 Energy crisis
 Strengthen agriculture system
 Regulate the flow of Indus river to avoid
flood.
 On april 1948,India cutoff supply of water from
three rivers Ravi,Satlaj & Beas.
 It causes a setback to our national economy and
disrupted Pakistan water resourses development
plan.
 To overcome this situation Indus water treaty(IWT)
was signed on 19 September 1960.
 Indus Basin Project was developed under IWT.
 Indus Basin Project had two subprojects on
Jhelum(Mangla) and Indus(Tarbella).
 Stakeholders were Government of Pakistan
and the people of Pakistan.
 Environment and climate
• In lower Indus plan , the temperature is 14-20
degree in winter and 42-44 degree in summer.
• Average rain fall in Indus plain is about
23cm.In lower Indus areas receives about 9cm
of average rainfall annually.
• Location of Tarbella Dam is such that about
90% of annual river is derived from snowmelt.
 Internal Constraints
• Provential Government
• Central Government
 External Constraints
• Indus Water Treaty(IWT):
 Affected Families
• About 135 villages were effected.
• It resulted in displacement of
population of about 9,6000 people.
• Land acquisition and a cash
compensation of RS.469.65 million
allotted to effected families.
 Design characteristics of Tarbella were evolved on the basis of
site investigation area over the period 1955-62.
 Searching the site for Dam was the responsibility of WAPDA,
which stated site investigation.
 It took 3 years of thorough investigation to select site.
 Sites Investigated
Three sites were chosen namely:
• Bara with Potential storage capacity of 13.7bcm.
• Kiara with potential storage capacity of 12.3bcm.
• Kirpalian with potential storage capacity of 5.3bcm.
 Final site chosen was Bara.
 Studies indicated that Bara had more favorable
geology.
 Bara would result in less expensive project.
 Contractor of projects
• Tarbella dam project was built by Tarbella dam
project venture , which was led by Italian
contractor Impregilo.
• The joint venture consist of 3 Italians and 3
French Civil Engineers.
• Five German and 2 Swiss companies joined them
in 1969.
• Chief Engr. Mr. SS Kerman was entrusted with
responsibility of evaluating technical aspects of
design on behalf of WAPDA.
• Estimated Hydropower potential was 2100MW.
 An estimate of financial requirement of Tarbella dam
project according to Lieftinck report were 1047.3 million
dollars including land resettlement and first eight power
units of 175MW each.
 This also include 150.5 million$ for import duties but
excluded interests during construction.
 Correspondingly estimated financial requirement
excluding Mechanical and Electrical power , but including
Civil Engineering work for eight power units was 99.6
million $.
Duration Capital Cost US$
Up to June 65 51 million
65-66 3 million
66-67 55 million
67-68 140million
68-69 618 million
69-70 983 million
70-71 1191 million
71-72 1159 million
72-73 394 million
73-74 612 million
74-75 497 million
75-76 334 million
 To meet capital cost balance of $354 million were
transferred from Indus Basin development fund to create
Tarbella development fund(TDF).
 TDF had a capital base of $ 989 million with commitment
from Govt. of Pakistan.
 Resources of Tarbella development fund.
Countries Funds( million $)
Australia 1
Canada 14
France 30
Germany 16
Italy 56
UK 51
USA 60
World Bank 71
Saudi Arabia 59
Kuwait 18
Abu Dhabi 25
Pakistan 697
Others 25
 Predicted and actual Impacts:
• Power House
Power Units Planned Actual(MW)
Tunnel 1 4*175=700MW 700MW(1977-78)
Tunnel 2 4*175=700MW 1050MW(1982-85)
Tunnel 3 4*175=700MW 1728MW(1992-93)
Total Installed
Capacity
2100MW 3478MW
 Predicted and actual Impacts:
• Schedule
Construction
Stages
Project
Component
Activities
Scheduled Actual
Mobilization Including award
of main contract
Jun1967- Dec1969 May1968-Dec 70
Stage 1 River diversion Jan 1968-Sep 70 May 68-Sep 70
Stage 2 Spillways,
Tunnels
Oct 70-Sep 73 Oct 70-Sep 73
Stage 3 Auxiliary Dam &
Power Station
Oct 73 –Sep 74 Sep 73-Sep 74
Flow through
Tunnel
Stage 4 Unit 1 & 2 Jan 75 – Mar 75 April 77-may 77
Commissioning
of Power
Unit 3 & 4 Oct 75 –Mar 76 Jun 77 – July 77
 Due to high demand of Electricity instead of making new
projects , the Govt. of Pakistan started to upgrade the
existing projects.
 In Sep 2013 , WAPDA signed RS:26.053 billion contract
with Chinese firm Sino hydro for executing Civil works on
the 1410MW Tarbella extension project.
 Work on the Project will be completed in 3 &1/2 years at
an estimated cost of $928 million.
 In June 2013 , The World Bank has agreed to provide a
$840 million loan for project.
 On completion , the project will increase generation
capacity from 3478MW to 4888 MW.
 Prime Minister Nawaz Sharif ordered WAPDA to increase
the feasibility study of Tarbella.
 Next extension would increase additional generation of
1320MW electricity and increase overall capacity to
6208MW.
 The Australian Govt. has shown its keen interest to
finance this latest extension.
Thank You

