French Ministry of the Environment - DPPR / SEI / BARPI N°26208
Sheet updated: March 2007
Chlorine leak in a liquefaction
workshop of a chemical plant
January 13, 2004
Vieux-Thann – [Haut Rhin]
France
THE INSTALLATIONS IN QUESTION
The site
The plant specialises in the fabrication of chlorine, and chlorinated and brominated products. It is governed by the "high
threshold" of the Seveso directive. The plant is located in an urbanized zone.
Part of the chlorine produced in the manufacturing facility by mercury-cathode electrolysis (200 t/day) is used on site.
The other part is liquefied and loaded into rail cars or stored in an 11-m3
tank. The installations containing liquid chlorine
are located in closed buildings equipped with a ventilation system and a neutralisation tower to process any accidental
releases. A prefectorial order required the company to adopt this confinement installation in 1995.
The unit concerned:
The chlorine coming from the electrolysis facility is compressed and condensed, and then the gas and liquid phases are
separated in a floatation pot-type separator. The liquid part is then directed to the storage facilities or to the loading
installation. The non-condensed part (referred to as residual gases), containing gaseous chlorine and non-condensable
gases (notably H2 and air) is distributed on site. As the liquefaction rate increases, the concentration of non-condensable
gases in the residual gases also increases (the enrichment factor is [1/1-τ]). As such, if 50% of the chlorine is liquefied,
the concentration of the non-condensable gases in the residual gases doubles, but is multiplied by 10 if the liquefaction
rate is 90%.
The presence of hydrogen and inert gases, inherent to the chlorine manufacturing process, is particularly important
during the installation restart phases, notably after long shutdown periods.
It should be reminded that hydrogen and chlorine react violently, producing hydrochloric acid.
The presence of hydrogen in gaseous chlorine thus requires a that certain number of precautions be taken, including
monitoring the changes in its concentration in the installations to ensure that it remains below the lower explosive limit
(LEL). The hydrogen contents are measured at the electrolysis shop's outlet and in the gas outlet of the floating pots by
means of an automatic analyser, or by manual analysis.
The company's internal procedures require that a maximum hydrogen concentration of 4.7% be respected in the residual
gases. The LEL of the chlorine-hydrogen-air mixture is 5% (source: INRS).
The automatic hydrogen analyser is inoperative during the installation's start-up phases due to the excessive quantity of
inert gases present. For this reason, during installation start-up operations, the operators perform manual concentration
measurements (a measurement every ten minutes, according to the procedures).
Electrolysis
Liquefaction
Hydrogen
Chlorine-Iron reaction
Re-start
Confinement
Organization / human factor
Interventions difficulties
French Ministry of the Environment - DPPR / SEI / BARPI N°26208
Sheet updated: March 2007
THE ACCIDENT, ITS BEHAVIOUR AND CONSEQUENCES
The accident:
In the morning of January 13, 2004, the electrolysis installations were being started after having been shut down due to
a lack of cooling water. During the first start-up phase, the chlorine produced is sent directly to the Javel (bleach) unit.
At 9.15 am, the concentrations measured leaving the electrolysis unit at analysis location No. 1 (1.3% H2, 80% Cl2)
enabled the liquefaction part of the workshop to be put back into service in accordance with the company's internal
procedures. Chlorine production was 1,600 kg/h, the output of residual gases 600 kg/h and the hydrogen concentration
in the residual gases 3.3% (analysis location No. 2).
The electrolysis facility's production level was progressively increased to 2,900 kg/h. A new series of measurements at
the "residual gases" outlet of the liquefaction facility at analysis location No. 2 showed an initial concentration of 4.6%
hydrogen in the residual gases. The measurement conducted ten minutes later gave a value of 6.7%. Noting this value,
the operator immediately performed the analysis again, which confirmed the first analysis.
The operator then decided to reduce the liquefaction rate by increasing the output of residual gases to 1,000 kg/h in
order to lower the hydrogen concentration.
Immediately afterward, a leak was detected at 10.10 am by the alarm and visually in the building. The operators initiated
the emergency shutdown; the confinement installations were automatically put into service and directed the majority of
the leak to the neutralisation tower.
The majority of the chlorine released by the leak was neutralised in the tower. The operators secured the installations
then grouped together to locate and were able to completely isolate the leak in 20 minutes.
Electrolysis
facility
condenser
compressor
1
2
1
2
H2 measurement before liquefaction
H2 measurement after liquefaction
Separator
TANK
GAS
LIQ.
SCRUBBER
Purification-liquefaction shop
Javel
unit,
HCl
ByPass
(javel unit)
French Ministry of the Environment - DPPR / SEI / BARPI N°26208
Sheet updated: March 2007
The consequences:
No employee or resident of the area was injured. A pipe was damaged in three locations. The quantity of chlorine
