SlideShare ist ein Scribd-Unternehmen logo
1 von 92
Downloaden Sie, um offline zu lesen
CHAPTER 8


PROJECT QUALITY  MANAGEMENT


       Ahmad H. Maharma
            PMP®
PM Knowledge Areas & Process Groups
PM Process        Initiating Process        Planning Process Group            Executing Process           Monitoring & Controlling           Closing
Groups /          Group                                                       Group                       Process Group                      Process
Knowledge                                                                                                                                    Group
Area Processes
Project           Develop Project Charter   Develop Project Management        Direct and Manage Project   Monitor and Control Project Work   Close Project
Management                                  Plan                              Execution                   Integrated Change Control
Integration

Project Scope                               Collect requirements                                          Verify Scope
Management                                  Define Scope                                                  Control Scope
                                            Create WBS

Project Time                                Define Activity                                               Schedule Control
Management                                  Sequence Activity
                                            Estimating Resource
                                            Estimating Duration
                                            Develop Schedule

Project Cost                                Estimating Cost                                               Control Cost
Management                                  Budgeting Cost

Project Quality                             Quality Planning                  Perform Quality Assurance   Perform Quality Control
Management

Project HR                                  Human Resources Planning          Acquire Project Team
Management                                                                    Develop Project Team
                                                                              Manage Project Team


Project           Identify Stakeholders     Plan Communications               Distribute Information      Performance Reporting
Communications                                                                Manage stakeholders
Management                                                                    expectations

Project Risk                                Plan Risk Management                                          Risk Monitoring and Control
Management                                  Risk Identification
                                            Qualitative / Quantitative Risk
                                            Analysis
                                                y
                                            Risk Response Planning

Project                                     Plan procurement                  Conduct procurement         Administer Contract                Close
Procurement                                                                                                                                  procurement
Management
8. Project Quality Management
                                                   Monitoring &
                                               Controlling Processes
                                                     Planning
                                                     Processes




     Enter phase/            Initiating                                   Closing         Exit phase/
     Start project          Processes                                    Processes        End project




                                                     Executing
                                                     Processes



Knowledge                                                        Process
  Area               Initiating           Planning           Executing          Monitoring & Contol     Closing


                                                         Perform Quality -       Perform Quality -
  Cost                             Quality Planning
                                                         Assurance               Control
PROJECT QUALITY MANAGEMENT
Project Quality Management includes the processes and
activities of the performing organization that determine quality
policies, objectives, and responsibilities so th t th project will
   li i    bj ti        d         ibiliti     that the   j t ill
satisfy the needs for which it was undertaken.



lt implements the quality management system through policy
and procedures with continuous process improvement activities
conducted throughout, as appropriate.
Project Quality Management Processes 
• 8.1 Plan Quality ‐ The process of identifying quality
  requirements and/or standards for the project and product,
  and d
    d documenting h
                ti   how th project will d
                            the      j t    ill demonstrate
                                                       t t
  compliance.

• 8.2 Perform Quality Assurance ‐ The process of auditing the
  quality requirements and the results from quality control
  measurements to ensure appropriate quality standards and
                                    i     li       d d      d
  operational definitions are used.

• 8.3 Perform Quality Control ‐ The process of monitoring and
  recording results of executing the quality activities to assess
  performance and recommend necessary changes.
     f                                      h
Quality Concepts
• Quality vs. Grade
   – Quality: the degree to which a set of inherent
     Quality: the degree to which a set of inherent 
     characteristics fulfill requirements
   – Quality level that fails to meet quality requirements is 
     always a PROBLEM

   – Grade: a category assigned to product or service having the
     Grade: a category assigned to product or service having the 
     same functional use but different technical characteristics
   – Low grade may not be a problem
         g         y         p
Quality Management: Important 
             points
• Customer satisfaction
   • Conformance to requirement
                         q
   • Fitness for use: product/service produced must satisfy real needs
• Prevention over inspection
   • C
     Cost of preventing mistakes < cost of correcting
           f        i    i k             f        i
• Continuous improvement (Kaizen)
   • Based on PDCA cycle
                      y
   • Using quality improvement initiatives e.g. TQM, 6 sigma
   • Using process improvement models e.g. OPM3, CMMI, Malcolm 
     Baldrige
• Management responsibility
   • To provide the resource needed to succeed
Quality Concepts
•   Gold Plating: giving the customer extras
     – This practice is not recommended
            p

•   Marginal Analysis: looking for the point where..
    benefits/revenue to be received from improving quality 
    benefits/revenue to be received from improving quality
    EQUALS the incremental cost to achieve that quality

•   Just in Time (JIT): j t h
                 ( ) just when they are needed or just before they 
                               th          d d j tb f         th
    are needed.
     – It forces attention on quality practices.

•   Total Quality Management (TQM)
     – Company & their employees focus on finding ways to continuous 
       improve the quality of their business practices & products.
Grade and Quality
Quality and grade are not the same. Quality is "the degree to
which a set of inherent characteristics fulfill requirements‘‘.



Grade is a categor assigned to prod cts or ser ices ha ing the
           category              products     services having
same functional use but different technical characteristics.



While a quality level that fails to meet quality requirements is
always a problem, low grade may not be.
Grade and Quality

For example, a software product can be of high quality (no
obvious defects,
readable manual) and low grade (a limited number of features),
or of low quality (many defects poorly organized user
                            defects,
documentation) and high grade (numerous features).



The project manager and the project management team are
responsible f managing th t d ff i l d t d li
       ibl for          i the tradeoffs involved to deliver th
                                                            the
required levels of both quality and grade.
Precision and Accuracy
Precision and accuracy are not equivalent. Precision means the
values of repeated measurements are clustered and have little
scatter.
   tt

Accuracy means that the measured value is very close to the true
value.

Precise measurements are not necessarily accurate.

A very accurate measurement is not necessarily precise.
The project management team must determine appropriate
levels of accuracy and precision
                       precision.
Basic Approach to Quality Management
The basic approach to quality management described in this
section is intended to be compatible with that of the
International 0
I t    ti   l 0rganization f St d di ti (lS0)
                   i ti for Standardization (lS0).

This is compatible with proprietary approaches to quality
management such as those recommended by Deming, Juran,
Crosby, and others, and non‐proprietary approaches such as
Total Quality Management (TOM) Si Si
T l Q li M                   (TOM), Six Sigma, f il
                                               failure mode and
                                                         d    d
effect analysis (FMEA), design reviews, voice of the customer,
cost of quality (C0Q), and continuous improvement.
Modern Quality Mgt and Project Quality Mgt.
Modern quality management complements project quality
management.
Both disciplines recognize the importance of:
                                           f

•   Customer satisfaction Understanding evaluating defining and
              satisfaction. Understanding, evaluating, defining,
    managing expectations so that customer requirements are met.

    This requires a combination of conformance to requirements (to
    ensure the project produces what it was created to produce)
    and fitness for use (the product or service must satisfy real
                         (    p                            y
    needs).
Modern Quality Mgt and Project Quality Mgt.
• Prevention over inspection. 0ne of the fundamental tenets 0f
  modern quality management states that quality is planned,
  designed,
  designed and built in not inspected in
                     in‐not           in.

  The cost of preventing mistakes is generally much less than the
               p        g            g       y
  cost of correcting them when they are found by inspection.
Modern Quality Mgt and Project Quality Mgt.
• Continuous improvement. The plan‐do‐check‐act cycle is the
  basis for quality improvement as defined by Shewhart and
  modified b D i
      difi d by Deming. l addition, quality i
                            ln dditi          lit improvement  t
  initiatives undertaken by the performing organizati0n, such as
  TQM and Six Sigma, should improve the quality of the project's
  management as well as the quality of the project's product.
  Process improvement models include Malcolm Baldrige,
  0rganizational Project Management Maturity Model (0PM3@)
                                                       (0PM3@),
  and Capability Maturity Model Integrated (CMMI@),
Modern Quality Mgt and Project Quality Mgt.
• Management         Responsibility.   Success    requires  the
  participati0n of all members of the project team, but remains
  the
  th responsibility of management t provide th resources
               ibilit f              t to      id the
  needed to succeed.
Cost of Quality
• Cost of quality (COQ) refers to the total cost of all
  efforts related to quality throughout the product life
  cycle.
• Project decisions can impact operational costs of
  quality as a result of product returns warranty claims
                                 returns,         claims,
  and recall campaigns,
• Therefore, due to the temporary nature of a project,
  the sponsoring organization may choose to invest in
  product quality improvement, especially defect
  prevention and appraisal to reduce the external cost of
                   appraisal,
  quality.
8.1 Plan Quality
Plan Quality is the process of identifying quality requirements
and/or standards for the project and product, and documenting
how the
h th project will d
           j t ill demonstrate compliance.
                           t t         li

Quality planning should be performed in parallel with the other
project planning processes. For example, proposed changes in
the product to meet identified quality standards may require
cost or schedule adjustments and a d il d risk analysis of the
          h d l dj              d detailed i k      l i f h
impact to plans.

The quality planning techniques discussed here are those most
frequently used on projects. There are many others that may be
useful on certain projects or in some application areas.
   f l                                   l
8.1.1 Plan Quality lnputs
.1 Scope Baseline:
   • Scope statement: The scope statement contains the project
     description,
     description major project deliverables and acceptance
                                     deliverables,
     criteria. The product scope description will often contain
     details of technical issues and other concerns that can
     affect q alit planning The definition of acceptance criteria
            quality planning.
     can significantly increase or decrease project costs quality
     costs. Satisfying all acceptance criteria implies the needs of
     the
     th customer h
             t      have bbeen met.t
   • WBS: The WBS identifies the deliverables, the work
     packages and the control accounts used to measure project
     performance.
   • WBS Dictionary: The WBS dictionary defines technical
     information for WBS elements.
8.1.1 Plan Quality lnputs
.2 Stakeholder Register:
   The stakeholder register identifies stakeholders with a
   particular interest in or impact on quality
                       in,          on, quality.
.3 Cost Performance Baseline:
   The cost performance baseline documents the accepted time
             p                                       p
   phase used to measure cost performance (Section 7.2.3.1 ).
.4 Schedule Baseline:
   The schedule baseline documents the accepted schedule
   performance measures including start and finish dates
   (Section 6.5.3.2).
.5 Risk Register:
     ik     i
   The risk register contains information on threats and
   opportunities that may impact quality
     pp                    y p q         y
   requirements (Section 11 .2‐3.1).
8.1.1 Plan Quality lnputs
.6 Enterprise Environmental Factors:
   The enterprise environmental factors that influence the Plan Quality
   process include but are not limited to: Governmental agency regulations
            include,                                           regulations,
   Rules, standards, and guidelines specific to the application area, and
   working/operating conditions of the project/product which may affect
   p ojec qua y
   project quality.

