SlideShare ist ein Scribd-Unternehmen logo
1 von 24
CRISIS AT MARUTI
SUZUKI’S MANESAR
      PLANT
        1




        PRESENTATION BY –
                  ANSHAK KALIA
                  NAINA CHAUDHARY
                  SAGAR RANJAN
                  SUMIT TYAGI
                  TANYA KAUR

                           11/8/2011
TABLE OF CONTENTS
                              2

S.NO.   CONTENTS                  SLIDE NUMBER


1       OVERVIEW                  3
2       PROBLEM                   4
3       FALL IN DEMAND            5
4       LOSS IN OUTPUT            6-7
5       WORKERS PERSPECTIVE       8-10
6       MANAGEMENT PERSPECTIVE    11-13
7       ACTIONS TAKEN             14-15
8       FACTS                     16-19
9       SOLUTION                  20-23
                                          11/8/2011
OVERVIEW
                              3

 India's largest passenger car company, accounting
    for over 45% of the domestic car market
   First company in India to mass-produce and sell
    more than a million cars
   Annually exports more than 50,000 cars
   Manufacturing facilities are located at two facilities
    Gurgaon and Manesar
   It offers 14 brands and over 150 variants ranging
    from peoples car Maruti 800 to the stylish hatchback
    Ritz
                                                     11/8/2011
THE PROBLEM
     4




              11/8/2011
FALL IN DEMAND
                           5

 Expected fall in demand during crucial festive
  season, when car sales touch the peak.
 The Manesar plant is the hub for the key 'Swift'
  model, which runs a huge backlog in the retail
  market.
 The bookings for the new Swift and waiting list of
  customers are very high. Delay in production affect
  the delivery of cars resulting in disappointment
  among customers.


                                                   11/8/2011
LOSS IN OUTPUT
                           6

 Estimated loss of more than 90 million dollar.
 On August 24, 1,230 cars were planned to be
  produced, but only 437 were assembled. Out of
  which, just 96 cars could pass quality check.
 Halt in production on the 5th September, around
  4000 workers rallied till the highway to block it.
 Poor dispatch numbers with respect to meeting
  targets and quality control



                                                   11/8/2011
CONT.
                          7




 With only around 20-25 of 950-odd workers agreed
  to sign the “Good Conduct” undertaking
 Production was stalled as the company barricaded
  various entrances to prohibit entry of those who
  refused to sign the 'good conduct bond'.




                                                11/8/2011
PROBLEM FROM WORKERS VIEW POINT
                            8




 “If the floor supervisor is rude and even slaps us, he
 is awarded with a promotion but in case a labourer
 dares to reply, he is issued a notice on grounds of
 disciplinary action," said Rajender Kumar, a
 technician




                                                    11/8/2011
CONT.
                                     9
 Revenge for June's strike.
 Cockroaches and dead flies found in the food in the hurried lunch-
    break that workers earn in the canteen ½ km from the working
    station.
   The tea was without tea leaves or sugar in the 7 minute break
   The company doctor give heavy doses of „instant‟ medicines even on
    minor complaint so that disruption of work could be prevented.
   One day‟s wage cut of Rs.1500, two days Rs.2200, three days cut of
    Rs.7-8000 is implemented, so that almost the total month‟s wage is
    cut.
   One second late into punching-card entry is a day‟s wage cut, but they
    have to give full production for that day too.
    Forced to fill an undertaking form, which means that in case of any
    problem, workers cannot raise any objections against management.
                                                                 11/8/2011
WORKER’S DEMAND
                         10



 Worker‟s demand to establish an independent union
  Maruti Suzuki Employees Union (MSEU)in the
  company.
 Currently, the company has one recognized union –
  Maruti Udyog Kamgar Union which is dominated by
  workers at the Gurgaon plant




                                               11/8/2011
MANAGEMENT VIEW OF PROBLEM
                         11




“ Unhappy workers have found out a new way to disrupt
  ongoing work at the plant by creating serious defects
  in quality of the cars, so they would fail the
  compulsory vehicle inspection (VI) quality test.”