released into the confinement building was indirectly estimated at 600 kg. The quantity released into the environment
was limited to just a few kilos while the confinement building was depressurizing. Nearly all of the chlorine leaked was
treated in the neutralisation tower for accidental releases.
European scale of industrial accidents:
By applying the rating rules of the 18 parameters of the scale made official in February 1994 by the Committee of
Competent Authorities of the Member States which oversees the application of the ‘SEVESO’ directive, the accident can
be characterised by the following 4 indices, based on the information available.
The parameters that comprise these indices and the corresponding rating method are indicated in the appendix hereto
and are available at the following address: http://www.aria.ecologie.gouv.fr
The 600 kg of chlorine from the leak represent 2.4% of the corresponding Seveso threshold (25 t) and result in a level 3
rating in terms of the "quantities of dangerous substances" according to parameter Q1.
ORIGIN, CAUSES AND CIRCUMSTANCES OF THE ACCIDENT
The expert assessment conducted immediately following the
incident showed that the leak, located along the limit of the
confined zone, resulted from the combustion of the steel in the
chlorine on a pipe transporting the gaseous chlorine: at two
locations (located near zones in which the pipe size was
reduced: valve and venturi), the pipe had disappeared over
several centimetres, including a flange. A hole of diameter
equal to that of the pipe (8 cm) was created in a third location.
The combustion of steel in chlorine is a process that is initiated
when the steel is brought to a temperature above 130 °C.
Once this reaction begins, it is self-sustaining until all the
chlorine has been consumed.
The operator identified the cause of the iron/chlorine
combustion process as a hydrogen-chlorine fire whose
ignition energy is sufficiently low to start spontaneously due to an output restriction or a significant flow rate. The
increase in the output to 1,000 kg/h could have also supplied the ignition energy required.
Acquire this
French Ministry of the Environment - DPPR / SEI / BARPI N°26208
Sheet updated: March 2007
The value of the hydrogen concentration leaving the electrolysis facility and the liquefaction rate could only result in the
LIE being exceeded (the hydrogen enriching factor being 5 just prior to the accident) as soon as the operator did not act
immediately when he measured a concentration of 4.6%.
The non-operation of the automatic analyser and related safety devices during the start-up phases made the security of
the installations rely only upon action by the operators, who are particularly busy during the rare start-up phases. This
point was brought up during the last risk analysis of March and December 2003, when the operator was searching for a
new analyser.
This incident can be broken down in the following manner:
Combustion of the hydrogen and chlorine
in a pipe restriction
Pipe temperature above 130°C
Combustion of the iron and chlorine
contained in the pipe
Pipe rupture
Chlorine leak
Excessive concentration of hydrogen in the chlorine
Infrequent restart
operation
Analyser non-
operational during
restart
Weakness of the procedure
barrier and manual
measurements
Dedicated staff
for analysis
during start-up
French Ministry of the Environment - DPPR / SEI / BARPI N°26208
Sheet updated: March 2007
ACTION TAKEN
Besides the verification of the installations and the replacement of damaged parts, several actions were implemented to
prevent the incident from happening again:
A material assessment was set up to monitor the hydrogen concentration in the residual gases according to the
liquefaction rate and the hydrogen content at the electrolysis facility's outlet.
Implementation of two continuous hydrogen analysers that can be used in the presence of inert gases (cost:
150,000 euros).
Supervision of start-up phases by a manager.
Modification of the instructions.
Re-examination of post-accident actions.
The installations are shut down if the hydrogen concentration is exceeded by more than 3.5%.
LESSONS LEARNED
The main feedback elements to remember concern:
The correct operation of the confinement installations during an incident without the building increasing in pressure.
The guillotine rupture scenario that is not a textbook example.
The analysis of transitory phases and the specific security arrangement to be implemented and not neglected.
The weakness of the operator barrier associated with the instructions that were not necessarily explicit (the number
of measurements, respect of the limit concentration of hydrogen in the residual chlorine, shut down of the
electrolysis facility).
An organisation to be improved through the modification of instructions and better operator training as well as the
reinforcement of the supervisors' role during delicate phases.
The relatively significant delay in isolating the leak (20 min.) following problems relating to the intervention and
locating the leak in a building in a chlorine atmosphere.
The drainage of upline and downline chlorine systems by depressurisation, particularly concerning the 11 m3
liquid
chlorine storage tank which supplied the leak for 5 minutes until it could be isolated.
The low ignition temperature of combustion between iron and chlorine (130°C).