.7 0rganizational Process Assets:
   The organizational process assets that influence the Plan 0uality process
   include, but are not limited to:
   ‐ Organizational quality policies, procedures, and guidelines,
   ‐ Historical databases,
    ‐ Lessons learned from previous projects, and
   ‐     Quality policy, as endorsed by senior management, which sets the
      intended direction of a performing organization with regard to quality.
      The quality policy of the performing organization for their products often
      can be adopted "as is" to use by the project.
8.1.2 Plan Quality: Tools and Techniques
.1 Cost‐Benefit Analysis:
   The primary benefits of meeting quality requirements can
   include less rework, higher productivity, lower costs, and
   increased stakeholder satisfaction.

  A business case for each quality activity compares the cost of
  the quality step to the expected benefit.
8.1.2 Plan Quality: Tools and Techniques
.2 Cost of Quality (COQ):
   Cost of quality includes all costs incurred over the life of the
   product by investment in preventing nonconformance to
   requirements, appraising the product 0r service for
   conformance to requirements, and failing to meet
                          q            ,             g
   requirements (rework).

  Failure costs are often categorized into internal (found by
  the project) and external (found by the customer).
  Failure costs are also called cost of poor quality.
  F il       t       l     ll d    t f          lit
  Figure 8‐4 provides some examples to consider in each area.
8.1.2 Plan Quality: Tools and Techniques
.3 Control Charts:
   Control charts are used to determine whether or not a process is stable or
   has predictable performance. Upper and lower specification limits are
   based on requirements of the contract. They reflect the maximum and
   minimum values allowed. There may be penalties associated with
   exceeding the specification limits.

   Upper and lower control limits are set by the project manager and
   appropriate stakeholders to reflect the points at which corrective action
   will be taken to prevent exceeding specification limits. For repetitive
   processes, the control limits are generally +_3 sigma.
Control charts
                                   Rule of seven (non random data points)
                                   Out of control
                                   Assignable/special cause                  Normal and expected variation
Upper control limit                                                          Usually 3 or 6 sigma




Lower control limit




                                                                            Normal distribution curve




        Out of control                   Specification limit: is
        Assignable/special cause         point determines by
                                         customer, not calculated
                                         based on control chart
The Seven Run Rule
           The Seven Run Rule
• You can use quality control charts and the 
  seven run rule to look for patterns in data

• The seven run rule states that if seven data 
  points in a row are all below the mean, above 
  the mean, or are all increasing or decreasing, 
  then the process needs to be examined for 
  nonrandom problems
Figure 8‐3: Sample Quality 
      Control Chart




                                                                               30
    Information Technology Project Management, Fifth Edition, Copyright 2007
8.1.2 Plan Quality: Tools and Techniques
A process is considered out of control when a data point exceeds a control
limit or if seven consecutive points are above or below the mean.



Control charts can be used to monitor various types of output variables.

Control charts may also be used to monitor cost and schedule variances,
volume, and frequency of scope changes, or other management results to
help determine if the project management processes are in control.
8.1.2 Plan Quality: Tools and Techniques
.4 Benchmarking:
   Benchmarking involves comparing actual or planned project
   p
   practices to those of comparable projects to identify best practices,
                             p      p j                y      p
   generate ideas for improvement, and provide a basis for measuring
   performance. These other projects can be within the performing
   organization or outside of it and can be within the same or in
   another application area
                       area.

.5 Design of Experiments:
   Design f
   D i of experiments (D0E) i a statistical method f id tif i
                   i     t       is   t ti ti l  th d for identifying
   which factors may influence specific variables of a product or
   process under development or in production.
   DOE should be used during the Plan Quality process to determine
   the number and type of tests and their impact on cost of quality.
   DOE can be used to reduce the sensitivity of product performance
   to sources of variations caused by environmental or manufacturing
   differences.
   diff
8.1.2 Plan Quality: Tools and Techniques
.6 Statistical Sampling:
   Statistical sampling involves choosing part of a population of
   interest for inspection (for example, selecting ten engineering
   drawings at random from a list of seventy‐five).
   Sample frequency and sizes should be determined during the
   Plan Quality process so the cost of quality will include the
   number of tests, expected scrap, etc.
   There is a substantial body of knowledge on statistical
   sampling.
    ln some application areas it may be necessary for the project
   management team to be familiar with a variety of sampling
   techniques to assure the sample selected actually represents
   the population of interest.
     h       l       f
8.1.2 Plan Quality: Tools and Techniques
.7 Flowcharting:
   A flowchart is a graphical representation of a process showing
   the relationships among process steps. There are many styles,
   but all process flowcharts show activities, decision points, and
   the order of processing.
                p        g
   During quality planning, flowcharting can help the project
   team anticipate quality problems that might occur.
   An awareness of potential problems can result in the
   development of test procedures or approaches for dealing
   with them.
   Figure 8‐7 is an example of a process flowchart for design
   reviews.
8.1.2 Plan Quality: Tools and Techniques
.8 Proprietary Quality Management Methodologies:
   These include Six Sigma, Lean Six Sigma, Quality Function Deployment,
   CMMI@, etc.
   Many other methodologies exist ‐ this is not intended to be a
   recommended or complete list of examples.

.9 Additional quality Planning Tools:
   0ther quality planning tools are often used to better define the quality
   requirements and plan effective quality management activities.
   These include, but are not limited to:
   • Brainstorming (defined in Section 11 .2.2.2).
   • Affinity diagrams, used to visually identify logical groupings based on
            y     g     ,               y       y g       g p g
      natural relationships,
   • Force field analysis, which are diagrams of the forces for and against
      change.
          g
8.1.2 Plan Quality: Tools and Techniques
• Nominal group techniques, to allow ideas to be
  brainstormed in small groups and then reviewed by a larger
  group.
• Matrix diagrams, which include two, three, or four groups
  of information and show relationships between factors,
                                        p                  ,
  causes, and objectives.
  Data in a matrix is organized in rows and columns with
  intersecting cells that can b fill d with i f
  i         i     ll h        be filled i h information that
                                                    i    h
  describes the demonstrated relationship between the items
  located in the row and column.
• Prioritization matrices, which provide a way of ranking a
  diverse set of problems and/or issues (usually generated
  through brainstorming) by their importance
                                  importance.
8.1.3 Plan Quality: 0utputs
.1 Quality Management Plan:
   The quality management plan describes how the project
   management team will implement the performing organization's
          g                      p          p         g g
   quality policy.
   lt is a component or a subsidiary plan of the project management
   plan (Section 4.2.3.1).
   The quality management plan provides input to the overall project
     h       l                  l      d            h       ll
   management plan and includes quality control, quality assurance,
   and continuous process improvement approaches for the project.
   The quality management plan may be formal or informal highly
                                                      informal,
   detailed, or broadly framed.
    The style and detail is determined by the requirements of the
   p j
   project. The quality management plan should be reviewed early in
                 q    y       g      p                          y
   the project to ensure that decisions are based on accurate
   information.
   The benefits of this review can include reduction of cost and
   schedule overruns caused b rework.
      h d l                 d by      k
8.1.3 Plan Quality: 0utputs
.2 Quality Metrics:
   A quality metric is an operational definition that describes, in
   very specific terms a project or product attribute and how
                  terms,
   the quality control process will measure it.
   A measurement is an actual value. The tolerance defines the
   allowable variations on the metrics. For example, a metric
   related to the quality objective of staying within the approved
   budget by + ‐ '10% could be to measure the cost of every
   deliverable and determine the percent variance from the
   approved budget for that deliverable.
   Q
   Quality metrics are used in the quality assurance and quality
          y                               q     y              q  y
   control processes. Some examples of quality metrics include
   on‐time performance, budget control, defect frequency,
   failure rate, availability, reliability, and test coverage.
               ,            y,           y,                g
8.1.3 Plan Quality: 0utputs
.3 Quality Checklists:
   A checklist is a structured tool, usually component‐specific,
   used to verify that a set of required steps has been
   performed.
   Checklists range from simple to complex based on project
   requirements and practices. Many organizations have
   standardized checklists available to ensure consistency in
   frequently performed tasks.
   f        l     f     d k
   ln some application areas, checklists are also available from
   professional associations or commercial service providers.
   Quality checklists are used in the quality control process.
8.1.3 Plan Quality: 0utputs
.4 Process lmprovement Plan
   The process improvement plan is a subsidiary of the project
   management plan (Section 4 2 3 1)
                                4.2.3.1).
   The process improvement plan details the steps for analyzing
   processes to identify activities which enhance their value.
   Areas to consider include:
   • Process boundaries. Describes the purpose of processes, their
     start and end, their inputs/outputs, the data required, the owner,
     and the stakeholders
             stakeholders.
   • Process configuration. A graphic depiction of processes, with
     interfaces identified, used to facilitate analysis.
   • P
     Process metrics. Al
                    i    Along with control li i
                                  ih          l limits, allows analysis of
                                                         ll       l i f
     process efficiency.
   • Targets for improved performance. Guides the process
     improvement activities.
     i            t ti iti
8.1.3 Plan Quality: 0utputs
.5  Project Document Updates:
    Project documents that may be updated include, but are not 
    limited to:
    • Stakeholder register, and
    • R
      Responsibility Assignment Matrix (Section 9.1 .2.1).
               ibilit A i       t M t i (S ti 9 1 2 1)
8.2 Perform Quality Assurance
Perform Quality Assurance is the process of auditing the quality
requirements and the results from quality control measurements
to
t ensure appropriate quality standards and operational
                       i t       lit   t d d         d       ti   l
definitions are used. See Figures 8‐8 and 8‐9.
Perform Quality Assurance is an execution process that uses data
          Q     y                            p
Perform 0uality Assurance also provides an umbrella for
continuous process improvement, which is an iterative means for
improving the quality of all processes.
i       i    h      li   f ll
Continuous process improvement reduces waste and eliminates
activities that do not add value. This allows processes to operate
at increased levels of efficiency and effectiveness.
8.2.1 Perform Quality Assurance: lnputs
.1 Project Management Plan:
   The project management plan described in Section 4.2.3.1
   contains the following information that is used to assure
   quality:
   • Quality management plan The quality management plan
                             plan.
     describes how quality assurance will be performed within
     the project.
   • Process improvement plan. The process improvement plan
     details the steps for analyzing processes to identify activities
     which enhance their value.
.2 Quality Metrics:
   Described in Section 8.1.3.2,
8.2.1 Perform Quality Assurance: lnputs
.3 Work Performance lnformation:
  Performance information from project activities is routinely
  collected as the project progresses, Performance results which may
                   p j     p g       ,                             y
  support the audit process include, but are not limited to:
  • Technical performance measures,
  • Project deliverables status,
  • Schedule progress, and
  • Costs incurred.