                                                      11/8/2011
                                   Source: http://www.ndtv.com/
CONT.
                          12



 Workers indulging in deliberate attempts to reduce
  output and are compromising customer interests
 Revenge for the June strike.
 Refused to sign good conduct form which aims at
  ensuring the production of good quality products.
 Employees are being charged with sabotage and
  causing quality problems in the cars produced.



                                                 11/8/2011
CONT.
                             13

 "In the last three days, a series of serious quality
 problems have been observed in the vehicles
 produced. For example, vehicle door was not
 properly clamped leading to doors falling during
 production, wiring harnesses were found cut in
 produced vehicle, dents were noticed on the body
 and critical components were not fitted on to
 vehicles. Such deliberate acts, if not detected during
 quality checks, would have led to serious
 implications and directly harmed customers," a
 senior company official said.


                                                         11/8/2011
ACTION TAKEN AGAINST EMPLOYEES
                              14

 Suspension of 10 workers
 Dismissal of five
 Discontinued the services of six trainees.
 Also suspended four workers for "instigating indiscipline"
  a week before
 Another four suspended in late July for manhandling
  supervisors.
 Charges of sabotage and causing quality problems in the
  cars produced.
 On 14th August; police force of 500 send to occupy the
  factory to „prevent violent activities‟           11/8/2011
CONT.
                           15

 The company terminated 11 workers and suspended
  38 on August 29th and 30th on false charges
  demanding a „good-conduct bond‟ with the state
  police and administration, the media, and „bouncers‟
  on its payroll as its willing pawns.
 The Maruti Suzuki Employees Union (MSEU) is
  demanding as an immediate measure, the
  withdrawal of the charge-sheet, termination,
  suspension of the 49 workers. The workers are
  sitting day-and-night at the factory gate, peeling off
  the layers of Maruti Suzuki‟s “way of life”.

                                                   11/8/2011
Facts
                                         16

     June –
     1) 13-days strike demanding the recognition of the MSEU at the Manesar plant
     2) Production loss of 12,600 cars, valued at about Rs 630 crore.

    July –
     1) Production stopped for a day at the same plant because of strike by some
     workers.

    August –
      1) Reported 12.74 per cent fall in sales for August to 91,442 as compare
       to the sale of 1,04,791 units in the same month last year

    September 7
     1) Loss suffered is estimated at about 8,550 units, valued at about Rs 425 crore.
Source: Economic Times
                                                                            11/8/2011
Confirmed by company‟s spokesperson
                           17

 Production is right now at a stop at Manesar
 Third production halt in three months at Manesar.
 The company stopped operations for 10 working
  days in June
 The firm lost Rs 400 crore because of the strike.




                                                      11/8/2011
Fall in Shares
                          18




 Shares fell as much as 2 per cent on the news to
 close at Rs 1,080 on the Bombay Stock Exchange




                         SOURCE: TIMES OF INDIA




                                                  11/8/2011
According to Chairman R.C. Bhargava
                          19

“ Manesar labour problem is essentially a political
 issue and not a problem which involves any
 significant demand from the workers”




                                                  11/8/2011
Solution
                            20

 Identified reasons of the conflict.
1. Establishment of separate union for Manesar Plant
2. Code of Conduct- Falling standards of
   manufacturing.
3. Basic sanitary enhancements demanded by the
   workforce.




