Weymouth Equation
 For Smaller Dia, <=10” &
Shorter Piping of the order
of ‘feet’
 Reynolds number of the
order of > ~11x106
 Moody friction factor is a
function of relative
roughness ()
 Though, P calculated is
over estimated, it is used for
a conservative design
Modified Panhandle
Equation
 For Larger Dia, >10” & long
pipelines (> ~20 miles)
 Reynolds Numbers of the
order of (4x106 to 40x106)
 Moody friction factor is
independent of relative
roughness ()
 Condensation in Pipelines is
not accounted.
AGA Equation
 For Partially Turbulent & Fully
Turbulent flow
 Applicable when internal pipe
roughness is known accurately
 Von Karman Transmission
factor is used instead of
friction factor to estimate P
Spitzglass Equation
 For Smaller Dia, <10”
 Low pressure Vent Lines
 P < 0.1 x Pinlet
General Flow Equation
 For pressures < 7 barg
 Assumes Isothermal Flow.
i.e., no heat transfer
 Pipeline is horizontal
 No mechanical work done by
gas
CHOOSING SINGLE PHASE GAS FLOW CORRELATIONS
References
 Recommended Practice for Design and Installation of Offshore
Production Platform Piping Systems, API Recommended Practice
14E (RP 14E) Fifth Edition, Oct,1991
 Sizing of Gas Pipelines, Mavis Nyarko, International Journal of
Energy Engineering, Dec. 2015, Vol. 4 Iss. 6, PP. 202-205
Notes
 Weymouth Equation is suitable for piping within production
facility (API 14E, 5th Edition)
 API 14E does not suggest applicability of Erosional velocity
criteria for Single Phase flow, but for 2 Phase (Gas/Liquid)

Weitere ähnliche Inhalte

Was ist angesagt?

Q913 re1 w3 lec 12
Q913 re1 w3 lec 12Q913 re1 w3 lec 12
Q913 re1 w3 lec 12
AFATous
 
Q913 re1 w4 lec 15
Q913 re1 w4 lec 15Q913 re1 w4 lec 15
Q913 re1 w4 lec 15
AFATous
 
Blow out preventer (bop)
Blow out preventer (bop)Blow out preventer (bop)
Blow out preventer (bop)
danperth
 
Q913 re1 w4 lec 14
Q913 re1 w4 lec 14Q913 re1 w4 lec 14
Q913 re1 w4 lec 14
AFATous
 
Q922+re2+l07 v1
Q922+re2+l07 v1Q922+re2+l07 v1
Q922+re2+l07 v1
AFATous
 

Was ist angesagt? (20)

Q913 re1 w3 lec 12
Q913 re1 w3 lec 12Q913 re1 w3 lec 12
Q913 re1 w3 lec 12
 
Pumps and piping
Pumps and pipingPumps and piping
Pumps and piping
 
Q913 re1 w4 lec 15
Q913 re1 w4 lec 15Q913 re1 w4 lec 15
Q913 re1 w4 lec 15
 
Factors effecting vertical lift performance
Factors effecting vertical lift performanceFactors effecting vertical lift performance
Factors effecting vertical lift performance
 
Psv scenario-and-calculation
Psv scenario-and-calculationPsv scenario-and-calculation
Psv scenario-and-calculation
 
Installation procedures of wellhead
Installation procedures of wellheadInstallation procedures of wellhead
Installation procedures of wellhead
 
Types of compressor and application in oil and gas industry
Types of compressor and application in oil and gas industryTypes of compressor and application in oil and gas industry
Types of compressor and application in oil and gas industry
 
Blow out preventer (bop)
Blow out preventer (bop)Blow out preventer (bop)
Blow out preventer (bop)
 
Single Phase Liquid Vessel Sizing for HYSYS Dynamics
Single Phase Liquid Vessel Sizing for HYSYS DynamicsSingle Phase Liquid Vessel Sizing for HYSYS Dynamics
Single Phase Liquid Vessel Sizing for HYSYS Dynamics
 
Q913 re1 w4 lec 14
Q913 re1 w4 lec 14Q913 re1 w4 lec 14
Q913 re1 w4 lec 14
 
Impact of No. of Pipe Segments on the flow rate calculated by Pipe Model (Pag...
Impact of No. of Pipe Segments on the flow rate calculated by Pipe Model (Pag...Impact of No. of Pipe Segments on the flow rate calculated by Pipe Model (Pag...
Impact of No. of Pipe Segments on the flow rate calculated by Pipe Model (Pag...
 
