. Generally signal for main
line is kept higher than those for branch lines
REPEATING SIGNAL
When the view of the main signal is obstructed due to
some structures or on curves etc. some signals are used to
repeat the information of the main signal. Such signal are
know as repeating signal.
CALLING ON SIGNAL
These signal are similar to semaphore signal, but
they are smaller in size and are fixed on the same post
below the main signals. A calling on signal permits a train
to proceed with caution after the train has been brought to
a halt by the main signal. These are helpful when repair
works are going on.
T
H
A
N
K
Y
O
U

Weitere ähnliche Inhalte

Was ist angesagt?

Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: TurnoutsVijai Krishnan V
 
Chapter 3 station,yards,points and crossing,signalling and interlocking
Chapter 3 station,yards,points and crossing,signalling and interlockingChapter 3 station,yards,points and crossing,signalling and interlocking
Chapter 3 station,yards,points and crossing,signalling and interlockingdhara dattani
 
Indian Railway Signals & Systems
Indian Railway Signals & SystemsIndian Railway Signals & Systems
Indian Railway Signals & SystemsArbaz Kazi
 
Points and crossing
Points and crossingPoints and crossing
Points and crossingAkash Patel
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)RAMPRASAD KUMAWAT
 
Basics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBasics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBhaskar Kumar Dan
 
Signaling in railways
Signaling in railways Signaling in railways
Signaling in railways Suresh Sunny
 
Stations and Yards of Railway
Stations and Yards of RailwayStations and Yards of Railway
Stations and Yards of RailwaySouvik Mondal
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway EngineeringLatif Hyder Wadho
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation PptSachin Singh
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian RailwayArbaz Kazi
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and jointsDeven Diran
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gaugeMani Vel
 

Was ist angesagt? (20)

Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: Turnouts
 
Sight distance
Sight distanceSight distance
Sight distance
 
Chapter 3 station,yards,points and crossing,signalling and interlocking
Chapter 3 station,yards,points and crossing,signalling and interlockingChapter 3 station,yards,points and crossing,signalling and interlocking
Chapter 3 station,yards,points and crossing,signalling and interlocking
 
Railway Track Maintenance
Railway Track  MaintenanceRailway Track  Maintenance
Railway Track Maintenance
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Indian Railway Signals & Systems
Indian Railway Signals & SystemsIndian Railway Signals & Systems
Indian Railway Signals & Systems
 
Points and crossing
Points and crossingPoints and crossing
Points and crossing
 
Railway signal
Railway signalRailway signal
Railway signal
 
road markings
road markingsroad markings
road markings
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
turnouts in railways
 turnouts in railways turnouts in railways
turnouts in railways
 
Basics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBasics of Metro Railway Signalling system
Basics of Metro Railway Signalling system
 
Signaling in railways
Signaling in railways Signaling in railways
Signaling in railways
 
Stations and Yards of Railway
Stations and Yards of RailwayStations and Yards of Railway
Stations and Yards of Railway
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway Engineering
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation Ppt
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian Railway
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and joints
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gauge
 

Ähnlich wie Railway Signalling by Aditi Shah

signals and GSM-R in railway ppt
signals and GSM-R in railway pptsignals and GSM-R in railway ppt
signals and GSM-R in railway pptLokesh Gogia
 
signal system ppt basic intro.pdf
signal system ppt  basic intro.pdfsignal system ppt  basic intro.pdf
signal system ppt basic intro.pdfAshish585772
 
Railway_signalling and interlocking_.pptx
Railway_signalling and interlocking_.pptxRailway_signalling and interlocking_.pptx
Railway_signalling and interlocking_.pptxSadanand Sahu
 
Rohit summer ppt
Rohit summer pptRohit summer ppt
Rohit summer pptrohit kumar
 
cc ppt Transportation engg poly unit 4(4)
cc ppt Transportation engg poly unit 4(4)cc ppt Transportation engg poly unit 4(4)
cc ppt Transportation engg poly unit 4(4)Coomarasamy Chidambaram
 
signalling & Interlocking.pptx
signalling & Interlocking.pptxsignalling & Interlocking.pptx
signalling & Interlocking.pptxAnujyadav514462
 
Motor Coach & Transit Drivers: Student Notes
Motor Coach & Transit Drivers: Student NotesMotor Coach & Transit Drivers: Student Notes
Motor Coach & Transit Drivers: Student NotesOperation Lifesaver
 