                                               11/8/2011
Trade Union Establishment
                          21

 Trade union would be established with prior
  conditions: -
1. Members of the trade union to be nominated with
   consent of both workers and management.
2. The leader of this union would be appointed by the
   management.
 If not agreed then management would move to
   plan B.
1. Technology oriented operations reducing demand
   of man power.
                                                11/8/2011
Code Of Conduct And Sanitary Problems
                              22

 ADOPT CHANGE PROCESS THEORY
     Unfreezing
     Change through cognitive restructuring
     Refreezing




                                               11/8/2011
23



     Improved hygienic
     conditions at
     workplace reduces
     employee‟s
     dissatisfaction




                11/8/2011
24




     11/8/2011

Weitere ähnliche Inhalte

Was ist angesagt?

case analysis mahindra and mahindra and nokia (Trade unions)
case analysis mahindra and mahindra and nokia (Trade unions)case analysis mahindra and mahindra and nokia (Trade unions)
case analysis mahindra and mahindra and nokia (Trade unions)
Sakshi Sharma
 
HR Practices at HUL
HR Practices at HUL HR Practices at HUL
HR Practices at HUL
Madhav Desai
 
case study of Philips india
case study of Philips indiacase study of Philips india
case study of Philips india
Sandeep Jadagoud
 
Strike at maruti suzuki
Strike at maruti suzukiStrike at maruti suzuki
Strike at maruti suzuki
Taha Sodawala
 
Maruti suzuki STRATEGIC MANAGEMENT
Maruti suzuki STRATEGIC MANAGEMENTMaruti suzuki STRATEGIC MANAGEMENT
Maruti suzuki STRATEGIC MANAGEMENT
sanjay p
 

Was ist angesagt? (20)

Manesar Violence - Industrial Relation - Legal Aspects Of Business
Manesar Violence - Industrial Relation - Legal Aspects Of BusinessManesar Violence - Industrial Relation - Legal Aspects Of Business
Manesar Violence - Industrial Relation - Legal Aspects Of Business
 
Case study of toyata industrial dispute
Case study of toyata industrial dispute Case study of toyata industrial dispute
Case study of toyata industrial dispute
 
Maruti Manesar Issue
Maruti Manesar IssueMaruti Manesar Issue
Maruti Manesar Issue
 
Maruti strike Case study.ER
Maruti strike Case study.ERMaruti strike Case study.ER
Maruti strike Case study.ER
 
Maruti suzuki dispute in manesar plant
Maruti suzuki dispute in manesar plantMaruti suzuki dispute in manesar plant
Maruti suzuki dispute in manesar plant
 
case analysis mahindra and mahindra and nokia (Trade unions)
case analysis mahindra and mahindra and nokia (Trade unions)case analysis mahindra and mahindra and nokia (Trade unions)
case analysis mahindra and mahindra and nokia (Trade unions)
 
Maruti unrest
Maruti unrestMaruti unrest
Maruti unrest
 
HMSI HR Failure
HMSI HR FailureHMSI HR Failure
HMSI HR Failure
 
Honda hr
Honda hr Honda hr
Honda hr
 
Industrial Dispute at Jet Airways
Industrial Dispute at Jet AirwaysIndustrial Dispute at Jet Airways
Industrial Dispute at Jet Airways
 
Honda
HondaHonda
Honda
 
Lockout at mrf tyres
Lockout at mrf tyresLockout at mrf tyres
Lockout at mrf tyres
 
Honda Motorcycles and Scooters India Ltd. (HMSI) case study
Honda Motorcycles and Scooters India Ltd. (HMSI) case studyHonda Motorcycles and Scooters India Ltd. (HMSI) case study
Honda Motorcycles and Scooters India Ltd. (HMSI) case study
 
Maruti Manesar Dispute (Human Resource management issue) Assignment
Maruti Manesar Dispute (Human Resource management issue) AssignmentMaruti Manesar Dispute (Human Resource management issue) Assignment
Maruti Manesar Dispute (Human Resource management issue) Assignment
 
HR Practices at HUL
HR Practices at HUL HR Practices at HUL
HR Practices at HUL
 
case study of Philips india
case study of Philips indiacase study of Philips india
case study of Philips india
 
Strike at maruti suzuki
Strike at maruti suzukiStrike at maruti suzuki
Strike at maruti suzuki
 