Well completion 1 wleg
Well completion 1 wlegWell completion 1 wleg
Well completion 1 wleg
 
Secondary cementing
Secondary cementingSecondary cementing
Secondary cementing
 
Tubing string
Tubing stringTubing string
Tubing string
 
Drilling Mannual
Drilling MannualDrilling Mannual
Drilling Mannual
 
Artificial lift technology
Artificial lift technologyArtificial lift technology
Artificial lift technology
 
Q922+re2+l07 v1
Q922+re2+l07 v1Q922+re2+l07 v1
Q922+re2+l07 v1
 
Sucker rod pumping short course!!! ~downhole diagnostic
Sucker rod pumping short course!!!   ~downhole diagnosticSucker rod pumping short course!!!   ~downhole diagnostic
Sucker rod pumping short course!!! ~downhole diagnostic
 
PIPESIM PROJECT_2012
PIPESIM PROJECT_2012PIPESIM PROJECT_2012
PIPESIM PROJECT_2012
 
Design and Operation of NHT Strippers to Protect Catalytic Reformers
Design and Operation of NHT Strippers to Protect Catalytic Reformers Design and Operation of NHT Strippers to Protect Catalytic Reformers
Design and Operation of NHT Strippers to Protect Catalytic Reformers
 

Ähnlich wie Single Phase Gas Flow Correlations

Liquid flow in pipelines
Liquid flow in pipelinesLiquid flow in pipelines
Liquid flow in pipelines
Eja E T
 
Design of sprinkler laterals, design of main line, selection of pumps,
Design of sprinkler laterals, design of main line,  selection of pumps,Design of sprinkler laterals, design of main line,  selection of pumps,
Design of sprinkler laterals, design of main line, selection of pumps,
Suyog Khose
 
Computer Simulation of a Heat Exchanger using Aspen
Computer Simulation of a Heat Exchanger using AspenComputer Simulation of a Heat Exchanger using Aspen
Computer Simulation of a Heat Exchanger using Aspen
Ali Raza
 
instrument and control value in petrleum
instrument and control value in petrleuminstrument and control value in petrleum
instrument and control value in petrleum
chilinks4all1
 

Ähnlich wie Single Phase Gas Flow Correlations (16)

Liquid flow in pipelines
Liquid flow in pipelinesLiquid flow in pipelines
Liquid flow in pipelines
 
Sizing and selection information
Sizing and selection informationSizing and selection information
Sizing and selection information
 
Gas-Lift-Production.ppt
Gas-Lift-Production.pptGas-Lift-Production.ppt
Gas-Lift-Production.ppt
 
Vertical vapor liquid separator
Vertical vapor liquid separatorVertical vapor liquid separator
Vertical vapor liquid separator
 
Nozzle
NozzleNozzle
Nozzle
 
silo.tips_pete-203-drilling-engineering.ppt
silo.tips_pete-203-drilling-engineering.pptsilo.tips_pete-203-drilling-engineering.ppt
silo.tips_pete-203-drilling-engineering.ppt
 
Design of sprinkler laterals, design of main line, selection of pumps,
Design of sprinkler laterals, design of main line,  selection of pumps,Design of sprinkler laterals, design of main line,  selection of pumps,
Design of sprinkler laterals, design of main line, selection of pumps,
 
Computer Simulation of a Heat Exchanger using Aspen
Computer Simulation of a Heat Exchanger using AspenComputer Simulation of a Heat Exchanger using Aspen
Computer Simulation of a Heat Exchanger using Aspen
 
Flash Steam and Steam Condensates in Return Lines
Flash Steam and Steam Condensates in Return LinesFlash Steam and Steam Condensates in Return Lines
Flash Steam and Steam Condensates in Return Lines
 
Flow through venturimeter
Flow through venturimeterFlow through venturimeter
Flow through venturimeter
 