Weitere ähnliche Inhalte

Was ist angesagt?

Organisational carbon footprint analysis
Organisational carbon footprint analysisOrganisational carbon footprint analysis
Organisational carbon footprint analysisKasun Wijerathna
 
Manufacturing nitric acid by ostwald process
Manufacturing nitric acid by ostwald processManufacturing nitric acid by ostwald process
Manufacturing nitric acid by ostwald processrita martin
 
Soda ash manufacturing and process flow diagram
Soda ash manufacturing and process flow diagramSoda ash manufacturing and process flow diagram
Soda ash manufacturing and process flow diagramUsama Pervaiz
 
BP Texas City Refinery Disaster Report
BP Texas City Refinery Disaster ReportBP Texas City Refinery Disaster Report
BP Texas City Refinery Disaster ReportChinedu Isiadinso
 
Glycerine distillation plant By Muhammad Fahad Ansari 12IEEM14
Glycerine distillation plant By Muhammad Fahad Ansari  12IEEM14Glycerine distillation plant By Muhammad Fahad Ansari  12IEEM14
Glycerine distillation plant By Muhammad Fahad Ansari 12IEEM14fahadansari131
 
Ethylene Glycol plant design
Ethylene Glycol plant designEthylene Glycol plant design
Ethylene Glycol plant designAhmed Kun
 
Present and Future Innovations in Solid Waste Management in Malaysia
Present and Future Innovations in Solid Waste Management in MalaysiaPresent and Future Innovations in Solid Waste Management in Malaysia
Present and Future Innovations in Solid Waste Management in MalaysiaZaipul Anwar Zainu
 
Dissolved Ni Soaps - and How To Minimize Them
Dissolved Ni Soaps - and How To Minimize ThemDissolved Ni Soaps - and How To Minimize Them
Dissolved Ni Soaps - and How To Minimize ThemGerard B. Hawkins
 
Manufacture of caustic soda and chlorine using electrolysis process ...
Manufacture of caustic soda and chlorine using electrolysis process          ...Manufacture of caustic soda and chlorine using electrolysis process          ...
Manufacture of caustic soda and chlorine using electrolysis process ...Ankush Gupta
 
Nitric acid preparation & uses
Nitric acid preparation &  usesNitric acid preparation &  uses
Nitric acid preparation & usesSumama Shakir
 

Was ist angesagt? (20)

Production Caustic soda (NaOH)
Production Caustic soda (NaOH)Production Caustic soda (NaOH)
Production Caustic soda (NaOH)
 
Chlor alkali
Chlor alkaliChlor alkali
Chlor alkali
 
Organisational carbon footprint analysis
Organisational carbon footprint analysisOrganisational carbon footprint analysis
Organisational carbon footprint analysis
 
Manufacturing nitric acid by ostwald process
Manufacturing nitric acid by ostwald processManufacturing nitric acid by ostwald process
Manufacturing nitric acid by ostwald process
 
Soda ash manufacturing and process flow diagram
Soda ash manufacturing and process flow diagramSoda ash manufacturing and process flow diagram
Soda ash manufacturing and process flow diagram
 
Nitric acid
Nitric acidNitric acid
Nitric acid
 
Oxalic acid industrial preparation
Oxalic acid industrial preparationOxalic acid industrial preparation
Oxalic acid industrial preparation
 
Ethyl acetate
Ethyl acetateEthyl acetate
Ethyl acetate
 
Carbon for Steel Making
Carbon for Steel MakingCarbon for Steel Making
Carbon for Steel Making
 
BP Texas City Refinery Disaster Report
BP Texas City Refinery Disaster ReportBP Texas City Refinery Disaster Report
BP Texas City Refinery Disaster Report
 
AMMONIA storage
AMMONIA storageAMMONIA storage
AMMONIA storage
 
Glycerine distillation plant By Muhammad Fahad Ansari 12IEEM14
Glycerine distillation plant By Muhammad Fahad Ansari  12IEEM14Glycerine distillation plant By Muhammad Fahad Ansari  12IEEM14
Glycerine distillation plant By Muhammad Fahad Ansari 12IEEM14
 
Ethylene Glycol plant design
Ethylene Glycol plant designEthylene Glycol plant design
Ethylene Glycol plant design
 
Oxygen production plant with cryogenic process
Oxygen production plant with cryogenic processOxygen production plant with cryogenic process
Oxygen production plant with cryogenic process
 
Present and Future Innovations in Solid Waste Management in Malaysia
Present and Future Innovations in Solid Waste Management in MalaysiaPresent and Future Innovations in Solid Waste Management in Malaysia
Present and Future Innovations in Solid Waste Management in Malaysia
 
Dissolved Ni Soaps - and How To Minimize Them
Dissolved Ni Soaps - and How To Minimize ThemDissolved Ni Soaps - and How To Minimize Them
Dissolved Ni Soaps - and How To Minimize Them
 
L 30 fertilizer industry
L 30 fertilizer industryL 30 fertilizer industry
L 30 fertilizer industry
 
Air pollution control
Air pollution control Air pollution control
Air pollution control
 
Manufacture of caustic soda and chlorine using electrolysis process ...
Manufacture of caustic soda and chlorine using electrolysis process          ...Manufacture of caustic soda and chlorine using electrolysis process          ...
Manufacture of caustic soda and chlorine using electrolysis process ...
 