Weitere ähnliche Inhalte

Was ist angesagt? (20)

Tarbela dam
Tarbela damTarbela dam
Tarbela dam
 
Polavaram project
Polavaram projectPolavaram project
Polavaram project
 
Warsak Hydro Power Plant
Warsak Hydro Power PlantWarsak Hydro Power Plant
Warsak Hydro Power Plant
 
dam
damdam
dam
 
Polavaram Irrigation Project
Polavaram Irrigation ProjectPolavaram Irrigation Project
Polavaram Irrigation Project
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam
 
Great man-made-river
Great man-made-riverGreat man-made-river
Great man-made-river
 
IFCDcompleted
IFCDcompletedIFCDcompleted
IFCDcompleted
 
Pakistan dams
Pakistan damsPakistan dams
Pakistan dams
 
IFCDongoing
IFCDongoingIFCDongoing
IFCDongoing
 
IFCDflood
IFCDfloodIFCDflood
IFCDflood
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
 
Kalabagh dam
Kalabagh damKalabagh dam
Kalabagh dam
 
Neelum jehlum hydropower project
Neelum jehlum hydropower projectNeelum jehlum hydropower project
Neelum jehlum hydropower project
 
SMALL HYDRO POWER PLANT
SMALL HYDRO POWER PLANTSMALL HYDRO POWER PLANT
SMALL HYDRO POWER PLANT
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPP
 
Neelum jhelum hydroelectric project ( NJHEP)
Neelum jhelum hydroelectric project ( NJHEP)Neelum jhelum hydroelectric project ( NJHEP)
Neelum jhelum hydroelectric project ( NJHEP)
 
Accident At Russias Biggest Hydroelectric Rev 00
Accident At Russias Biggest Hydroelectric   Rev 00Accident At Russias Biggest Hydroelectric   Rev 00
Accident At Russias Biggest Hydroelectric Rev 00
 
IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...
IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...
IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...
 

Andere mochten auch

Design of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistanDesign of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistanShoaib Madridista
 
Hydroelectric power plant
Hydroelectric power plantHydroelectric power plant
Hydroelectric power plantMuddassar Awan
 
Dams and Development - Case of Pakistan, by Pervaiz Amir
Dams and Development - Case of Pakistan, by Pervaiz AmirDams and Development - Case of Pakistan, by Pervaiz Amir
Dams and Development - Case of Pakistan, by Pervaiz AmirGlobal Water Partnership
 
4 clay mineralogy
4 clay mineralogy4 clay mineralogy
4 clay mineralogyMarvin Ken
 
Water Resources of pakistan
Water Resources of pakistanWater Resources of pakistan
Water Resources of pakistanFarhan Khan
 
Canal System of Pakistan
Canal System of PakistanCanal System of Pakistan
Canal System of PakistanFahad Iqbal
 
Hydro Power In Pakistan
Hydro Power In PakistanHydro Power In Pakistan
Hydro Power In PakistanFarooq Saeed
 
Link canals, Baraages and Dams
Link canals, Baraages and DamsLink canals, Baraages and Dams
Link canals, Baraages and DamsRaees Shah
 
Chapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examplesChapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examplesMohsin Siddique
 

Andere mochten auch (12)

Design of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistanDesign of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistan
 
Hydroelectric power plant
Hydroelectric power plantHydroelectric power plant
Hydroelectric power plant
 
Dams and Development - Case of Pakistan, by Pervaiz Amir
Dams and Development - Case of Pakistan, by Pervaiz AmirDams and Development - Case of Pakistan, by Pervaiz Amir
Dams and Development - Case of Pakistan, by Pervaiz Amir
 
4 clay mineralogy
4 clay mineralogy4 clay mineralogy
4 clay mineralogy
 
Geotechnical Engineering - Dams
Geotechnical Engineering - DamsGeotechnical Engineering - Dams
Geotechnical Engineering - Dams
 
KALA BAGH DAM Presentation by WAPDA . . .
KALA BAGH DAM Presentation by WAPDA . . .KALA BAGH DAM Presentation by WAPDA . . .
KALA BAGH DAM Presentation by WAPDA . . .
 