Maruthi Suzuki Industrial issue in 2002
Maruthi Suzuki Industrial issue in 2002Maruthi Suzuki Industrial issue in 2002
Maruthi Suzuki Industrial issue in 2002
 
Labour unrest-at-toyota
Labour unrest-at-toyotaLabour unrest-at-toyota
Labour unrest-at-toyota
 
Maruti suzuki STRATEGIC MANAGEMENT
Maruti suzuki STRATEGIC MANAGEMENTMaruti suzuki STRATEGIC MANAGEMENT
Maruti suzuki STRATEGIC MANAGEMENT
 

Andere mochten auch

Maruti Suzuki a brief PPT assignment
Maruti Suzuki a brief PPT assignmentMaruti Suzuki a brief PPT assignment
Maruti Suzuki a brief PPT assignment
Navneet Jingar
 

Andere mochten auch (16)

maruti case study
maruti case  studymaruti case  study
maruti case study
 
Maruti manesar case study august 6 2012
Maruti manesar case study august 6 2012Maruti manesar case study august 6 2012
Maruti manesar case study august 6 2012
 
Maruti suzuki ppt
Maruti suzuki pptMaruti suzuki ppt
Maruti suzuki ppt
 
Ammy maruti
Ammy marutiAmmy maruti
Ammy maruti
 
Toyota – case study
Toyota – case study   Toyota – case study
Toyota – case study
 
Maruti Suzuki a brief PPT assignment
Maruti Suzuki a brief PPT assignmentMaruti Suzuki a brief PPT assignment
Maruti Suzuki a brief PPT assignment
 
Maruti manesar
Maruti manesarMaruti manesar
Maruti manesar
 
settlement of industrial disputes with case study: Hero Honda
 settlement of industrial disputes with case study: Hero Honda  settlement of industrial disputes with case study: Hero Honda
settlement of industrial disputes with case study: Hero Honda
 
IR Case Study
IR Case StudyIR Case Study
IR Case Study
 
Hrm maruti suzuki
Hrm maruti suzukiHrm maruti suzuki
Hrm maruti suzuki
 
Hr policy in maruthi
Hr policy in maruthi Hr policy in maruthi
Hr policy in maruthi
 
Strike
StrikeStrike
Strike
 
Maruti
MarutiMaruti
Maruti
 
Labour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzukiLabour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzuki
 
Maruti
Maruti Maruti
Maruti
 
My Activa 401
My Activa 401My Activa 401
My Activa 401
 

Ähnlich wie Presentation1

Maruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 finalMaruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 final
Jagtar Dhaliwal
 
manesarissue-140331131632-phpapp01.pdf
manesarissue-140331131632-phpapp01.pdfmanesarissue-140331131632-phpapp01.pdf
manesarissue-140331131632-phpapp01.pdf
ssusercd51df
 
Customer satisfaction with reference to ambuja cement ltd
Customer satisfaction with reference to ambuja cement ltdCustomer satisfaction with reference to ambuja cement ltd
Customer satisfaction with reference to ambuja cement ltd
Shakti Prasad Tiwari
 
Assets performance of the select cement companies in tamilnadu
Assets performance of the select cement companies in tamilnaduAssets performance of the select cement companies in tamilnadu
Assets performance of the select cement companies in tamilnadu
IAEME Publication
 

Ähnlich wie Presentation1 (20)

Manesar plant
Manesar plantManesar plant
Manesar plant
 
Maruti
MarutiMaruti
Maruti
 
Maruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 finalMaruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 final
 
manesarissue-140331131632-phpapp01.pdf
manesarissue-140331131632-phpapp01.pdfmanesarissue-140331131632-phpapp01.pdf
manesarissue-140331131632-phpapp01.pdf
 
Collective bargaing maruti suzuki manesar plant case study
Collective bargaing maruti suzuki manesar plant case studyCollective bargaing maruti suzuki manesar plant case study
Collective bargaing maruti suzuki manesar plant case study
 
Sustainability of Kia motors.
Sustainability of Kia motors. Sustainability of Kia motors.
Sustainability of Kia motors.
 