Signalling System At railway
Signalling System At railwaySignalling System At railway
Signalling System At railwayShikha Mishra
 
Alive and Truckin': Student Notes
Alive and Truckin': Student NotesAlive and Truckin': Student Notes
Alive and Truckin': Student NotesOperation Lifesaver
 
Newly Licensed Drivers: Student Notes
Newly Licensed Drivers: Student NotesNewly Licensed Drivers: Student Notes
Newly Licensed Drivers: Student NotesOperation Lifesaver
 
Live to Help Another Day: Student Notes
Live to Help Another Day: Student NotesLive to Help Another Day: Student Notes
Live to Help Another Day: Student NotesOperation Lifesaver
 
Airfield Lighting Introductory
Airfield Lighting IntroductoryAirfield Lighting Introductory
Airfield Lighting IntroductoryMilten Jose
 
report on the West central railway
report on the West central railwayreport on the West central railway
report on the West central railwayYuvraj Singh
 
Make It A Roundtrip: Student Notes
Make It A Roundtrip: Student NotesMake It A Roundtrip: Student Notes
Make It A Roundtrip: Student NotesOperation Lifesaver
 
AIRPORT 06.pptx
AIRPORT 06.pptxAIRPORT 06.pptx
AIRPORT 06.pptxRishi Nath
 

Ähnlich wie Railway Signalling by Aditi Shah (20)

Signals.pptx
Signals.pptxSignals.pptx
Signals.pptx
 
signals and GSM-R in railway ppt
signals and GSM-R in railway pptsignals and GSM-R in railway ppt
signals and GSM-R in railway ppt
 
signal system ppt basic intro.pdf
signal system ppt  basic intro.pdfsignal system ppt  basic intro.pdf
signal system ppt basic intro.pdf
 
Railway_signalling and interlocking_.pptx
Railway_signalling and interlocking_.pptxRailway_signalling and interlocking_.pptx
Railway_signalling and interlocking_.pptx
 
Rohit summer ppt
Rohit summer pptRohit summer ppt
Rohit summer ppt
 
Station yards
Station yardsStation yards
Station yards
 
cc ppt Transportation engg poly unit 4(4)
cc ppt Transportation engg poly unit 4(4)cc ppt Transportation engg poly unit 4(4)
cc ppt Transportation engg poly unit 4(4)
 
signalling & Interlocking.pptx
signalling & Interlocking.pptxsignalling & Interlocking.pptx
signalling & Interlocking.pptx
 
Motor Coach & Transit Drivers: Student Notes
Motor Coach & Transit Drivers: Student NotesMotor Coach & Transit Drivers: Student Notes
Motor Coach & Transit Drivers: Student Notes
 
Signalling System At railway
Signalling System At railwaySignalling System At railway
Signalling System At railway
 
Airport lighting
Airport lightingAirport lighting
Airport lighting
 
Alive and Truckin': Student Notes
Alive and Truckin': Student NotesAlive and Truckin': Student Notes
Alive and Truckin': Student Notes
 
Newly Licensed Drivers: Student Notes
Newly Licensed Drivers: Student NotesNewly Licensed Drivers: Student Notes
Newly Licensed Drivers: Student Notes
 
Live to Help Another Day: Student Notes
Live to Help Another Day: Student NotesLive to Help Another Day: Student Notes
Live to Help Another Day: Student Notes
 
Airport lighting
Airport lightingAirport lighting
Airport lighting
 
Airfield Lighting Introductory
Airfield Lighting IntroductoryAirfield Lighting Introductory
Airfield Lighting Introductory
 
report on the West central railway
report on the West central railwayreport on the West central railway
report on the West central railway
 
Make It A Roundtrip: Student Notes
Make It A Roundtrip: Student NotesMake It A Roundtrip: Student Notes
Make It A Roundtrip: Student Notes
 
Signals
SignalsSignals
Signals
 
AIRPORT 06.pptx
AIRPORT 06.pptxAIRPORT 06.pptx
AIRPORT 06.pptx
 

Mehr von Aditi Shah

Construction Material: Lime
Construction Material: LimeConstruction Material: Lime
Construction Material: LimeAditi Shah
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction managementAditi Shah
 