Nitric acid preparation & uses
Nitric acid preparation &  usesNitric acid preparation &  uses
Nitric acid preparation & uses
 

Ähnlich wie Liquid chlorine incident

Explosion of a sulphuric acid tank
Explosion of a sulphuric acid tankExplosion of a sulphuric acid tank
Explosion of a sulphuric acid tankUsama Khan
 
Case study on halon replacement in Bosnia and Herzegovina
Case study on halon replacement in Bosnia and Herzegovina Case study on halon replacement in Bosnia and Herzegovina
Case study on halon replacement in Bosnia and Herzegovina UNEP OzonAction
 
AMMONIA PLANT MATERIAL BALANCE.pdf
AMMONIA PLANT MATERIAL BALANCE.pdfAMMONIA PLANT MATERIAL BALANCE.pdf
AMMONIA PLANT MATERIAL BALANCE.pdfPremBaboo4
 
Ammonia plant material balance
Ammonia plant material balanceAmmonia plant material balance
Ammonia plant material balancePrem Baboo
 
A Unique Syngas Cleanup Scheme - China Syngas to Acetic Acid
A Unique Syngas Cleanup Scheme - China Syngas to Acetic Acid A Unique Syngas Cleanup Scheme - China Syngas to Acetic Acid
A Unique Syngas Cleanup Scheme - China Syngas to Acetic Acid James Bixby
 
Armfield Gas Absorption Column Experiment
Armfield Gas Absorption Column ExperimentArmfield Gas Absorption Column Experiment
Armfield Gas Absorption Column ExperimentHadeer Khalid
 
Orsat appatarus
Orsat appatarus Orsat appatarus
Orsat appatarus umar farooq
 
SRU Troubleshooting
SRU TroubleshootingSRU Troubleshooting
SRU TroubleshootingAhmed Omran
 
Paper id 41201605
Paper id 41201605Paper id 41201605
Paper id 41201605IJRAT
 
Carbon dioxide removal and capture for landfill gas up grading
Carbon dioxide removal and capture for landfill gas up gradingCarbon dioxide removal and capture for landfill gas up grading
Carbon dioxide removal and capture for landfill gas up gradingCatherine Maria Centanaro Chavez
 
Callide oxyfuel research project, Part 2: CO2 quality control prior to compre...
Callide oxyfuel research project, Part 2: CO2 quality control prior to compre...Callide oxyfuel research project, Part 2: CO2 quality control prior to compre...
Callide oxyfuel research project, Part 2: CO2 quality control prior to compre...Global CCS Institute
 
HNG® – HydroAtomic Nano Gas | Verification test report June, 2013
HNG® – HydroAtomic Nano Gas | Verification test report June, 2013HNG® – HydroAtomic Nano Gas | Verification test report June, 2013
HNG® – HydroAtomic Nano Gas | Verification test report June, 2013HydroInfra Technologies
 
Study of the Sulfur Trioxide Generation Mechanism and Control Method Using We...
Study of the Sulfur Trioxide Generation Mechanism and Control Method Using We...Study of the Sulfur Trioxide Generation Mechanism and Control Method Using We...
Study of the Sulfur Trioxide Generation Mechanism and Control Method Using We...inventionjournals
 
WASTEWATER TREATMENT TECHNOLOGIES FOR THE REMOVAL OF NITROGEN & PHOSPHORUS
WASTEWATER TREATMENT TECHNOLOGIES FOR THE REMOVAL OF NITROGEN & PHOSPHORUS WASTEWATER TREATMENT TECHNOLOGIES FOR THE REMOVAL OF NITROGEN & PHOSPHORUS
WASTEWATER TREATMENT TECHNOLOGIES FOR THE REMOVAL OF NITROGEN & PHOSPHORUS Rabia Aziz
 
IRJET-Design and Performance Evaluation of AQUA Silencer
IRJET-Design and Performance Evaluation of AQUA SilencerIRJET-Design and Performance Evaluation of AQUA Silencer
IRJET-Design and Performance Evaluation of AQUA SilencerIRJET Journal
 
Final_Report_124
Final_Report_124Final_Report_124
Final_Report_124Alan Tam
 
A green building in a grey cement plant – Transforming bypass dust into indus...
A green building in a grey cement plant – Transforming bypass dust into indus...A green building in a grey cement plant – Transforming bypass dust into indus...
A green building in a grey cement plant – Transforming bypass dust into indus...A TEC Group
 