KIAMotors.pdf
KIAMotors.pdfKIAMotors.pdf
KIAMotors.pdf
 
comprehensive report
comprehensive report comprehensive report
comprehensive report
 
Customer satisfaction with reference to ambuja cement ltd
Customer satisfaction with reference to ambuja cement ltdCustomer satisfaction with reference to ambuja cement ltd
Customer satisfaction with reference to ambuja cement ltd
 
0601022 marketing possibilities of mr.cook product
0601022 marketing possibilities of mr.cook product0601022 marketing possibilities of mr.cook product
0601022 marketing possibilities of mr.cook product
 
Insights of metro corporation
Insights of metro corporationInsights of metro corporation
Insights of metro corporation
 
hi tech arai pvt ltd madurai
hi tech arai pvt ltd maduraihi tech arai pvt ltd madurai
hi tech arai pvt ltd madurai
 
Identification of Operational Issues at a Switchgear Manufacturing Company: A...
Identification of Operational Issues at a Switchgear Manufacturing Company: A...Identification of Operational Issues at a Switchgear Manufacturing Company: A...
Identification of Operational Issues at a Switchgear Manufacturing Company: A...
 
Assets performance of the select cement companies in tamilnadu
Assets performance of the select cement companies in tamilnaduAssets performance of the select cement companies in tamilnadu
Assets performance of the select cement companies in tamilnadu
 
TRY6.pdf
TRY6.pdfTRY6.pdf
TRY6.pdf
 
ultratech cement 2017
ultratech cement 2017 ultratech cement 2017
ultratech cement 2017
 
Equity Market Reactions based on Company’s Financial Strategies
Equity Market Reactions based on Company’s Financial StrategiesEquity Market Reactions based on Company’s Financial Strategies
Equity Market Reactions based on Company’s Financial Strategies
 
Cement 120322054853-phpapp02
Cement 120322054853-phpapp02Cement 120322054853-phpapp02
Cement 120322054853-phpapp02
 
English research report
English research report English research report
English research report
 
A STUDY OF ENQUIRY RESPONSE LEAD TIME AND CAPACITY UTILIZATION AT PEEKAY STEE...
A STUDY OF ENQUIRY RESPONSE LEAD TIME AND CAPACITY UTILIZATION AT PEEKAY STEE...A STUDY OF ENQUIRY RESPONSE LEAD TIME AND CAPACITY UTILIZATION AT PEEKAY STEE...
A STUDY OF ENQUIRY RESPONSE LEAD TIME AND CAPACITY UTILIZATION AT PEEKAY STEE...
 

Kürzlich hochgeladen

What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
srcw2322l101
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
seri bangash
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
zukhrafshabbir
 
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 

Kürzlich hochgeladen (20)

FEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service LightningFEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service Lightning
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
 
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdfبروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
 
New Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9loNew Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9lo
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.
 
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionSeries A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
 
Aptar Closures segment - Corporate Overview-India.pdf
Aptar Closures segment - Corporate Overview-India.pdfAptar Closures segment - Corporate Overview-India.pdf
Aptar Closures segment - Corporate Overview-India.pdf
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
 
Powers and Functions of CPCB - The Water Act 1974.pdf
Powers and Functions of CPCB - The Water Act 1974.pdfPowers and Functions of CPCB - The Water Act 1974.pdf
Powers and Functions of CPCB - The Water Act 1974.pdf
 
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
 
Sedex Members Ethical Trade Audit (SMETA) Measurement Criteria
Sedex Members Ethical Trade Audit (SMETA) Measurement CriteriaSedex Members Ethical Trade Audit (SMETA) Measurement Criteria
Sedex Members Ethical Trade Audit (SMETA) Measurement Criteria
 
Hyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings releaseHyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings release
 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
 
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxBlinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
 
