DETAILED PROJECT REPORT
 Detailed project report is a complete
document for investment , decision-
making, approval, planning.
 Detailed project report is base
document for planning the project and
implementing the project.
OBJECTIVES
 To understand the importance of developing a
detailed project report that assure performance
for reliable quality with in optimum cost
 To appreciate that projects are site specific
 To understand importance of optimization of the
schemes , detailed cost estimate , payback period
and return on investment.
 To describe how bankable projects can help to
achieve required performance
 To understand methodology of project appraisal
Brief Description of Project Area
 Name of utility
 District / town (s) village covered
 Location : latitude and longitude
 Area , population , boundaries
 Climatic conditions
 Status of development. Access to electricity
 Economic structure – socio – economic features
 urban / rural
Data Collection of Existing Project
PROJECT COST DETAILS
 Basic Equipment Cost
 Consultant charges
 Duties , Taxes & Freight
a) Excise duty / customs duty/ sales tax
 Freight and Transit Insurance
 Raw materials
 Man Power cost
 Engineering Project Management.
Supervision
 Interest During Construction
Major Benefits from the Project
Project Investment Criteria
 Basically Cost – Benefits analysis
 Investment criteria can be
 payback period
Discounted cash flow (DCF) Technique
a) Net Present Worth (NPW)
b) Benefit Cost Ratio ( B C Ratio)
c) Internal rate of return ( IRR )
Project Investment Criteria
Payback Period
 length of the time required by the
cumulative net cash inflows to cover up
the fixed capital Investment .
PBP = Total Capital Investment / Total
cash inflow or Net benefits per year
Project Investment Criteria
Payback Period
 Easy to understand
 Other methods are complicated in nature
and difficult to comprehend for technical
people
 Investment should include fixed capital
&working capital
 Net benefits to be adjusted for interest and
tax liabilities
Project Investment Criteria
Discounted Cash Flow ( DCF) Technique
 A technique which brings past & future
cost benefits to their Present Worth ( PW)
 Take into account “ Time Value of Money
’’
Project Investment Criteria
 Discounted Cash Flow ( DCF)
 Past Benefits Cost – Compounding
 Future Benefits Cost – Discounting
 Past Present Future
DPR Structure
Title Page , Name,affliation,date etc
Acknowledgement
Content list
Abbreviation
Executive Summary
Introduction Background
Main technical & financial analysis
chapters
Recommended action plan
Appendices
What DPR Should ideally
provide ?
Final cost details and benefits expected
Detailed specification of equipment &
materials.
All information to prepare tender
documents.
Probable list of equipment & material
manufacturers
Project management process
PARAMETERS OF PROJECT
APPRAISAL AND APPRAISAL
PROCEDURE
PROJECT ELIGILITY
Technically feasible and provide optimal cost
solution for the selected alternative
Techno – economically sound with IRR not
less than 12% (Internal Rate of Return )
Compatible with expansion plan of the utility
& region
Complies with all environmental standards
guideline.
All clearances have been obtained
PARAMETERS OF PROJECT
APPRAISAL AND APPRAISAL
PROCEDURE
ASCERTAIN PROJECT PROFILE
Type , Purpose , Scope
Location , Access to site
Environmental Management
Technology
REVIEW PROJECT
Need & Justification :
 Existing and proposed system
 Demand supply scenario
 Alternative considered
Study if any carried out by State Govt /
utility
Status & Preparedness
Procurement procedures &
competitiveness
REVIEW PROJECT
 status & Preparedness
Procurement procedures &
competitiveness
O & M arrangements
Market & selling arrangements
a) PPA with purchaser if applicable
(Power purchasing agreement)
REVIEW PROJECT
 Financing plan
a) Debt Equity
b) Phasing of expenditure
CHECK AVAILABILITY OF
APPROVALS & CLEARANCES
Statutory Clearances such as
Land Availability & Acquisition
Forest Clearance
Highway Clearance
Electricity clearance
Fund related clearance
Pollution control board clearance etc
CHECK AVAILABILITY OF
APPROVALS & CLEARANCES
APPROVALS
 Board approval
 Approval of PPA
 CERS / SERC
 State government
ASSESS REASONABLENESS
OF COST
 Price level
 Basis and reasonableness of cost
estimate
a) Information available for similar
projects appraised in the past
b) Budgetary offers received from
suppliers
c) Similar job done by same / other
borrowers in the past
ASSESS REASONABLENESS
OF COST
IDC - Price variation
Contingency – Other costs
PERFOM FINANCIAL & RISK
ANALYSIS
Evaluate Costs & Benefits
a) Benefits
b) Reduction in losses
c) Additional Generation in MU
PERFOM FINANCIAL & RISK
ANALYSIS
 Specify Assumptions of base case .
Calculate FIRR, EIRR
 Financial Internal Rate of Return
 Economic Internal Rate of Return
Assess Risks :
a) Pre implementation
b) Implementation
c) Post implementation
 Perform Sensitivity & Scenario Building
CASY STUDY
THANK YOU

Weitere ähnliche Inhalte

Was ist angesagt?

Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in WorksDr K M SONI
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction ManagementShahin MB
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.Abhishek kumar maurya
 
Tendering documentation
Tendering documentationTendering documentation
Tendering documentationnipuna_bopage
 
Project formulation and appraisal
Project formulation and appraisalProject formulation and appraisal
Project formulation and appraisalAmandaBvera
 
Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Mohd. Ikhwan
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In ConstructionAB MAKASANA
 
Analytical comparision of BOT,BOOT and PPP models
 Analytical comparision of BOT,BOOT and PPP models Analytical comparision of BOT,BOOT and PPP models
Analytical comparision of BOT,BOOT and PPP modelsBhavin Sharma
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Processarpantripathi2
 
Bot(build operate transfr)
Bot(build operate transfr)Bot(build operate transfr)
Bot(build operate transfr)Kritika Garg
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management Rajat Nainwal
 
Valuation in Civil Engineering
Valuation in Civil EngineeringValuation in Civil Engineering
Valuation in Civil EngineeringKailash Chander
 

Was ist angesagt? (20)

Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in Works
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.
 
Tendering documentation
Tendering documentationTendering documentation
Tendering documentation
 
Project formulation and appraisal
Project formulation and appraisalProject formulation and appraisal
Project formulation and appraisal
 
Valuation
ValuationValuation
Valuation
 
Valuation(1)
Valuation(1)Valuation(1)
Valuation(1)
 
Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Valuation part of Building
Valuation part of Building Valuation part of Building
Valuation part of Building
 
Earnest Money
Earnest MoneyEarnest Money
Earnest Money
 
Analytical comparision of BOT,BOOT and PPP models
 Analytical comparision of BOT,BOOT and PPP models Analytical comparision of BOT,BOOT and PPP models
Analytical comparision of BOT,BOOT and PPP models
 
Valuation
ValuationValuation
Valuation
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
Tender
TenderTender
Tender
 
Bot(build operate transfr)
Bot(build operate transfr)Bot(build operate transfr)
Bot(build operate transfr)
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
Valuation in Civil Engineering
Valuation in Civil EngineeringValuation in Civil Engineering
Valuation in Civil Engineering
 
Contracts
ContractsContracts
Contracts
 

Andere mochten auch (13)

Introduction to managerial economics
Introduction to managerial economicsIntroduction to managerial economics
Introduction to managerial economics
 
Contract management
Contract managementContract management
Contract management
 
Detailed Project Report
Detailed Project ReportDetailed Project Report
Detailed Project Report
 
Infosys Case Study, Organizational Structure- Infosys
Infosys Case Study, Organizational Structure- InfosysInfosys Case Study, Organizational Structure- Infosys
Infosys Case Study, Organizational Structure- Infosys
 
Contract management
Contract managementContract management
Contract management
 
A project on taxi
A  project on taxi A  project on taxi
A project on taxi
 
Processes of management
Processes of managementProcesses of management
Processes of management
 
Theory of the firm
Theory of the firmTheory of the firm
Theory of the firm
 
Theory of costs, micro economics
Theory of costs, micro economicsTheory of costs, micro economics
Theory of costs, micro economics
 
Presentation on project report
Presentation on project reportPresentation on project report
Presentation on project report
 
Standardization
StandardizationStandardization
Standardization
 
Theory of Production
Theory of ProductionTheory of Production
Theory of Production
 
Basic concept of management
Basic concept of managementBasic concept of management
Basic concept of management
 

Ähnlich wie Detailed project report

Ch 2 project planning and control
Ch 2 project planning and controlCh 2 project planning and control
Ch 2 project planning and controlJanak Singh Chauhan
 
Turnkey implementation of distribution projects
Turnkey implementation of distribution projectsTurnkey implementation of distribution projects
Turnkey implementation of distribution projectsD.Pawan Kumar
 