Ähnlich wie Liquid chlorine incident (20)

Explosion of a sulphuric acid tank
Explosion of a sulphuric acid tankExplosion of a sulphuric acid tank
Explosion of a sulphuric acid tank
 
Case study on halon replacement in Bosnia and Herzegovina
Case study on halon replacement in Bosnia and Herzegovina Case study on halon replacement in Bosnia and Herzegovina
Case study on halon replacement in Bosnia and Herzegovina
 
AMMONIA PLANT MATERIAL BALANCE.pdf
AMMONIA PLANT MATERIAL BALANCE.pdfAMMONIA PLANT MATERIAL BALANCE.pdf
AMMONIA PLANT MATERIAL BALANCE.pdf
 
Ammonia plant material balance
Ammonia plant material balanceAmmonia plant material balance
Ammonia plant material balance
 
PRESENTATION ON HYDROGEN GAS PRODUCTION BY PARTIAL OXIDATION OF HEAVY FUEL OI...
PRESENTATION ON HYDROGEN GAS PRODUCTION BY PARTIAL OXIDATION OF HEAVY FUEL OI...PRESENTATION ON HYDROGEN GAS PRODUCTION BY PARTIAL OXIDATION OF HEAVY FUEL OI...
PRESENTATION ON HYDROGEN GAS PRODUCTION BY PARTIAL OXIDATION OF HEAVY FUEL OI...
 
A Unique Syngas Cleanup Scheme - China Syngas to Acetic Acid
A Unique Syngas Cleanup Scheme - China Syngas to Acetic Acid A Unique Syngas Cleanup Scheme - China Syngas to Acetic Acid
A Unique Syngas Cleanup Scheme - China Syngas to Acetic Acid
 
Armfield Gas Absorption Column Experiment
Armfield Gas Absorption Column ExperimentArmfield Gas Absorption Column Experiment
Armfield Gas Absorption Column Experiment
 
Orsat appatarus
Orsat appatarus Orsat appatarus
Orsat appatarus
 
SRU Troubleshooting
SRU TroubleshootingSRU Troubleshooting
SRU Troubleshooting
 
Paper id 41201605
Paper id 41201605Paper id 41201605
Paper id 41201605
 
Carbon dioxide removal and capture for landfill gas up grading
Carbon dioxide removal and capture for landfill gas up gradingCarbon dioxide removal and capture for landfill gas up grading
Carbon dioxide removal and capture for landfill gas up grading
 
Callide oxyfuel research project, Part 2: CO2 quality control prior to compre...
Callide oxyfuel research project, Part 2: CO2 quality control prior to compre...Callide oxyfuel research project, Part 2: CO2 quality control prior to compre...
Callide oxyfuel research project, Part 2: CO2 quality control prior to compre...
 
HNG® – HydroAtomic Nano Gas | Verification test report June, 2013
HNG® – HydroAtomic Nano Gas | Verification test report June, 2013HNG® – HydroAtomic Nano Gas | Verification test report June, 2013
HNG® – HydroAtomic Nano Gas | Verification test report June, 2013
 
Study of the Sulfur Trioxide Generation Mechanism and Control Method Using We...
Study of the Sulfur Trioxide Generation Mechanism and Control Method Using We...Study of the Sulfur Trioxide Generation Mechanism and Control Method Using We...
Study of the Sulfur Trioxide Generation Mechanism and Control Method Using We...
 
WASTEWATER TREATMENT TECHNOLOGIES FOR THE REMOVAL OF NITROGEN & PHOSPHORUS
WASTEWATER TREATMENT TECHNOLOGIES FOR THE REMOVAL OF NITROGEN & PHOSPHORUS WASTEWATER TREATMENT TECHNOLOGIES FOR THE REMOVAL OF NITROGEN & PHOSPHORUS
WASTEWATER TREATMENT TECHNOLOGIES FOR THE REMOVAL OF NITROGEN & PHOSPHORUS
 
IRJET-Design and Performance Evaluation of AQUA Silencer
IRJET-Design and Performance Evaluation of AQUA SilencerIRJET-Design and Performance Evaluation of AQUA Silencer
IRJET-Design and Performance Evaluation of AQUA Silencer
 
Final_Report_124
Final_Report_124Final_Report_124
Final_Report_124
 
Final_Report_124
Final_Report_124Final_Report_124
Final_Report_124
 
Final_Report_124
Final_Report_124Final_Report_124
Final_Report_124
 
A green building in a grey cement plant – Transforming bypass dust into indus...
A green building in a grey cement plant – Transforming bypass dust into indus...A green building in a grey cement plant – Transforming bypass dust into indus...
A green building in a grey cement plant – Transforming bypass dust into indus...
 