.4 Quality Control Measurements:
  Quality control measurements are the results of quality control
  activities. They are used to analyze and evaluate the quality
                 y                   y                    q     y
  standards and processes of the performing organization
  (Section 8.3.3.1).
8.2.2 Perform Quality Assurance: Tools and Techniques

.1  Plan Quality and Perform Quality Control Tools and 
    Techniques:
    Tools and techniques from PIan Quality and Perform Quality 
    Control, are discussed in Section 8.1 .2.
    Section 8‐3.2 can also be used for quality assurance activities.
    Section 8‐3 2 can also be used for quality assurance activities
8.2.2 Perform Quality Assurance: Tools and Techniques
.2 Quality Audits:
   A quality audit is a structured, independent review to determine
   whether project activities comply with 0rganizational and project
   policies, processes, and procedures. The objectives of a quality audit
   are:
   • ldentify all the good/best practices being implemented,
   • ldentify all the gaps/shortcomings,
   • Sh
     Share th good practices iintroduced or iimplemented iin similar
             the       d     ti      t d d           l     t d     i il
     projects in the 0rganization and/or industry,
8.2.2 Perform Quality Assurance: Tools and Techniques

• Proactively offer assistance in a positive manner to improve
  implementation of processes to help the team raise
  productivity,
  productivity and
• Highlight contributions 0f each audit in the lessons learned
  repository of the organization,
The subsequent effort to correct any deficiencies should
result in a reduced cost of quality and an increase in sponsor
or customer acceptance of the project's product.
                  p             p j       p
Quality audits may be scheduled or random and may be
conducted by internal or external auditors. Quality audits can
confirm the implementation of approved change requests
including corrective actions, defect repairs, and preventive
actions.
8.2.2 Perform Quality Assurance: Tools and Techniques

.3 Process Analysis:
   Process analysis follows the steps outlined in the process
   improvement plan to identity needed improvements. This
   analysis also examines problems experienced, constraints
   experienced, and non‐value‐added activities identified during
     p          ,                                                g
   process operation.
   Process analysis includes root cause analysis ‐ a specific
   technique to id if a problem, di
      h i         identify        bl     discover the underlying
                                                    h      d l i
   causes that lead to it, and develop preventive actions.
8.2.3 Perform Quality Assurance: 0utputs
.1 0rganizational Process Assets Updates:
   Elements of the organizational process assets that may be
   updated include, but are not limited to, the quality standards.

.2 Change Requests
 2         Requests:
   Quality improvement includes taking action to increase the
   effectiveness and/or efficiency of the policies, processes, and
                     /            y       p       ,p         ,
   procedures of the performing organization.
   Change requests are created and used as input into the
   Perform l t
   P f       lntegrated Ch
                    t d Change C t l (S ti 4 5) process t
                                 Control (Section 4.5)          to
   allow full consideration of the recommended improvements.
   Change requests can be used to take corrective action or
   preventive action or to perform defect repair.
8.2.3 Perform Quality Assurance: 0utputs
.3 Project Management Plan Updates
   Elements of the project management plan that may be 
   updated include, but are not limited to
   • Quality management plan,
   • Sched le management plan and
     Schedule management plan, and
   • Cost management plan.
.4 Project Document Updates:
   Project documents that may be updated include, but are not 
   limited to:
   • Quality audits reports,
   • Training plans, and
   • Process documentation.
8.3 Perform Quality Control
Perform Quality Control is the process of monitoring and
recording results of executing the quality activities to assess
performance and recommend necessary changes.
   f             d            d             h
Quality control is performed throughout the project. Quality
standards include project processes and product goals.
                   p j p                  p        g
Project results include deliverables and project management
results, such as cost and schedule performance.
Quality control is often performed by a quality control
department or similarly titled organizational unit.
Quality control activities identify causes of poor process or
product quality and recommend and/or take action to eliminate
them. See Figures 8‐ 10 and 8‐1 1.
8.3 Perform Quality Control
The project management team should have a working
knowledge of statistical quality control, especially sampling and
probability, t h l evaluate quality control outputs.
     b bilit to help    l t      lit     t l t t
Among other subjects, the team may find it useful to know the
differences between the following pairs of terms:
                                  gp
• Prevention (keeping errors out of the process) and inspection
   (keeping errors out of the hands of the customer.
• Attribute sampling (the result either conforms or does not
   c0nform) and variables sampling (the result is rated on a
   continuous scale that measures the degree of conformity).
• Tolerances (specified range of acceptable results) and control
   limits (thresholds, which can indicate whether the process is
   out of control).
         f       l)
8.3.1 Perform Quality Control: lnputs
.1 Project Management Plan:
   The project management plan described in Section 4.2.3.1
   contains the quality management plan, which is used to
   control quality.
   The quality management plan describes how quality control
   will be performed within the project.
.2 Quality Metrics:
   Q      y
   Described in Section 8.1.3.2
.3 Quality Checklists:
    Described in Section 8.1 .3.3
8.3.1 Perform Quality Control: lnputs
.4 Work Performance Measurements:
  Work performance measurements are used to produce project
  activity metrics to evaluate actual progress as compared to planned
         y                            p g            p        p
  progress.
  These metrics include, but are not limited to:
  • Planned vs. actual technical performance,
  • Planned vs. actual schedule performance, and
  • Planned vs. actual cost performance

.5 Approved Change Requests:
  As part of the Perform lntegrated Change Control process a change
  control status update will indicate that some changes are approved
                  p                                 g        pp
  and some are not. Approved change requests can include
  modifications such as defect repairs, revised work methods and
  revised schedule. The timely implementation of approved changes
  needs to be verified
               verified.
8.3.2 Perform Quality Control: Tools and Techniques
The first seven of these tools and techniques are known as
lshikawa's seven basic tools of quality:
.1 Cause and Effect Diagrams
   Cause and effect diagrams, also called lshikawa diagrams or
   fishbone diagrams ill strate ho various factors might be
              diagrams, illustrate how ario s
   linked to potential problems or effects. Figures 8‐1 2 and 8‐13
   are examples of cause and effect diagrams. A possible root
   cause can be uncovered by continuing to ask "why“ or "how"
   along one of the Iines.
   "Why Why" and "How How" diagrams may be used in root
     Why‐Why          How‐How
   cause analysis. Cause and effect diagrams are also used in risk
   analysis (Section 11.2.2.5).
8.3.2 Perform Quality Control: Tools and Techniques
.2 Control Charts:
   Control charts are described in Section 8.1.2.3. ln this process,
   the
   th appropriate d t i collected and analyzed t i di t th
                i t data is ll t d d          l d to indicate the
   quality status of project processes and products.
   Control charts illustrate how a process behaves over time and
                                   p
   when a process is subject to special cause variation, resulting
   in an out‐of‐control condition.
   They
   Th graphically answer the question: "l this process variance
              hi ll           h       i   "ls hi               i
   within acceptable limits?"
   The pattern of data points on a control chart may reveal
   random fluctuating values, sudden process jumps, or a
   gradual trend in increased variation.
Control charts
                                   Rule of seven (non random data points)
                                   Out of control
                                   Assignable/special cause                  Normal and expected variation
Upper control limit                                                          Usually 3 or 6 sigma




Lower control limit




                                                                            Normal distribution curve




        Out of control                   Specification limit: is
        Assignable/special cause         point determines by
                                         customer, not calculated
                                         based on control chart
The Seven Run Rule
           The Seven Run Rule
• You can use quality control charts and the 
  seven run rule to look for patterns in data

• The seven run rule states that if seven data 
  points in a row are all below the mean, above 
  the mean, or are all increasing or decreasing, 
  then the process needs to be examined for 
  nonrandom problems
Figure 8‐3: Sample Quality 
      Control Chart




                                                                               68
    Information Technology Project Management, Fifth Edition, Copyright 2007
8.3.1 Perform Quality Control: lnputs
.6 Deliverables:
   Described in Section 4.3.3.1