The most important skill-Communication
The most important skill-CommunicationThe most important skill-Communication
The most important skill-CommunicationAditi Shah
 
Drainage system
Drainage systemDrainage system
Drainage systemAditi Shah
 

Mehr von Aditi Shah (6)

Construction Material: Lime
Construction Material: LimeConstruction Material: Lime
Construction Material: Lime
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
The most important skill-Communication
The most important skill-CommunicationThe most important skill-Communication
The most important skill-Communication
 
Flooring
FlooringFlooring
Flooring
 
Chandigarh
ChandigarhChandigarh
Chandigarh
 
Drainage system
Drainage systemDrainage system
Drainage system
 

Kürzlich hochgeladen

Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 

Kürzlich hochgeladen (20)

Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 

Railway Signalling by Aditi Shah

  • 2. SALIENT FEATURES OF IR • More than 150 years old • In beginning it was total private ownership • Now it is owned and managed by the Govt. Of India. • Mix of the oldest technology to the latest state of the art • Largest employer • Annual output measured in billions • Perceived as harbinger of economic development • Considered the lifeline of the nation
  • 3. IR’S DAILY TRANSPORT OUTPUT 17 Million Passengers 2 Million Tonnes freight loading 8800 Passenger trains 5900 Freight trains Thus, IR's trains cover the round-trip distance between earth and moon, four times a day !
  • 4. To err is human… To safeguard against that is Railway Signalling
  • 5. HISTORY OF RAILWAY SIGNALLING 1825: FIRST RAILWAY LINE FOR GOODS TRAFFIC WAS OPENED BETWEEN DARLINGTON TO STOCKTON(U.K.) UNIFORMED MEN ON HORSESUNIFORMED MEN ON HORSES GUIDED THE TRAINGUIDED THE TRAIN 1830 : FIRST PASSENGER TRAIN BETWEEN LIVERPOOL AND MANCHESTER POLICEMAN WERE POSTED ATPOLICEMAN WERE POSTED AT FIXED INTERVALSFIXED INTERVALS
  • 6. HISTORY OF RAILWAY SIGNALLING 1838 : POLICEMEN WERE REPLACED BY FIXED MECHANICAL SIGNALSFIXED MECHANICAL SIGNALS 1853 : FIRST TRAIN SERVICE INTRODUCED ON INDIAN RAILWAYS, SEMAPHORE SIGNALS WERE USED.SEMAPHORE SIGNALS WERE USED.
  • 7.  Operating rail traffic, safely, speedily and economically.  Increasing line capacity.  Providing systems on safe principles.  Preventing conflicting movements of trains.  Ensuring adequate interval of space between following trains or those which can cross or approach each other’s path. SIGNALLING Signalling is a device by which the movement of the train is controlled PURPOSE OF SIGNALLING
  • 8. CLASSIFICATION OF SIGNALS SIGNALS FUNCTION PURPOSELOCATION OPERATION STOP WARNER DISC COLORED OUTER HOME STARTER ADVANCE ROUTING REPEATER CALL ON HAND FIXED DETONATING
  • 9. CLASSIFICATION OF SIGNALS Controlling signals Which are mandatory to observe for train movement
  • 10. CLASSIFICATION OF SIGNALS Indicating signals Correspond to the traffic signs of highways. Also mandatory to observe.
  • 11. CLASSIFICATION OF SIGNALS Warning signals They provide a pre-hand warning to the driver about the controlling signals ahead. These only enhance the efficiency and provide a further safety caution.
  • 12. STOP SIGNAL • The normal position of the signal is horizontal & it can be lowered at an angle of 45o to 60o with horizontal by pulling the wire from the signal cabin. In the horizontal position, the signal indicates the “danger stop” & it is said “on position”. When the arm is in inclined position it indicates “clear-proceed” & is said in “off-position”. • In the night, the light of the lamp passing through the spectacles gives signals. Thus red light indicates danger and green light indicates clear.
  • 13. STOP SIGNAL The length and width of arm vary from 120-167 cm and 23-35 cm respectively The outer end of the arm is about 2.45 cm Broader than that of the hinged end It is placed on the left hand side of the direction of movement of train The side of the arm facing the driver is painted red with white band near the end The other side is painted white with black bands 7.67 m
  • 14. SEMAPHORE Operation Time Position Of Arm Position Of Signal Indication Given Horizontal Arm ON Stop Inclined At 60 o or 45 o OFF Proceed Red Light ON Stop Green Light OFF Proceed Day Time Night Time STOP SIGNAL
  • 15. WARNER SIGNAL These signals are similar to stop signals with the exception that at their free end V notch is cut to distinguish it from stop signals Signals placed ahead of the stop signals to warn the driver before entering the station Warner signals are placed generally at about 540 m away from the stop signals SIGNAL INDICATIONS Inclined Position: Track is clear and driver can proceed with confidence Horizontal Position: Deriver can take his train upto Stop signal cautiously
