WS Atkins plc 
Analyst and investor visit to ITER 
2 October 2014
Uwe Krueger 
Chief executive officer
Simon Layzell 
Project Director, ITER
Today’s agenda 
4 
•Welcome 
•Health and safety 
•Atkins and ITER –project overview 
•Site visit 
•Our Energy business.
The ITER programme 
5 
•International Thermonuclear Experimental Reactor 
•A €15bn research & development programme to demonstrate the scientific and technological viability of controlled fusion for power production 
•Involvement of parties representing over half of the world’s population –the world’s largest R&D project 
•The world’s largest nuclear fusion machine, in the south of France (Cadarache).
The science of nuclear fusion 
6 
Limitless supply of fuel 
Deuterium is abundant 
Tritium can be bred from Lithium 
An enormous energy yield (250kg/year for 1GW) 
•No high activity waste 
•No chain reaction –stops if disturbed 
•Fusion machines have been around since the 1950’s but not on a commercial basis. 
http//www.iter.org : The Science
Development timetable 
7
The ITER organisation 8 
•Created in 1985 (Gorbachev & Reagan) 
•It is an umbrella organisation (designer of fusion process plant, programme manager, future operator and license holder) 
•There are 7 domestic agencies (DAs) –funding through ‘in kind’ delivery of engineering, equipment and construction services 
•Fusion for Energy (F4E ) represents the EU. 
F4E 
(Barcelona)
F4E Buildings Team 
Support to the Owner 
Internal and External 
Experts 
Health and SafetyCoordination 
Legal Inspection 
Architect Engineer 
Main contractor 
Project organisation 
OWNER 
ITER Buildings 
IMPLEMENTATION 
Main contractor 
Main contractor 
9
Engage’s customer 
10 
F4E –EU domestic agency 
•Responsible for 45% of the €15bn overall project 
•Based in Barcelona with limited on site representation 
•Provision of all 39 buildings and associated services (10% of project) 
•Supported by owner’s engineer (Energhia consortium).
EngageA joint venture operation 
11 
An equal partnership, international JV comprising: 
•Assystem 
•Atkins 
•EmpresariosAgrupados 
•Iosis/Egis 
Architect engineer for the buildings, services and site infrastructure.
•39 buildings and structures -€1.5bn of capital spend 
•Design stages: 
–Tender design 
–Construction design for nuclear buildings 
•Designdisciplines: 
–Civil&structuralengineering 
–HVAC,electrical(HV,MV,LV),C&I,piping 
–Mechanicalhandling 
–Nuclearenvironment:seismic,blast,aircraft,confinement 
–Architecture 
–Permitting 
•Support to the procurement process 
•Construction management for the buildings, including services and site infrastructure 
•Around €250m fee over nine years. 
12 
EngageDesigner and constructionsupervisor
Buildings and infrastructure€1.5bn project within the €15bn programme 
13 
Site layout 
View of Tokamakcomplex 
Tokamakcomplex
ITER buildings’ project 
14 
Site dimensions: 1,000m x 400m
15 
Construction of pit -March 2011 
15
16 
Construction - July 2012 
Anti-seismic pit
17 
Tokamakbasement slab -April 2013
Project complexity 
•Health & safety 
•Interfaces with a R&D project under development -configuration and change control 
•Process integration 
•Technical requirements 
•Embedded plates –80,000+ (forecast 110,000+) 
•Multiple stakeholders 
•Multiple cultures and languages 
•French nuclear regulator 
•Multiple contractors and interfaces. 
18
19 
Key challenges 
Technical change management 
Process integration
Interesting facts 
•ITER Tokamakweighs 23,000 tons (3x Eiffel Tower) 
•ITER produces 500 MW of output power for 50MW of input (Q=10). Current record 16MW 
•Temperature of sun at its core is 15 million ºC, ITER temperature will reach 150 million ºC 
•Steel frame buildings have a footprint of 29,000 m² and will incorporate 14,500 tons of structural steel 
•8km of underground tunnels for cables, pipes and other services. 
20
ITER –the future 
21
Summary 
•The ITER programme will deliver the world’s largest fusion machine 
•As part of the Engage joint venture Atkins is responsible for the design, support to procurement and construction management 
•This represents a €1.5bn project within the €15bn research and development programme 
•The ITER project represents progress in our strategy to increase our involvement in new build projects 
•It provides a showcase for our expertise with a global profile at the technical limits of our industry. 
22
Mike McNicholas 
Design and Engineering 
Managing Director
We deliver the design of the UK’s largest most critical 
infrastructure projects –with scale and complexity 
24
We excel in projects of scale and regulatory complexity -bringing our cross industry learning to the nuclear market 
25
New Build 
Generation 
Fuel 
Decommissioning 
We work across the nuclear market 
26
How do we create a winning proposition 
How do we create a winning proposition 
… it is about the whole integrated solution 27
This is what Energy do… 
This is what Energy does… 
……. process, plant and equipment 28
This is what D&E does… 
is what D&E do… 
……. buildings and infrastructure 29
It can be the hidden stuff-the tunnels and caverns that connect the plant –the early works that unlock the programme 
It can be the hidden structures -the tunnels and caverns that connect plant -the early works that unlock the programme 
……. getting to regulatory compliance more quickly, smartly and predictably
Laurent Schmeider 
F4E project manager for site, buildings and power supplies
Disclaimer 
32 
The information in this presentation pack, which does not purport to be comprehensive, has been provided by Atkins and has not been independently verified. While this information has been prepared in good faith, no representation or warranty, express or implied, is or will be made and no responsibility or liability is or will be accepted by Atkins as to or in relation to the accuracy or completeness of this presentation pack or any other written or oral information made available as part of the presentation and any such liability is expressly disclaimed. Further, whilst Atkins may subsequently update the information made available in this presentation, we expressly disclaim any obligation to do so. 
The presentation contains indications of likely future developments and other forward-looking statements that are subject to risk factors associated with, among other things, the economic and business circumstances occurring from time to time in the countries, sectors and business segments in which the Group operates.These and other factors could adversely affect the Group’s results, strategy and prospects.Forward-looking statements involve risks, uncertainties and assumptions.They relate to events and/or depend on circumstances in the future which could cause actual results and outcomes to differ materially from those currently expected.No obligation is assumed to update any forward-looking statements, whether as a result of new information, future events or otherwise.