.7 0rganizational Process Assets:
   The organizational process assets that can influence the
   Perform Quality Control process include, but are not limited
   to:
   • Quality standards and policies.
   • Standard work guidelines, and
   • lssue and defect reporting procedures and communication
       policies.
8.3.2 Perform Quality Control: Tools and Techniques
 By monitoring the output of a process over time, a control chart can
 help assess whether the application of process changes resulted in
 the desired
 th d i d iimprovements.  t
 When a process is within acceptable limits it is in control and does
 not need to be adjusted.
 Conversely, when a process is outside acceptable limits, the process
 should be adjusted.
 Seven consecutive points outside the upper or lower control limits
 indicate a process that is out of control. The upper control limit and
 lower control limit are usually set at +-3 sigma where sigma is one
                                          3
 standard deviation.
8.3.2 Perform Quality Control: Tools and Techniques
.3 Flowcharting:
   Described in Section 8.1 .2.7, flowcharting is used during Perform
    Quality Control to determine a failing process step(s) and identify
    potential process improvement opportunities. Flowcharting is also
    used in risk analysis (Section 11.2.2.5).
.4 Hi
 4 Histogram:
   A histogram is a vertical bar chart showing how often a particular
   variable state occurred. Each column represents an attribute 0r
   characteristic of a problem/situation.
   The height of each column represents the relative frequency of the
   characteristic. This tool helps illustrates the most common cause of
   problems in a process by the number and relative heights of the
   bars. Figure 8‐14 is an example of an unordered histogram showing
   causes of late time entry by a project team
                                            team.
8.3.2 Perform Quality Control: Tools and Techniques
.5 Pareto Chart:
   A Pareto chart, also refined to as a Pareto diagram, is a
   specific type of histogram ordered by frequency of
                        histogram,
   occurrence. lt shows how many defects were generated by
   type or category of identified cause (Figure B‐1 5).
   Rank ordering is used to focus corrective action. The project
   team should address the causes creating the greatest number
   of defects first
              first.
   Pareto diagrams are conceptually related to Pareto's Law,
   which holds that a relatively small number of causes will
   typically produce a majority of the problems or defects. This is
   commonly referred to as the 80/20 principle, where B0% of
   the problems are due to 2070 of the causes. Pareto diagrams
       p                                                    g
   can be used to summarize various types of data for 80/20
   analyses,
8.3.2 Perform Quality Control: Tools and Techniques
.6 Run Chart:
   Similar to a control chart without displayed limits, a run chart
   shows the history and pattern of variation
                                      variation.
   A run chart is a ljne graph that shows data points pl0tted in
   the order in which they occur.
   Run charts show trends in a process over time, variation over
   time, or declines or improvements in a process over time.
   Trend analysis is performed using run charts and involves
   mathematical techniques to forecast future outcomes based
   on historical results. Trend analysis is often used to monitor:
   • Technical performance. How many errors or defects have
     been identified, and how many remain uncorrected?
   • Cost and schedule performance How many activities per
                            performance.
     period were completed with significant variances?
8.3.2 Perform Quality Control: Tools and Techniques
.7 Scatter Diagram:
   A scatter diagram (Figure 8‐16) shows the relationship
   between two variables. This tool allows the quality team to
   study and identify the possible relationship between changes
   observed in two variables.
   Dependent variables versus independent variables are
   plotted. The closer the points are to a diagonal line, the more
   closely they are related.
    l l h             l d
   Figure 8‐16 shows the correlation between the timecard
   submission date and the number of days traveling per month.
.8 Statistical Sampling:
   Described in Section 8.1.2.6. Samples are selected and tested
   as defined in the quality plan.
8.3.2 Perform Quality Control: Tools and Techniques
.9 lnspection:
   An inspection is the examination of a work product to
   determine whether it conforms to documented standards.
   The results of an inspection generally include measurements
   and may be conducted at any level. For example, the results
            y                    y                p ,
   of a single activity can be inspected, or the final product of
   the project can be inspected. lnspections may be called
   reviews,
   reviews peer reviews audits or walkthroughs
                 reviews, audits, walkthroughs.
   ln some application areas, these terms have narrow and
   specific meanings. Inspections are also used to validate defect
   repairs.
.10 Approved Change Requests Review:
    All approved change requests should b reviewed to verify
     ll         d h                 h ld be            d        f
    that they were implemented as approved
8.3.3 Perform Quality Control: Outputs
.1 Quality Control Measurements:
   Quality control measurements are the documented results of
   quality control activities in the format specified during quality
   planning.
.2 Validated Changes:
 2
   Any changed or repaired items are inspected and will be
   either accepted or rejected before notification of the decision
   is provided. Rejected items may require rework.
.3 Validated Deliverables:
   A goal of quality control i t d t
         l f      lit      t l is to determine th correctness of
                                             i the         t       f
   deliverables‐ The results of the execution quality control
   processes are validated deliverables. Validated deliverables
   are an input to Verify Scope for formalized acceptance.
8.3.3 Perform Quality Control: Outputs
.4 Organizational Process Assets Updates:
   Elements of the 0rganizational process assets that may be
   updated include, but are not limited to:
   • Completed checklists. When checklists are used, the
      completed checklists become part of the project's records
                                              project s
   • Lessons learned documentation. The causes of variances,
      the reasoning behind the corrective action chosen, and
      other types of lessons learned from quality control are
      documented so they become part of the historical
      database for both the project and the performing
      organization. Lessons learned are documented throughout
      the project life cycle, but at a minimum, during project
      closure.
      closure
8.3.3 Perform Quality Control: Outputs
.5 Change Requests:
   lf the recommended corrective or preventive actions or a
   defect
   d f t repair requires a change t th project management
                i       i      h     to the    j t              t
   plan, a change request (Section 4.4.3.1)should be initiated in
   accordance with the defined Perform lntegrated Change
   Control (4.5) process.
.6 Project Management Plan Updates:
   Elements 0f the project management plan that may b
   El              h       j                  l    h          be
   updated include, but are not limited to:
   • Quality management plan, and
   • Process improvement plan.
.7 Project Document Updates:
   Project documents that may be updated include, but are not
   limited to, quality standards.
Important Terms
• Mutual Exclusive: if two events cannot both occur in a single trial
•   Probability: something will occur

• Normal Distribution: common probability density distribution 
    chart 

• S i i li d
  Statistical independence: the probability of one event 
                     d
    occurring does not affect the probability of another event occurring

• Standard deviation (or Sigma): h f
  Standard deviation (or Sigma): how far you are from 
                                                 f
    the mean

• 3 or 6 sigma
  3 or 6 sigma
     – Represent the level of quality has decided to try to achieve
     – 6σ is higher quality standard than 3σ
     – Used to calculate the upper and lower control limits in a control chart
       Used to calculate the upper and lower control limits in a control chart
Important Terms

              Percentage of occurrences between two control
Number of σ                       limits


    1                           68.26%

    2                           95.64%

    3                           99.73%

    6                         99.99985%
Who s Responsible for the Quality 
 Who’s Responsible for the Quality
           of Projects?
• Project managers are ultimately responsible for quality 
  management on their projects

• Several organizations and references can help project 
  managers and their teams understand quality
    a age s a d t e tea s u de sta d qua ty

   – International Organization for Standardization (www.iso.org)

   – IEEE (www.ieee.org)
Six Sigma
                        Six Sigma
• Six Sigma is “a comprehensive and flexible
  Six Sigma is  a comprehensive and flexible 
  system for achieving, sustaining, and 
  maximizing business success. Six Sigma is 
  maximizing business success Six Sigma is
  uniquely driven by close understanding of 
  customer needs, disciplined use of facts, data, 
  customer needs disciplined use of facts data
  and statistical analysis, and diligent attention to 
  managing, improving, and reinventing business 
  managing improving and reinventing business
  processes.”*
*Pande, Peter S., Robert P. Neuman, and Roland R. Cavanagh, The
                                                        g
Six Sigma Way, New York: McGraw-Hill, 2000, p. xi.
Basic Information on Six Sigma
   Basic Information on Six Sigma
• The target for perfection is the achievement of 
         g       p
  no more than 3.4 defects per million 
   pp
  opportunities

• The principles can apply to a wide variety of 
      p     p         pp y                 y
  processes

• Six Sigma projects normally follow a five‐phase 
  improvement process called DMAIC
     p          p
DMAIC
•   DMAIC is a systematic, closed‐loop process for continued improvement that is 
    scientific and fact based
•   DMAIC stands for:
     – Define: Define the problem/opportunity, process, and customer 
        requirements
     – Measure: Define measures, then collect, compile, and display data
     – Analyze: Scrutinize process details to find improvement opportunities
     – Improve: Generate solutions and ideas for improving the problem
        Improve: Generate solutions and ideas for improving the problem
     – Control: Track and verify the stability of the improvements and the 
        predictability of the solution
Figure 8‐9: Normal Distribution and 
  g
        Standard Deviation




                                   89
Table 8‐3: Sigma Conversion Table
Table 8 3: Sigma Conversion Table




                                90
ISO Standards
                    ISO Standards
• ISO 9000 is a quality system standard that:

   – Is a three‐part, continuous cycle of planning, controlling, and 
     documenting quality in an organization

   – Provides minimum requirements needed for an organization 
     to meet its quality certification standards

   – Helps organizations around the world reduce costs and 
     improve customer satisfaction

• See www.iso.org for more information
For more information do not hesitate to 
     contact me.

   Ahmad H. Maharma ‐ PMP®


• Ramallah, Palestine 
• Phone: + (972) (2) 2968644
• Mobile: + (972) (599) 001155
  E‐Mail: ahmad.maharma@gmail.com

Weitere ähnliche Inhalte

Was ist angesagt?

PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1Anand Bobade
 
Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Managementguest90bddb
 
Project management
Project managementProject management
Project managementJay Raval
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPTbletindia
 
Introduction to Project Portfolio Management (PPM)
Introduction to Project Portfolio Management (PPM)Introduction to Project Portfolio Management (PPM)
Introduction to Project Portfolio Management (PPM)Kimmy Chen
 
PMP PMBOK 5th Ch 11 Project Risk Management
PMP PMBOK 5th Ch 11 Project Risk ManagementPMP PMBOK 5th Ch 11 Project Risk Management
PMP PMBOK 5th Ch 11 Project Risk ManagementAbdullah Ahmed, PMP, RMP
 
Project Initiation Checklist
Project Initiation ChecklistProject Initiation Checklist
Project Initiation ChecklistAnand Subramaniam
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1Anand Bobade
 
Project Scope Management
Project Scope ManagementProject Scope Management
Project Scope ManagementAhmed Alageed
 
Project Quality Management - PMBOK
Project Quality Management - PMBOKProject Quality Management - PMBOK
Project Quality Management - PMBOKArief Rahmana
 
Pmbok 4th edition chapter 10 - Project Communication Management
Pmbok 4th edition   chapter 10 - Project Communication ManagementPmbok 4th edition   chapter 10 - Project Communication Management
Pmbok 4th edition chapter 10 - Project Communication ManagementAhmad Maharma, PMP,RMP
 
Project scope management
Project scope managementProject scope management
Project scope managementAnit Roy
 
9.1 Plan Resource Management
9.1 Plan Resource Management9.1 Plan Resource Management
9.1 Plan Resource ManagementDavidMcLachlan1
 
Project Management - Basic Concepts
Project Management - Basic ConceptsProject Management - Basic Concepts
Project Management - Basic ConceptsImran Jamil
 
APMP Foundation: Proposal Process Management
APMP Foundation: Proposal Process ManagementAPMP Foundation: Proposal Process Management
APMP Foundation: Proposal Process ManagementBid to Win Ltd
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management Yesica Adicondro
 

Was ist angesagt? (20)

PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1
 
Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Management
 
Project management
Project managementProject management
Project management
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPT
 
Introduction to Project Portfolio Management (PPM)
Introduction to Project Portfolio Management (PPM)Introduction to Project Portfolio Management (PPM)
Introduction to Project Portfolio Management (PPM)
 
PMP PMBOK 5th Ch 11 Project Risk Management
PMP PMBOK 5th Ch 11 Project Risk ManagementPMP PMBOK 5th Ch 11 Project Risk Management
PMP PMBOK 5th Ch 11 Project Risk Management
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Project Initiation Checklist
Project Initiation ChecklistProject Initiation Checklist
Project Initiation Checklist
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1
 
Project Scope Management
Project Scope ManagementProject Scope Management
Project Scope Management
 