Engagement Rings vs Promise Rings | Detailed Guide
Engagement Rings vs Promise Rings | Detailed GuideEngagement Rings vs Promise Rings | Detailed Guide
Engagement Rings vs Promise Rings | Detailed Guide
 
Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
 
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
 
Revolutionizing Industries: The Power of Carbon Components
Revolutionizing Industries: The Power of Carbon ComponentsRevolutionizing Industries: The Power of Carbon Components
Revolutionizing Industries: The Power of Carbon Components
 
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptxUnveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
 

Presentation1

  • 1. CRISIS AT MARUTI SUZUKI’S MANESAR PLANT 1 PRESENTATION BY – ANSHAK KALIA NAINA CHAUDHARY SAGAR RANJAN SUMIT TYAGI TANYA KAUR 11/8/2011
  • 2. TABLE OF CONTENTS 2 S.NO. CONTENTS SLIDE NUMBER 1 OVERVIEW 3 2 PROBLEM 4 3 FALL IN DEMAND 5 4 LOSS IN OUTPUT 6-7 5 WORKERS PERSPECTIVE 8-10 6 MANAGEMENT PERSPECTIVE 11-13 7 ACTIONS TAKEN 14-15 8 FACTS 16-19 9 SOLUTION 20-23 11/8/2011
  • 3. OVERVIEW 3  India's largest passenger car company, accounting for over 45% of the domestic car market  First company in India to mass-produce and sell more than a million cars  Annually exports more than 50,000 cars  Manufacturing facilities are located at two facilities Gurgaon and Manesar  It offers 14 brands and over 150 variants ranging from peoples car Maruti 800 to the stylish hatchback Ritz 11/8/2011
  • 4. THE PROBLEM 4 11/8/2011
  • 5. FALL IN DEMAND 5  Expected fall in demand during crucial festive season, when car sales touch the peak.  The Manesar plant is the hub for the key 'Swift' model, which runs a huge backlog in the retail market.  The bookings for the new Swift and waiting list of customers are very high. Delay in production affect the delivery of cars resulting in disappointment among customers. 11/8/2011
  • 6. LOSS IN OUTPUT 6  Estimated loss of more than 90 million dollar.  On August 24, 1,230 cars were planned to be produced, but only 437 were assembled. Out of which, just 96 cars could pass quality check.  Halt in production on the 5th September, around 4000 workers rallied till the highway to block it.  Poor dispatch numbers with respect to meeting targets and quality control 11/8/2011
  • 7. CONT. 7  With only around 20-25 of 950-odd workers agreed to sign the “Good Conduct” undertaking  Production was stalled as the company barricaded various entrances to prohibit entry of those who refused to sign the 'good conduct bond'. 11/8/2011
  • 8. PROBLEM FROM WORKERS VIEW POINT 8  “If the floor supervisor is rude and even slaps us, he is awarded with a promotion but in case a labourer dares to reply, he is issued a notice on grounds of disciplinary action," said Rajender Kumar, a technician 11/8/2011
  • 9. CONT. 9  Revenge for June's strike.  Cockroaches and dead flies found in the food in the hurried lunch- break that workers earn in the canteen ½ km from the working station.  The tea was without tea leaves or sugar in the 7 minute break  The company doctor give heavy doses of „instant‟ medicines even on minor complaint so that disruption of work could be prevented.  One day‟s wage cut of Rs.1500, two days Rs.2200, three days cut of Rs.7-8000 is implemented, so that almost the total month‟s wage is cut.  One second late into punching-card entry is a day‟s wage cut, but they have to give full production for that day too.  Forced to fill an undertaking form, which means that in case of any problem, workers cannot raise any objections against management. 11/8/2011
  • 10. WORKER’S DEMAND 10  Worker‟s demand to establish an independent union Maruti Suzuki Employees Union (MSEU)in the company.  Currently, the company has one recognized union – Maruti Udyog Kamgar Union which is dominated by workers at the Gurgaon plant 11/8/2011
  • 11. MANAGEMENT VIEW OF PROBLEM 11 “ Unhappy workers have found out a new way to disrupt ongoing work at the plant by creating serious defects in quality of the cars, so they would fail the compulsory vehicle inspection (VI) quality test.” 11/8/2011 Source: http://www.ndtv.com/