Weitere ähnliche Inhalte

Ähnlich wie Analyst and investor visit to ITER - 02 October 2014

Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...Cluster TWEED
 
Regulatory Innovation Zones for Smart Energy Networks
Regulatory Innovation Zones for Smart Energy NetworksRegulatory Innovation Zones for Smart Energy Networks
Regulatory Innovation Zones for Smart Energy NetworksLeonardo ENERGY
 
Presentation-of-ITER-Project-France.pdf
Presentation-of-ITER-Project-France.pdfPresentation-of-ITER-Project-France.pdf
Presentation-of-ITER-Project-France.pdfAnonymousTxhyGf
 
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...Sirris
 
ETIP PV conference: 'Photovoltaics: centre-stage in the power system
ETIP PV conference: 'Photovoltaics: centre-stage in the power systemETIP PV conference: 'Photovoltaics: centre-stage in the power system
ETIP PV conference: 'Photovoltaics: centre-stage in the power systemCluster TWEED
 
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy BoardThe ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy BoardInvest Northern Ireland
 
Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014Atkins
 
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...TECNALIA Research & Innovation
 
Catalysing Green Innovation Strand 2
Catalysing Green Innovation Strand 2Catalysing Green Innovation Strand 2
Catalysing Green Innovation Strand 2KTN
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowresAustin Antony
 
Accessing 10Bn€ of EU capital for breakthrough innovation • EIC slides
Accessing 10Bn€ of EU capital for breakthrough innovation • EIC slidesAccessing 10Bn€ of EU capital for breakthrough innovation • EIC slides
Accessing 10Bn€ of EU capital for breakthrough innovation • EIC slidesAlexandre Terrien
 
Nuclear: The Challenges for Investment
Nuclear: The Challenges for InvestmentNuclear: The Challenges for Investment
Nuclear: The Challenges for Investment39 Essex Chambers
 
Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen' Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen' UKTI2014
 

Ähnlich wie Analyst and investor visit to ITER - 02 October 2014 (20)

Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
 
Regulatory Innovation Zones for Smart Energy Networks
Regulatory Innovation Zones for Smart Energy NetworksRegulatory Innovation Zones for Smart Energy Networks
Regulatory Innovation Zones for Smart Energy Networks
 
Sgcp13ellerington
Sgcp13elleringtonSgcp13ellerington
Sgcp13ellerington
 
Presentation-of-ITER-Project-France.pdf
Presentation-of-ITER-Project-France.pdfPresentation-of-ITER-Project-France.pdf
Presentation-of-ITER-Project-France.pdf
 
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
 
ETIP PV conference: 'Photovoltaics: centre-stage in the power system
ETIP PV conference: 'Photovoltaics: centre-stage in the power systemETIP PV conference: 'Photovoltaics: centre-stage in the power system
ETIP PV conference: 'Photovoltaics: centre-stage in the power system
 