Project Quality Management - PMBOK
Project Quality Management - PMBOKProject Quality Management - PMBOK
Project Quality Management - PMBOK
 
Pmbok 4th edition chapter 10 - Project Communication Management
Pmbok 4th edition   chapter 10 - Project Communication ManagementPmbok 4th edition   chapter 10 - Project Communication Management
Pmbok 4th edition chapter 10 - Project Communication Management
 
Project scope management
Project scope managementProject scope management
Project scope management
 
9.1 Plan Resource Management
9.1 Plan Resource Management9.1 Plan Resource Management
9.1 Plan Resource Management
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Project Management - Basic Concepts
Project Management - Basic ConceptsProject Management - Basic Concepts
Project Management - Basic Concepts
 
PMP ITTOs Quick Review
PMP ITTOs Quick Review PMP ITTOs Quick Review
PMP ITTOs Quick Review
 
APMP Foundation: Proposal Process Management
APMP Foundation: Proposal Process ManagementAPMP Foundation: Proposal Process Management
APMP Foundation: Proposal Process Management
 
Project Management
Project ManagementProject Management
Project Management
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management
 

Ähnlich wie Pmbok 4th edition chapter 8 - Project Quality Management

Pmbok 4th edition chapter 7 - Project Cost Management
Pmbok 4th edition   chapter 7 - Project Cost Management Pmbok 4th edition   chapter 7 - Project Cost Management
Pmbok 4th edition chapter 7 - Project Cost Management Ahmad Maharma, PMP,RMP
 
Pmbok 4th edition chapter 5 - Project Scope Management
Pmbok 4th edition   chapter 5 - Project Scope Management Pmbok 4th edition   chapter 5 - Project Scope Management
Pmbok 4th edition chapter 5 - Project Scope Management Ahmad Maharma, PMP,RMP
 
Pmbok 4th edition chapter 6 - Project Time Management
Pmbok 4th edition   chapter 6 - Project Time Management Pmbok 4th edition   chapter 6 - Project Time Management
Pmbok 4th edition chapter 6 - Project Time Management Ahmad Maharma, PMP,RMP
 
Pmbok 4th edition chapter 4 - Project Integration Management
Pmbok 4th edition   chapter 4 - Project Integration Management Pmbok 4th edition   chapter 4 - Project Integration Management
Pmbok 4th edition chapter 4 - Project Integration Management Ahmad Maharma, PMP,RMP
 
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
Pmbok 4th edition   chapter 3 - Project Management Processes for a Project Pmbok 4th edition   chapter 3 - Project Management Processes for a Project
Pmbok 4th edition chapter 3 - Project Management Processes for a Project Ahmad Maharma, PMP,RMP
 
Pmbok 4th edition chapter 11 - Project Risk Management
Pmbok 4th edition   chapter 11 - Project Risk ManagementPmbok 4th edition   chapter 11 - Project Risk Management
Pmbok 4th edition chapter 11 - Project Risk ManagementAhmad Maharma, PMP,RMP
 
ERP Implementation Methodology
ERP Implementation MethodologyERP Implementation Methodology
ERP Implementation MethodologyThanh Nguyen
 
Safak Ebesek RiskSimple
Safak Ebesek RiskSimpleSafak Ebesek RiskSimple
Safak Ebesek RiskSimpleSafak EBESEK
 
Fr205 are you_agile_tk2012
Fr205 are you_agile_tk2012Fr205 are you_agile_tk2012
Fr205 are you_agile_tk2012Don Bolen
 
Agile Project Management for elearning development
Agile Project Management for elearning developmentAgile Project Management for elearning development
Agile Project Management for elearning developmentDon Bolen
 
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process GroupsVanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groupsvanessahartsfield
 
PMBOK 2008 Map of Processes
PMBOK 2008 Map of ProcessesPMBOK 2008 Map of Processes
PMBOK 2008 Map of ProcessesMurilo Juchem
 
Project Management
Project ManagementProject Management
Project Managementguest4408ddc
 
Project management
Project managementProject management
Project managementSameer Kumar
 
Prince2 Complement Pmbok
Prince2 Complement PmbokPrince2 Complement Pmbok
Prince2 Complement Pmbokguest095b6b
 
Prince2 Vs PMBOK
Prince2 Vs PMBOKPrince2 Vs PMBOK
Prince2 Vs PMBOKsundong
 

Ähnlich wie Pmbok 4th edition chapter 8 - Project Quality Management (20)

Pmbok 4th edition chapter 7 - Project Cost Management
Pmbok 4th edition   chapter 7 - Project Cost Management Pmbok 4th edition   chapter 7 - Project Cost Management
Pmbok 4th edition chapter 7 - Project Cost Management
 
Pmbok 4th edition chapter 5 - Project Scope Management
Pmbok 4th edition   chapter 5 - Project Scope Management Pmbok 4th edition   chapter 5 - Project Scope Management
Pmbok 4th edition chapter 5 - Project Scope Management
 
Pmbok 4th edition chapter 6 - Project Time Management
Pmbok 4th edition   chapter 6 - Project Time Management Pmbok 4th edition   chapter 6 - Project Time Management
Pmbok 4th edition chapter 6 - Project Time Management
 
Pmbok 4th edition chapter 4 - Project Integration Management
Pmbok 4th edition   chapter 4 - Project Integration Management Pmbok 4th edition   chapter 4 - Project Integration Management
Pmbok 4th edition chapter 4 - Project Integration Management
 
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
Pmbok 4th edition   chapter 3 - Project Management Processes for a Project Pmbok 4th edition   chapter 3 - Project Management Processes for a Project
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
 
Pmp an introduction
Pmp an introductionPmp an introduction
Pmp an introduction
 
Pmp an introduction
Pmp an introductionPmp an introduction
Pmp an introduction
 
Pmbok 4th edition chapter 11 - Project Risk Management
Pmbok 4th edition   chapter 11 - Project Risk ManagementPmbok 4th edition   chapter 11 - Project Risk Management
Pmbok 4th edition chapter 11 - Project Risk Management
 
ERP Implementation Methodology
ERP Implementation MethodologyERP Implementation Methodology
ERP Implementation Methodology
 
Safak Ebesek RiskSimple
Safak Ebesek RiskSimpleSafak Ebesek RiskSimple
Safak Ebesek RiskSimple
 
Fr205 are you_agile_tk2012
Fr205 are you_agile_tk2012Fr205 are you_agile_tk2012
Fr205 are you_agile_tk2012
 
Agile Project Management for elearning development
Agile Project Management for elearning developmentAgile Project Management for elearning development
Agile Project Management for elearning development
 
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process GroupsVanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
Vanessa Hartsfield Gm591 Unit 4 Project Management Process Groups
 
PMBOK 2008 Map of Processes
PMBOK 2008 Map of ProcessesPMBOK 2008 Map of Processes
PMBOK 2008 Map of Processes
 
Pmp prep v4
Pmp prep v4Pmp prep v4
Pmp prep v4
 
Project Management
Project ManagementProject Management
Project Management
 
Project management
Project managementProject management
Project management
 
Prince2 Complement Pmbok
Prince2 Complement PmbokPrince2 Complement Pmbok
Prince2 Complement Pmbok
 
Prince2 Vs PMBOK
Prince2 Vs PMBOKPrince2 Vs PMBOK
Prince2 Vs PMBOK
 
Killing the Myth: Agile & CMMI
Killing the Myth: Agile & CMMIKilling the Myth: Agile & CMMI
Killing the Myth: Agile & CMMI
 

Kürzlich hochgeladen

How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jisc
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 

Kürzlich hochgeladen (20)