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...Project Controls Expo
 
Preparation of project reports and appraisal of projects
Preparation of project reports and appraisal of projectsPreparation of project reports and appraisal of projects
Preparation of project reports and appraisal of projectsKrishna Mohan
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef samNermeen gerges
 
EMERGENT POWER DEVELOPMENT CO
EMERGENT POWER DEVELOPMENT COEMERGENT POWER DEVELOPMENT CO
EMERGENT POWER DEVELOPMENT COJohn Oluwagbemiga
 
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERRESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERShafeek Nazar
 
Renewable Energy Feed-in Tarriff presentation
Renewable Energy Feed-in Tarriff presentationRenewable Energy Feed-in Tarriff presentation
Renewable Energy Feed-in Tarriff presentationJerry Sakala
 
Pittsburgh case study midfield energy system
Pittsburgh case study midfield energy systemPittsburgh case study midfield energy system
Pittsburgh case study midfield energy systempriyang2004
 
N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016NITIN VAIDYA
 
CORE AIA Presentation
CORE AIA PresentationCORE AIA Presentation
CORE AIA Presentationcfiorilli
 
Session 17 project management & monitoring
Session 17   project management & monitoringSession 17   project management & monitoring
Session 17 project management & monitoringChirag Jain
 
FUNDAMENTALS OF MINE DESIGN, AND PLANNINGS
FUNDAMENTALS OF MINE DESIGN, AND PLANNINGSFUNDAMENTALS OF MINE DESIGN, AND PLANNINGS
FUNDAMENTALS OF MINE DESIGN, AND PLANNINGSJefMichaelLDahuyla
 

Ähnlich wie Detailed project report (20)

Ch 2 project planning and control
Ch 2 project planning and controlCh 2 project planning and control
Ch 2 project planning and control
 
Turnkey implementation of distribution projects
Turnkey implementation of distribution projectsTurnkey implementation of distribution projects
Turnkey implementation of distribution projects
 
5 financial new
5 financial new5 financial new
5 financial new
 
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
 
Preparation of project reports and appraisal of projects
Preparation of project reports and appraisal of projectsPreparation of project reports and appraisal of projects
Preparation of project reports and appraisal of projects
 
CV_Cost Engineer
CV_Cost EngineerCV_Cost Engineer
CV_Cost Engineer
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef sam
 
EMERGENT POWER DEVELOPMENT CO
EMERGENT POWER DEVELOPMENT COEMERGENT POWER DEVELOPMENT CO
EMERGENT POWER DEVELOPMENT CO
 
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERRESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
 
151213CS2426993.2 (1)
151213CS2426993.2 (1)151213CS2426993.2 (1)
151213CS2426993.2 (1)
 
Renewable Energy Feed-in Tarriff presentation
Renewable Energy Feed-in Tarriff presentationRenewable Energy Feed-in Tarriff presentation
Renewable Energy Feed-in Tarriff presentation
 
Apd Overview Training
Apd Overview TrainingApd Overview Training
Apd Overview Training
 
Pittsburgh case study midfield energy system
Pittsburgh case study midfield energy systemPittsburgh case study midfield energy system
Pittsburgh case study midfield energy system
 
Project development handbook rl website
Project development handbook rl websiteProject development handbook rl website
Project development handbook rl website
 
Project Development Handbook presentation
Project Development Handbook presentationProject Development Handbook presentation
Project Development Handbook presentation
 
N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016
 
CORE AIA Presentation
CORE AIA PresentationCORE AIA Presentation
CORE AIA Presentation
 
Session 17 project management & monitoring
Session 17   project management & monitoringSession 17   project management & monitoring
Session 17 project management & monitoring
 
Topic 1.ppt
Topic 1.pptTopic 1.ppt
Topic 1.ppt
 
FUNDAMENTALS OF MINE DESIGN, AND PLANNINGS
FUNDAMENTALS OF MINE DESIGN, AND PLANNINGSFUNDAMENTALS OF MINE DESIGN, AND PLANNINGS
FUNDAMENTALS OF MINE DESIGN, AND PLANNINGS
 

Kürzlich hochgeladen

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Kürzlich hochgeladen (20)

DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 

Detailed project report

  • 2. DETAILED PROJECT REPORT  Detailed project report is a complete document for investment , decision- making, approval, planning.  Detailed project report is base document for planning the project and implementing the project.
  • 3. OBJECTIVES  To understand the importance of developing a detailed project report that assure performance for reliable quality with in optimum cost  To appreciate that projects are site specific  To understand importance of optimization of the schemes , detailed cost estimate , payback period and return on investment.  To describe how bankable projects can help to achieve required performance  To understand methodology of project appraisal
  • 4. Brief Description of Project Area  Name of utility  District / town (s) village covered  Location : latitude and longitude  Area , population , boundaries  Climatic conditions  Status of development. Access to electricity  Economic structure – socio – economic features  urban / rural
  • 5. Data Collection of Existing Project
  • 6. PROJECT COST DETAILS  Basic Equipment Cost  Consultant charges  Duties , Taxes & Freight a) Excise duty / customs duty/ sales tax  Freight and Transit Insurance  Raw materials  Man Power cost  Engineering Project Management. Supervision  Interest During Construction
  • 7. Major Benefits from the Project
  • 8. Project Investment Criteria  Basically Cost – Benefits analysis  Investment criteria can be  payback period Discounted cash flow (DCF) Technique a) Net Present Worth (NPW) b) Benefit Cost Ratio ( B C Ratio) c) Internal rate of return ( IRR )
  • 9. Project Investment Criteria Payback Period  length of the time required by the cumulative net cash inflows to cover up the fixed capital Investment . PBP = Total Capital Investment / Total cash inflow or Net benefits per year
  • 10. Project Investment Criteria Payback Period  Easy to understand  Other methods are complicated in nature and difficult to comprehend for technical people  Investment should include fixed capital &working capital  Net benefits to be adjusted for interest and tax liabilities
  • 11. Project Investment Criteria Discounted Cash Flow ( DCF) Technique  A technique which brings past & future cost benefits to their Present Worth ( PW)  Take into account “ Time Value of Money ’’
  • 12. Project Investment Criteria  Discounted Cash Flow ( DCF)  Past Benefits Cost – Compounding  Future Benefits Cost – Discounting  Past Present Future
  • 13. DPR Structure Title Page , Name,affliation,date etc Acknowledgement Content list Abbreviation Executive Summary Introduction Background Main technical & financial analysis chapters Recommended action plan Appendices
  • 14. What DPR Should ideally provide ? Final cost details and benefits expected Detailed specification of equipment & materials. All information to prepare tender documents. Probable list of equipment & material manufacturers Project management process
  • 15. PARAMETERS OF PROJECT APPRAISAL AND APPRAISAL PROCEDURE PROJECT ELIGILITY Technically feasible and provide optimal cost solution for the selected alternative Techno – economically sound with IRR not less than 12% (Internal Rate of Return ) Compatible with expansion plan of the utility & region Complies with all environmental standards guideline. All clearances have been obtained
  • 16. PARAMETERS OF PROJECT APPRAISAL AND APPRAISAL PROCEDURE ASCERTAIN PROJECT PROFILE Type , Purpose , Scope Location , Access to site Environmental Management Technology
  • 17. REVIEW PROJECT Need & Justification :  Existing and proposed system  Demand supply scenario  Alternative considered Study if any carried out by State Govt / utility Status & Preparedness Procurement procedures & competitiveness
  • 18. REVIEW PROJECT  status & Preparedness Procurement procedures & competitiveness O & M arrangements Market & selling arrangements a) PPA with purchaser if applicable (Power purchasing agreement)
  • 19. REVIEW PROJECT  Financing plan a) Debt Equity b) Phasing of expenditure
  • 20. CHECK AVAILABILITY OF APPROVALS & CLEARANCES Statutory Clearances such as Land Availability & Acquisition Forest Clearance Highway Clearance Electricity clearance Fund related clearance Pollution control board clearance etc
  • 21. CHECK AVAILABILITY OF APPROVALS & CLEARANCES APPROVALS  Board approval  Approval of PPA  CERS / SERC  State government
  • 22. ASSESS REASONABLENESS OF COST  Price level  Basis and reasonableness of cost estimate a) Information available for similar projects appraised in the past b) Budgetary offers received from suppliers c) Similar job done by same / other borrowers in the past
  • 23. ASSESS REASONABLENESS OF COST IDC - Price variation Contingency – Other costs
  • 24. PERFOM FINANCIAL & RISK ANALYSIS Evaluate Costs & Benefits a) Benefits b) Reduction in losses c) Additional Generation in MU
  • 25. PERFOM FINANCIAL & RISK ANALYSIS  Specify Assumptions of base case . Calculate FIRR, EIRR  Financial Internal Rate of Return  Economic Internal Rate of Return Assess Risks : a) Pre implementation b) Implementation c) Post implementation  Perform Sensitivity & Scenario Building