Mehr von Usama Khan

The humble check_valve
The humble check_valveThe humble check_valve
The humble check_valveUsama Khan
 
British women chemists and world war 1
British women chemists and world war 1British women chemists and world war 1
British women chemists and world war 1Usama Khan
 
Oilivia gasolino upstream_en
Oilivia gasolino upstream_enOilivia gasolino upstream_en
Oilivia gasolino upstream_enUsama Khan
 
Results phe works 2.0 2
Results phe works 2.0 2Results phe works 2.0 2
Results phe works 2.0 2Usama Khan
 
A non-Iterative way for preliminary designing Plate & Frame Exchanger
A non-Iterative way for preliminary designing Plate & Frame ExchangerA non-Iterative way for preliminary designing Plate & Frame Exchanger
A non-Iterative way for preliminary designing Plate & Frame ExchangerUsama Khan
 
Storage container tank mathematics
Storage container tank mathematicsStorage container tank mathematics
Storage container tank mathematicsUsama Khan
 
Asahi AKC electrolyzer magazine
Asahi AKC electrolyzer magazineAsahi AKC electrolyzer magazine
Asahi AKC electrolyzer magazineUsama Khan
 
Understanding units of gas concentration
Understanding units of gas concentrationUnderstanding units of gas concentration
Understanding units of gas concentrationUsama Khan
 
The psychrometric chart theory and application
The psychrometric chart theory and applicationThe psychrometric chart theory and application
The psychrometric chart theory and applicationUsama Khan
 
Wet Binary Hydrogen & Chlorine
Wet Binary Hydrogen & ChlorineWet Binary Hydrogen & Chlorine
Wet Binary Hydrogen & ChlorineUsama Khan
 
VLE VAPOR LIQUID EQUILIBRIUM - Introduction
VLE VAPOR LIQUID EQUILIBRIUM -  Introduction VLE VAPOR LIQUID EQUILIBRIUM -  Introduction
VLE VAPOR LIQUID EQUILIBRIUM - Introduction Usama Khan
 
Kf units Electrolytic Cell Volt Regression
Kf units Electrolytic Cell Volt RegressionKf units Electrolytic Cell Volt Regression
Kf units Electrolytic Cell Volt RegressionUsama Khan
 
Vocabulary For Engineering Resumes
Vocabulary For Engineering ResumesVocabulary For Engineering Resumes
Vocabulary For Engineering ResumesUsama Khan
 
Compressor Polytropic Efficiency Calculation
Compressor Polytropic Efficiency CalculationCompressor Polytropic Efficiency Calculation
Compressor Polytropic Efficiency CalculationUsama Khan
 
details_calculated
details_calculateddetails_calculated
details_calculatedUsama Khan
 

Mehr von Usama Khan (16)

The humble check_valve
The humble check_valveThe humble check_valve
The humble check_valve
 
British women chemists and world war 1
British women chemists and world war 1British women chemists and world war 1
British women chemists and world war 1
 
Oilivia gasolino upstream_en
Oilivia gasolino upstream_enOilivia gasolino upstream_en
Oilivia gasolino upstream_en
 
Results phe works 2.0 2
Results phe works 2.0 2Results phe works 2.0 2
Results phe works 2.0 2
 
A non-Iterative way for preliminary designing Plate & Frame Exchanger
A non-Iterative way for preliminary designing Plate & Frame ExchangerA non-Iterative way for preliminary designing Plate & Frame Exchanger
A non-Iterative way for preliminary designing Plate & Frame Exchanger
 
Storage container tank mathematics
Storage container tank mathematicsStorage container tank mathematics
Storage container tank mathematics
 
Asahi AKC electrolyzer magazine
Asahi AKC electrolyzer magazineAsahi AKC electrolyzer magazine
Asahi AKC electrolyzer magazine
 
Understanding units of gas concentration
Understanding units of gas concentrationUnderstanding units of gas concentration
Understanding units of gas concentration
 
The psychrometric chart theory and application
The psychrometric chart theory and applicationThe psychrometric chart theory and application
The psychrometric chart theory and application
 
Wet Binary Hydrogen & Chlorine
Wet Binary Hydrogen & ChlorineWet Binary Hydrogen & Chlorine
Wet Binary Hydrogen & Chlorine
 
VLE VAPOR LIQUID EQUILIBRIUM - Introduction
VLE VAPOR LIQUID EQUILIBRIUM -  Introduction VLE VAPOR LIQUID EQUILIBRIUM -  Introduction
VLE VAPOR LIQUID EQUILIBRIUM - Introduction
 
Kf units Electrolytic Cell Volt Regression
Kf units Electrolytic Cell Volt RegressionKf units Electrolytic Cell Volt Regression
Kf units Electrolytic Cell Volt Regression
 