How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 

Pmbok 4th edition chapter 8 - Project Quality Management

  • 2. PM Knowledge Areas & Process Groups PM Process Initiating Process Planning Process Group Executing Process Monitoring & Controlling Closing Groups / Group Group Process Group Process Knowledge Group Area Processes Project Develop Project Charter Develop Project Management Direct and Manage Project Monitor and Control Project Work Close Project Management Plan Execution Integrated Change Control Integration Project Scope Collect requirements Verify Scope Management Define Scope Control Scope Create WBS Project Time Define Activity Schedule Control Management Sequence Activity Estimating Resource Estimating Duration Develop Schedule Project Cost Estimating Cost Control Cost Management Budgeting Cost Project Quality Quality Planning Perform Quality Assurance Perform Quality Control Management Project HR Human Resources Planning Acquire Project Team Management Develop Project Team Manage Project Team Project Identify Stakeholders Plan Communications Distribute Information Performance Reporting Communications Manage stakeholders Management expectations Project Risk Plan Risk Management Risk Monitoring and Control Management Risk Identification Qualitative / Quantitative Risk Analysis y Risk Response Planning Project Plan procurement Conduct procurement Administer Contract Close Procurement procurement Management
  • 3. 8. Project Quality Management Monitoring & Controlling Processes Planning Processes Enter phase/ Initiating Closing Exit phase/ Start project Processes Processes End project Executing Processes Knowledge Process Area Initiating Planning Executing Monitoring & Contol Closing Perform Quality - Perform Quality - Cost Quality Planning Assurance Control
  • 4. PROJECT QUALITY MANAGEMENT Project Quality Management includes the processes and activities of the performing organization that determine quality policies, objectives, and responsibilities so th t th project will li i bj ti d ibiliti that the j t ill satisfy the needs for which it was undertaken. lt implements the quality management system through policy and procedures with continuous process improvement activities conducted throughout, as appropriate.
  • 5. Project Quality Management Processes  • 8.1 Plan Quality ‐ The process of identifying quality requirements and/or standards for the project and product, and d d documenting h ti how th project will d the j t ill demonstrate t t compliance. • 8.2 Perform Quality Assurance ‐ The process of auditing the quality requirements and the results from quality control measurements to ensure appropriate quality standards and i li d d d operational definitions are used. • 8.3 Perform Quality Control ‐ The process of monitoring and recording results of executing the quality activities to assess performance and recommend necessary changes. f h
  • 6. Quality Concepts • Quality vs. Grade – Quality: the degree to which a set of inherent Quality: the degree to which a set of inherent  characteristics fulfill requirements – Quality level that fails to meet quality requirements is  always a PROBLEM – Grade: a category assigned to product or service having the Grade: a category assigned to product or service having the  same functional use but different technical characteristics – Low grade may not be a problem g y p
  • 7. Quality Management: Important  points • Customer satisfaction • Conformance to requirement q • Fitness for use: product/service produced must satisfy real needs • Prevention over inspection • C Cost of preventing mistakes < cost of correcting f i i k f i • Continuous improvement (Kaizen) • Based on PDCA cycle y • Using quality improvement initiatives e.g. TQM, 6 sigma • Using process improvement models e.g. OPM3, CMMI, Malcolm  Baldrige • Management responsibility • To provide the resource needed to succeed
  • 8. Quality Concepts • Gold Plating: giving the customer extras – This practice is not recommended p • Marginal Analysis: looking for the point where.. benefits/revenue to be received from improving quality  benefits/revenue to be received from improving quality EQUALS the incremental cost to achieve that quality • Just in Time (JIT): j t h ( ) just when they are needed or just before they  th d d j tb f th are needed. – It forces attention on quality practices. • Total Quality Management (TQM) – Company & their employees focus on finding ways to continuous  improve the quality of their business practices & products.
  • 9. Grade and Quality Quality and grade are not the same. Quality is "the degree to which a set of inherent characteristics fulfill requirements‘‘. Grade is a categor assigned to prod cts or ser ices ha ing the category products services having same functional use but different technical characteristics. While a quality level that fails to meet quality requirements is always a problem, low grade may not be.
  • 10. Grade and Quality For example, a software product can be of high quality (no obvious defects, readable manual) and low grade (a limited number of features), or of low quality (many defects poorly organized user defects, documentation) and high grade (numerous features). The project manager and the project management team are responsible f managing th t d ff i l d t d li ibl for i the tradeoffs involved to deliver th the required levels of both quality and grade.
  • 11. Precision and Accuracy Precision and accuracy are not equivalent. Precision means the values of repeated measurements are clustered and have little scatter. tt Accuracy means that the measured value is very close to the true value. Precise measurements are not necessarily accurate. A very accurate measurement is not necessarily precise. The project management team must determine appropriate levels of accuracy and precision precision.
  • 12. Basic Approach to Quality Management The basic approach to quality management described in this section is intended to be compatible with that of the International 0 I t ti l 0rganization f St d di ti (lS0) i ti for Standardization (lS0). This is compatible with proprietary approaches to quality management such as those recommended by Deming, Juran, Crosby, and others, and non‐proprietary approaches such as Total Quality Management (TOM) Si Si T l Q li M (TOM), Six Sigma, f il failure mode and d d effect analysis (FMEA), design reviews, voice of the customer, cost of quality (C0Q), and continuous improvement.
  • 13. Modern Quality Mgt and Project Quality Mgt. Modern quality management complements project quality management. Both disciplines recognize the importance of: f • Customer satisfaction Understanding evaluating defining and satisfaction. Understanding, evaluating, defining, managing expectations so that customer requirements are met. This requires a combination of conformance to requirements (to ensure the project produces what it was created to produce) and fitness for use (the product or service must satisfy real ( p y needs).
  • 14. Modern Quality Mgt and Project Quality Mgt. • Prevention over inspection. 0ne of the fundamental tenets 0f modern quality management states that quality is planned, designed, designed and built in not inspected in in‐not in. The cost of preventing mistakes is generally much less than the p g g y cost of correcting them when they are found by inspection.
  • 15. Modern Quality Mgt and Project Quality Mgt. • Continuous improvement. The plan‐do‐check‐act cycle is the basis for quality improvement as defined by Shewhart and modified b D i difi d by Deming. l addition, quality i ln dditi lit improvement t initiatives undertaken by the performing organizati0n, such as TQM and Six Sigma, should improve the quality of the project's management as well as the quality of the project's product. Process improvement models include Malcolm Baldrige, 0rganizational Project Management Maturity Model (0PM3@) (0PM3@), and Capability Maturity Model Integrated (CMMI@),
  • 16. Modern Quality Mgt and Project Quality Mgt. • Management Responsibility. Success requires the participati0n of all members of the project team, but remains the th responsibility of management t provide th resources ibilit f t to id the needed to succeed.
  • 17.
  • 18. Cost of Quality • Cost of quality (COQ) refers to the total cost of all efforts related to quality throughout the product life cycle. • Project decisions can impact operational costs of quality as a result of product returns warranty claims returns, claims, and recall campaigns, • Therefore, due to the temporary nature of a project, the sponsoring organization may choose to invest in product quality improvement, especially defect prevention and appraisal to reduce the external cost of appraisal, quality.
  • 19. 8.1 Plan Quality Plan Quality is the process of identifying quality requirements and/or standards for the project and product, and documenting how the h th project will d j t ill demonstrate compliance. t t li Quality planning should be performed in parallel with the other project planning processes. For example, proposed changes in the product to meet identified quality standards may require cost or schedule adjustments and a d il d risk analysis of the h d l dj d detailed i k l i f h impact to plans. The quality planning techniques discussed here are those most frequently used on projects. There are many others that may be useful on certain projects or in some application areas. f l l
  • 20.
  • 21. 8.1.1 Plan Quality lnputs .1 Scope Baseline: • Scope statement: The scope statement contains the project description, description major project deliverables and acceptance deliverables, criteria. The product scope description will often contain details of technical issues and other concerns that can affect q alit planning The definition of acceptance criteria quality planning. can significantly increase or decrease project costs quality costs. Satisfying all acceptance criteria implies the needs of the th customer h t have bbeen met.t • WBS: The WBS identifies the deliverables, the work packages and the control accounts used to measure project performance. • WBS Dictionary: The WBS dictionary defines technical information for WBS elements.
  • 22. 8.1.1 Plan Quality lnputs .2 Stakeholder Register: The stakeholder register identifies stakeholders with a particular interest in or impact on quality in, on, quality. .3 Cost Performance Baseline: The cost performance baseline documents the accepted time p p phase used to measure cost performance (Section 7.2.3.1 ). .4 Schedule Baseline: The schedule baseline documents the accepted schedule performance measures including start and finish dates (Section 6.5.3.2). .5 Risk Register: ik i The risk register contains information on threats and opportunities that may impact quality pp y p q y requirements (Section 11 .2‐3.1).
  • 23. 8.1.1 Plan Quality lnputs .6 Enterprise Environmental Factors: The enterprise environmental factors that influence the Plan Quality process include but are not limited to: Governmental agency regulations include, regulations, Rules, standards, and guidelines specific to the application area, and working/operating conditions of the project/product which may affect p ojec qua y project quality. .7 0rganizational Process Assets: The organizational process assets that influence the Plan 0uality process include, but are not limited to: ‐ Organizational quality policies, procedures, and guidelines, ‐ Historical databases, ‐ Lessons learned from previous projects, and ‐ Quality policy, as endorsed by senior management, which sets the intended direction of a performing organization with regard to quality. The quality policy of the performing organization for their products often can be adopted "as is" to use by the project.
  • 24.
  • 25. 8.1.2 Plan Quality: Tools and Techniques .1 Cost‐Benefit Analysis: The primary benefits of meeting quality requirements can include less rework, higher productivity, lower costs, and increased stakeholder satisfaction. A business case for each quality activity compares the cost of the quality step to the expected benefit.
  • 26. 8.1.2 Plan Quality: Tools and Techniques .2 Cost of Quality (COQ): Cost of quality includes all costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product 0r service for conformance to requirements, and failing to meet q , g requirements (rework). Failure costs are often categorized into internal (found by the project) and external (found by the customer). Failure costs are also called cost of poor quality. F il t l ll d t f lit Figure 8‐4 provides some examples to consider in each area.
  • 27. 8.1.2 Plan Quality: Tools and Techniques .3 Control Charts: Control charts are used to determine whether or not a process is stable or has predictable performance. Upper and lower specification limits are based on requirements of the contract. They reflect the maximum and minimum values allowed. There may be penalties associated with exceeding the specification limits. Upper and lower control limits are set by the project manager and appropriate stakeholders to reflect the points at which corrective action will be taken to prevent exceeding specification limits. For repetitive processes, the control limits are generally +_3 sigma.
  • 28. Control charts Rule of seven (non random data points) Out of control Assignable/special cause Normal and expected variation Upper control limit Usually 3 or 6 sigma Lower control limit Normal distribution curve Out of control Specification limit: is Assignable/special cause point determines by customer, not calculated based on control chart
  • 29. The Seven Run Rule The Seven Run Rule • You can use quality control charts and the  seven run rule to look for patterns in data • The seven run rule states that if seven data  points in a row are all below the mean, above  the mean, or are all increasing or decreasing,  then the process needs to be examined for  nonrandom problems
  • 30. Figure 8‐3: Sample Quality  Control Chart 30 Information Technology Project Management, Fifth Edition, Copyright 2007