Water Resources of pakistan
Water Resources of pakistanWater Resources of pakistan
Water Resources of pakistan
 
Canal System of Pakistan
Canal System of PakistanCanal System of Pakistan
Canal System of Pakistan
 
Hydro Power In Pakistan
Hydro Power In PakistanHydro Power In Pakistan
Hydro Power In Pakistan
 
Link canals, Baraages and Dams
Link canals, Baraages and DamsLink canals, Baraages and Dams
Link canals, Baraages and Dams
 
Irrigation system of Pakistan
Irrigation system of PakistanIrrigation system of Pakistan
Irrigation system of Pakistan
 
Chapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examplesChapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examples
 

Ähnlich wie Tarbela dam project

Government project
Government projectGovernment project
Government projectlutuf Ullah
 
Colin Warwick (The Crown Estate) - “Harvesting in Harmony”
Colin Warwick (The Crown Estate) - “Harvesting in Harmony”Colin Warwick (The Crown Estate) - “Harvesting in Harmony”
Colin Warwick (The Crown Estate) - “Harvesting in Harmony”Shellfish Association
 
tarbela-dam-project97-2003.ppt
tarbela-dam-project97-2003.ppttarbela-dam-project97-2003.ppt
tarbela-dam-project97-2003.pptLeenaMujahed
 
Tidal Lagoon Power - Presentation to CCC
Tidal Lagoon Power - Presentation to CCCTidal Lagoon Power - Presentation to CCC
Tidal Lagoon Power - Presentation to CCCtheCCCuk
 
Djibouti geothermal project study
Djibouti geothermal project studyDjibouti geothermal project study
Djibouti geothermal project studyParti Djibouti
 
Environment Project Managment
Environment Project Managment Environment Project Managment
Environment Project Managment Syeda Maheen Ali
 
Uri hydel power project
Uri hydel power projectUri hydel power project
Uri hydel power projectlonez
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Nikhil Jaipurkar
 
The Severn Estuary - A sustainable low carbon energy resource - Peter Kydd
The Severn Estuary - A sustainable low carbon energy resource - Peter KyddThe Severn Estuary - A sustainable low carbon energy resource - Peter Kydd
The Severn Estuary - A sustainable low carbon energy resource - Peter KyddSustainable Severn
 
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...Er. Abhushan Neupane
 
Mangla Dam by Zain Ramzan
Mangla Dam by Zain RamzanMangla Dam by Zain Ramzan
Mangla Dam by Zain RamzanZain Ramzan
 
Libya great man made river project
Libya   great man made river projectLibya   great man made river project
Libya great man made river projectissa ibrahim
 
Quaid‑e‑Azam Solar Park 1.pptx
Quaid‑e‑Azam Solar Park 1.pptxQuaid‑e‑Azam Solar Park 1.pptx
Quaid‑e‑Azam Solar Park 1.pptxFarooqCheema7
 
Department of Public Enterprises presentation on SOEs
Department of Public Enterprises presentation on SOEsDepartment of Public Enterprises presentation on SOEs
Department of Public Enterprises presentation on SOEsSABC News
 
EIA POWER PLANT.pptx
EIA POWER PLANT.pptxEIA POWER PLANT.pptx
EIA POWER PLANT.pptxsunilghosh11
 
EIA-Thermal-Powerplant-1.pptx
EIA-Thermal-Powerplant-1.pptxEIA-Thermal-Powerplant-1.pptx
EIA-Thermal-Powerplant-1.pptxSandeep754657
 

Ähnlich wie Tarbela dam project (20)

Thar coal hurdle&solution
Thar coal hurdle&solutionThar coal hurdle&solution
Thar coal hurdle&solution
 
Government project
Government projectGovernment project
Government project
 
Colin Warwick (The Crown Estate) - “Harvesting in Harmony”
Colin Warwick (The Crown Estate) - “Harvesting in Harmony”Colin Warwick (The Crown Estate) - “Harvesting in Harmony”
Colin Warwick (The Crown Estate) - “Harvesting in Harmony”
 
IRON SAND
IRON SANDIRON SAND
IRON SAND
 
tarbela-dam-project97-2003.ppt
tarbela-dam-project97-2003.ppttarbela-dam-project97-2003.ppt
tarbela-dam-project97-2003.ppt
 