Vocabulary For Engineering Resumes
Vocabulary For Engineering ResumesVocabulary For Engineering Resumes
Vocabulary For Engineering Resumes
 
Compressor Polytropic Efficiency Calculation
Compressor Polytropic Efficiency CalculationCompressor Polytropic Efficiency Calculation
Compressor Polytropic Efficiency Calculation
 
Folders
FoldersFolders
Folders
 
details_calculated
details_calculateddetails_calculated
details_calculated
 

Kürzlich hochgeladen

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 

Kürzlich hochgeladen (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 

Liquid chlorine incident

  • 1. French Ministry of the Environment - DPPR / SEI / BARPI N°26208 Sheet updated: March 2007 Chlorine leak in a liquefaction workshop of a chemical plant January 13, 2004 Vieux-Thann – [Haut Rhin] France THE INSTALLATIONS IN QUESTION The site The plant specialises in the fabrication of chlorine, and chlorinated and brominated products. It is governed by the "high threshold" of the Seveso directive. The plant is located in an urbanized zone. Part of the chlorine produced in the manufacturing facility by mercury-cathode electrolysis (200 t/day) is used on site. The other part is liquefied and loaded into rail cars or stored in an 11-m3 tank. The installations containing liquid chlorine are located in closed buildings equipped with a ventilation system and a neutralisation tower to process any accidental releases. A prefectorial order required the company to adopt this confinement installation in 1995. The unit concerned: The chlorine coming from the electrolysis facility is compressed and condensed, and then the gas and liquid phases are separated in a floatation pot-type separator. The liquid part is then directed to the storage facilities or to the loading installation. The non-condensed part (referred to as residual gases), containing gaseous chlorine and non-condensable gases (notably H2 and air) is distributed on site. As the liquefaction rate increases, the concentration of non-condensable gases in the residual gases also increases (the enrichment factor is [1/1-τ]). As such, if 50% of the chlorine is liquefied, the concentration of the non-condensable gases in the residual gases doubles, but is multiplied by 10 if the liquefaction rate is 90%. The presence of hydrogen and inert gases, inherent to the chlorine manufacturing process, is particularly important during the installation restart phases, notably after long shutdown periods. It should be reminded that hydrogen and chlorine react violently, producing hydrochloric acid. The presence of hydrogen in gaseous chlorine thus requires a that certain number of precautions be taken, including monitoring the changes in its concentration in the installations to ensure that it remains below the lower explosive limit (LEL). The hydrogen contents are measured at the electrolysis shop's outlet and in the gas outlet of the floating pots by means of an automatic analyser, or by manual analysis. The company's internal procedures require that a maximum hydrogen concentration of 4.7% be respected in the residual gases. The LEL of the chlorine-hydrogen-air mixture is 5% (source: INRS). The automatic hydrogen analyser is inoperative during the installation's start-up phases due to the excessive quantity of inert gases present. For this reason, during installation start-up operations, the operators perform manual concentration measurements (a measurement every ten minutes, according to the procedures). Electrolysis Liquefaction Hydrogen Chlorine-Iron reaction Re-start Confinement Organization / human factor Interventions difficulties
  • 2. French Ministry of the Environment - DPPR / SEI / BARPI N°26208 Sheet updated: March 2007 THE ACCIDENT, ITS BEHAVIOUR AND CONSEQUENCES The accident: In the morning of January 13, 2004, the electrolysis installations were being started after having been shut down due to a lack of cooling water. During the first start-up phase, the chlorine produced is sent directly to the Javel (bleach) unit. At 9.15 am, the concentrations measured leaving the electrolysis unit at analysis location No. 1 (1.3% H2, 80% Cl2) enabled the liquefaction part of the workshop to be put back into service in accordance with the company's internal procedures. Chlorine production was 1,600 kg/h, the output of residual gases 600 kg/h and the hydrogen concentration in the residual gases 3.3% (analysis location No. 2). The electrolysis facility's production level was progressively increased to 2,900 kg/h. A new series of measurements at the "residual gases" outlet of the liquefaction facility at analysis location No. 2 showed an initial concentration of 4.6% hydrogen in the residual gases. The measurement conducted ten minutes later gave a value of 6.7%. Noting this value, the operator immediately performed the analysis again, which confirmed the first analysis. The operator then decided to reduce the liquefaction rate by increasing the output of residual gases to 1,000 kg/h in order to lower the hydrogen concentration. Immediately afterward, a leak was detected at 10.10 am by the alarm and visually in the building. The operators initiated the emergency shutdown; the confinement installations were automatically put into service and directed the majority of the leak to the neutralisation tower. The majority of the chlorine released by the leak was neutralised in the tower. The operators secured the installations then grouped together to locate and were able to completely isolate the leak in 20 minutes. Electrolysis facility condenser compressor 1 2 1 2 H2 measurement before liquefaction H2 measurement after liquefaction Separator TANK GAS LIQ. SCRUBBER Purification-liquefaction shop Javel unit, HCl ByPass (javel unit)