NNB 2nd_final 1 3222
NNB 2nd_final 1 3222NNB 2nd_final 1 3222
NNB 2nd_final 1 3222
 
1 3 amec
1 3 amec1 3 amec
1 3 amec
 
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy BoardThe ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
 
Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014
 
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
 
Catalysing Green Innovation Strand 2
Catalysing Green Innovation Strand 2Catalysing Green Innovation Strand 2
Catalysing Green Innovation Strand 2
 
road_map (1)
road_map (1)road_map (1)
road_map (1)
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowres
 
Accessing 10Bn€ of EU capital for breakthrough innovation • EIC slides
Accessing 10Bn€ of EU capital for breakthrough innovation • EIC slidesAccessing 10Bn€ of EU capital for breakthrough innovation • EIC slides
Accessing 10Bn€ of EU capital for breakthrough innovation • EIC slides
 
CV-rev5
CV-rev5CV-rev5
CV-rev5
 
ENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_ENENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_EN
 
Nuclear: The Challenges for Investment
Nuclear: The Challenges for InvestmentNuclear: The Challenges for Investment
Nuclear: The Challenges for Investment
 
Christian Koch
Christian KochChristian Koch
Christian Koch
 
Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen' Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen'
 

Mehr von Atkins

Business uses for blockchain
Business uses for blockchainBusiness uses for blockchain
Business uses for blockchainAtkins
 
Nuclear energy mythbuster
Nuclear energy mythbusterNuclear energy mythbuster
Nuclear energy mythbusterAtkins
 
Sustainable Aerospace
Sustainable AerospaceSustainable Aerospace
Sustainable AerospaceAtkins
 
Geospatial data infographic
Geospatial data infographicGeospatial data infographic
Geospatial data infographicAtkins
 
Building what matters
Building what mattersBuilding what matters
Building what mattersAtkins
 
Electrification of aircraft
Electrification of aircraftElectrification of aircraft
Electrification of aircraftAtkins
 
Atkins' End of Year Highlights 2017
Atkins' End of Year Highlights 2017Atkins' End of Year Highlights 2017
Atkins' End of Year Highlights 2017Atkins
 
Digital Reality Report Infographic
Digital Reality Report InfographicDigital Reality Report Infographic
Digital Reality Report InfographicAtkins
 
Procurement Made Simple
Procurement Made SimpleProcurement Made Simple
Procurement Made SimpleAtkins
 
Green Sky Thinking: bringing forest schools to the inner city
Green Sky Thinking: bringing forest schools to the inner cityGreen Sky Thinking: bringing forest schools to the inner city
Green Sky Thinking: bringing forest schools to the inner cityAtkins
 
Cyber resilient infrastructure
Cyber resilient infrastructureCyber resilient infrastructure
Cyber resilient infrastructureAtkins
 
A glance at Atkins' landscape architecture projects
A glance at Atkins' landscape architecture projectsA glance at Atkins' landscape architecture projects
A glance at Atkins' landscape architecture projectsAtkins
 
Could you be an engineer?
Could you be an engineer?Could you be an engineer?
Could you be an engineer?Atkins
 
8 ways to protect your digital footprint infographic
8 ways to protect your digital footprint infographic8 ways to protect your digital footprint infographic
8 ways to protect your digital footprint infographicAtkins
 
The advent of digital engineering - a year in review
The advent of digital engineering - a year in reviewThe advent of digital engineering - a year in review
The advent of digital engineering - a year in reviewAtkins
 
The renewable energy market in Asia
The renewable energy market in AsiaThe renewable energy market in Asia
The renewable energy market in AsiaAtkins
 
Cyber resilient infrastructure infographic
Cyber resilient infrastructure infographicCyber resilient infrastructure infographic
Cyber resilient infrastructure infographicAtkins
 
Welcome to Atkins Acuity
Welcome to Atkins AcuityWelcome to Atkins Acuity
Welcome to Atkins AcuityAtkins
 
Atkins: Preliminary results for the year ended 31 March 2016
Atkins: Preliminary results for the year ended 31 March 2016Atkins: Preliminary results for the year ended 31 March 2016
Atkins: Preliminary results for the year ended 31 March 2016Atkins
 
Middle East Rail brochure
Middle East Rail brochureMiddle East Rail brochure
Middle East Rail brochureAtkins
 

Mehr von Atkins (20)

Business uses for blockchain
Business uses for blockchainBusiness uses for blockchain
Business uses for blockchain
 