  • 31. 8.1.2 Plan Quality: Tools and Techniques A process is considered out of control when a data point exceeds a control limit or if seven consecutive points are above or below the mean. Control charts can be used to monitor various types of output variables. Control charts may also be used to monitor cost and schedule variances, volume, and frequency of scope changes, or other management results to help determine if the project management processes are in control.
  • 32.
  • 33. 8.1.2 Plan Quality: Tools and Techniques .4 Benchmarking: Benchmarking involves comparing actual or planned project p practices to those of comparable projects to identify best practices, p p j y p generate ideas for improvement, and provide a basis for measuring performance. These other projects can be within the performing organization or outside of it and can be within the same or in another application area area. .5 Design of Experiments: Design f D i of experiments (D0E) i a statistical method f id tif i i t is t ti ti l th d for identifying which factors may influence specific variables of a product or process under development or in production. DOE should be used during the Plan Quality process to determine the number and type of tests and their impact on cost of quality. DOE can be used to reduce the sensitivity of product performance to sources of variations caused by environmental or manufacturing differences. diff
  • 34.
  • 35. 8.1.2 Plan Quality: Tools and Techniques .6 Statistical Sampling: Statistical sampling involves choosing part of a population of interest for inspection (for example, selecting ten engineering drawings at random from a list of seventy‐five). Sample frequency and sizes should be determined during the Plan Quality process so the cost of quality will include the number of tests, expected scrap, etc. There is a substantial body of knowledge on statistical sampling. ln some application areas it may be necessary for the project management team to be familiar with a variety of sampling techniques to assure the sample selected actually represents the population of interest. h l f
  • 36.
  • 37. 8.1.2 Plan Quality: Tools and Techniques .7 Flowcharting: A flowchart is a graphical representation of a process showing the relationships among process steps. There are many styles, but all process flowcharts show activities, decision points, and the order of processing. p g During quality planning, flowcharting can help the project team anticipate quality problems that might occur. An awareness of potential problems can result in the development of test procedures or approaches for dealing with them. Figure 8‐7 is an example of a process flowchart for design reviews.
  • 38. 8.1.2 Plan Quality: Tools and Techniques .8 Proprietary Quality Management Methodologies: These include Six Sigma, Lean Six Sigma, Quality Function Deployment, CMMI@, etc. Many other methodologies exist ‐ this is not intended to be a recommended or complete list of examples. .9 Additional quality Planning Tools: 0ther quality planning tools are often used to better define the quality requirements and plan effective quality management activities. These include, but are not limited to: • Brainstorming (defined in Section 11 .2.2.2). • Affinity diagrams, used to visually identify logical groupings based on y g , y y g g p g natural relationships, • Force field analysis, which are diagrams of the forces for and against change. g
  • 39. 8.1.2 Plan Quality: Tools and Techniques • Nominal group techniques, to allow ideas to be brainstormed in small groups and then reviewed by a larger group. • Matrix diagrams, which include two, three, or four groups of information and show relationships between factors, p , causes, and objectives. Data in a matrix is organized in rows and columns with intersecting cells that can b fill d with i f i i ll h be filled i h information that i h describes the demonstrated relationship between the items located in the row and column. • Prioritization matrices, which provide a way of ranking a diverse set of problems and/or issues (usually generated through brainstorming) by their importance importance.
  • 40.
  • 41. 8.1.3 Plan Quality: 0utputs .1 Quality Management Plan: The quality management plan describes how the project management team will implement the performing organization's g p p g g quality policy. lt is a component or a subsidiary plan of the project management plan (Section 4.2.3.1). The quality management plan provides input to the overall project h l l d h ll management plan and includes quality control, quality assurance, and continuous process improvement approaches for the project. The quality management plan may be formal or informal highly informal, detailed, or broadly framed. The style and detail is determined by the requirements of the p j project. The quality management plan should be reviewed early in q y g p y the project to ensure that decisions are based on accurate information. The benefits of this review can include reduction of cost and schedule overruns caused b rework. h d l d by k
  • 42. 8.1.3 Plan Quality: 0utputs .2 Quality Metrics: A quality metric is an operational definition that describes, in very specific terms a project or product attribute and how terms, the quality control process will measure it. A measurement is an actual value. The tolerance defines the allowable variations on the metrics. For example, a metric related to the quality objective of staying within the approved budget by + ‐ '10% could be to measure the cost of every deliverable and determine the percent variance from the approved budget for that deliverable. Q Quality metrics are used in the quality assurance and quality y q y q y control processes. Some examples of quality metrics include on‐time performance, budget control, defect frequency, failure rate, availability, reliability, and test coverage. , y, y, g
  • 43. 8.1.3 Plan Quality: 0utputs .3 Quality Checklists: A checklist is a structured tool, usually component‐specific, used to verify that a set of required steps has been performed. Checklists range from simple to complex based on project requirements and practices. Many organizations have standardized checklists available to ensure consistency in frequently performed tasks. f l f d k ln some application areas, checklists are also available from professional associations or commercial service providers. Quality checklists are used in the quality control process.
  • 44. 8.1.3 Plan Quality: 0utputs .4 Process lmprovement Plan The process improvement plan is a subsidiary of the project management plan (Section 4 2 3 1) 4.2.3.1). The process improvement plan details the steps for analyzing processes to identify activities which enhance their value. Areas to consider include: • Process boundaries. Describes the purpose of processes, their start and end, their inputs/outputs, the data required, the owner, and the stakeholders stakeholders. • Process configuration. A graphic depiction of processes, with interfaces identified, used to facilitate analysis. • P Process metrics. Al i Along with control li i ih l limits, allows analysis of ll l i f process efficiency. • Targets for improved performance. Guides the process improvement activities. i t ti iti
  • 45. 8.1.3 Plan Quality: 0utputs .5  Project Document Updates: Project documents that may be updated include, but are not  limited to: • Stakeholder register, and • R Responsibility Assignment Matrix (Section 9.1 .2.1). ibilit A i t M t i (S ti 9 1 2 1)
  • 46. 8.2 Perform Quality Assurance Perform Quality Assurance is the process of auditing the quality requirements and the results from quality control measurements to t ensure appropriate quality standards and operational i t lit t d d d ti l definitions are used. See Figures 8‐8 and 8‐9. Perform Quality Assurance is an execution process that uses data Q y p Perform 0uality Assurance also provides an umbrella for continuous process improvement, which is an iterative means for improving the quality of all processes. i i h li f ll Continuous process improvement reduces waste and eliminates activities that do not add value. This allows processes to operate at increased levels of efficiency and effectiveness.
  • 47. 8.2.1 Perform Quality Assurance: lnputs .1 Project Management Plan: The project management plan described in Section 4.2.3.1 contains the following information that is used to assure quality: • Quality management plan The quality management plan plan. describes how quality assurance will be performed within the project. • Process improvement plan. The process improvement plan details the steps for analyzing processes to identify activities which enhance their value. .2 Quality Metrics: Described in Section 8.1.3.2,
  • 48.
  • 49. 8.2.1 Perform Quality Assurance: lnputs .3 Work Performance lnformation: Performance information from project activities is routinely collected as the project progresses, Performance results which may p j p g , y support the audit process include, but are not limited to: • Technical performance measures, • Project deliverables status, • Schedule progress, and • Costs incurred. .4 Quality Control Measurements: Quality control measurements are the results of quality control activities. They are used to analyze and evaluate the quality y y q y standards and processes of the performing organization (Section 8.3.3.1).
  • 50.
  • 51. 8.2.2 Perform Quality Assurance: Tools and Techniques .1  Plan Quality and Perform Quality Control Tools and  Techniques: Tools and techniques from PIan Quality and Perform Quality  Control, are discussed in Section 8.1 .2. Section 8‐3.2 can also be used for quality assurance activities. Section 8‐3 2 can also be used for quality assurance activities
  • 52. 8.2.2 Perform Quality Assurance: Tools and Techniques .2 Quality Audits: A quality audit is a structured, independent review to determine whether project activities comply with 0rganizational and project policies, processes, and procedures. The objectives of a quality audit are: • ldentify all the good/best practices being implemented, • ldentify all the gaps/shortcomings, • Sh Share th good practices iintroduced or iimplemented iin similar the d ti t d d l t d i il projects in the 0rganization and/or industry,
  • 53. 8.2.2 Perform Quality Assurance: Tools and Techniques • Proactively offer assistance in a positive manner to improve implementation of processes to help the team raise productivity, productivity and • Highlight contributions 0f each audit in the lessons learned repository of the organization, The subsequent effort to correct any deficiencies should result in a reduced cost of quality and an increase in sponsor or customer acceptance of the project's product. p p j p Quality audits may be scheduled or random and may be conducted by internal or external auditors. Quality audits can confirm the implementation of approved change requests including corrective actions, defect repairs, and preventive actions.
  • 54. 8.2.2 Perform Quality Assurance: Tools and Techniques .3 Process Analysis: Process analysis follows the steps outlined in the process improvement plan to identity needed improvements. This analysis also examines problems experienced, constraints experienced, and non‐value‐added activities identified during p , g process operation. Process analysis includes root cause analysis ‐ a specific technique to id if a problem, di h i identify bl discover the underlying h d l i causes that lead to it, and develop preventive actions.
  • 55. 8.2.3 Perform Quality Assurance: 0utputs .1 0rganizational Process Assets Updates: Elements of the organizational process assets that may be updated include, but are not limited to, the quality standards. .2 Change Requests 2 Requests: Quality improvement includes taking action to increase the effectiveness and/or efficiency of the policies, processes, and / y p ,p , procedures of the performing organization. Change requests are created and used as input into the Perform l t P f lntegrated Ch t d Change C t l (S ti 4 5) process t Control (Section 4.5) to allow full consideration of the recommended improvements. Change requests can be used to take corrective action or preventive action or to perform defect repair.
  • 56. 8.2.3 Perform Quality Assurance: 0utputs .3 Project Management Plan Updates Elements of the project management plan that may be  updated include, but are not limited to • Quality management plan, • Sched le management plan and Schedule management plan, and • Cost management plan. .4 Project Document Updates: Project documents that may be updated include, but are not  limited to: • Quality audits reports, • Training plans, and • Process documentation.
  • 57. 8.3 Perform Quality Control Perform Quality Control is the process of monitoring and recording results of executing the quality activities to assess performance and recommend necessary changes. f d d h Quality control is performed throughout the project. Quality standards include project processes and product goals. p j p p g Project results include deliverables and project management results, such as cost and schedule performance. Quality control is often performed by a quality control department or similarly titled organizational unit. Quality control activities identify causes of poor process or product quality and recommend and/or take action to eliminate them. See Figures 8‐ 10 and 8‐1 1.
  • 58. 8.3 Perform Quality Control The project management team should have a working knowledge of statistical quality control, especially sampling and probability, t h l evaluate quality control outputs. b bilit to help l t lit t l t t Among other subjects, the team may find it useful to know the differences between the following pairs of terms: gp • Prevention (keeping errors out of the process) and inspection (keeping errors out of the hands of the customer. • Attribute sampling (the result either conforms or does not c0nform) and variables sampling (the result is rated on a continuous scale that measures the degree of conformity). • Tolerances (specified range of acceptable results) and control limits (thresholds, which can indicate whether the process is out of control). f l)