Tidal Lagoon Power - Presentation to CCC
Tidal Lagoon Power - Presentation to CCCTidal Lagoon Power - Presentation to CCC
Tidal Lagoon Power - Presentation to CCC
 
Djibouti geothermal project study
Djibouti geothermal project studyDjibouti geothermal project study
Djibouti geothermal project study
 
Environment Project Managment
Environment Project Managment Environment Project Managment
Environment Project Managment
 
Uri hydel power project
Uri hydel power projectUri hydel power project
Uri hydel power project
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
 
The Severn Estuary - A sustainable low carbon energy resource - Peter Kydd
The Severn Estuary - A sustainable low carbon energy resource - Peter KyddThe Severn Estuary - A sustainable low carbon energy resource - Peter Kydd
The Severn Estuary - A sustainable low carbon energy resource - Peter Kydd
 
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
 
Mangla Dam by Zain Ramzan
Mangla Dam by Zain RamzanMangla Dam by Zain Ramzan
Mangla Dam by Zain Ramzan
 
Libya great man made river project
Libya   great man made river projectLibya   great man made river project
Libya great man made river project
 
Eric Thorpe - IHS Markit
Eric Thorpe - IHS MarkitEric Thorpe - IHS Markit
Eric Thorpe - IHS Markit
 
offshore.pptx
offshore.pptxoffshore.pptx
offshore.pptx
 
Quaid‑e‑Azam Solar Park 1.pptx
Quaid‑e‑Azam Solar Park 1.pptxQuaid‑e‑Azam Solar Park 1.pptx
Quaid‑e‑Azam Solar Park 1.pptx
 
Department of Public Enterprises presentation on SOEs
Department of Public Enterprises presentation on SOEsDepartment of Public Enterprises presentation on SOEs
Department of Public Enterprises presentation on SOEs
 
EIA POWER PLANT.pptx
EIA POWER PLANT.pptxEIA POWER PLANT.pptx
EIA POWER PLANT.pptx
 
EIA-Thermal-Powerplant-1.pptx
EIA-Thermal-Powerplant-1.pptxEIA-Thermal-Powerplant-1.pptx
EIA-Thermal-Powerplant-1.pptx
 

Kürzlich hochgeladen

unang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog versionunang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog versionGLADYSNUEVO1
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLSarandianics
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Partito democratico
 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32JSchaus & Associates
 
31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.Christina Parmionova
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfSamirsinh Parmar
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30JSchaus & Associates
 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31JSchaus & Associates
 
Make a difference in a girl's life by donating to her education!
Make a difference in a girl's life by donating to her education!Make a difference in a girl's life by donating to her education!
Make a difference in a girl's life by donating to her education!SERUDS INDIA
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'NAP Global Network
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCNAP Global Network
 
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfPeace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfNAP Global Network
 
3 May, Journalism in the face of the Environmental Crisis.
3 May, Journalism in the face of the Environmental Crisis.3 May, Journalism in the face of the Environmental Crisis.
3 May, Journalism in the face of the Environmental Crisis.Christina Parmionova
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s educationSERUDS INDIA
 
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...kajalverma014
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisChristina Parmionova
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCNAP Global Network
 
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...kumargunjan9515
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...HyderabadDolls
 

Kürzlich hochgeladen (20)

unang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog versionunang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog version
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32
 
31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.
 
tOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTRtOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTR
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31
 
Make a difference in a girl's life by donating to her education!
Make a difference in a girl's life by donating to her education!Make a difference in a girl's life by donating to her education!
Make a difference in a girl's life by donating to her education!
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfPeace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
 
3 May, Journalism in the face of the Environmental Crisis.
3 May, Journalism in the face of the Environmental Crisis.3 May, Journalism in the face of the Environmental Crisis.
3 May, Journalism in the face of the Environmental Crisis.
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s education
 