FIRE FIGHTING SYSTEM-website.pdf
FIRE FIGHTING SYSTEM-website.pdfFIRE FIGHTING SYSTEM-website.pdf
FIRE FIGHTING SYSTEM-website.pdf
 
instrument and control value in petrleum
instrument and control value in petrleuminstrument and control value in petrleum
instrument and control value in petrleum
 
197264747 104999991-aph-performance-improvements
197264747 104999991-aph-performance-improvements197264747 104999991-aph-performance-improvements
197264747 104999991-aph-performance-improvements
 
Orifice assembly
Orifice assemblyOrifice assembly
Orifice assembly
 
anaesthesia machine-140810030802-pptx.pptx
anaesthesia machine-140810030802-pptx.pptxanaesthesia machine-140810030802-pptx.pptx
anaesthesia machine-140810030802-pptx.pptx
 
Dilute Phase Conveying
Dilute Phase ConveyingDilute Phase Conveying
Dilute Phase Conveying
 

Mehr von Vijay Sarathy

BOIL OFF GAS ANALYSIS OF LIQUEFIED NATURAL GAS (LNG) AT RECEIVING TERMINALS
BOIL OFF GAS ANALYSIS OF LIQUEFIED NATURAL GAS (LNG) AT RECEIVING TERMINALSBOIL OFF GAS ANALYSIS OF LIQUEFIED NATURAL GAS (LNG) AT RECEIVING TERMINALS
BOIL OFF GAS ANALYSIS OF LIQUEFIED NATURAL GAS (LNG) AT RECEIVING TERMINALS
Vijay Sarathy
 

Mehr von Vijay Sarathy (20)

Exploring LPG Cylinders for Medical Oxygen - A Preliminary Study
Exploring LPG Cylinders for Medical Oxygen - A Preliminary StudyExploring LPG Cylinders for Medical Oxygen - A Preliminary Study
Exploring LPG Cylinders for Medical Oxygen - A Preliminary Study
 
Heating Value Estimation for Natural Gas Applications
Heating Value Estimation for Natural Gas ApplicationsHeating Value Estimation for Natural Gas Applications
Heating Value Estimation for Natural Gas Applications
 
Empirical Approach to Hydrate Formation in Natural Gas Pipelines
Empirical Approach to Hydrate Formation in Natural Gas PipelinesEmpirical Approach to Hydrate Formation in Natural Gas Pipelines
Empirical Approach to Hydrate Formation in Natural Gas Pipelines
 
Evaporation Pond Process Design in Oil & Gas Industry
Evaporation Pond Process Design in Oil & Gas IndustryEvaporation Pond Process Design in Oil & Gas Industry
Evaporation Pond Process Design in Oil & Gas Industry
 
Key Thermo-Physical Properties of Light Crude Oils
Key Thermo-Physical Properties of Light Crude OilsKey Thermo-Physical Properties of Light Crude Oils
Key Thermo-Physical Properties of Light Crude Oils
 
Cooling Tower Makeup Water Estimation
Cooling Tower Makeup Water EstimationCooling Tower Makeup Water Estimation
Cooling Tower Makeup Water Estimation
 
Design Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve SizingDesign Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve Sizing
 
Gas Compression Stages – Process Design & Optimization
Gas Compression Stages – Process Design & OptimizationGas Compression Stages – Process Design & Optimization
Gas Compression Stages – Process Design & Optimization
 
Gas Condensate Separation Stages – Design & Optimization
Gas Condensate Separation Stages – Design & OptimizationGas Condensate Separation Stages – Design & Optimization
Gas Condensate Separation Stages – Design & Optimization
 
ECONOMIC INSULATION FOR INDUSTRIAL PIPING
ECONOMIC INSULATION FOR INDUSTRIAL PIPINGECONOMIC INSULATION FOR INDUSTRIAL PIPING
ECONOMIC INSULATION FOR INDUSTRIAL PIPING
 
Evaluating Pipeline Operational Integrity - Sand Production
Evaluating Pipeline Operational Integrity - Sand ProductionEvaluating Pipeline Operational Integrity - Sand Production
Evaluating Pipeline Operational Integrity - Sand Production
 