  • 59.
  • 60.
  • 61. 8.3.1 Perform Quality Control: lnputs .1 Project Management Plan: The project management plan described in Section 4.2.3.1 contains the quality management plan, which is used to control quality. The quality management plan describes how quality control will be performed within the project. .2 Quality Metrics: Q y Described in Section 8.1.3.2 .3 Quality Checklists: Described in Section 8.1 .3.3
  • 62. 8.3.1 Perform Quality Control: lnputs .4 Work Performance Measurements: Work performance measurements are used to produce project activity metrics to evaluate actual progress as compared to planned y p g p p progress. These metrics include, but are not limited to: • Planned vs. actual technical performance, • Planned vs. actual schedule performance, and • Planned vs. actual cost performance .5 Approved Change Requests: As part of the Perform lntegrated Change Control process a change control status update will indicate that some changes are approved p g pp and some are not. Approved change requests can include modifications such as defect repairs, revised work methods and revised schedule. The timely implementation of approved changes needs to be verified verified.
  • 63. 8.3.2 Perform Quality Control: Tools and Techniques The first seven of these tools and techniques are known as lshikawa's seven basic tools of quality: .1 Cause and Effect Diagrams Cause and effect diagrams, also called lshikawa diagrams or fishbone diagrams ill strate ho various factors might be diagrams, illustrate how ario s linked to potential problems or effects. Figures 8‐1 2 and 8‐13 are examples of cause and effect diagrams. A possible root cause can be uncovered by continuing to ask "why“ or "how" along one of the Iines. "Why Why" and "How How" diagrams may be used in root Why‐Why How‐How cause analysis. Cause and effect diagrams are also used in risk analysis (Section 11.2.2.5).
  • 64.
  • 65. 8.3.2 Perform Quality Control: Tools and Techniques .2 Control Charts: Control charts are described in Section 8.1.2.3. ln this process, the th appropriate d t i collected and analyzed t i di t th i t data is ll t d d l d to indicate the quality status of project processes and products. Control charts illustrate how a process behaves over time and p when a process is subject to special cause variation, resulting in an out‐of‐control condition. They Th graphically answer the question: "l this process variance hi ll h i "ls hi i within acceptable limits?" The pattern of data points on a control chart may reveal random fluctuating values, sudden process jumps, or a gradual trend in increased variation.
  • 66. Control charts Rule of seven (non random data points) Out of control Assignable/special cause Normal and expected variation Upper control limit Usually 3 or 6 sigma Lower control limit Normal distribution curve Out of control Specification limit: is Assignable/special cause point determines by customer, not calculated based on control chart
  • 67. The Seven Run Rule The Seven Run Rule • You can use quality control charts and the  seven run rule to look for patterns in data • The seven run rule states that if seven data  points in a row are all below the mean, above  the mean, or are all increasing or decreasing,  then the process needs to be examined for  nonrandom problems
  • 68. Figure 8‐3: Sample Quality  Control Chart 68 Information Technology Project Management, Fifth Edition, Copyright 2007
  • 69. 8.3.1 Perform Quality Control: lnputs .6 Deliverables: Described in Section 4.3.3.1 .7 0rganizational Process Assets: The organizational process assets that can influence the Perform Quality Control process include, but are not limited to: • Quality standards and policies. • Standard work guidelines, and • lssue and defect reporting procedures and communication policies.
  • 70. 8.3.2 Perform Quality Control: Tools and Techniques By monitoring the output of a process over time, a control chart can help assess whether the application of process changes resulted in the desired th d i d iimprovements. t When a process is within acceptable limits it is in control and does not need to be adjusted. Conversely, when a process is outside acceptable limits, the process should be adjusted. Seven consecutive points outside the upper or lower control limits indicate a process that is out of control. The upper control limit and lower control limit are usually set at +-3 sigma where sigma is one 3 standard deviation.
  • 71.
  • 72. 8.3.2 Perform Quality Control: Tools and Techniques .3 Flowcharting: Described in Section 8.1 .2.7, flowcharting is used during Perform Quality Control to determine a failing process step(s) and identify potential process improvement opportunities. Flowcharting is also used in risk analysis (Section 11.2.2.5). .4 Hi 4 Histogram: A histogram is a vertical bar chart showing how often a particular variable state occurred. Each column represents an attribute 0r characteristic of a problem/situation. The height of each column represents the relative frequency of the characteristic. This tool helps illustrates the most common cause of problems in a process by the number and relative heights of the bars. Figure 8‐14 is an example of an unordered histogram showing causes of late time entry by a project team team.
  • 73. 8.3.2 Perform Quality Control: Tools and Techniques .5 Pareto Chart: A Pareto chart, also refined to as a Pareto diagram, is a specific type of histogram ordered by frequency of histogram, occurrence. lt shows how many defects were generated by type or category of identified cause (Figure B‐1 5). Rank ordering is used to focus corrective action. The project team should address the causes creating the greatest number of defects first first. Pareto diagrams are conceptually related to Pareto's Law, which holds that a relatively small number of causes will typically produce a majority of the problems or defects. This is commonly referred to as the 80/20 principle, where B0% of the problems are due to 2070 of the causes. Pareto diagrams p g can be used to summarize various types of data for 80/20 analyses,
  • 74.
  • 75. 8.3.2 Perform Quality Control: Tools and Techniques .6 Run Chart: Similar to a control chart without displayed limits, a run chart shows the history and pattern of variation variation. A run chart is a ljne graph that shows data points pl0tted in the order in which they occur. Run charts show trends in a process over time, variation over time, or declines or improvements in a process over time. Trend analysis is performed using run charts and involves mathematical techniques to forecast future outcomes based on historical results. Trend analysis is often used to monitor: • Technical performance. How many errors or defects have been identified, and how many remain uncorrected? • Cost and schedule performance How many activities per performance. period were completed with significant variances?
  • 76.
  • 77. 8.3.2 Perform Quality Control: Tools and Techniques .7 Scatter Diagram: A scatter diagram (Figure 8‐16) shows the relationship between two variables. This tool allows the quality team to study and identify the possible relationship between changes observed in two variables. Dependent variables versus independent variables are plotted. The closer the points are to a diagonal line, the more closely they are related. l l h l d Figure 8‐16 shows the correlation between the timecard submission date and the number of days traveling per month. .8 Statistical Sampling: Described in Section 8.1.2.6. Samples are selected and tested as defined in the quality plan.
  • 78.
  • 79. 8.3.2 Perform Quality Control: Tools and Techniques .9 lnspection: An inspection is the examination of a work product to determine whether it conforms to documented standards. The results of an inspection generally include measurements and may be conducted at any level. For example, the results y y p , of a single activity can be inspected, or the final product of the project can be inspected. lnspections may be called reviews, reviews peer reviews audits or walkthroughs reviews, audits, walkthroughs. ln some application areas, these terms have narrow and specific meanings. Inspections are also used to validate defect repairs. .10 Approved Change Requests Review: All approved change requests should b reviewed to verify ll d h h ld be d f that they were implemented as approved
  • 80. 8.3.3 Perform Quality Control: Outputs .1 Quality Control Measurements: Quality control measurements are the documented results of quality control activities in the format specified during quality planning. .2 Validated Changes: 2 Any changed or repaired items are inspected and will be either accepted or rejected before notification of the decision is provided. Rejected items may require rework. .3 Validated Deliverables: A goal of quality control i t d t l f lit t l is to determine th correctness of i the t f deliverables‐ The results of the execution quality control processes are validated deliverables. Validated deliverables are an input to Verify Scope for formalized acceptance.
  • 81. 8.3.3 Perform Quality Control: Outputs .4 Organizational Process Assets Updates: Elements of the 0rganizational process assets that may be updated include, but are not limited to: • Completed checklists. When checklists are used, the completed checklists become part of the project's records project s • Lessons learned documentation. The causes of variances, the reasoning behind the corrective action chosen, and other types of lessons learned from quality control are documented so they become part of the historical database for both the project and the performing organization. Lessons learned are documented throughout the project life cycle, but at a minimum, during project closure. closure
  • 82. 8.3.3 Perform Quality Control: Outputs .5 Change Requests: lf the recommended corrective or preventive actions or a defect d f t repair requires a change t th project management i i h to the j t t plan, a change request (Section 4.4.3.1)should be initiated in accordance with the defined Perform lntegrated Change Control (4.5) process. .6 Project Management Plan Updates: Elements 0f the project management plan that may b El h j l h be updated include, but are not limited to: • Quality management plan, and • Process improvement plan. .7 Project Document Updates: Project documents that may be updated include, but are not limited to, quality standards.
  • 83. Important Terms • Mutual Exclusive: if two events cannot both occur in a single trial • Probability: something will occur • Normal Distribution: common probability density distribution  chart  • S i i li d Statistical independence: the probability of one event  d occurring does not affect the probability of another event occurring • Standard deviation (or Sigma): h f Standard deviation (or Sigma): how far you are from  f the mean • 3 or 6 sigma 3 or 6 sigma – Represent the level of quality has decided to try to achieve – 6σ is higher quality standard than 3σ – Used to calculate the upper and lower control limits in a control chart Used to calculate the upper and lower control limits in a control chart
  • 84. Important Terms Percentage of occurrences between two control Number of σ limits 1 68.26% 2 95.64% 3 99.73% 6 99.99985%
  • 85. Who s Responsible for the Quality  Who’s Responsible for the Quality of Projects? • Project managers are ultimately responsible for quality  management on their projects • Several organizations and references can help project  managers and their teams understand quality a age s a d t e tea s u de sta d qua ty – International Organization for Standardization (www.iso.org) – IEEE (www.ieee.org)
  • 86. Six Sigma Six Sigma • Six Sigma is “a comprehensive and flexible Six Sigma is  a comprehensive and flexible  system for achieving, sustaining, and  maximizing business success. Six Sigma is  maximizing business success Six Sigma is uniquely driven by close understanding of  customer needs, disciplined use of facts, data,  customer needs disciplined use of facts data and statistical analysis, and diligent attention to  managing, improving, and reinventing business  managing improving and reinventing business processes.”* *Pande, Peter S., Robert P. Neuman, and Roland R. Cavanagh, The g Six Sigma Way, New York: McGraw-Hill, 2000, p. xi.
  • 87. Basic Information on Six Sigma Basic Information on Six Sigma • The target for perfection is the achievement of  g p no more than 3.4 defects per million  pp opportunities • The principles can apply to a wide variety of  p p pp y y processes • Six Sigma projects normally follow a five‐phase  improvement process called DMAIC p p
  • 88. DMAIC • DMAIC is a systematic, closed‐loop process for continued improvement that is  scientific and fact based • DMAIC stands for: – Define: Define the problem/opportunity, process, and customer  requirements – Measure: Define measures, then collect, compile, and display data – Analyze: Scrutinize process details to find improvement opportunities – Improve: Generate solutions and ideas for improving the problem Improve: Generate solutions and ideas for improving the problem – Control: Track and verify the stability of the improvements and the  predictability of the solution
  • 91. ISO Standards ISO Standards • ISO 9000 is a quality system standard that: – Is a three‐part, continuous cycle of planning, controlling, and  documenting quality in an organization – Provides minimum requirements needed for an organization  to meet its quality certification standards – Helps organizations around the world reduce costs and  improve customer satisfaction • See www.iso.org for more information
  • 92. For more information do not hesitate to  contact me. Ahmad H. Maharma ‐ PMP® • Ramallah, Palestine  • Phone: + (972) (2) 2968644 • Mobile: + (972) (599) 001155 E‐Mail: ahmad.maharma@gmail.com