  • 3. French Ministry of the Environment - DPPR / SEI / BARPI N°26208 Sheet updated: March 2007 The consequences: No employee or resident of the area was injured. A pipe was damaged in three locations. The quantity of chlorine released into the confinement building was indirectly estimated at 600 kg. The quantity released into the environment was limited to just a few kilos while the confinement building was depressurizing. Nearly all of the chlorine leaked was treated in the neutralisation tower for accidental releases. European scale of industrial accidents: By applying the rating rules of the 18 parameters of the scale made official in February 1994 by the Committee of Competent Authorities of the Member States which oversees the application of the ‘SEVESO’ directive, the accident can be characterised by the following 4 indices, based on the information available. The parameters that comprise these indices and the corresponding rating method are indicated in the appendix hereto and are available at the following address: http://www.aria.ecologie.gouv.fr The 600 kg of chlorine from the leak represent 2.4% of the corresponding Seveso threshold (25 t) and result in a level 3 rating in terms of the "quantities of dangerous substances" according to parameter Q1. ORIGIN, CAUSES AND CIRCUMSTANCES OF THE ACCIDENT The expert assessment conducted immediately following the incident showed that the leak, located along the limit of the confined zone, resulted from the combustion of the steel in the chlorine on a pipe transporting the gaseous chlorine: at two locations (located near zones in which the pipe size was reduced: valve and venturi), the pipe had disappeared over several centimetres, including a flange. A hole of diameter equal to that of the pipe (8 cm) was created in a third location. The combustion of steel in chlorine is a process that is initiated when the steel is brought to a temperature above 130 °C. Once this reaction begins, it is self-sustaining until all the chlorine has been consumed. The operator identified the cause of the iron/chlorine combustion process as a hydrogen-chlorine fire whose ignition energy is sufficiently low to start spontaneously due to an output restriction or a significant flow rate. The increase in the output to 1,000 kg/h could have also supplied the ignition energy required. Acquire this
  • 4. French Ministry of the Environment - DPPR / SEI / BARPI N°26208 Sheet updated: March 2007 The value of the hydrogen concentration leaving the electrolysis facility and the liquefaction rate could only result in the LIE being exceeded (the hydrogen enriching factor being 5 just prior to the accident) as soon as the operator did not act immediately when he measured a concentration of 4.6%. The non-operation of the automatic analyser and related safety devices during the start-up phases made the security of the installations rely only upon action by the operators, who are particularly busy during the rare start-up phases. This point was brought up during the last risk analysis of March and December 2003, when the operator was searching for a new analyser. This incident can be broken down in the following manner: Combustion of the hydrogen and chlorine in a pipe restriction Pipe temperature above 130°C Combustion of the iron and chlorine contained in the pipe Pipe rupture Chlorine leak Excessive concentration of hydrogen in the chlorine Infrequent restart operation Analyser non- operational during restart Weakness of the procedure barrier and manual measurements Dedicated staff for analysis during start-up
  • 5. French Ministry of the Environment - DPPR / SEI / BARPI N°26208 Sheet updated: March 2007 ACTION TAKEN Besides the verification of the installations and the replacement of damaged parts, several actions were implemented to prevent the incident from happening again: A material assessment was set up to monitor the hydrogen concentration in the residual gases according to the liquefaction rate and the hydrogen content at the electrolysis facility's outlet. Implementation of two continuous hydrogen analysers that can be used in the presence of inert gases (cost: 150,000 euros). Supervision of start-up phases by a manager. Modification of the instructions. Re-examination of post-accident actions. The installations are shut down if the hydrogen concentration is exceeded by more than 3.5%. LESSONS LEARNED The main feedback elements to remember concern: The correct operation of the confinement installations during an incident without the building increasing in pressure. The guillotine rupture scenario that is not a textbook example. The analysis of transitory phases and the specific security arrangement to be implemented and not neglected. The weakness of the operator barrier associated with the instructions that were not necessarily explicit (the number of measurements, respect of the limit concentration of hydrogen in the residual chlorine, shut down of the electrolysis facility). An organisation to be improved through the modification of instructions and better operator training as well as the reinforcement of the supervisors' role during delicate phases. The relatively significant delay in isolating the leak (20 min.) following problems relating to the intervention and locating the leak in a building in a chlorine atmosphere. The drainage of upline and downline chlorine systems by depressurisation, particularly concerning the 11 m3 liquid chlorine storage tank which supplied the leak for 5 minutes until it could be isolated. The low ignition temperature of combustion between iron and chlorine (130°C).