Natural Gas Pipeline Transmission Cost & Economics
Natural Gas Pipeline Transmission Cost & EconomicsNatural Gas Pipeline Transmission Cost & Economics
Natural Gas Pipeline Transmission Cost & Economics
 
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM DataPredicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
Predicting Performance Curves of Centrifugal Pumps in the Absence of OEM Data
 
Load Sharing for Parallel Operation of Gas Compressors
Load Sharing for Parallel Operation of Gas CompressorsLoad Sharing for Parallel Operation of Gas Compressors
Load Sharing for Parallel Operation of Gas Compressors
 
Basic Unit Conversions for Turbomachinery Calculations
Basic Unit Conversions for Turbomachinery Calculations Basic Unit Conversions for Turbomachinery Calculations
Basic Unit Conversions for Turbomachinery Calculations
 
Key Process Considerations for Pipeline Design Basis
Key Process Considerations for Pipeline Design BasisKey Process Considerations for Pipeline Design Basis
Key Process Considerations for Pipeline Design Basis
 
Chemical Process Calculations – Short Tutorial
Chemical Process Calculations – Short TutorialChemical Process Calculations – Short Tutorial
Chemical Process Calculations – Short Tutorial
 
Process Design for Natural Gas Transmission
Process Design for Natural Gas TransmissionProcess Design for Natural Gas Transmission
Process Design for Natural Gas Transmission
 
OPERATING ENVELOPES FOR CENTRIFUGAL PUMPS
OPERATING ENVELOPES FOR CENTRIFUGAL PUMPSOPERATING ENVELOPES FOR CENTRIFUGAL PUMPS
OPERATING ENVELOPES FOR CENTRIFUGAL PUMPS
 
BOIL OFF GAS ANALYSIS OF LIQUEFIED NATURAL GAS (LNG) AT RECEIVING TERMINALS
BOIL OFF GAS ANALYSIS OF LIQUEFIED NATURAL GAS (LNG) AT RECEIVING TERMINALSBOIL OFF GAS ANALYSIS OF LIQUEFIED NATURAL GAS (LNG) AT RECEIVING TERMINALS
BOIL OFF GAS ANALYSIS OF LIQUEFIED NATURAL GAS (LNG) AT RECEIVING TERMINALS
 

Kürzlich hochgeladen

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Kürzlich hochgeladen (20)

data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 

Single Phase Gas Flow Correlations

  • 1. e.g., 24” Gas Export Line e.g.,6” Gas Line e.g., 8” Gas Line e.g., 8” Gas Line Weymouth Equation  For Smaller Dia, <=10” & Shorter Piping of the order of ‘feet’  Reynolds number of the order of > ~11x106  Moody friction factor is a function of relative roughness ()  Though, P calculated is over estimated, it is used for a conservative design Modified Panhandle Equation  For Larger Dia, >10” & long pipelines (> ~20 miles)  Reynolds Numbers of the order of (4x106 to 40x106)  Moody friction factor is independent of relative roughness ()  Condensation in Pipelines is not accounted. AGA Equation  For Partially Turbulent & Fully Turbulent flow  Applicable when internal pipe roughness is known accurately  Von Karman Transmission factor is used instead of friction factor to estimate P Spitzglass Equation  For Smaller Dia, <10”  Low pressure Vent Lines  P < 0.1 x Pinlet General Flow Equation  For pressures < 7 barg  Assumes Isothermal Flow. i.e., no heat transfer  Pipeline is horizontal  No mechanical work done by gas CHOOSING SINGLE PHASE GAS FLOW CORRELATIONS References  Recommended Practice for Design and Installation of Offshore Production Platform Piping Systems, API Recommended Practice 14E (RP 14E) Fifth Edition, Oct,1991  Sizing of Gas Pipelines, Mavis Nyarko, International Journal of Energy Engineering, Dec. 2015, Vol. 4 Iss. 6, PP. 202-205 Notes  Weymouth Equation is suitable for piping within production facility (API 14E, 5th Edition)  API 14E does not suggest applicability of Erosional velocity criteria for Single Phase flow, but for 2 Phase (Gas/Liquid)