Nuclear energy mythbuster
Nuclear energy mythbusterNuclear energy mythbuster
Nuclear energy mythbuster
 
Sustainable Aerospace
Sustainable AerospaceSustainable Aerospace
Sustainable Aerospace
 
Geospatial data infographic
Geospatial data infographicGeospatial data infographic
Geospatial data infographic
 
Building what matters
Building what mattersBuilding what matters
Building what matters
 
Electrification of aircraft
Electrification of aircraftElectrification of aircraft
Electrification of aircraft
 
Atkins' End of Year Highlights 2017
Atkins' End of Year Highlights 2017Atkins' End of Year Highlights 2017
Atkins' End of Year Highlights 2017
 
Digital Reality Report Infographic
Digital Reality Report InfographicDigital Reality Report Infographic
Digital Reality Report Infographic
 
Procurement Made Simple
Procurement Made SimpleProcurement Made Simple
Procurement Made Simple
 
Green Sky Thinking: bringing forest schools to the inner city
Green Sky Thinking: bringing forest schools to the inner cityGreen Sky Thinking: bringing forest schools to the inner city
Green Sky Thinking: bringing forest schools to the inner city
 
Cyber resilient infrastructure
Cyber resilient infrastructureCyber resilient infrastructure
Cyber resilient infrastructure
 
A glance at Atkins' landscape architecture projects
A glance at Atkins' landscape architecture projectsA glance at Atkins' landscape architecture projects
A glance at Atkins' landscape architecture projects
 
Could you be an engineer?
Could you be an engineer?Could you be an engineer?
Could you be an engineer?
 
8 ways to protect your digital footprint infographic
8 ways to protect your digital footprint infographic8 ways to protect your digital footprint infographic
8 ways to protect your digital footprint infographic
 
The advent of digital engineering - a year in review
The advent of digital engineering - a year in reviewThe advent of digital engineering - a year in review
The advent of digital engineering - a year in review
 
The renewable energy market in Asia
The renewable energy market in AsiaThe renewable energy market in Asia
The renewable energy market in Asia
 
Cyber resilient infrastructure infographic
Cyber resilient infrastructure infographicCyber resilient infrastructure infographic
Cyber resilient infrastructure infographic
 
Welcome to Atkins Acuity
Welcome to Atkins AcuityWelcome to Atkins Acuity
Welcome to Atkins Acuity
 
Atkins: Preliminary results for the year ended 31 March 2016
Atkins: Preliminary results for the year ended 31 March 2016Atkins: Preliminary results for the year ended 31 March 2016
Atkins: Preliminary results for the year ended 31 March 2016
 
Middle East Rail brochure
Middle East Rail brochureMiddle East Rail brochure
Middle East Rail brochure
 

Kürzlich hochgeladen

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfrs7054576148
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 

Kürzlich hochgeladen (20)

