6. Above water surface – Inspection & Repair
By rope access In Splash zone
By jack up vessel / lift Structural retrofitting
®
7. Confined space – Inspection & Repair
Installation of equipment Grouted connection inspection
Confined space diving Grouted connection repair
®
8. Offshore – focus: Access & Safety
logistics management
Engineering/
Skilled
Construction
personnel
of tools
Onshore
Execution
training
Local
knowledge
®
9. Offshore - focus Access & Safety
logistics management
Engineering/
Skilled
Construction
personnel
of tools
Onshore
Execution
training
Local
knowledge
®
10. Offshore - focus Access & Safety
logistics management
Engineering/
Skilled
Construction
personnel
of tools
Onshore
Execution
training
Local
knowledge
®
11. Offshore - focus Access & Safety
logistics management
Engineering/
Skilled
Construction
personnel
of tools
Onshore
Execution
training
Local
knowledge
®
12. Offshore - focus Access & Safety
logistics management
Engineering/
Skilled
Construction
personnel
of tools
Onshore
Execution
training
Local
knowledge
®
13. Offshore - focus Access & Safety
logistics management
Engineering/
Skilled
Construction
personnel
of tools
Onshore
Execution
training
Local
knowledge
®
14. Offshore - focus Access & Safety
logistics management
Engineering/
Skilled
Construction
personnel
of tools
Onshore
Execution
training
Local
knowledge
®
15. Project scope:
•Minor repairs on 6 x boatlanding
•Retrofitting of flanges
•Paint repair
•Clamps installation (subsea)
Project – Alpha Ventus • Paint repairs on braces
®
16. Training:
• Onshore training
• 1:1 size mock up
• Personal transfer
• ”Dry training” for divers
Project – Alpha Ventus • Scaffolding
• Welding procedures
• Paint procedures
®
17. Project Tool box:
• Project management
• Fabrication of structural parts
• Logistical management
• Spare part management
Project – Alpha Ventus • Working procedures
• Documentation/repporting
®
18. Project Tool box:
• Project management
• Fabrication of structural parts
• Logistical management
• Spare part management
Project – Alpha Ventus • Working procedures
• Documentation
• Access
• Transfer by boatlanding
• Rope access
• Scaffolding
• Air diving (0-20meter)
• Generator to working platform
• Equipment transfer by deckcrane
®
19. Project Tool box:
• Project management
•Fabrication of structural parts
• Logistical management
• Spare part management
Project – Alpha Ventus • Working procedures
• Documentation
• Access
• Transfer by boatlanding
• Generator to working platform
• Equipment transferd by crane
• Rope access
• Air diving (0-20meter)
• Scaffolding
•Diciplines
• Build of scaffolds
• Cutting and fitting
• Structural welding
• NDE (test of welding)
• Diving – removal of marine growht
• Diving – mounting of clamps
• Cleaning of structures
• Painting
®
20. Diving scope:
• Removal of marine growth
• Inspection and survey
• Installation of clamps
• Salvage of lost items
Project – Alpha Ventus • Diving from 4 point mooring
®
21. Vessels:
• Vessels / Accomodation
• Deck space available for
• Accomodation containers
• Diving equipment
Project – Alpha Ventus • Spare parts storage
• Spare parts handling