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
 

Tarbela dam project

  • 1.
  • 2.
  • 4.  Energy crisis  Strengthen agriculture system  Regulate the flow of Indus river to avoid flood.
  • 5.  On april 1948,India cutoff supply of water from three rivers Ravi,Satlaj & Beas.  It causes a setback to our national economy and disrupted Pakistan water resourses development plan.  To overcome this situation Indus water treaty(IWT) was signed on 19 September 1960.
  • 6.  Indus Basin Project was developed under IWT.  Indus Basin Project had two subprojects on Jhelum(Mangla) and Indus(Tarbella).
  • 7.  Stakeholders were Government of Pakistan and the people of Pakistan.  Environment and climate • In lower Indus plan , the temperature is 14-20 degree in winter and 42-44 degree in summer. • Average rain fall in Indus plain is about 23cm.In lower Indus areas receives about 9cm of average rainfall annually. • Location of Tarbella Dam is such that about 90% of annual river is derived from snowmelt.
  • 8.  Internal Constraints • Provential Government • Central Government  External Constraints • Indus Water Treaty(IWT):
  • 9.  Affected Families • About 135 villages were effected. • It resulted in displacement of population of about 9,6000 people. • Land acquisition and a cash compensation of RS.469.65 million allotted to effected families.
  • 10.  Design characteristics of Tarbella were evolved on the basis of site investigation area over the period 1955-62.  Searching the site for Dam was the responsibility of WAPDA, which stated site investigation.  It took 3 years of thorough investigation to select site.  Sites Investigated Three sites were chosen namely: • Bara with Potential storage capacity of 13.7bcm. • Kiara with potential storage capacity of 12.3bcm. • Kirpalian with potential storage capacity of 5.3bcm.  Final site chosen was Bara.
  • 11.  Studies indicated that Bara had more favorable geology.  Bara would result in less expensive project.  Contractor of projects • Tarbella dam project was built by Tarbella dam project venture , which was led by Italian contractor Impregilo. • The joint venture consist of 3 Italians and 3 French Civil Engineers.
  • 12. • Five German and 2 Swiss companies joined them in 1969. • Chief Engr. Mr. SS Kerman was entrusted with responsibility of evaluating technical aspects of design on behalf of WAPDA. • Estimated Hydropower potential was 2100MW.
  • 13.  An estimate of financial requirement of Tarbella dam project according to Lieftinck report were 1047.3 million dollars including land resettlement and first eight power units of 175MW each.  This also include 150.5 million$ for import duties but excluded interests during construction.  Correspondingly estimated financial requirement excluding Mechanical and Electrical power , but including Civil Engineering work for eight power units was 99.6 million $.
  • 14. Duration Capital Cost US$ Up to June 65 51 million 65-66 3 million 66-67 55 million 67-68 140million 68-69 618 million 69-70 983 million 70-71 1191 million 71-72 1159 million 72-73 394 million 73-74 612 million 74-75 497 million 75-76 334 million
  • 15.  To meet capital cost balance of $354 million were transferred from Indus Basin development fund to create Tarbella development fund(TDF).  TDF had a capital base of $ 989 million with commitment from Govt. of Pakistan.
  • 16.  Resources of Tarbella development fund. Countries Funds( million $) Australia 1 Canada 14 France 30 Germany 16 Italy 56 UK 51 USA 60 World Bank 71 Saudi Arabia 59 Kuwait 18 Abu Dhabi 25 Pakistan 697 Others 25
  • 17.  Predicted and actual Impacts: • Power House Power Units Planned Actual(MW) Tunnel 1 4*175=700MW 700MW(1977-78) Tunnel 2 4*175=700MW 1050MW(1982-85) Tunnel 3 4*175=700MW 1728MW(1992-93) Total Installed Capacity 2100MW 3478MW
  • 18.  Predicted and actual Impacts: • Schedule Construction Stages Project Component Activities Scheduled Actual Mobilization Including award of main contract Jun1967- Dec1969 May1968-Dec 70 Stage 1 River diversion Jan 1968-Sep 70 May 68-Sep 70 Stage 2 Spillways, Tunnels Oct 70-Sep 73 Oct 70-Sep 73 Stage 3 Auxiliary Dam & Power Station Oct 73 –Sep 74 Sep 73-Sep 74 Flow through Tunnel Stage 4 Unit 1 & 2 Jan 75 – Mar 75 April 77-may 77 Commissioning of Power Unit 3 & 4 Oct 75 –Mar 76 Jun 77 – July 77
  • 19.  Due to high demand of Electricity instead of making new projects , the Govt. of Pakistan started to upgrade the existing projects.  In Sep 2013 , WAPDA signed RS:26.053 billion contract with Chinese firm Sino hydro for executing Civil works on the 1410MW Tarbella extension project.  Work on the Project will be completed in 3 &1/2 years at an estimated cost of $928 million.  In June 2013 , The World Bank has agreed to provide a $840 million loan for project.
  • 20.  On completion , the project will increase generation capacity from 3478MW to 4888 MW.  Prime Minister Nawaz Sharif ordered WAPDA to increase the feasibility study of Tarbella.  Next extension would increase additional generation of 1320MW electricity and increase overall capacity to 6208MW.  The Australian Govt. has shown its keen interest to finance this latest extension.