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 

Analyst and investor visit to ITER - 02 October 2014

  • 1. WS Atkins plc Analyst and investor visit to ITER 2 October 2014
  • 2. Uwe Krueger Chief executive officer
  • 3. Simon Layzell Project Director, ITER
  • 4. Today’s agenda 4 •Welcome •Health and safety •Atkins and ITER –project overview •Site visit •Our Energy business.
  • 5. The ITER programme 5 •International Thermonuclear Experimental Reactor •A €15bn research & development programme to demonstrate the scientific and technological viability of controlled fusion for power production •Involvement of parties representing over half of the world’s population –the world’s largest R&D project •The world’s largest nuclear fusion machine, in the south of France (Cadarache).
  • 6. The science of nuclear fusion 6 Limitless supply of fuel Deuterium is abundant Tritium can be bred from Lithium An enormous energy yield (250kg/year for 1GW) •No high activity waste •No chain reaction –stops if disturbed •Fusion machines have been around since the 1950’s but not on a commercial basis. http//www.iter.org : The Science
  • 8. The ITER organisation 8 •Created in 1985 (Gorbachev & Reagan) •It is an umbrella organisation (designer of fusion process plant, programme manager, future operator and license holder) •There are 7 domestic agencies (DAs) –funding through ‘in kind’ delivery of engineering, equipment and construction services •Fusion for Energy (F4E ) represents the EU. F4E (Barcelona)
  • 9. F4E Buildings Team Support to the Owner Internal and External Experts Health and SafetyCoordination Legal Inspection Architect Engineer Main contractor Project organisation OWNER ITER Buildings IMPLEMENTATION Main contractor Main contractor 9
  • 10. Engage’s customer 10 F4E –EU domestic agency •Responsible for 45% of the €15bn overall project •Based in Barcelona with limited on site representation •Provision of all 39 buildings and associated services (10% of project) •Supported by owner’s engineer (Energhia consortium).
  • 11. EngageA joint venture operation 11 An equal partnership, international JV comprising: •Assystem •Atkins •EmpresariosAgrupados •Iosis/Egis Architect engineer for the buildings, services and site infrastructure.
  • 12. •39 buildings and structures -€1.5bn of capital spend •Design stages: –Tender design –Construction design for nuclear buildings •Designdisciplines: –Civil&structuralengineering –HVAC,electrical(HV,MV,LV),C&I,piping –Mechanicalhandling –Nuclearenvironment:seismic,blast,aircraft,confinement –Architecture –Permitting •Support to the procurement process •Construction management for the buildings, including services and site infrastructure •Around €250m fee over nine years. 12 EngageDesigner and constructionsupervisor
  • 13. Buildings and infrastructure€1.5bn project within the €15bn programme 13 Site layout View of Tokamakcomplex Tokamakcomplex
  • 14. ITER buildings’ project 14 Site dimensions: 1,000m x 400m
  • 15. 15 Construction of pit -March 2011 15
  • 16. 16 Construction - July 2012 Anti-seismic pit
  • 17. 17 Tokamakbasement slab -April 2013
  • 18. Project complexity •Health & safety •Interfaces with a R&D project under development -configuration and change control •Process integration •Technical requirements •Embedded plates –80,000+ (forecast 110,000+) •Multiple stakeholders •Multiple cultures and languages •French nuclear regulator •Multiple contractors and interfaces. 18
  • 19. 19 Key challenges Technical change management Process integration
  • 20. Interesting facts •ITER Tokamakweighs 23,000 tons (3x Eiffel Tower) •ITER produces 500 MW of output power for 50MW of input (Q=10). Current record 16MW •Temperature of sun at its core is 15 million ºC, ITER temperature will reach 150 million ºC •Steel frame buildings have a footprint of 29,000 m² and will incorporate 14,500 tons of structural steel •8km of underground tunnels for cables, pipes and other services. 20
  • 22. Summary •The ITER programme will deliver the world’s largest fusion machine •As part of the Engage joint venture Atkins is responsible for the design, support to procurement and construction management •This represents a €1.5bn project within the €15bn research and development programme •The ITER project represents progress in our strategy to increase our involvement in new build projects •It provides a showcase for our expertise with a global profile at the technical limits of our industry. 22
  • 23. Mike McNicholas Design and Engineering Managing Director
  • 24. We deliver the design of the UK’s largest most critical infrastructure projects –with scale and complexity 24
  • 25. We excel in projects of scale and regulatory complexity -bringing our cross industry learning to the nuclear market 25
  • 26. New Build Generation Fuel Decommissioning We work across the nuclear market 26
  • 27. How do we create a winning proposition How do we create a winning proposition … it is about the whole integrated solution 27
  • 28. This is what Energy do… This is what Energy does… ……. process, plant and equipment 28
  • 29. This is what D&E does… is what D&E do… ……. buildings and infrastructure 29
  • 30. It can be the hidden stuff-the tunnels and caverns that connect the plant –the early works that unlock the programme It can be the hidden structures -the tunnels and caverns that connect plant -the early works that unlock the programme ……. getting to regulatory compliance more quickly, smartly and predictably
  • 31. Laurent Schmeider F4E project manager for site, buildings and power supplies
  • 32. Disclaimer 32 The information in this presentation pack, which does not purport to be comprehensive, has been provided by Atkins and has not been independently verified. While this information has been prepared in good faith, no representation or warranty, express or implied, is or will be made and no responsibility or liability is or will be accepted by Atkins as to or in relation to the accuracy or completeness of this presentation pack or any other written or oral information made available as part of the presentation and any such liability is expressly disclaimed. Further, whilst Atkins may subsequently update the information made available in this presentation, we expressly disclaim any obligation to do so. The presentation contains indications of likely future developments and other forward-looking statements that are subject to risk factors associated with, among other things, the economic and business circumstances occurring from time to time in the countries, sectors and business segments in which the Group operates.These and other factors could adversely affect the Group’s results, strategy and prospects.Forward-looking statements involve risks, uncertainties and assumptions.They relate to events and/or depend on circumstances in the future which could cause actual results and outcomes to differ materially from those currently expected.No obligation is assumed to update any forward-looking statements, whether as a result of new information, future events or otherwise.