  • 16. SEMAPHORE AND WARNER SIGNAL Semaphore and Warner Signals can be placed on same the pole. Semaphore is placed on top and the Warner at about 2 m below it SIGNAL INDICATIONS Both in Horizontal Position: Neither approaching section nor next block is clear When Semaphore is inclined and Warner Horizontal proceed with precaution i.e. section up to station is clear but not the block beyond. Both in Inclined Position: Track is clear and proceed with confidence SEMAPHORE WARNER
  • 17. DISC SIGNAL These are shunting signals which are used for low speed movements during shunting operations. They consist of circular discs with red bands on white background SIGNAL INDICATIONS When Red band is Horizontal: Stop When Red band is Inclined: Proceed
  • 18. COLORED LIGHT SIGNALS These are automatic signals & give indications by electric lights both during the day as well as in night. The signals are provided with green, yellow and red light. These signals are provided with special lenses & hoods to emit beam of light which can be visible from a long distance even during the day. Proceed Proceed with Caution Stop
  • 19. OPERATIONAL SIGNAL Fixed. (a) Semaphore. (b) Colour light. Moveable. (a) HAND SIGNALS. (Such as Flags, hand lights) (b) Detonators. (c) Cabin Signals.
  • 20. OUTER SIGNAL This is Warner signal for the driver which gives the indication of the position ahead whether the platform is clear or not. A certain distance is required to bring a moving train to halt. This distance depends upon the speed of the train, its weight, brake power of the locomotive etc. Thus the first signal is provided at this distance beyond the station limit, that is why it is know as outer signal
  • 21. ASS SSHS OS OHS SIGNALS ACCORDING TO LOCATION INTERLOCKING STANDARDS STANDARD-I Applicable for station for train speeds upto 50 kmph STANDARD-II Applicable for station for train speeds upto 75 kmph STANDARD-III Applicable for station for unrestrictedspeeds
  • 22. In the inclined or proceed position it indicates that track and platform is clear and proceed normally without any danger. In horizontal or stop position it indicates that the driver must bring his train to halt within 90 m before outer signal and than proceed to the home signal with caution OUTER SIGNAL OS
  • 23. HOME SIGNAL After the outer signal towards station is a stop signal and exactly placed at the station limit is called home or stop signal. Its main function is to protect the stations. The permission to enter the platform is given by the operation of this signal. The maximum unprotected distance between the signal and the point, it is intended to protect is specified as 180 m due to its location at the door of station, it is called home signal. HSOHS
  • 24. STARTER SIGNAL This signal is provided at the forward end of platform and controls the movement of the train as they leave the station. It gives permission to the train to leave the platform for next station. No train can leave the platform unless this signal is lowered, that is why it is called starter signal. A separate signal is provided for each line. SS
  • 25. ADVANCE STARTER SIGNAL The limit of a station section lies between the home signal and the advance starter signal. The signal which allows the train to enter in block section is called advance starter signal. It is always placed beyond the outer most set of the point connections. ASS SSHSOHS station section
  • 26. ROUTING SIGNAL When many branch lines diverge in different directions from the main line, it is very difficult to provide individual signal for each line at the divergent point. In such situations various signals for main line and branch lines are fixed on the same vertical post. These signals are called routing signal. Generally signal for main line is kept higher than those for branch lines
  • 27. REPEATING SIGNAL When the view of the main signal is obstructed due to some structures or on curves etc. some signals are used to repeat the information of the main signal. Such signal are know as repeating signal.
  • 28. CALLING ON SIGNAL These signal are similar to semaphore signal, but they are smaller in size and are fixed on the same post below the main signals. A calling on signal permits a train to proceed with caution after the train has been brought to a halt by the main signal. These are helpful when repair works are going on.