  • 12. CONT. 12  Workers indulging in deliberate attempts to reduce output and are compromising customer interests  Revenge for the June strike.  Refused to sign good conduct form which aims at ensuring the production of good quality products.  Employees are being charged with sabotage and causing quality problems in the cars produced. 11/8/2011
  • 13. CONT. 13  "In the last three days, a series of serious quality problems have been observed in the vehicles produced. For example, vehicle door was not properly clamped leading to doors falling during production, wiring harnesses were found cut in produced vehicle, dents were noticed on the body and critical components were not fitted on to vehicles. Such deliberate acts, if not detected during quality checks, would have led to serious implications and directly harmed customers," a senior company official said. 11/8/2011
  • 14. ACTION TAKEN AGAINST EMPLOYEES 14  Suspension of 10 workers  Dismissal of five  Discontinued the services of six trainees.  Also suspended four workers for "instigating indiscipline" a week before  Another four suspended in late July for manhandling supervisors.  Charges of sabotage and causing quality problems in the cars produced.  On 14th August; police force of 500 send to occupy the factory to „prevent violent activities‟ 11/8/2011
  • 15. CONT. 15  The company terminated 11 workers and suspended 38 on August 29th and 30th on false charges demanding a „good-conduct bond‟ with the state police and administration, the media, and „bouncers‟ on its payroll as its willing pawns.  The Maruti Suzuki Employees Union (MSEU) is demanding as an immediate measure, the withdrawal of the charge-sheet, termination, suspension of the 49 workers. The workers are sitting day-and-night at the factory gate, peeling off the layers of Maruti Suzuki‟s “way of life”. 11/8/2011
  • 16. Facts 16  June – 1) 13-days strike demanding the recognition of the MSEU at the Manesar plant 2) Production loss of 12,600 cars, valued at about Rs 630 crore.  July – 1) Production stopped for a day at the same plant because of strike by some workers.  August – 1) Reported 12.74 per cent fall in sales for August to 91,442 as compare to the sale of 1,04,791 units in the same month last year  September 7 1) Loss suffered is estimated at about 8,550 units, valued at about Rs 425 crore. Source: Economic Times 11/8/2011
  • 17. Confirmed by company‟s spokesperson 17  Production is right now at a stop at Manesar  Third production halt in three months at Manesar.  The company stopped operations for 10 working days in June  The firm lost Rs 400 crore because of the strike. 11/8/2011
  • 18. Fall in Shares 18  Shares fell as much as 2 per cent on the news to close at Rs 1,080 on the Bombay Stock Exchange SOURCE: TIMES OF INDIA 11/8/2011
  • 19. According to Chairman R.C. Bhargava 19 “ Manesar labour problem is essentially a political issue and not a problem which involves any significant demand from the workers” 11/8/2011
  • 20. Solution 20  Identified reasons of the conflict. 1. Establishment of separate union for Manesar Plant 2. Code of Conduct- Falling standards of manufacturing. 3. Basic sanitary enhancements demanded by the workforce. 11/8/2011
  • 21. Trade Union Establishment 21  Trade union would be established with prior conditions: - 1. Members of the trade union to be nominated with consent of both workers and management. 2. The leader of this union would be appointed by the management.  If not agreed then management would move to plan B. 1. Technology oriented operations reducing demand of man power. 11/8/2011
  • 22. Code Of Conduct And Sanitary Problems 22  ADOPT CHANGE PROCESS THEORY  Unfreezing  Change through cognitive restructuring  Refreezing 11/8/2011
  • 23. 23 Improved hygienic conditions at workplace reduces employee‟s dissatisfaction 11/8/2011
  • 24. 24 11/8/2011